ML16200A091: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML16200A091
| number = ML16200A091
| issue date = 06/27/2016
| issue date = 06/27/2016
| title = Boiling Water Reactor License Termination Plan - Chapter 8, - Supplement to the Environmental Report, Rev 0
| title = License Termination Plan - Chapter 8, - Supplement to the Environmental Report, Rev 0
| author name =  
| author name =  
| author affiliation = LaCrosseSolutions, LLC
| author affiliation = LaCrosseSolutions, LLC
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:LA CROSSE BOILIN G WATER REACTOR LICENSE TERMINATION PLAN CHAPTER 8 SUPPLEMENT TO THE ENVIRONMENTAL REPORT  
{{#Wiki_filter:LA CROSSE BOILING WATER REACTOR LICENSE TERMINATION PLAN CHAPTER 8 SUPPLEMENT TO THE ENVIRONMENTAL REPORT  


La Cros s License T Revisio n 8.Sup 8.1.8.1.8.1.8.2.8.2.8.3.8.4.8.5.8.5.8 8
La Cross License T Revision 8.
Sup 8.1.
8.1.
8.1.
8.2.
8.2.
8.3.
8.4.
8.5.
8.5.
8 8
8 8.5.
8 8.5.
8.5.8 8
8.5.
8 8.5.4 8.6.8.6.
8.6.8 8
8 8
8 8
8 8.6.8 8
8 8.5.4 8.6.
8.6.
8.6.
8 8
8 8
8 8
8 8
8 8.6.
8 8
8 8
8 8
8 8
8 8
8 8
8 8
8 8
8 s e Boiling W Termination n 0 plement to t Introductio n 1.Purpos 2.Backg rSite Locati o 1.Site D eRemaining Impacts to t La Crosse B 1.Geogr a.5.1.1.Sit e.5.1.2.Po p.5.1.3.Sit e 2.Climat e 3.Topog r.5.3.1.To p.5.3.2.Ge o.5.3.3.Sei 4.Hydro lEnvironme n 1.Summ a 2.Radiol o.6.2.1.Oc c.6.2.2.Of f.6.2.3.En v.6.2.4.St o.6.2.5.Ra d 3.Non-r a.6.3.1.On s.6.3.2.Of f.6.3.3.W a.6.3.4.W a.6.3.5.Ai r.6.3.6.Aq u.6.3.7.Te r.6.3.8.Th r.6.3.9.Oc c.6.3.10.C o.6.3.11.S o.6.3.12.E n.6.3.13.C u.6.3.14.A e.6.3.15.N o W ater Reacto r Plan t he Environ m n .................
8 8
e .................
8 8
r oun d ..........
8 8
o n and Desc r e scription A fDismantle m t he Post-Sh u Boiling Wat e a phy and De m e Location a n p ulation ......
8 se Boiling W Termination n 0 plement to t Introduction 1.
e Access, L a e .................
Purpos 2.
r aphy, Geol o p ography ....
Backgr Site Locatio 1.
o logy ..........smology .....
Site De Remaining Impacts to t La Crosse B 1.
l ogy and Hy d ntal Effects o ary ..............
Geogra
ogical Effec t c upational R f site Radiati o vironmental rage and Di s diological C r a diological E site Land U s fsite Land U ater Use .......
.5.1.1. Site
ater Quality .
.5.1.2. Pop
r Quality .....
.5.1.3. Site 2.
uatic Ecolo g rrestrial Eco l reatened or E c upational I s o st...............
Climate 3.
ocioeconom i nvironment a ultural, Hist o e sthetics .....
Topogr
o ise.............
.5.3.1. Top
r TABLE O mental Repo r...................
.5.3.2. Geo
....................
.5.3.3. Sei 4.
....................
Hydrol Environmen 1.
.r iption ........
Summa 2.
.f ter Unrestri m ent and De c u tdown Dec o e r Reactor E m ography ..
Radiolo
.n d Descript i...................
.6.2.1. Occ
.a nd and Wat
.6.2.2. Off
...................
.6.2.3. Env
.o gy and Sei s...................
.6.2.4. Sto
....................
.6.2.5. Rad 3.
....................
Non-ra
.d rogeology
.6.3.1. Ons
.o f Decomm i...................
.6.3.2. Off
.t s of Deco m R adiation Ex p o n Exposur eEffects of A s posal of L o riteria for L i Effects of D e s e ................
.6.3.3. Wa
.se (in the V i...................
.6.3.4. Wa
....................
.6.3.5. Air
....................
.6.3.6. Aqu
.g y................
.6.3.7. Ter
.l ogy ............
.6.3.8. Thr
.E ndangered ssues/Safet y...................
.6.3.9. Occ
.ic Impacts ...
.6.3.10. Co
.al Justice .....
.6.3.11. So
.o ric, and Ar c...................
.6.3.12. En
....................
.6.3.13. Cu
.8-i OF CONT E r t ................
.6.3.14. Ae
....................
.6.3.15. No Water Reactor Plan the Environm n.................
....................
e.................
....................
round..........
....................
on and Descr escription Af Dismantlem the Post-Shu Boiling Wate aphy and Dem e Location an pulation......
.cted Releas e commission i o mmissioni nnvironment
e Access, La e.................
...................
raphy, Geolo pography....
.i on ..............
ology..........
....................
smology.....
.er Use ........
logy and Hyd ntal Effects o ary..............
....................
ogical Effect cupational R fsite Radiatio vironmental rage and Dis diological Cr adiological E site Land Us fsite Land U ater Use.......
.smology......
ater Quality.
....................
r Quality.....
....................
uatic Ecolog rrestrial Ecol reatened or E cupational Is ost...............
....................
ocioeconomi nvironmenta ultural, Histo esthetics.....
....................
oise.............
.issioning ....
r TABLE O mental Repor ription.........
....................
fter Unrestri ment and Dec utdown Deco er Reactor E mography...
.mmissioning
nd Descripti and and Wat ogy and Seis drogeology.
.p osure ........
of Decommi ts of Decom Radiation Exp on Exposure Effects of A sposal of Lo riteria for Li Effects of De se.................
.e and Monit o A ccidents an d o w-Level R a i cense Term e commissio n...................
se (in the Vi gy.................
.i cinity) .......
logy.............
....................
Endangered ssues/Safety ic Impacts....
....................
al Justice......
....................
oric, and Arc 8-i OF CONTE rt.................
....................
cted Release commissioni ommissionin nvironment ion...............
....................
er Use.........
.Species ......
smology.......
.y ..................
issioning.....
....................
mmissioning.
....................
posure.........
....................
e and Monito Accidents and ow-Level Ra icense Term ecommission icinity)........
.c heological R...................
Species.......
....................
y...................
.E NTS ...................
cheological R ENTS e..................
....................
ing Activitie ng Activities Description oring............
....................
d Decommis adioactive W mination........
....................
ning.............
....................
Resources...
.e .................
es.................
.i ng Activiti e n g Activities Descriptio n...................
Report (PSD n...................
....................
ssioning Eve Waste............
....................
DAR)..........
....................
ents.............
....................
... 8-1
....................
... 8-1
....................
... 8-1
....................
... 8-1
....................
... 8-2
....................
... 8-3
....................
... 8-5
....................
... 8-5
....................
... 8-6
....................
... 8-6
.o ring ...........
... 8-6
.d Decommi s a dioactive W m ination .......
... 8-6
.n ing ............
... 8-6
....................
... 8-7
....................
... 8-7
....................
... 8-7
....................
... 8-8
....................
... 8-8
....................
... 8-8
....................
... 8-9
....................
... 8-9
....................
. 8-10
....................
. 8-10
....................
. 8-12
....................
. 8-12
.R esources ..
. 8-13
....................
. 8-14
....................
. 8-14
....................
. 8-14
....................
. 8-14
....................
. 8-15
....................
. 8-16
....................
. 8-17
....................
. 8-17
.e s ................
. 8-18
. Report (PS D n ..................
. 8-19
....................
. 8-20
....................
. 8-20
....................
. 8-20
....................
. 8-21
....................
. 8-21
....................
. 8-22
....................
. 8-22
....................
 
