ML18032A261: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:AGENDA ADVISORY COMMITTEE ON REACTOR SAFEGUARDS FUTURE PLANT DESIGNS SUBCOMMITTEE ---------------------------------------------------------------- REVIEW OF FINAL REGULATORY GUIDE 1.232, "GUIDANCE FOR DEVELOPING PRINCIPAL DESIGN CRITERIA FOR NON-LIGHT-WATER REACTORS
{{#Wiki_filter:AGENDA ADVISORY COMMITTEE ON REACTOR SAFEGUARDS FUTURE PLANT DESIGNS SUBCOMMITTEE REVIEW OF FINAL REGULATORY GUIDE 1.232, GUIDANCE FOR DEVELOPING PRINCIPAL DESIGN CRITERIA FOR NON-LIGHT-WATER REACTORS ROCKVILLE, MARYLAND February 7, 2018 Cognizant Staff Engineer/DFO: Derek A Widmayer Email: derek.widmayer@nrc.gov Phone #: (301) 415-5375 February 7, 2018 Topic                                         Presenter(s)         Time
" --------------------------------------------------------------- ROCKVILLE, MARYLAND February 7, 2018 Cognizant Staff Engineer/DFO: Derek A Widmayer Email: derek.widmayer@nrc.gov Phone #: (301) 415-5375 February 7, 2018 Topic Presenter(s)
: 1. Opening Remarks                                                   Dr. Dennis Bley, ACRS   8:30 - 8:35 AM
Time 1. Opening Remarks Dr. Dennis Bley, ACRS 8:30 - 8:35 AM
: 2. Staff Introduction/summary ACRS Interactions                     John Segala, NRO       8:35 - 8:45 AM
: 2. Staff Introduction/summary ACRS Interactions John Segala, NRO 8:35 - 8:45 AM
: 3. Background and summary of non-LWR design                                                 8:45 - 9:00 AM Jan Mazza, NRO criteria discussed with ACRS in 2017 Interface between Vision and Strategy activities 3 and 5 4
: 3. Background and summary of non-LWR design criteria discussed with ACRS in 2017 Jan Mazza, NRO 8:45 - 9:00 AM 4 Interface between Vision and Strategy activities 3 and 5
* Technology Specific Licensing Basis Event               Jan Mazza, NRO          9:00-9:30 AM Selection
* Technology Specific Licensing Basis Event Selection
* Facilitate PRA
* Facilitate PRA
* MHTGR Fuel Design LimitsJan Mazza, NRO 9:00-9:30 AM
* MHTGR Fuel Design Limits Containment Design
: 5. Containment Design
* Definitions of essentially leaktight and low
* Definitions of "essentially leaktight" and "low leakage"
: 5.            leakage                                               Imtiaz Madni, NRO       9:30-10:00 AM
* Impact of reactor pressure boundary failure on containment Imtiaz Madni, NRO 9:30-10:00 AM 6 Electric Power Systems
* Impact of reactor pressure boundary failure on containment Electric Power Systems
* Clarity on "vital functions" to include monitoring plant status, habitability, lighting, and communications.
* Clarity on vital functions to include monitoring 6            plant status, habitability, lighting, and               Bob Fitzpatrick, NRR   10:00-10:30 AM communications.
* Changes made due to public comments Bob Fitzpatrick, NRR 10:00-10:30 AM Break 10:30-10:45 AM
* Changes made due to public comments Break                                                                                     10:30-10:45 AM Reactivity Control Systems
: 7. Reactivity Control Systems
: 7.
* Controlling the rate of reactivity changes resulting from planned normal power changes
* Controlling the rate of reactivity changes             Jeff Schmidt, NRO      10:45-11:15 AM resulting from planned normal power changes
* Changes made due to public comments Jeff Schmidt, NRO 10:45-11:15 AM
* Changes made due to public comments
: 8. Resolution of Comments / Final RG Criteria
: 8. Resolution of Comments / Final RG Criteria                       Jan Mazza, NRO         11:15-11:45 AM
* Public Comment Summary & Next Steps Jan Mazza, NRO 11:15-11:45 AM
* Public Comment Summary & Next Steps
: 9. Subcommittee Discussion Mr. Dennis Bley, ACRS 11:45 AM - Noon Adjourn Noon 2
: 9. Subcommittee Discussion                                           Mr. Dennis Bley, ACRS 11:45 AM - Noon Adjourn                                                                                       Noon 1
 
