ML16333A426: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 11/28/2016 | | issue date = 11/28/2016 | ||
| title = Notification of NRC Initial Operator Licensing Examination 05000498/2017301 and 05000499/2017301 | | title = Notification of NRC Initial Operator Licensing Examination 05000498/2017301 and 05000499/2017301 | ||
| author name = Gaddy V | | author name = Gaddy V | ||
| author affiliation = NRC/RGN-IV/DRS/OB | | author affiliation = NRC/RGN-IV/DRS/OB | ||
| addressee name = Koehl D | | addressee name = Koehl D | ||
| Line 14: | Line 14: | ||
| page count = 4 | | page count = 4 | ||
}} | }} | ||
See also: [[ | See also: [[see also::IR 05000498/2017301]] | ||
=Text= | =Text= | ||
{{#Wiki_filter:November 28, 2016 | {{#Wiki_filter:November 28, 2016 | ||
| Line 24: | Line 23: | ||
Mr. Dennis Koehl | Mr. Dennis Koehl | ||
President and Chief Executive Officer | President and Chief Executive Officer | ||
STP Nuclear Operating Company | STP Nuclear Operating Company | ||
P.O. Box 289 | P.O. Box 289 | ||
Wadsworth, TX 77483 | Wadsworth, TX 77483 | ||
SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000498/2017301 | SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - NOTIFICATION | ||
OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000498/2017301 | |||
AND 05000499/2017301 | AND 05000499/2017301 | ||
Dear Mr. Koehl: | Dear Mr. Koehl: | ||
In a telephone conversation on November 16, 2016, between Messrs. T. Hurley, Supervisor for | In a telephone conversation on November 16, 2016, between Messrs. T. Hurley, Supervisor for | ||
this Initial Licensing Exam, and K. Clayton, Chief Examiner, arrangements were made for the | this Initial Licensing Exam, and K. Clayton, Chief Examiner, arrangements were made for the | ||
administration of licensing examinations at | administration of licensing examinations at South Texas Project Electric Generating Station, | ||
Units 1 and 2, during the weeks of September 25 and October 9, 2017. | |||
As agreed during the telephone conversation, your | As agreed during the telephone conversation, your staff will prepare the examinations based on | ||
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power | |||
the guidelines in NUREG-1021, | Reactors, Revision 10, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power | ||
Plant Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your | |||
Reactors, | staff any changes that might be necessary before the examinations are administered. | ||
Plant Operators, | |||
staff any changes that might be necessary | |||
To meet the above schedule, it will be necessary | To meet the above schedule, it will be necessary for your staff to furnish the examination | ||
for your staff to furnish the examination | |||
outlines by June 26, 2017. The written examination, operating tests, and supporting reference | outlines by June 26, 2017. The written examination, operating tests, and supporting reference | ||
materials identified in Attachment 3 to ES-201 will be due by July 24, 2017. Pursuant to Title | materials identified in Attachment 3 to ES-201 will be due by July 24, 2017. Pursuant to Title | ||
10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized | 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized | ||
representative of the facility licensee shall approve the outlines, examinations, and tests before | |||
representative of the facility licensee shall | |||
they are submitted to the NRC for review and approval. All materials shall be complete and | they are submitted to the NRC for review and approval. All materials shall be complete and | ||
ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards | |||
ready-to-use. We request that any personal, | |||
information in your response be contained in a separate enclosure and appropriately marked. | information in your response be contained in a separate enclosure and appropriately marked. | ||
Any delay in receiving the required examinations and reference materials, or the submittal of | Any delay in receiving the required examinations and reference materials, or the submittal of | ||
inadequate or incomplete materials, may cause the examinations to be rescheduled. | inadequate or incomplete materials, may cause the examinations to be rescheduled. | ||
In order to conduct the requested written examinations and operating tests, it will be necessary | In order to conduct the requested written examinations and operating tests, it will be necessary | ||
for your staff to provide adequate space and accommodations in accordance with ES-402, and | for your staff to provide adequate space and accommodations in accordance with ES-402, and | ||
to make the simulation facility available on the dates noted above and for validation the week of | to make the simulation facility available on the dates noted above and for validation the week of | ||
August 14, 2017. In addition, Appendix E to NUREG-1021 contains a number of NRC policies | August 14, 2017. In addition, Appendix E to NUREG-1021 contains a number of NRC policies | ||
and guidelines that will be in effect while the written examination is being administered. | and guidelines that will be in effect while the written examination is being administered. | ||
UNITED STATES | UNITED STATES | ||
NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD. | NUCLEAR REGULATORY COMMISSION | ||
ARLINGTON, TX 76011-4511 | REGION IV | ||