....................
La Cross License T Revision 8
....................
8 8
....................
8.7.
....................
8.7.
....................
8 8
....................
8.7.
....................
8.8.
.s sioning Ev e W aste ...........
8.9.
....................
Table 8-1 Figure 8-Figure 8-Figure 8-Figure 8-Figure 8-se Boiling W Termination n 0
....................
.6.3.16. Irr
....................
.6.3.17. Tr
....................
.6.3.18. Cu Overview o 1.
....................
Federal
....................
.7.1.1. Nuc
....................
.7.1.2. U.S 2.
....................
Federal Conclusion References 1
....................
Summa Nuclea
....................
-1 Site Re
....................
-2 Site Ov
....................
-3 LACBW
....................
-4 Topogr
....................
-5 Ground Water Reactor Plan retrievable R raffic and Tr umulative Im of Regulation l Requireme clear Regula S. Environme l, State and L ary of the En ar Power Fac egional Loca verview.......
....................
WR Building raphical Map dwater Samp r
....................
Resources.....
....................
ransportation mpacts..........
....................
ns Governing ents..............
....................
atory Comm ental Protect Local Requi LIST nvironmenta cilities.........
....................
LIST O ation.............
....................
gs................
....................
p..................
....................
pling Wells -
....................
8-ii n..................
.DAR) .........
g Decommis ission..........
....................
tion Agency rements......
....................
OF TABLE al Impacts fro OF FIGURE
....................
- LACBWR ssioning Act y...................
....................
ES om Decomm RES R Site...........
....................
tivities and S missioning Site Release
....................
. 8-23
....................
. 8-23
....................
. 8-23 8-24
....................
. 8-24
....................
. 8-24
....................
. 8-25
....................
. 8-25
....................
. 8-25
....................
. 8-26
....................
. 8-11
....................
. 8-28
.e nts ............
. 8-29
....................
. 8-30
....................
. 8-31
....................
. 8-32
....................
 
....................
La Cross License T Revision ACS AEC AMSL ALARA BGS BMP BWR DOE DOT D-Plan/
....................
PSDAR EPA ER FESW FRS G-1 G-3 GEIS GMU ISFSI LACBW LSE LTP MWe MWt NPDES NRC ODCM OSHA PCB PSDAR RWP se Boiling W Termination n 0 Amer Atom Above As Lo Below Best M Boilin Depar Depar Decom Enviro Enviro Fuel E Final Genoa Genoa Gener Geogr Indep WR La Cr LACB Licen Megaw Megaw Nation Nucle Off-S Occup Polych Post-S Radia Water Reactor Plan LIST OF ican Commu ic Energy C e Mean Sea ow As Reaso w Ground Su Management ng Water Re rtment of En rtment of Tra mmissioning onmental Pr onmental Re Element Stor Radiation Su a No. 1 Stati a No. 3 Foss ric Environm raphic Mana endent Spen rosse Boiling BWR Site En se Terminati watts Electri watts Therm nal Pollutant ear Regulator ite Dose Cal pational Safe hlorinated B Shutdown D ation Work P r
....................
ACRONYM unity Survey ommission Level onably Achie urface t Practices actor nergy ansportation g Plan/Post S rotection Age eport rage Well urvey ion sil Station mental Impac agement Uni nt Fuel Stora g Water Reac nclosure ion Plan ic mal t Discharge ry Commiss lculation Ma ety and Heal Biphenyl ecommissio Permit 8-iii MS AND AB y
....................
evable n
....................
Shutdown A ency ct Statement it age Installatio ctor Elimination ion anual lth Administ ning Activit BBREVIAT ctivities Rep t
....................
on System tration ties Report TIONS port
....................
 
....................
La Cross License T Revision RCRA REMP RPV SAFSTO SSC TEDE TSCA USACE USEPA VCC WCS WDNR WPDES se Boiling W Termination n 0 Resou Radio React OR SAFe Struct Total Toxic United United Vertic Waste Wisco Wisco Water Reactor Plan urce Conserv ological Envi or Pressure V STORage tures, System Effective Do Substance C d States Arm d States Env cal Concrete e Control Sp onsin Depart onsin Polluta r
....................
vation and R ironmental M Vessel ms and Comp ose Equivale Control Act my Corps of vironmental P Cask ecialists tment of Nat ant Discharg 8-iv Recovery Act Monitoring P ponents ent Engineers Protection A tural Resour ge Eliminatio t
....................
Program Agency rces on System
....................
 
....................
La Cross License T Revision
....................
: 8.
....................
S 8.1.
.... 8-1... 8-1... 8-1... 8-1... 8-2... 8-3... 8-5... 8-5... 8-6... 8-6... 8-6... 8-6... 8-6... 8-7... 8-7... 8-7... 8-8... 8-8... 8-8... 8-9... 8-9. 8-10. 8-10. 8-12. 8-12. 8-13. 8-14. 8-14. 8-14. 8-14. 8-15. 8-16. 8-17. 8-17. 8-18. 8-19. 8-20. 8-20. 8-20. 8-21. 8-21. 8-22. 8-22 La Cros s License T Revisio n 8 8 8 8.7.8.7.8 8 8.7.8.8.8.9. Table 8-1 Figure 8-Figure 8-Figure 8-Figure 8-Figure 8-  s e Boiling W Termination n 0 .6.3.16.Ir r.6.3.17.T r.6.3.18.C u Overview o 1.Federa l.7.1.1.Nu c.7.1.2.U.S 2.Federa l Conclusion References 1Summ a Nucle a-1Site R e-2Site O v-3LACB W-4Topog r-5Groun d W ater Reacto r Plan retrievable R r affic and T r umulative I m o f Regulatio n l Requirem e clear Regul a S. Environm e l, State and L...................
In In accor Regulato Nuclear describin specific d Reactor (
8.1.1. P This cha Report, L describin specific Terminat detailed d between activities The supp predicted Environm (NUREG (GEIS) o LACBWR Plan/PSD to be pe activities 8.1.2. B LACBW Water R U.S. Ato 1973, the April 30, electrical Characte Limited disposal consistin (FESW)
Septemb se Boiling W Termination n 0 Supplemen ntroduction rdance with ory Guide 1.
Power Reac ng any new decommissio (LACBWR)
Purpose apter supplem La Crosse B ng any new decommiss tion Plan (L description o those activ
: s.
plement disc d by the Un mental State G-0191) (4);
on Decomm R Decommis DAR) (6). T erformed fro
: s.  


