ML12300A446: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[W3F1-2012-0092, Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)]]
| number = ML12300A446
| issue date = 10/26/2012
| title = Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
| author name = Jacobs D
| author affiliation = Entergy Operations, Inc
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000382
| license number = NPF-038
| contact person =
| case reference number = EA-12-051, W3F1-2012-0092
| document type = Letter, Status Report
| page count = 2
| project =
| stage = Other
}}
 
=Text=
{{#Wiki_filter:W3F1-2012-0092 October 26, 2012 U.S. Nuclear Regulatory Commission Attn:  Document Control Desk 11555 Rockville Pike Rockville, MD 20852
 
==Subject:==
Initial Status Report in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
Waterford Steam Electric Station, Unit 3 (Waterford 3)
Docket No. 50-382 License No. NPF-38 
 
==Dear Sir or Madam:==
 
On March 12, 2012, the NRC issued an order (Reference 1) to Waterford Steam Electric Station, Unit 3 (Waterford 3). Reference 1 was immediately effective and directs Waterford 3 to have a reliable indication of the water level in associated spent fuel storage pools. Specific requirements are outlined in Attachment 2 of Reference 1.
Reference 1 requires submission of an initial status report 60 days following issuance of the final interim staff guidance. The final interim staff guidance (Reference 2) was issued August 29, 2012. The purpose of this letter is to provide the initial status report pursuant to Section IV, Condition C.2, of Reference 1 within 60 days following issuance of Reference 2. This report confirms that Waterford 3 has received Reference 2 and is in the process of evaluating the guidance for the purpose of providing a reliable indication of the water level in associated spent fuel storage pools as described in  of Reference 1.
 
==References:==
: 1. NRC Order Number EA-12-051, Issuance of Order to Modify Licenses with Regard to Reliable Spent Fuel Pool Instrumentation , dated March 12, 2012 (ADAMS Accession Number ML12054A679)
: 2. NRC Interim Staff Guidance JLD-ISG-2012-03, Compliance with Order EA-12-051, Reliable Spent Fuel Pool Instrumentation, Revision 0 , dated August 29, 2012 (ADAMS Accession Number ML12221A339)
Entergy Operations, Inc.
17265 River Road Killona, LA 70057-3093 Tel 504-739-6660 Fax 504-739-6678 djacob2@entergy.com Donna Jacobs Vice President - Operations Waterford 3
 
W3F1-2012-0092 Page 2 of 2 Major activities completed during this reporting period:
Resources are being identified and project plans initiated, including development of milestones, to assure compliance with Reference 1.
Planned activities for the next six months:
Development and submittal of the overall integrated plan Technical difficulties encountered that could affect the ability to provide the licensee's February 28, 2013, submittal:
None at this time Project milestones schedule through completion of installation and testing:
A project milestones schedule will be provided with the overall integrated plan. Implementation of the order will be completed for Waterford 3 prior to startup from refueling outage RF-20 (Fall 2015).
There are no new commitments contained in this submittal. Please contact Michael Mason, Licensing Manager (acting), at (504) 739-6673 if you have questions regarding this information.
I declare under penalty of perjury that the foregoing is true and correct. Executed on October 26, 2012.
Sincerely,          DJ/WH  cc: Director, Office of Nuclear Reactor Regulation U. S. NRC RidsNrrMailCenter@nrc.gov Mr. Elmo E. Collins, Jr., Regional Administrator U. S. NRC, Region IV RidsRgn4MailCenter@nrc.gov NRC Program Manager for Waterford 3 Kaly.Kalyanam@nrc.gov NRC Senior Resident Inspector for Waterford 3 Marlone.Davis@nrc.gov}}

Latest revision as of 16:31, 19 August 2019