1600 E. LAMAR BLVD. | |||
D. Koehl - 2 - | ARLINGTON, TX 76011-4511 | ||
D. Koehl | |||
- 2 - | |||
To permit timely NRC review and evaluation, your | To permit timely NRC review and evaluation, your staff should submit preliminary operator | ||
license applications (Office of Management and Budget (OMB) approval number 3150-0090), | |||
license applications (Office of Management | medical certifications (OMB approval number 3150-0024), and waiver requests (if any) | ||
(OMB approval number 3150-0090) by August 21, 2017. Signed applications certifying that all | |||
number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) by August 21, 2017. Signed applications certifying that all | |||
training has been completed should be submitted by September 11, 2017. If the final signed | training has been completed should be submitted by September 11, 2017. If the final signed | ||
applications are not received by that date, a postponement may be necessary. | applications are not received by that date, a postponement may be necessary. | ||
This letter contains information collections that are subject to the | This letter contains information collections that are subject to the Paperwork Reduction Act of | ||
Paperwork Reduction Act of | |||
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under | 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under | ||
approval number 3150-0018. The public reporting burden for this collection of information is | approval number 3150-0018. The public reporting burden for this collection of information is | ||
estimated to average 50 hours per response, including the time for reviewing instructions, | estimated to average 50 hours per response, including the time for reviewing instructions, | ||
gathering and maintaining the data needed, and completing and reviewing the collection of | gathering and maintaining the data needed, and completing and reviewing the collection of | ||
information. Send comments regarding this burden estimate or any other aspect of these | information. Send comments regarding this burden estimate or any other aspect of these | ||
information collections, including suggestions for reducing the burden, to the Records and | information collections, including suggestions for reducing the burden, to the Records and | ||
FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, | FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington, | ||
DC 20555-0001, or by Internet electronic mail to | DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. | ||
INFOCOLLECTS@NRC.GOV. | |||
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an | |||
information collection, unless it displays a currently valid OMB control number. | information collection, unless it displays a currently valid OMB control number. | ||
In accordance with 10 CFR 2.390 of the | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of | ||
this letter and its enclosures will be available electronically for public inspection in the NRCs | |||
this letter and its enclosures will be available electronically for public inspection in the | Public Document Room or from the Publicly Available Records (PARS) component of the NRCs | ||
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible | |||
Public Document Room or from the Publicly | from the electronic Reading Room page of the NRCs public Web site at | ||
Available Records (PARS) component of the | http://www.nrc.gov/reading-rm/adams.html. | ||
Agencywide Documents Access and Management | |||
Thank you for your cooperation in this matter. Mr. Hurley has been advised of the policies | |||
from the electronic Reading Room page of the | and guidelines referenced in this letter. If you have any questions regarding the NRCs | ||
http://www.nrc.gov/reading-rm/adams.html | |||
and guidelines referenced in this letter. If you have any questions regarding the | |||
examination procedures and guidelines, please contact Mr. Clayton at 817-200-1216 or | examination procedures and guidelines, please contact Mr. Clayton at 817-200-1216 or | ||
myself at 817-200-1159. | myself at 817-200-1159. | ||
Sincerely, | |||
Sincerely, | |||
Vincent G. Gaddy, Chief | |||
Operations Branch | /RA/ | ||
Division of Reactor Safety | |||
Vincent G. Gaddy, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
Docket Nos. 50-498 and 50-499 | Docket Nos. 50-498 and 50-499 | ||
License Nos. NPF-76 and NPF-80 | License Nos. NPF-76 and NPF-80 | ||
cc: Electronic Distribution | |||
D. Koehl | |||
- 2 - | |||
To permit timely NRC review and evaluation, your staff should submit preliminary operator | |||
license applications (Office of Management and Budget (OMB) approval number 3150-0090), | |||
medical certifications (OMB approval number 3150-0024), and waiver requests (if any) | |||
To permit timely NRC review and evaluation, your | (OMB approval number 3150-0090) by August 21, 2017. Signed applications certifying that all | ||
license applications (Office of Management | |||
number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) by August 21, 2017. Signed applications certifying that all | |||
training has been completed should be submitted by September 11, 2017. If the final signed | training has been completed should be submitted by September 11, 2017. If the final signed | ||
applications are not received by that date, a postponement may be necessary. | applications are not received by that date, a postponement may be necessary. | ||