...................
===Background===
a ry of the E n ar Power Fa c e gional Loc a v erview .......
WR consists eactor (BWR omic Energy e reactor and
W R Buildin g r aphical Ma p d water Sam p r  R esources ....
, 1987, when l output. T rization Surv dismantlem of the Reac ng of 333 sp to dry cask er 19, 2012.
.r ansportatio n m pacts .........
Water Reactor Plan nt to the E n
.ns Governin g e nts .............
h the requi 179, Standa ctors (1), th information oning and si site.
.atory Comm ental Protec t L ocal Requi
ments the 1 Boiling Water information sioning and LTP). This of the remai vities and th cusses wheth nited States ement related NUREG-05 missioning of ssioning Pla This chapter om time of of a single R) construct Commissio d its fuel we n it was shu The plant w vey for SAF ment activitie ctor Pressur pent fuel ass storage at th On March r
...................
Environme rements of ard Format his chapter p n or signific ite closure a 1972 Dairyla r Reactor (E n or significa d license t supplement, ning decomm he environm her the activ Nuclear Re d to operati 586, Supple f Nuclear F an and Post discusses de submittal o Allis-Chalm ted in 1967 on (AEC). T ere transferre ut down bec was placed i FSTOR was c es were sta re Vessel (R semblies, wa he on-site Ind h 12, 2014, D 8-1 ental Repo f 10 CFR 50 and Conte provides a s cant environm activities per and Power ER) (2), whi ant environm termination  
....................
, including r missioning a ment, and the vities and th egulatory Co ion of La C ment 1, Ge Facilities, N t-Shutdown ecommission f this LTP mers designe as a demon The plant wa ed to Dairyl ause of econ in SAFSTO completed in arted in 199 RPV) in Ma as transferre dependent S Dairyland su ort 0.82 (a)(9)(ii ents for Lic supplement mental chan rformed at t Cooperative ich was revi mental chan activities reference to and site clos e likely env heir impacts ommission (
.LIST nvironment a c ilities ........
Cross Boiling eneric Envir November 2 Decommissi ning activiti until the co ed 50 megaw nstration rea as commissi land. It was nomic reaso OR on Augu n October 19 94, includin ay 2007. A ed from the pent Fuel St ubmitted a r i)(A) and t ense Termin to the envi nge associat the La Cross e (Dairyland sed on June nges associat presented i o LTP Chap sure activitie vironmental are bounde (NRC) NUR g Water Rea ronmental I 2002 (5); an ioning Activ ies, with a fo ompletion o watt electric actor in conj ioned in Nov s operated by ons due to it ust 7, 1991.
.LIST O a tion ............
995.
....................
ng the remo ll of the sp Fuel Eleme torage Instal evision of th the guidanc nation Plan ironmental r ted with the se Boiling W d) Environm 15, 1973 (3 ted with the in this Lic pter 3, provi es, the intera impact of d by the im REG-0191, F actor, April Impact State nd the Dairy vities Repor ocus on activ f site restor c (MWe) Bo junction wit vember 1969 y Dairyland ts small size An initial oval and of pent nuclear ent Storage llation (ISFS he LACBW ce of ns for report site-Water mental 3), by e site-cense des a action those mpacts Final 1980 ement yland rt (D-vities ration oiling th the
.g s ...............
: 9. In d until e and l Site ff-site
.p .................
: fuel, Well SI) by WR D-
.p ling Wells  ii ...................
.n .................
....................
.g Decommi s...................
.ission .........
.t ion Agenc yrements .....
....................
....................
.OF TABL E al Impacts fr o...................
.O F FIGUR E...................
....................
....................
....................
.- LACBW R...................
....................
....................
.s sioning Ac t...................
....................
.y ..................
....................
....................
....................
.E S om Decom m...................
.RES ...................
....................
....................
....................
.R Site ..........
....................
....................
....................
.tivities and S...................
....................
....................
....................
....................
....................
.m issioning 
...................
....................
....................
....................
....................
....................
....................
....................
....................
.Site Release
...................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
....................
.. 8-23. 8-23. 8-238-24. 8-24. 8-24. 8-25. 8-25. 8-25. 8-26. 8-11. 8-28. 8-29. 8-30. 8-31. 8-32 La Cros s License T Revisio nACS AEC AMSL ALARA BGS BMP BWR DOE DOT D-Plan/ PSDAR EPA ER FESW FRS G-1 G-3 GEIS GMU ISFSI LACB W LSE LTP MWe MWt NPDES NRC ODCM OSHA PCB PSDAR RWP s e Boiling W Termination n 0 AmerAtom Abov e As L o Belo w Best M Boili n Depa r Depa r Deco m Envir o Envir o Fuel E Final Geno a Geno a Gene r Geog r Indep WR La C r LAC B Licen Mega w Mega w Natio n Nucl e Off-S Occu p Polyc h Post-S Radi a W ater Reacto r Plan LIST OF i can Comm u i c Energy C e Mean Sea o w As Reas o w Ground S u Managemen t ng Water Re rtment of E n rtment of Tr a mmissionin g onmental P r onmental R e Element Sto r Radiation S u a No. 1 Stat i a No. 3 Fos s ric Environ m r aphic Man a endent Spe n r osse Boilin g B WR Site E nse Terminat i w atts Electr i w atts Ther m nal Pollutan t ear Regulato r i te Dose Ca l pational Saf e hlorinated B S hutdown D ation Work P r  ACRONY M u nity Surve yommission Level o nably Achi e u rface t Practices acto r n ergy a nsportatio n g Plan/Post S rotection Ag e e port rage Well urvey i on sil Station mental Impa c agement Un i n t Fuel Stor a g Water Rea c n closure i on Plan i c m al t Discharge ry Commis s l culation M a e ty and Hea l B iphenyl ecommissio Permit 8-iii M S AND A B y e vable n S hutdown A e ncy ct Statemen t i t age Installati o c to r Elimination ion a nual l th Adminis t ning Activi t B BREVIA Tctivities Re p t on  System tration ties Report TIONS p ort La Cros s License T Revisio n RCRA REMP RPV SAFST O SSC TEDE TSCA USACE USEPA VCC WCS WDNR WPDES s e Boiling W Termination n 0 Reso u Radi o React O R SAFe Struc t Total Toxi c Unite d Unite d Verti c Wast eWisc oWisc o W ater Reacto r Plan u rce Conser v o logical Env i or Pressure V STORage tures, Syste m Effective D o Substance C d States Ar m d States En v cal Concrete e Control S p o nsin Depar t o nsin Pollut a r  v ation and R ironmental M V essel ms and Com p o se Equival e C ontrol Act m y Corps of vironmental P Cask ecialists tment of Na t a nt Dischar g 8-iv R ecovery Ac t M onitoring P p onents e nt Engineers P rotection A t ural Resou r g e Eliminati o t P rogra m A gency rces o n System La Cros s License T Revisio n 8.S 8.1.I n In acco r R egulat o Nuclear describi n specific d Reactor (8.1.1.P This ch a R eport, L describi n specific Termina t detailed d b etween activitie s The sup ppredicte d Environ m (NURE G(GEIS) o LACBW R Plan/PS D to be p eactivitie s 8.1.2.B LACB W Water R U.S. At o 1973, th e April 30 , electrica l Charact eLimited disposal consisti n(FESW)
Septemb s e Boiling W Termination n 0 S uppleme n n troductio n rdance wit h ory Guide 1.
Power Rea c n g any new decommissi o (LACBWR)P urpose a pter supple m L a Crosse B n g any new decommis s t ion Plan (L description othose acti v s. plement dis c d by the U n mental Stat e G-0191) (4);
o n Decom m R Decommi s D AR) (6).
T erformed fr o s. B ack g round W R consists eactor (BW R omic Energ y e reactor an d , 1987, whe n l output.
T rization Sur vdismantle m of the Rea c n g of 333 s p to dry cask e r 19, 2012.
W ater Reacto r Plan n t to the E n h the requi 179, Stand a ctors (1), t hinformatio n o ning and s isite. m ents the 1 B oiling Wate rinformatio n s ioning an d L TP). This of the remai vities and t h c usses whet h n ited States ement relate d NUREG-0 5 m issioning o f ssioning Pl a T his chapter om time of of a single R) construc t Commissi o d its fuel w e n it was sh u T he plant w v ey for SA F m ent activiti e c tor Pressu r p ent fuel as sstorage at t h On Marc h r E nvironm erements o f a rd Format his chapter p n or signifi c ite closure a 1 972 Dairyl a r Reactor (E n or signific a d license tsupplement
, ning decom m h e environ m h er the acti vNuclear R e d to operat i 5 86, Supple f Nuclear F a n and Pos t discusses d esubmittal o Allis-Chal m t ed in 1967 o n (AEC).
T e re transferr e u t down b ec w as placed i FSTOR was c es were st a r e Vessel (R s emblies, w a he on-site In d h 12, 2014, D 8-1 e ntal Rep o f 10 CFR 5 0 and Cont e p rovides a s c ant environ m activities pe r a nd Power E R) (2), wh i a nt environ m termination  
, including r missioning a m ent, and th e v ities and t h e gulatory C o i on of La Cment 1, "G e Facilities", N t-Shutdown e commissio n f this LTP m ers design eas a demo n T he plant w a ed to Dairy l ause of eco n i n SAFST O c ompleted i n arted in 19 9 R PV) in M a a s transferr e d ependent S D airylan d s u o rt 0.82 (a)(9)(i i e nts for Lic supplement m ental cha n rformed at t Cooperativ e i ch was revi m ental chan activities r eference t o a nd site clo s e likely en v heir impacts ommission (C ross Boilin g e neric Envi r Novembe r 2 Decommiss i ning activit i until the c o ed 50 mega w n stration re a as commiss i l an d. It wa snomic reas o OR on Aug u n October 1 9 94, includi n ay 2007. A ed from the pent Fuel S t ubmitted a r i)(A) and tense Termi nto the env i n ge associa t t he La Cros s e (Dairylan d sed on June n ges associa t presented i o LTP Chap sure activiti e vironmental are bounde (NRC) NU R g Water Re a r onmental I 2 002 (5); a n ioning Acti v i es, with a f o ompletion o w att electri c a ctor in con j i oned in No v s operated b y o ns due to i t u st 7, 1991.
9 95. ng the rem oll of the s p Fuel Elem e t orage Insta l evision of t h t he guidan c nation Pla n i ronmental r t ed with the s e Boiling W d) Environ m 15, 1973 (3 t ed with th ein this Li c p ter 3, provi es, the inter aimpact of d by the i m R EG-0191, F actor, Apri l I mpact Stat e n d the Dair y vities Repo r o cus on acti vf site resto r c (MWe) B o j unction wi t v embe r 196 9 y Dairylan d t s small siz e An initia l o val and o f pent nuclear e nt Storage llation (ISF S h e LACB W ce of ns for report site-W ater m enta l 3), by e site-c ense des a action those mpacts F inal 1980 e ment yland r t (D-vities ration oiling t h the 9. In d until e an d l Site ff-site fuel, Well S I) by W R D-La Cros s License T Revisio n Plan/PS D characte r concludi n Energy S o Survey R Charact e As state d was doc u 1987. L A environ m support o LACB W noted in 1,155 M W known a LACB W the gen e decomm i located i that this


