GE-6: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page with "{{Reactor-Nav}}") |
StriderTol (talk | contribs) No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Reactor-Nav}} | * NRC model standard TS for General Electric Plants, BWR/6, Rev. 5 STS ([[NUREG-1434]]), Vol. 1, Specifications Vol. 1 | ||
* NRC model standard TS bases for General Electric Plants, BWR/6, Rev. 5 STS ([[NUREG-1434]]), Vol. 2, Bases Vol. 2 | |||
{{Reactor-Nav|category=BWR}} |
Latest revision as of 23:05, 4 March 2024
- NRC model standard TS for General Electric Plants, BWR/6, Rev. 5 STS (NUREG-1434), Vol. 1, Specifications Vol. 1
- NRC model standard TS bases for General Electric Plants, BWR/6, Rev. 5 STS (NUREG-1434), Vol. 2, Bases Vol. 2