This letter contains information collections that are subject to the | This letter contains information collections that are subject to the Paperwork Reduction Act of | ||
Paperwork Reduction Act of | |||
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under | 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under | ||
approval number 3150-0018. The public reporting burden for this collection of information is | approval number 3150-0018. The public reporting burden for this collection of information is | ||
estimated to average 50 hours per response, including the time for reviewing instructions, | estimated to average 50 hours per response, including the time for reviewing instructions, | ||
gathering and maintaining the data needed, and completing and reviewing the collection of | gathering and maintaining the data needed, and completing and reviewing the collection of | ||
information. Send comments regarding this burden estimate or any other aspect of these | information. Send comments regarding this burden estimate or any other aspect of these | ||
information collections, including suggestions for reducing the burden, to the Records and | information collections, including suggestions for reducing the burden, to the Records and | ||
FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, | FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, | ||
Washington, DC 20555-0001, or by Internet electronic mail to | Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV. | ||
INFOCOLLECTS@NRC.GOV. | |||
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an | |||
information collection, unless it displays a currently valid OMB control number. | information collection, unless it displays a currently valid OMB control number. | ||
In accordance with 10 CFR 2.390 of the | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of | ||
this letter and its enclosures will be available electronically for public inspection in the NRCs | |||
this letter and its enclosures will be available electronically for public inspection in the | Public Document Room or from the Publicly Available Records (PARS) component of the NRCs | ||
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible | |||
Public Document Room or from the Publicly | from the electronic Reading Room page of the NRCs public Web site at | ||
Available Records (PARS) component of the | http://www.nrc.gov/reading-rm/adams.html. | ||
Agencywide Documents Access and Management | |||
Thank you for your cooperation in this matter. Mr. Hurley has been advised of the policies | |||
from the electronic Reading Room page of the | and guidelines referenced in this letter. If you have any questions regarding the NRCs | ||
http://www.nrc.gov/reading-rm/adams.html | |||
and guidelines referenced in this letter. If you have any questions regarding the | |||
examination procedures and guidelines, please contact Mr. Clayton at 817-200-1216 or | examination procedures and guidelines, please contact Mr. Clayton at 817-200-1216 or | ||
myself at 817-200-1159. | myself at 817-200-1159. | ||
Sincerely, | |||
Sincerely, | |||
Operations Branch | |||
Division of Reactor Safety | /RA/ | ||
Vincent G. Gaddy, Chief | |||
Operations Branch | |||
Division of Reactor Safety | |||
Docket Nos. 50-498 and 50-499 | Docket Nos. 50-498 and 50-499 | ||
License Nos. NPF-76 and NPF-80 | License Nos. NPF-76 and NPF-80 | ||
cc: Electronic Distribution | cc: Electronic Distribution | ||
Distribution: | |||
See next page | See next page | ||
ADAMS ACCESSION NUMBER: ML16333A426 | |||
SUNSI Review | |||
By: VGaddy | |||
ADAMS | |||
Yes No | |||
Publicly Available | |||
Non-Publicly Available | |||
Non-Sensitive | |||
Sensitive | |||
Keyword: | |||
NRC-002 | |||
OFFICE | |||
SOE:OB | |||
C:OB | |||
NAME | |||
KClayton | |||
VGaddy | |||
SIGNATURE | |||
/RA/ | |||
/RA/ | |||
DATE | |||
11/18/16 | |||
11/28/16 | |||
Letter to Dennis Koehl from Vincent G. Gaddy, dated November 28, 2016 | |||
SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - NOTIFICATION | |||
OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000498/2017301 | |||
AND 05000499/2017301 | AND 05000499/2017301 | ||
Electronic Distribution by RIV: | Electronic Distribution by RIV: | ||
Regional Administrator (Kriss.Kennedy@nrc.gov) | Regional Administrator (Kriss.Kennedy@nrc.gov) | ||
Deputy Regional Administrator (Scott.Morris@nrc.gov) | Deputy Regional Administrator (Scott.Morris@nrc.gov) | ||
DRP Director (Troy.Pruett@nrc.gov) | DRP Director (Troy.Pruett@nrc.gov) | ||
DRP Deputy Director (Ryan.Lantz@nrc.gov) | DRP Deputy Director (Ryan.Lantz@nrc.gov) | ||
DRS Director (Anton.Vegel@nrc.gov) | DRS Director (Anton.Vegel@nrc.gov) | ||
DRS Deputy Director (Jeff.Clark@nrc.gov) | DRS Deputy Director (Jeff.Clark@nrc.gov) | ||
Acting Senior Resident Inspector (Nicholas.Hernandez@nrc.gov) | Acting Senior Resident Inspector (Nicholas.Hernandez@nrc.gov) | ||
Branch Chief, DRP/B (Nick.Taylor@nrc.gov) | Branch Chief, DRP/B (Nick.Taylor@nrc.gov) | ||
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) | Senior Project Engineer, DRP/B (David.Proulx@nrc.gov) | ||
Project Engineer, DRP/B (Steven.Janicki@nrc.gov) | Project Engineer, DRP/B (Steven.Janicki@nrc.gov) | ||
Project Engineer, DRP/B (Jim.Melfi@nrc.gov) | Project Engineer, DRP/B (Jim.Melfi@nrc.gov) | ||
STP Administrative Assistant (Lynn.Wright@nrc.gov) | STP Administrative Assistant (Lynn.Wright@nrc.gov) | ||