Elk Riv elicense t e The late s"The en dismantl e specific a this Sup p potential Offs iAqu aTerr eThre aSoci oEnvi r 8.2.S LACB W Mississi p south of site loca t coordina t s e Boiling W Termination n 0 DAR to the N rization wa s n g on Aug u o lutions is d Report for O e rization Su r d in the D-P l umented in ACBWR d e mental impa o f the Augu s W R, dated A pthe ER an d We WNP-2 as Columbi a WR is a muc h e ric environ m i ssioning i m n Elk Rive rdecommiss i e r facility w a e rmination i n st D-Plan/P S vironmenta l ement activ i ally evaluate plement as aenvironme n te land use a a tic ecology estrial ecolo g a tened and e oeconomic ronmental j u ite Locatio n W R is locate d ppi River, a bthe city of L tion, includi n t es for LA C W ater Reacto r Plan N RC that a c s performe d ust 6, 2015.
La Cross License T Revision Plan/PSD character concludin EnergySo Survey R Characte As stated was docu 1987. LA environm support o LACBW noted in 1,155 MW known a LACBW the gene decommi located i that this Elk Rive license te The lates The en dismantle specifica this Supp potential Offsi Aqua Terre Threa Socio Envir 8.2.
documented i O ctober an d rvey Report f l an/PSDAR ,a suppleme n e commissio n ct not pre v s t 7, 1991, D pril 21, 198 0 d NUREG-0 BWR ope r a Generati n h smaller re a mental ass e m pact of a s m r , Minnesot a i oning was c a s another A n 1974 (9).
S LACBW Mississip south of site locat coordinat se Boiling W Termination n 0 DAR to the N rization was ng on Augu olutions is d Report for O erization Sur d in the D-Pl umented in ACBWR de mental impa of the Augus WR, dated Ap the ER and We WNP-2 as Columbia WR is a much eric environm issioning im n Elk River decommissi er facility wa ermination in st D-Plan/PS vironmental ement activi ally evaluate plement as a environmen te land use a atic ecology estrial ecolog atened and e oeconomic ronmental ju ite Location WR is located ppi River, ab the city of L tion, includin tes for LAC Water Reactor Plan NRC that ac s performed ust 6, 2015.
S DAR docu m l impact o f i ties is SM A d in the GE a basis for m ntal impacts activities as to activit i g y as to acti v e ndangered s u stice" n and Desc r d in south w bout 1 mile L a Crosse, W n g nearby p C BWR are l r ccounts for t d by Ener g The result s i n two sepa r d November f or June thr u , "Review o f n t to the E n n ing and dis m viously eval u Decommissi o 0.This rev 0 586. The r ated by W a n g Station, actor compa r essment. N mall 58.2 m e a , which wa s c ompleted s a Allis-Chalm e m ent (issued fall compl e A LL as deter m IS. As stat e m eeting the r enot determi n i es beyond t h v ities beyon d s pecies ription western Wis c south of th e W I. The Si trominent fe a l ongitude 9 8-2 the completi g y Solutions s of the sit e r ate reports, L 2014 Fiel d u August 20 1 f post-opera t nvironmenta l mantlement uated in th e o ning Order iew include d reference B a shington P u owned and red to WNP-N UREG-058 6 e gawatt the r s dismantle d afely with l i ers reactor, ain March 2 0 e ted or pla n m ined by t h ed in the G E equirement s n ed in the G h e operatio n d the operat i c onsin, in V e Village o f te Regional atures such 1 o , 13', 53.
documented i October and rvey Report f lan/PSDAR, a supplemen ecommission ct not prev st 7, 1991, D pril 21, 1980 d NUREG-0 BWR oper a Generatin h smaller rea mental asse mpact of a sm r, Minnesota ioning was c as another A n 1974 (9).
3 i on of the s pcommenci n e characteri z L ACBWR R d Work (7)15 Field W o a ting license l Report fo r activities h a e NRC's E n or NURE G d the evalu a BWR facili t u blic Powe r operated b-2, its impa c 6 also pro v rmal (MWt) d between 1 i ttle risk to w a superheate 0 14) conclu d nned LAC B h e GEIS. L A E IS, license e s in 10 CFR G EIS are: nal are a i onal area V ernon Cou n fGenoa, WI Location gr as highway s35" West a p ent fuel tra n ng on Oct o zation surv e adiological and LACB W o rk (8). stage envir o r LACBWR a ve resulted nvironment a G-0191 relat e ation of imp a t y in NUR E r Supply S y b y Energy N cts fall withi n vided infor mBWR dem o 971 and 19 7 w orkers an d d test BW R ded the foll o B WR deco m A CBWR de c es can rely o50.83(a)(6)
SDAR docum l impact of ities is SMA d in the GE a basis for m ntal impacts activities as to activiti gy as to activ endangered s ustice n and Descr d in southw bout 1 mile La Crosse, W ng nearby p CBWR are l r
(n ty, on the e and appro x aphic (Figu r s , rivers an d a nd latitude n sfe r. Addi t o be r 9, 201 4 e ys perform e Characteri z W R Radiol o onmental i m dated Dec e in no signi f a l Assessm e e d to operat i a cts against EG-0586 w a ystem (plan t N orthwest).
ccounts for t d by Energ The results in two separ d November for June thru
n the envel o mation abo u o nstration r e 74. It was n d the public.
, Review of nt to the En ning and dism viously evalu Decommissio
R , which ach o wing: mmissionin g commission i on informat i (ii). Site-sp e east shore o ximately 19 m re 8-1) sho w d lakes. Th e 43 o, 33', 3 tional 4 and ed by z ation o gical m pacts ember f icant e nt in i on of those a s the t now As o pe of u t the e actor n oted  The ieved g and ing is i on in e cific of the miles ws the e map 6.22" La Cros s License T Revisio n North. T The Rea cthe carg o 639 feet Mississi pfilled wi tThe lice n LACB Wthe plant the l aform ethe l a gene r the Lthe l athe p a The Site The site i Mississi p Corps o f The site Highwa y Highwa ycurrentl y Mississi p2.4 mile s mussels, 0.75 mil e 8.2.1.S This se c decomm i defined a piping a n 10 CFR 2 The dec o b uilding s structure be remo v and flo o structure s e Boiling W Termination n 0 The site is a ctor Buildin g o-carrying-o n Above M e ppi River.
: 0. This rev 0586. The rated by Wa ng Station, actor compar essment. N mall 58.2 me a, which was completed sa Allis-Chalme ment (issued f all comple ALL as determ IS. As state meeting the re not determin ies beyond th vities beyond species ription western Wisc south of the WI. The Sit rominent fea longitude 9 8-2 the completi gySolutions s of the site rate reports, L 2014 Field u August 201 f post-operat nvironmental mantlement uated in the oning Order iew included reference B ashington Pu owned and red to WNP-NUREG-0586 egawatt ther s dismantled afely with li ers reactor, a in March 20 eted or plan mined by th ed in the GE equirements ned in the G he operation d the operati consin, in V e Village of te Regional atures such 1o, 13, 53.3 ion of the sp commencin e characteriz LACBWR R d Work (7) 15 Field Wo ating license l Report for activities ha e NRC's En or NUREG d the evalua BWR facilit ublic Power operated b
T th sand mat e n sed site co m W R plant co moff of High w a nd north o f e r Genoa N o a nd area di r rating statio n LACBWR pl a nd area sou t arcel of lan dOverview (F is bordered o ppi River a n f Engineers (is border e y 35. A B y 35, carries y do not use ppi River N a s from LA C brook tro u e s south of t hite Descrip t c tion provi d i ssioning an d as the confi g n d open la n 2 0.1402.
-2, its impac 6 also prov rmal (MWt) d between 1 ittle risk to w a superheate 014) conclud nned LACB he GEIS. LA EIS, licensee s in 10 CFR GEIS are:
ommissioni n s, structures s above a d e ved from b a o rs in the "s: W ater Reacto r Plan at mile 678.
nal area ional area Vernon Coun f Genoa, WI Location gr as highways 35 West a pent fuel tran ng on Octo zation surve adiological and LACBW ork (8).
6 g is approxi nly rail roa d e an Sea Le v T he covered e rial dredge d m prises a to m prising onl y way 35. Ot h f the LACB W o. 1 Station (r ectly south n (Genoa N ant, t h of G-3, w d to the east o F igure 8-2) i o n the nort h nd Highway (USACE) R o e d on the w B urlington N commercia lthis rail lin a tional Wil d CBWR, is t u t and sturg h e LACBW R t ion After U d es a sum m d site closu r g uration of t nd areas at n g of the Cl aand comp o e pth of 3 fe e asements lo c"En d-State."r 6 on the Mimately 300  
stage enviro r LACBWR ave resulted nvironmenta G-0191 relate ation of impa ty in NURE r Supply Sy by Energy N cts fall within vided inform BWR demo 971 and 197 workers and d test BWR ded the follo BWR decom ACBWR dec es can rely o 50.83(a)(6)(
: d. The Rea c v el (AMS Lland consis t d from the M t al of 163.5 y 1.5 acres.
nty, on the e and approx aphic (Figur s, rivers and and latitude nsfer. Addit ober 9, 2014 eys performe Characteriz WR Radiolo onmental im dated Dece in no signif al Assessme ed to operati acts against EG-0586 wa ystem (plant Northwest).
her promine n WR plant, w (G-1) coal (a of LACB W No. 3 Fossil S where the IS F o f Highway illustrates th h by the Mis s 35. The U
n the envelo mation abou onstration re
.ock Island D w est b y th e N orthern-S a l freight al o e. The site dlife & Fis h t he Genoa eon. On t h R plant, the r Unrestricte d m ary of the re activities.
: 74. It was n d the public.
the remaini nthe time o ass 1 areas o o nents) will e t below gra d c ated below  
R, which ach owing:
This ap p 8-3 ssissippi Ri vfeet from t h ctor Buildin g L), or 19 fe t ed of the ri v Mississippi R acres whic h The site is n t site featu r w hich includ a nd later oil
mmissioning commissioni on informati (ii). Site-spe east shore o ximately 19 m re 8-1) show d lakes. The 43o, 33, 3 tional 4 and ed by zation ogical mpacts ember ficant ent in ion of those as the t now As ope of ut the eactor noted The ieved g and ing is ion in ecific of the miles ws the e map 6.22  
)WR, which c Station [G-3 FSI is locate d 35, across fr e boundary o s issippi Riv e.S. Lock &
 