Notes:
Notes:
* During the meeting, Telephone No. 301-415-7360 should be used to contact anyone in the ACRS Office.
* During the meeting, Telephone No. 301-415-7360 should be used to contact anyone in the ACRS Office.
* Presentation time should not exceed 50 percent of the total time allocated for a given item. The remaining 50 percent of the time is reserved for discussion.
* Presentation time should not exceed 50 percent of the total time allocated for a given item. The remaining 50 percent of the time is reserved for discussion.
* Thirty five (35) hard copies of each presentation or handout should be provided to the Designated Federal Official 30 minutes before the meeting.
* Thirty five (35) hard copies of each presentation or handout should be provided to the Designated Federal Official 30 minutes before the meeting.
* One (1) electronic copy of each presentation should be emailed to the Designated Federal Official 1 day before the meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the Designated Federal Official with a CD containing each presentation at least 30 minutes before the meeting.}}
* One (1) electronic copy of each presentation should be emailed to the Designated Federal Official 1 day before the meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the Designated Federal Official with a CD containing each presentation at least 30 minutes before the meeting.
2}}

Latest revision as of 17:02, 3 February 2020

Agenda - Future Plant Design Subcommittee Meeting - February 7, 2018
ML18032A261
Person / Time
Issue date: 02/01/2018
From: Derek Widmayer
Advisory Committee on Reactor Safeguards
To:
Widmayer D
References
Download: ML18032A261 (2)


Text

AGENDA ADVISORY COMMITTEE ON REACTOR SAFEGUARDS FUTURE PLANT DESIGNS SUBCOMMITTEE REVIEW OF FINAL REGULATORY GUIDE 1.232, GUIDANCE FOR DEVELOPING PRINCIPAL DESIGN CRITERIA FOR NON-LIGHT-WATER REACTORS ROCKVILLE, MARYLAND February 7, 2018 Cognizant Staff Engineer/DFO: Derek A Widmayer Email: derek.widmayer@nrc.gov Phone #: (301) 415-5375 February 7, 2018 Topic Presenter(s) Time

1. Opening Remarks Dr. Dennis Bley, ACRS 8:30 - 8:35 AM
2. Staff Introduction/summary ACRS Interactions John Segala, NRO 8:35 - 8:45 AM
3. Background and summary of non-LWR design 8:45 - 9:00 AM Jan Mazza, NRO criteria discussed with ACRS in 2017 Interface between Vision and Strategy activities 3 and 5 4
  • Technology Specific Licensing Basis Event Jan Mazza, NRO 9:00-9:30 AM Selection
  • MHTGR Fuel Design Limits Containment Design
  • Definitions of essentially leaktight and low
5. leakage Imtiaz Madni, NRO 9:30-10:00 AM
  • Impact of reactor pressure boundary failure on containment Electric Power Systems
  • Clarity on vital functions to include monitoring 6 plant status, habitability, lighting, and Bob Fitzpatrick, NRR 10:00-10:30 AM communications.
  • Changes made due to public comments Break 10:30-10:45 AM Reactivity Control Systems
7.
  • Controlling the rate of reactivity changes Jeff Schmidt, NRO 10:45-11:15 AM resulting from planned normal power changes
  • Changes made due to public comments
8. Resolution of Comments / Final RG Criteria Jan Mazza, NRO 11:15-11:45 AM
  • Public Comment Summary & Next Steps
9. Subcommittee Discussion Mr. Dennis Bley, ACRS 11:45 AM - Noon Adjourn Noon 1

Notes:

  • During the meeting, Telephone No. 301-415-7360 should be used to contact anyone in the ACRS Office.
  • Presentation time should not exceed 50 percent of the total time allocated for a given item. The remaining 50 percent of the time is reserved for discussion.
  • Thirty five (35) hard copies of each presentation or handout should be provided to the Designated Federal Official 30 minutes before the meeting.
  • One (1) electronic copy of each presentation should be emailed to the Designated Federal Official 1 day before the meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the Designated Federal Official with a CD containing each presentation at least 30 minutes before the meeting.

2