Public Affairs Officer (Victor.Dricks@nrc.gov) | Public Affairs Officer (Victor.Dricks@nrc.gov) | ||
Project Manager (Lisa.Regner@nrc.gov) | Project Manager (Lisa.Regner@nrc.gov) | ||
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) | Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov) | ||
RITS Coordinator (Marisa.Herrera@nrc.gov) | RITS Coordinator (Marisa.Herrera@nrc.gov) | ||
ACES (R4Enforcement.Resource@nrc.gov) | ACES (R4Enforcement.Resource@nrc.gov) | ||
Regional Counsel (Karla.Fuller@nrc.gov) | Regional Counsel (Karla.Fuller@nrc.gov) | ||
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov) | Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov) | ||
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov) | Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov) | ||
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov) | ||
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) | RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov) | ||
RIV RSLO (Bill.Maier@nrc.gov) | RIV RSLO (Bill.Maier@nrc.gov) | ||
}} | }} | ||
Latest revision as of 18:57, 9 January 2025
| ML16333A426 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 11/28/2016 |
| From: | Vincent Gaddy Operations Branch IV |
| To: | Koehl D South Texas |
| References | |
| IR 2017301 | |
| Download: ML16333A426 (4) | |
See also: IR 05000498/2017301
Text
November 28, 2016
Mr. Dennis Koehl
President and Chief Executive Officer
STP Nuclear Operating Company
P.O. Box 289
Wadsworth, TX 77483
SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - NOTIFICATION
OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000498/2017301
AND 05000499/2017301
Dear Mr. Koehl:
In a telephone conversation on November 16, 2016, between Messrs. T. Hurley, Supervisor for
this Initial Licensing Exam, and K. Clayton, Chief Examiner, arrangements were made for the
administration of licensing examinations at South Texas Project Electric Generating Station,
Units 1 and 2, during the weeks of September 25 and October 9, 2017.
As agreed during the telephone conversation, your staff will prepare the examinations based on
the guidelines in NUREG-1021, Operator Licensing Examination Standards for Power
Reactors, Revision 10, and NUREG-1122, Knowledge and Abilities Catalog for Nuclear Power
Plant Operators, Revision 2, Supplement 1. The NRCs regional office will discuss with your
staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be necessary for your staff to furnish the examination
outlines by June 26, 2017. The written examination, operating tests, and supporting reference
materials identified in Attachment 3 to ES-201 will be due by July 24, 2017. Pursuant to Title
10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outlines, examinations, and tests before
they are submitted to the NRC for review and approval. All materials shall be complete and
ready-to-use. We request that any personal, proprietary, sensitive unclassified, or safeguards
information in your response be contained in a separate enclosure and appropriately marked.
Any delay in receiving the required examinations and reference materials, or the submittal of
inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the requested written examinations and operating tests, it will be necessary
for your staff to provide adequate space and accommodations in accordance with ES-402, and
to make the simulation facility available on the dates noted above and for validation the week of
August 14, 2017. In addition, Appendix E to NUREG-1021 contains a number of NRC policies
and guidelines that will be in effect while the written examination is being administered.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD.
ARLINGTON, TX 76011-4511
D. Koehl
- 2 -
To permit timely NRC review and evaluation, your staff should submit preliminary operator
license applications (Office of Management and Budget (OMB) approval number 3150-0090),
medical certifications (OMB approval number 3150-0024), and waiver requests (if any)
(OMB approval number 3150-0090) by August 21, 2017. Signed applications certifying that all
training has been completed should be submitted by September 11, 2017. If the final signed
applications are not received by that date, a postponement may be necessary.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018. The public reporting burden for this collection of information is
estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions,
gathering and maintaining the data needed, and completing and reviewing the collection of
information. Send comments regarding this burden estimate or any other aspect of these
information collections, including suggestions for reducing the burden, to the Records and
FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission, Washington,
DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of
this letter and its enclosures will be available electronically for public inspection in the NRCs
Public Document Room or from the Publicly Available Records (PARS) component of the NRCs
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
from the electronic Reading Room page of the NRCs public Web site at
http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Hurley has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRCs
examination procedures and guidelines, please contact Mr. Clayton at 817-200-1216 or
myself at 817-200-1159.