D istrict, is l o e Mississip p a nta Fe rai l o ng the east eis bordered h Refuge Po oNational F i h e southwe s r e is a publi c d Release final con d The "End-S n g below gr of license t e o f the plantinclude the de (designatthe 636 fo o proach will v e r above t h h e Mississip p g stands on et above t h v er edge an d River. h is owned baccessed b y res include:
La Cross License T Revision North. T The Reac the cargo 639 feet Mississip filled wit The licen LACBW the plant the la forme the la gener the L the la the pa The Site The site i Mississip Corps of The site Highway Highway currently Mississip 2.4 miles
: mussels, 0.75 mile 8.2.1. S This sec decommi defined a piping an 10 CFR 2 The deco buildings structure be remov and floo structure se Boiling W Termination n 0 The site is a ctor Building o-carrying-on Above Me ppi River. T th sand mate nsed site com WR plant com off of Highw and north of er Genoa No and area dir rating station LACBWR pl and area sout arcel of land Overview (F is bordered o ppi River an f Engineers (
is bordere y 35. A B y 35, carries y do not use ppi River Na s from LAC brook trou es south of th ite Descript ction provid issioning and as the config nd open lan 20.1402.
ommissionin s, structures s above a de ved from ba ors in the s:
Water Reactor Plan at mile 678.6 g is approxi nly rail road ean Sea Lev The covered erial dredged mprises a to mprising only way 35. Oth f the LACBW
: o. 1 Station (
rectly south n (Genoa N ant, th of G-3, w d to the east o Figure 8-2) i on the north nd Highway (USACE) Ro ed on the w Burlington N commercial this rail lin ational Wild CBWR, is t ut and sturg he LACBWR tion After U des a summ d site closur guration of t nd areas at ng of the Cla and compo epth of 3 fee asements loc End-State.
r 6 on the Mi mately 300
: d. The Reac vel (AMSL land consist d from the M tal of 163.5 y 1.5 acres.
her prominen WR plant, w (G-1) coal (a of LACBW No. 3 Fossil S where the ISF of Highway illustrates th h by the Miss
: 35. The U.
ock Island D west by the Northern-Sa l freight alo
: e. The site dlife & Fish the Genoa eon. On th R plant, ther Unrestricted mary of the re activities.
the remainin the time o ass 1 areas o onents) will et below grad cated below This app 8-3 ssissippi Riv feet from th ctor Building L), or 19 fe ted of the riv Mississippi R acres which The site is nt site featur which includ and later oil)
WR, which c Station [G-3 FSI is located 35, across fr e boundary o sissippi Rive
.S. Lock &
District, is lo e Mississipp anta Fe rail ong the easte is bordered h Refuge Poo National Fi he southwes re is a public d Release final cond The End-S ng below gro f license te of the plant include the de (designat the 636 foo proach will ver above th he Mississipp g stands on et above th ver edge and River.
h is owned b accessed by res include:
es the site s
es the site s
) fueled po w c ontains an 3]), located d , and from LACB Wof the licen s e r an d a nar rDam No. 8, o cate d appro p i River a nl line, loc a e rn portion oto the sout hol 9 area.
) fueled pow contains an 3]), located d, and from LACBW of the licens er and a narr Dam No. 8, ocated appro pi River an l line, loca ern portion o to the south ol 9 area. F ish Hatchery stern corner c boat launch dition of the State for LA ound backfil ermination m (the on-site demolition, ed as 636 fo ot elevation apply to th he mouth of pi River and filled land a he normal d low forest a by Dairyland y a road on witchyard a wer plant (rem operational approximate WR.
F i sh Hatcher ystern corne r c boat launc h dition of th e State" for L A o und b ackfi l ermination m (the on-sit e demolition,ed as 636 f o o t elevation apply to t h h e mouth o f pi River an dfilled land a he normal d low forest a b y Dairylan d y a road on witchyard a w er plant (re m operational approximat e W R. sed site.
sed site.
r ow strip of managed bximately 0.
row strip of managed b ximately 0.6 nd bordered ated betwee of the site.
6 nd bordered ated betwe e of the site.
h by a segm Further sout y, which ra r of the site hing ramp w e site at th ACBWR dec lled building meeting the e radiologica removal an oot AMSL).
h by a seg m F urther sou t y , which r a r of the sit e hing ramp w e site at t h ACBWR de c lled b uildin g meeting the e radiologic a removal a n o ot AMSL).
leaving onl he followin f the Ohio R d 475 feet we at an elevati elevation o areas which d, with the a the south si and the site o moved in 19 350 MWe ely 175 feet land betwee by the U.S. A 6 miles upstr on the eas en the site Passenger t ment of the U th, approxim aises endang e, approxim with a parking he conclusio commissioni gs, structure requiremen ally contamin nd disposal o All systems ly concrete ng buildings River.
leaving on l he followi n f the Ohio R d 475 feet w e a t an elevati elevation o areas which d, with the a the south s i a nd the site o m oved in 19 350 MWe ely 175 feet land betwe e b y the U.S.
est of on of f the were actual ide of of the 89),
A 6 miles upst r on the ea s en the site Passenger t m ent of the U t h, approxi m a ises endan g e, approxi m w ith a parkin g he conclusi o commission i gs, structurerequireme n ally contami n n d disposal o All system s l y concrete n g building s R iver. est of on of f the were actual i de of of the 89), fossil from e n the Army ream. st by and trains U pper m ately gered m ately g lot. o n of i ng is s and n ts of n ated of all s will walls s and La Cros s License T Revisio nReac tWas tVent iPipe Was tTurb iLow Mai n The deb r disposal.Figure 8-structurewill be d and stru c require r e G-3 Cri b structure potential  
fossil from en the Army ream.
st by and trains Upper mately gered mately g lot.
on of ing is s and nts of nated of all s will walls s and  
 
