#REDIRECT [[0CAN061202, Response to NRC Request for Information Per 10CFR50.54(f) Re Flooding Aspects of Recommendations 2.1 and 2.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident]]
| number = ML12164A567
| issue date = 06/08/2012
| title = Response to NRC Request for Information Per 10CFR50.54(f) Re Flooding Aspects of Recommendations 2.1 and 2.3 of the Near-Term Task Force Review of Insights from Fukushima Dai-ichi Accident
| author name = Schwarz C J
| author affiliation = Entergy Operations, Inc
| addressee name =
| addressee affiliation = NRC/NRR, NRC/Document Control Desk
| docket = 05000313, 05000368
| license number = DPR-051, NPF-006
| contact person =
| case reference number = 0CAN061202
| document type = Letter
| page count = 5
| project =
| stage = Response to RAI
}}
 
=Text=
{{#Wiki_filter:0CAN061202
 
June 8, 2012
 
U.S. Nuclear Regulatory Commission
 
ATTN: Document Control Desk
 
11555 Rockville Pike
 
Rockville, MD 20852
 
==SUBJECT:==
Entergy's Response to NRC Request for Information (RFI)
Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of
 
Recommendations 2.1 and 2.3 of the Near-Term Task Force
 
Review of Insights from the Fukushima Dai-ichi Accident
 
Arkansas Nuclear One - Units 1 and 2
 
Docket Nos. 50-313 and 50-368
 
License Nos. DPR-51 and NPF-6
 
==References:==
: 1. NRC letter to Entergy, RFI Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima
 
Dai-ichi Accident , dated March 12, 2012 (0CNA031208) (ML12053A340) 2. NRC Letter to Entergy, Prioritization of Response Due Dates for Site Flooding Hazard Evaluations , dated May 11, 2012 (0CNA051203) (ML12097A509) 3. NRC letter, Endorsement of Nuclear Energy Institute (NEI) 12-07, "Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features
," dated May 31, 2012
 
==Dear Sir or Madam:==
 
On March 12, 2012, the NRC issued Reference 1 to all power reactor licensees. 
 
Enclosures 2 and 4 of Reference 1 contain specific requested actions, requested
 
information, and required responses associated with Recommendations 2.1 and 2.3 for
 
flooding evaluations and walkdowns. This letter provides Entergy Operations', Inc.
(Entergy's) 90-day response to Reference 1 for Arkansas Nuclear One (ANO). Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR  72802
 
Tel  479-858-3110 Christopher J. Schwarz Vice President, Operations A rkansas Nuclear One
 
0CAN061202 Page 2 of 3
 
Recommendation 2.1: Flooding
 
The response date for ANO's flood hazard evaluation was identified in Reference 2 as
 
March 12, 2014, which corresponds to two years from the date of Reference 1.
 
Entergy plans to meet the requested date for the other required responses in of Reference 1. Specifically, an approach for developing an Integrated
 
Assessment for ANO will be submitted 60 days after NRC endorsement of the Integrated
 
Assessment Guidance. In addition, an Integrated Assessment report for ANO, if it is
 
necessary, will be submitted two years a fter the flood evaluation is submitted.
 
Recommendation 2.3: Flooding
 
For flooding Recommendation 2.3 (walkdowns), Enclosure 4 of Reference 1 states that
 
each licensee is to confirm that it will use the NRC-endorsed flooding walkdown
 
procedure or provide a description of the process it will use. Entergy confirms that it will
 
use the flooding walkdown procedure (NEI 12-07, Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features) endorsed by Reference 3 as the basis for the flooding walkdowns at ANO.
 
Entergy plans to comply with the response timeline in Enclosure 4 of Reference 1. 
 
Specifically, Entergy will submit a report documenting the results of its flooding design
 
basis walkdowns at ANO by November 27, 2012, which corresponds to 180 days after
 
NRC endorsement of the generic guidance.
 
The new commitments contained in this submittal are summarized in the attachment. 
 
Should you have any questions concerning the content of this letter, please contact
 
Stephenie Pyle at 479.858.4704.
 
I declare under penalty of perjury that the foregoing is true and correct. Executed on
 
June 8, 2012.
 
Sincerely,
 
Original signed by Christopher J. Schwarz
 
CJS/nbm
 
==Attachment:==
List of Regulatory Commitments 0CAN061202 Page 3 of 3
 
cc: Mr. Elmo Collins Regional Administrator
 
U. S. Nuclear Regulatory Commission, Region IV
 
1600 East Lamar Boulevard Arlington, TX 76011-4511
 
U. S. Nuclear Regulatory Commission
 
Attn: Director, Office of Nuclear Reactor Regulation
 
One White Flint North
 
11555 Rockville Pike
 
Rockville, MD 20852
 
NRC Senior Resident Inspector
 
Arkansas Nuclear One
 
P.O. Box 310
 
London, AR 72847
 
U. S. Nuclear Regulatory Commission
 
Attn: Mr. Kaly Kalyanam
 
MS O-8 B1
 
One White Flint North
 
11555 Rockville Pike
 
Rockville, MD 20852 
 
Attachment to 0CAN061202 List of Regulatory Commitments Attachment to 0CAN061202
 
Page 1 of 1
 
List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other
 
statements in this submittal are provided for information purposes and are not considered to be
 
regulatory commitments.
TYPE (Check One)
COMMITMENT ONE-TIME ACTION CONTINUING COMPLIANCE SCHEDULED COMPLETION DATE (If Required)
Submit flood hazard evaluation to the NRC. X  March 12, 2014 An approach for developing an Integrated Assessment for Arkansas Nuclear One (ANO) will be submitted.
X  60-days after NRC endorsement of the
 
Integrated Assessment
 
Guidance An Integrated Assessment report for
 
ANO, if it is necessary, will be submitted
 
two years after the flood evaluation is
 
completed.
X  March 12, 2016 (if necessary)
Entergy will use the flooding walkdown
 
procedure (Nuclear Energy Institute
 
12-07, Guidelines for Performing Verification Walkdowns of Plant Flood Protection Features) endorsed by Reference 3 as the basis for the flooding
 
walkdowns and plans to comply with the
 
response timeline in Enclosure 4 of
 
Reference 1 by submitting a report
 
documenting the results of its flooding
 
design basis walkdowns at ANO 180 days
 
after NRC endorsement of the generic
 
guidance. X  November 27, 2012}}