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket Nos. 50-498 and 50-499
License Nos. NPF-76 and NPF-80
cc: Electronic Distribution
D. Koehl
- 2 -
To permit timely NRC review and evaluation, your staff should submit preliminary operator
license applications (Office of Management and Budget (OMB) approval number 3150-0090),
medical certifications (OMB approval number 3150-0024), and waiver requests (if any)
(OMB approval number 3150-0090) by August 21, 2017. Signed applications certifying that all
training has been completed should be submitted by September 11, 2017. If the final signed
applications are not received by that date, a postponement may be necessary.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under
approval number 3150-0018. The public reporting burden for this collection of information is
estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per response, including the time for reviewing instructions,
gathering and maintaining the data needed, and completing and reviewing the collection of
information. Send comments regarding this burden estimate or any other aspect of these
information collections, including suggestions for reducing the burden, to the Records and
FOIA/Privacy Services Branch (T-5 F52), U.S. Nuclear Regulatory Commission,
Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV.
The NRC may neither conduct nor sponsor, and a person is not required to respond to, an
information collection, unless it displays a currently valid OMB control number.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice and Procedure, a copy of
this letter and its enclosures will be available electronically for public inspection in the NRCs
Public Document Room or from the Publicly Available Records (PARS) component of the NRCs
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
from the electronic Reading Room page of the NRCs public Web site at
http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. Mr. Hurley has been advised of the policies
and guidelines referenced in this letter. If you have any questions regarding the NRCs
examination procedures and guidelines, please contact Mr. Clayton at 817-200-1216 or
myself at 817-200-1159.
Sincerely,
/RA/
Vincent G. Gaddy, Chief
Operations Branch
Division of Reactor Safety
Docket Nos. 50-498 and 50-499
License Nos. NPF-76 and NPF-80
cc: Electronic Distribution
Distribution:
See next page
ADAMS ACCESSION NUMBER: ML16333A426
SUNSI Review
By: VGaddy
Yes No
Publicly Available
Non-Publicly Available
Non-Sensitive
Sensitive
Keyword:
OFFICE
SOE:OB
C:OB
NAME
KClayton
VGaddy
SIGNATURE
/RA/
/RA/
DATE
11/18/16
11/28/16
Letter to Dennis Koehl from Vincent G. Gaddy, dated November 28, 2016
SUBJECT: SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION - NOTIFICATION
OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000498/2017301
AND 05000499/2017301
Electronic Distribution by RIV:
Regional Administrator (Kriss.Kennedy@nrc.gov)
Deputy Regional Administrator (Scott.Morris@nrc.gov)
DRP Director (Troy.Pruett@nrc.gov)
DRP Deputy Director (Ryan.Lantz@nrc.gov)
DRS Director (Anton.Vegel@nrc.gov)
DRS Deputy Director (Jeff.Clark@nrc.gov)
Acting Senior Resident Inspector (Nicholas.Hernandez@nrc.gov)
Branch Chief, DRP/B (Nick.Taylor@nrc.gov)
Senior Project Engineer, DRP/B (David.Proulx@nrc.gov)
Project Engineer, DRP/B (Steven.Janicki@nrc.gov)
Project Engineer, DRP/B (Jim.Melfi@nrc.gov)
STP Administrative Assistant (Lynn.Wright@nrc.gov)
Public Affairs Officer (Victor.Dricks@nrc.gov)
Project Manager (Lisa.Regner@nrc.gov)
Team Leader, DRS/IPAT (Thomas.Hipschman@nrc.gov)
RITS Coordinator (Marisa.Herrera@nrc.gov)
ACES (R4Enforcement.Resource@nrc.gov)
Regional Counsel (Karla.Fuller@nrc.gov)
Project Engineer, DRS/IPAT (Eduardo.Uribe@nrc.gov)
Senior Congressional Affairs Officer (Jenny.Weil@nrc.gov)
RIV Congressional Affairs Officer (Angel.Moreno@nrc.gov)
RIV/ETA: OEDO (Jeremy.Bowen@nrc.gov)
RIV RSLO (Bill.Maier@nrc.gov)