La Cross License T Revision React Wast Venti Pipe Wast Turbi Low Main The debr disposal.
Figure 8-structure will be d and struc require re G-3 Crib structure potential the LTP The belo filled wit Departm backfille The stru dismantle Adm LACB Outfa G-3 C coal water Elect Paved plant After all process a and the s se Boiling W Termination n 0 tor Building te Treatment ilation Stack and Ventilat te Gas Tank ine Building Specific Act ntenance Eat ris generated
-3 shows th s and compo demolished a ctures assoc emedial acti b House, will s at depths g removal. F Chapter 3.
ow grade stru th suitable c ent of Natur d, returned t uctures outs ed and will r inistration B BWR Crib H all diffuser d Coal Plant an barge washi r systems an trical Switch d roadways area.
demolition as described surrounding Water Reactor Plan g,
t Building, k,
tion Tunnels Vault, g and Turbin tivity (LSA)
Shack.
d from demo he key LAC onents, othe and removed ciated with G ions; therefo l remain inta greater than Further infor uctures to re clean soil, sa ral Resource to grade, see ide of the remain on si Building, incl House, inclu discharge pip nd all associ ing station t nd piping, hyard, and, and the Bur and remedi in Chapter open land r
s, ne Office Bui
) Storage Bu lition and re CBWR build er than the L d to a depth o G-3 are exp ore, no remed act and func 3 foot below rmation on t emain in the and and/or o es (WDNR) eded and app LACBWR te. These in luding assoc uding fire pro ping, extendi iated buildin to the north rlington Nor iation activi 5 of this LT areas within 8-4 ilding, uilding, and emoval opera dings at the LACBWR A of at least 3 pected to be diation is pla ctional for G w grade will the approach e End State other suitabl regulations propriate ero R Site Encl nclude:
ciated sanitar otection pipi ing 110 feet ngs, warehou h of the plan rthern-Santa ities are com TP, will be p n its license ations will b site. All o Administratio feet below g e radiologica anned and th G-3 power op l be assessed h to the vari e such as b le media, as
. The resto sion control losure (LS ry sewer and ing systems, into the Mis uses and sup nt and all as Fe rail line mplete, a Fi performed to d boundarie be segregated on-site LAC on Building grade. None ally impacte hese structur perations. A d for radiolo ious buildin basement fou s allowable ored areas on s will be est E) are not d water syste ssissippi Riv pport structur ssociated sa and spur in inal Radiatio o demonstrat es, with the d for recycli CBWR build and Crib H e of the buil ed such that res, includin Any contamin ogical impac ngs is provid undations w under Wisc n the site w ablished.
expected t ems and pipi
: ver, res, includin anitary sewer nto the LACB on Survey (
te that LACB exception o ing or
: dings, House, dings t they ng the nated ct and ded in will be onsin will be to be
: ing, ng the r and BWR (FRS)
BWR of the
 
La Cross License T Revision ISFSI fa 10 CFR 2 dry stora dry stora Isolation remediat control m comprom equipmen access. I there is n survey ar Several s support t supportin 8.3.
R To date, removal RPV incor FESW Vario
: RPV, Purif Vario Chapter 3 remediat achieve t 8.4.
Im As previ decommi associate by the pr NUR NUR Chapter 3 schedule footprint se Boiling W Termination n 0 acility, com 20.1402. As age casks an ge within th and contro ion activitie measures w mised by th nt. Open la Isolation and no risk of re reas that hav services such the ISFSI m ng the adjace Remaining D several key of the follow and associa re monitor gu W stored com ous system p
, and primar fication, Seal ous Turbine 3 of this LT ion activitie the End-Sta mpacts to th iously noted issioning op ed with deco reviously issu REG-0191, an REG-0586.
3 of the LT d to be com
). The ident Water Reactor Plan mply with s part of the d transferred e ISFSI unti ol measures
: s. These act will be impl he potential and areas, ac d control me
-contaminat ve been relea h as sanitary monitoring a ent G-3 fossi Dismantlem dismantlem wing compon ated reactor uide tubes, e mponents su piping and c ry systems su l Injection an and auxiliar P provides d es currently b ate conditio he Post-Shu d, the D-Pl perations at t ommissionin ued environm nd TP identifie mpleted prio tified activiti r
the radiolo decommissi d to the ISF il it is transfe will be imp tivities will lemented to for re-con ccess roads a easures will ion from de ased from the y sewer servi and security il station wh ent and Dec ment and deco nents:
components etc.),
uch as fuel sh components uch as the C nd Main Ste ry systems.
detailed desc being perfor on.
utdown Deco lan/PSDAR, the site and ng the site ha mental impa es the dism or to the un ies are not s 8-5 ogical criter ioning proce SI. It is exp erred to the D plemented fo be complete o ensure the ntamination and boundar remain in e commission e license.
ices and elec operations.
hich will rem commission ommissionin s (e.g. fuel hrouds, contr associated ontrol Rod D am.
criptions of rmed and th ommissionin amended concluded t ave already act statement mantlement a nrestricted re ignificantly ria for unr ess, all spent pected that t Department following th ed prior to st e final radi as result ries will be ffect through ning. These ctrical servic There are main in place ning Activiti ng activities shrouds, co rol rods, and with the Fo Drive Mecha the dismant he remaining ng Activitie in March 2 that the pote been postula ts, specifical and deconta elease of th different fro restricted u t nuclear fue this spent fu of Energy (D e conclusion tarting the F iological co of access b posted with hout FRS ac measures ar ce will rema e three potab
: e.
ies have occurr ntrol rods, s d start-up sou orced Circula anisms, Dec lement, deco g activities t es Report (P 014, describ ential enviro ated in, and lly:
amination ac he site (excl om those ori use specifie el was loaded uel will rema DOE).
n of radiolo FRS process.
onditions are by personne h signs restri ctivities and re not requir in in operati ble wells on red, includin steam separa urces, and ation system cay Heat, Pri ontamination to be execut PSDAR) bed the pla onmental im d will be bou ctivities tha luding the I iginally discu ed in d into ain in ogical The e not el or icting d until red in ion to n site ng the
: ators, m, the imary n and ted to anned mpacts unded at are ISFSI ussed
 
La Cross License T Revision in the D-will be d identified provide decommi 8.5.
L 8.5.1. G 8.5.1.1.
The site Vernon C 300 feet by filling The site 642 feet Mississip silts) und sands and 8.5.1.2.
The U.S reliable c total pop 744 for S near the small tow (populati 5 miles s 8.5.1.3.
The LAC of the M bounded north, an electric p This stat Genoa, lo within th The area and fresh to the G-site, loca se Boiling W Termination n 0
-Plan/PSDA defined durin d in the D-additional issioning.
La Crosse Bo Geography a Site L location and County, Wis from the eas g in river ed is relatively AMSL bou ppi River to derlain by fin d gravels. B Popul
. Census Bu census data f pulation in 2 Stoddard, loc plant, locat wns west o ion 397), lo outhwest.
Site A CBWR prope Mississippi R by the Mis nd a wildlife power station tion is locate ocated appro he town. The a of the Miss h water fishi
-3 station lo ated approxim Water Reactor Plan R. Althoug ng decommi
-Plan/PSDAR evaluation oiling Wate and Demogr Location and d description sconsin, in t st bank of the dge and low y flat with th unded by the the west. T ne to medium Bedrock is en lation ureau, Amer for nearby W 2013 was 25 cated 7 miles ted 17 miles of the plant cated 3 mil Access, Land erty is locate River. Altho ssissippi Riv and fish ref n completed ed to the so oximately 1 m ere are no re sissippi Rive ing) and com cated south mately 4,000 r
gh additional issioning pl R have bee and infor er Reactor E raphy Description n were discu the Mississip e Mississipp forest areas he reactor f e railroad tr The geology m sands with ncountered a rican Comm Wisconsin vi 8 for the Vi s N of the pl N; and 30, across the es northwe d and Water ed in the far ough the site ver to the w fuge to the s d in 1969, w outh, adjacen mile to the n esidences wit er adjacent t mmercial bar of the LAC 0 feet south o 8-6 l details rega anning effor en identified rmation reg Environmen n
ussed in secti ppi River V pi River. Tw s with mater facilities stan acks to the y consists pr h some soils at approxima munity Surve illages and c illage of Ge lant; 51,522
,329 for Ver Mississippi st, and New Use r western por e area is 163 west, a rail li south. The s which is also nt to the LA northeast of t thin 2,000 fe to the site is rge and ship CBWR plant) of the plant.
arding majo rts, no signi
: d. Subsequ garding the nt Descriptio ion 8.2. The alley, with t wenty-seven rial dredged nding at elev east and th rimarily of f s containing ately 130 fee ey (ACS) re cities and Ve enoa, located for La Cros rnon County i River, inc w Albin, IA rtion of Ver 3.5 acres, it ine to the e site includes owned and ACBWR fac the site. An eet of any LA s used for re p traffic (e.g.
). There is There is a p r decommis ificant impa uent sections environme on e 163.5 acre the Reactor acres of the d from the M vations rang he riprap on fill materials higher perc et below grou eport (11) pr ernon County d 1 mile nor se, the large
: y. There ar luding Reno A (populati rnon County is relatively east, USACE s G-3, a coa d operated by cilities. The n elementary ACBWR str ecreational p
. barges of c a public bo portion (Poo sioning activ cts beyond s in this ch ental effect e site is locat Building lo site were fo Mississippi R ging from 6 the shore o s (fine sand entages of c und surface rovides the
: y. The estim rth of LACB st Wisconsin re also num o township, ion 513), lo y on the east y isolated as E property t al-fired 379 M y Dairyland e closest tow school is lo ructure.
purposes (bo coal are deliv at landing o ol 9) of the U vities those hapter ts of ted in ocated ormed River.
36 to of the s and coarse (10).
most mated BWR; n city erous MN ocated bank s it is to the MWe (12).
wn is ocated oating vered on the Upper
 
La Cross License T Revision Mississip for hunti Genoa N mile 679 long lock public ac through Highway No. 8.
8.5.2. C The clim continent river vall Lock and of the in from 60 winter m the avera summer s The aver range fro month fo The bluff winds at monthly experienc tornado o F3 (maxi center inj 8.5.3. T 8.5.3.1.
The site i dissected varies be river leve Highway Prior to c lying we dredged to constr se Boiling W Termination n 0 ppi River Na ing, fishing National Fish
.2, is approx k and dam s ccess to an o November.
y 35 approxi Climate mate at the L tal climate w ley location d Dam No. 8 nformation f to 90o F du months of De age tempera season (15).
rage annual r om 3 to 5 inc or the remain fs of the Mis t the site wh average wi ced tornados occurred 27 imum wind jured one pe Topography Topog is located w d uplands. F etween 21/2 a el. The LAC y 35. Figure construction tlands. The sands from t ruction, the a Water Reactor Plan ational Wildl and recreati h Hatchery.
ximately 0.6 structure ow observation The State imately 1/2 m La Crosse r with cold wi of the site.
8 site with a for the past uring the mo ecember 201 ture is appr rainfall is 35 ches per mon nder of the y ssissippi Riv here the va ind speeds
: s. On April
.4 miles awa speeds 158-erson and cau
, Geology an graphy ithin the Mi From La Cro and 41/2 mile CBWR site i 8-4 provide n of the LAC e property gr the Mississip area was gra r
life & Fish R onal activiti
. Lock and 6 miles north ned and ope platform, op e of Wiscon mile north o region of W inters and ho The USAC archived wea year (May onths of Jun 14 to Februa oximately 2 5.2 inches. M nth in the sp ear.
ver Valley ch lley runs no are typicall l 30, 1954, a ay from the 216 mph) to used betwee nd Seismolo ssissippi Riv sse to Prairi s in width.
is located be es a Topogra CBWR facil rade was the ppi River. D aded to a rel 8-7 Refuge just s ies (13). Fur d Dam No.
h of the site erated by the pen from da nsin also m of the LACB Wisconsin an ot summers CE maintains ather inform 2014 to Ma ne through A ary 2015. C 20o F in the Monthly prec pring and sum hannel the w orth-south a y 6 to 10 m a category F4 Genoa villa ornado that o en $500,000 ogy ver Valley, w e du Chien, The valley etween two v aphy Map of lity, the site en increased During grade latively flat south of the rther south a 8, located
: e. The dam e USACE (
awn to dusk maintains a BWR site, a nd at the LA and extrem s an active w mation for the ay 2015) ind August 2014 City data com winter mon cipitation av mmer season winds at the L are from the mph. The 4 (maximum age center.
occurred 6.6 and $5,000, where the va approximate walls rise s valleys on e f the site.
location co d through the e manipulati ground surf site which h are public la on the Mis m is a 110 fe 14). This fac k during the highway w across from ACBWR sit mes influence weather stat e Genoa, W dicated temp 4 and 45 to mpiled for G nths and reac verages in the ns and from LACBWR s e north and Genoa, WI m wind spee On June 5, 6 miles away 000 in dama alley is deep ely 40 miles sharply 500 either side of onsisted of m e deposition ion and site face. The re has limited a and areas an sissippi Riv et wide, 600 cility also a months of wayside off m Lock and te is typical ed because o ion at the ne I area. A re peratures ran
-5o F durin Genoa shows ches 72o F i e Genoa, WI 1 to 3 inche ite. Predom the south.
I area has r ds 207-260 1980, a cate y from the vi ages.
ly cut into h s south, the v to 600 feet f the bluff ea marshes and n of hydrauli preparation esulting grad access nd the ver at 0 feet llows April State Dam of a of the earby eview nging ng the s that in the I area es per minant The rarely mph) egory illage highly valley from ast of low-ically prior de for
 
La Cross License T Revision the LAC access ro 8.5.3.2.
LACBW of the Ce of the W bedrock i Generally to 130 fe Valley.
Dreshbac Precambr (BGS). A 509 feet river sho 8.5.3.3.
Many fau capable i condition in the sit nuclear p any evid Therefor Seismic a 2008 all 8.5.4. H Hydrolog Groundw 25 feet B Mississip the Missi the west towards groundw fossil sta some per flooding.
Hydrauli the shallo structure se Boiling W Termination n 0 BWR site is oad along the Geolo WR is located entral Lowla Wisconsin Do in this region y, the local g et of glacial These unco ch Group (
rian crystall At the subje AMSL near reline.
Seism ults have be in accordanc ns in the site te region, bu power plant dence of cap e, capable fa activity (ma occurred ove Hydrology a gy and hyd water beneath BGS and the ppi River. T issippi River and discharg the west bu water elevatio ation, it appe riods where ic conductivi ow sands tha of the shall Water Reactor Plan s generally f e eastern bou ogy d on the east and Physiogr me and the n dips less th geology is d outwash an onsolidated d Upper Cam line rocks e ect site, the b r the Reactor mology een mapped ce with 10 C e vicinity tha ut investigati sites in the pable faultin aulting does agnitudes ran er 180 miles nd Hydroge drogeologica h the site is water table Therefore, ch
: r. Groundw ges into the M ut then may on measurem ears that the the gradien ity is influen at were hydr low soils wo r
flat with gra undary of the bank of the raphic Provi western flan han 20 feet p described as a d fluvial dep deposits are mbrian). Th encountered bedrock surf r Building a d in the site CFR 100, A at represent ions of all o region, in ad ng. Additio not need to nging from 3 s from the sit eology al informat s first encou aquifer is in hanges in the ater in the sh Mississippi turn and flo ments collec ere is a sligh nts are rever nced by the s raulically dre ould not like 8-8 ade level at e site to the r Mississippi ince (16). T nk of the Wi per mile to th approximate posits on the underlain b he Dreshbac d at approxi face is encou and slopes to region. No Appendix A.
hazard to th f these fault ddition to st onally, the a be considere 3.5 to 5.4) th te and did no tion was p untered at de n strong hyd e water table hallow depo River. The ow parallel cted during ht downwar rsed and thi soil structure edged, depo ely influence approximate riprap along i River in the The site is lo isconsin Arc he southwes ely 15 feet o e east flood p by flat lying ch Group i imately 650 untered at an o approximat one of these Per the N he facility. N ts during the tudies for the area is one o ed in the ana hat has been ot impact the primarily ob epths rangin draulic comm e elevation a sits and fill m deeper grou to the river routine sam rd vertical g is is likely d e and grain sited, and co e groundwat ely 639 feet g the river sh e Wisconsin ocated on the ch. The sedi st.
f hydraulic f plain of the M sandstone a is then und 0 feet below n elevation tely 501 fee e faults are NRC, There Numerous f e course of v e LACBWR of relatively alysis of this n recorded b e plant site o btained from ng from app munication w are dependen material like undwater is a
: r. Based on mpling in sup gradient. Ho due to high size distribu ompacted on ter flow dire AMSL from hore.
n Driftless se e southwest imentary stra fill overlying Mississippi R and shales o derlain by d w ground su of approxim t AMSL nea considered e are no geo faults are ma validating se R, have not f y low seism s site (17).
etween 1975 or operations m Referenc roximately with the adj nt on the sta ely flows tow also likely to n a review o pport of the owever, ther river stages ution. Becau n site, the int ection. How m the ection flank ata or g 100 River of the dense urface mately ar the to be ologic apped everal found micity.
5 and
: s.
ce 10.
15 to acent age of wards o flow of the e G-3 re are s and use of ternal
: wever,
 
La Cross License T Revision the nativ anisotrop the horiz these lay The velo gradient.
across th the groun range) ev 8.6.
E 8.6.1. S The eval follows t includes considere Large.
evaluatio For thos evaluatio
: 1)
T N
id
: 2)
A
: 3)
P d
: 4)
A es en ad av th
: 5)
A A conclu the level 0586 eva the forme Table 8-1 LACBW screen th se Boiling W Termination n 0 ve sands und py of the aqu ontal directi ers.
ocity of grou The gradie he site it is li ndwater velo ven though th Environmen ummary luation of th the approach identificatio ed to be gen If identifie on in NUREG se environm on, a standard The issue or NUREG-019 dentified in t Applicable re otential imp escribed.
An evaluatio stimate or d nvironment dditional mi voided, a de he resource o A conclusion usion is deriv of significa aluation. No er G-1 coal/o 1 was used WR. It is exc he issues t Water Reactor Plan derlying the uifer would ion than in th undwater flo ent of the wa kely that the ocity across he hydraulic ntal Effects o he environme h and method on of enviro neric, it is a ed as generic G-0586 whic mental issu d approach i activity is s 1 and D-Pla these docum egulations, p pacts from de on is perfor determine wh considering itigation mea etermination or attribute.
is reached.
ved from the ance of the ote that the e oil fueled po as the bas cerpted from o identify r
hydraulic fi be more per he vertical d ow is directly ater table is e water table the site is c conductivit of Decommi ental effects dology outli nmental issu assigned a s c, the enviro ch concludes es or deco is followed.
summarized, an/PSDAR.
ments.
ermits, limit ecommission rmed. This hether the a the availab asures that c is made as e evaluation impacts. Si environmenta ower plant w sis for the m Table 6.1 o site-specific 8-9 fill would lik rmeable and direction. Th y related to influenced b e has a very also relative ty could supp issioning (or impacts ined and des ues as either ignificance onmental im s that the ov ommissionin It is summa including a Note that m ts or other re ning activitie s includes ctivity is lik ble informati can be taken to whether steps summ ite-specific i al impacts o was not consi site specific of NUREG-0 c issues. D kely provide d have a high his decreases both the hy by the topog low gradien ely slow (i.e port faster fl s) of the dec scribed in N r generic or level of eith mpact is cons verall impact ng activities arized as foll a summary o many decom egulatory req es relating to analysis an kely to make ion. If an im n are evalua the impact i marized abov issues are n of the operati idered in this c environme 0586. The f Decommissi e sufficient her hydrauli s the vertica ydraulic con graphy and w nt. Therefor e., in the inc flow.
commissioni NUREG-0586 site-specific her Small, sidered to be t significance s that requ lows:
of the impac mmissioning quirements a o the environ nd profession e a noticeab mpact is lik ated. If an i is likely to s ve. The con ot bounded ing G-3 coal s review.
ental impact first step in ioning activ structure tha ic conductiv al transport w ductivity an with the flat re, it is likely ches and fee ing of LACB
: 6. This appr
: c. If the iss Moderate e bounded b e is Small.
uire site-spe cts as report activities ar are identified nmental issu nal judgme ble impact o kely, existing impact cann seriously dam nclusion iden by the NUR l power plan t assessmen this process vities specif at the vity in within nd the areas y that et/day BWR roach sue is e, or by the ecific ted in re not
: d.
ue are nt to on the g and not be mage ntifies REG-nt and nt for s is to fic to
 
La Cross License T Revision LACBW identified evaluatio Offsi 35 ye Aqua sensit Terre of sen Threa threat Envir 35 ye Cultu histor 8.6.2. R 8.6.2.1.
During d in accord of the Ra exposure 2,000 mr also be m program Radiation materials In Augus of the sta 1994 wit allowed levels at Protectio exposure significan removal (SSCs).
se Boiling W Termination n 0 WR are then
: d. The scre on:
te land use a ears, since th atic ecology tive areas.
estrial Ecolo nsitive areas atened and tened and en ronmental J ears.
ural and Hi ric landmark Radiological Occup decommissio dance with th adiation Pro es and maint rem/yr Total maintained A and proced n Work Perm s incorporate st 1987, Dair abilized and th the comm for the deca the facility.
on Program e during the nt contributo and packag Water Reactor Plan reviewed a eening ident activities: ch he FES was i affected by gy affected b
: s.
endangered ndangered sp Justice: chan storic Resou k designation l Effects of D pational Rad oning, Soluti he license sp tection Prog tain occupat l Effective D As Low As R dures will e mits (RWP) e effective ra ryland place defueled fac mencement o ay of most s
. This delay and ALARA e decommiss ors to occup ging of rema r
and the activ tified the fo hanges in dem issued.
activities be by activities species: ch pecies that h nges in dem urce impact ns and other Decommissi diation Expo ions will con pecifications gram are to tional worke Dose Equiva Reasonably A ensure that involving po adiological c ed LACBWR cility). LAC of increment short-lived r y, combined A measures, sioning of L ational dose aining Reac 8-10 vities that m ollowing po mographics eyond the op s beyond the hanges in lo have occurred mographics ts beyond t cultural reso ioning sure ntinue to im s and the req control radia er exposures alent (TEDE Achievable (
work speci otential radia controls.
R in a SAFS CBWR remai tal decommi radionuclides d with the ef
, minimized LACBWR t from remai tor Building may require otential areas and zoning t perational are operational ocal flora an d in the past and socioe the operatio ources.
mplement a R quirements o ation hazard s to less tha E). Dose to (ALARA).
ifications, d ation exposu STOR condit ined in a ful issioning act s, which sub ffective impl the actual to date. It ining disman g Structures e site-specifi s for additio that have oc ea; changes l area; chang nd fauna an t 35 years.
economic st onal areas; c Radiation Pro f 10 CFR 20 ds, avoid acc an the admin workers and The LACBW designs, wor ure or handli tion (a perio lly SAFSTO tivities. Th bsequently r lementation and projecte is anticipate ntlement acti s, Systems, ic evaluation onal site-spe curred in the in designati ges in design nd designatio tatus in the changes in otection Pro
: 0. The objec cidental radi nistrative lim d the public WR work co rk packages ing of radioa od of safe sto OR condition his period of reduced radi of the Radi ed radiation ed that the ivities will b and Compo n are ecific e past ion of nation on of past local ogram ctives iation mit of must ontrol s and active orage n until f time iation iation dose most be the onents
 
La Cross License T Revision Table 8 Sectio 8.6.2 8.6.3.1 8.6.3.2 8.6.3.3 8.6.3.4 8.6.3.5 8.6.3.6 8.6.3.7 8.6.3.8 8.6.3.9 8.6.3.1 8.6.3.12 8.6.3.13 8.6.3.14 8.6.3.15 8.6.3.16 8.6.3.17 8.6.3.18 8.6.3.19 8.6.3.20 se Boiling W Termination n 0 8-1 Summ Powe on Radiolo Activiti workers Activiti Radiolo Onsite l Offsite Water U Water Q Surface Ground Air Qua Aquatic Activiti Activiti Terrestr Activiti Activiti Threate Occupa 1
Socioec 2
Environ 3
Cultura Activiti Activiti 4
Aesthet 5
Noise 6
Irretriev 7
Traffic 8
ISFSI c 9
VCC co impacts 0
Rail lin offsite)
Water Reactor Plan mary of the r Facilities Enviro ogical ies resulting i s
ies resulting i ogical Accide land use activ land use activ Use Quality e water d water ality c Ecology ies within the ies beyond th rial Ecology ies within the ies beyond th ened and Enda ational Issues conomic nmental Justic al and Historic ies within the ies beyond th tics vable Resourc and Transpor construction: l onstruction fo s (onsite) ne upgrade and r
Environme onmental Issu in occupation in dose to the ents vities vities e operational a e operational e operational a e operational angered Spec ce c Resource Im e operational a e operational ces rtation land use impa or the ISFSI: l d extension (o 8-11 ental Impact ue al dose to public area area area area cies mpacts area area acts (onsite) land use onsite and ts from Dec NUREG 0586 (GEIS)
Yes Yes Yes Yes No Yes Yes Yes Yes Yes No Yes No No Yes Yes No Yes No Yes Yes Yes Yes No No No commissioni G-
)
Impac Small Small Small Small Site-spe Small Small Small Small Small Site-spe Small Site-spe Site-spe Small Small Site-spe Small Site-spe Small Small Small Small Site-spe Site-spe Site-spe ing Nuclear ct Significanc cific cific cific cific cific cific cific cific cific r
ce
 
La Cross License T Revision NUREG-The curr estimated dose for bounded 8.6.2.2.
Dairylan (REMP) environm the radio decommi of 10 CF to adhere public do considere The only liquid wa piping w collection through t discharge of the c protectio LACBW bounded The gase meteorol noble gas or exposu gaseous r 8.6.2.3.
Decomm this analy conducte Fuel Acc decommi the mini LACBW otherwise The deco and cont Protectio se Boiling W Termination n 0
-0586 estim rent occupat d to be 130.3 the decomm by NUREG Offsit d implement at LACBW ment in and a oactive gase issioning act FR 50, Appen e to these l ose from dec ed as Small y authorized aste from th which is a pa n system pu the East Tu es to the inle current and n in accor WR to date co by the evalu eous pathwa logical condi s, the gaseou ure pathway releases.
Enviro missioning ac ysis has con ed and provi cident Analy issioning and mal radioac WR site is in e involving a ommissionin amination le on and Safet Water Reactor Plan mated that 1, tional expen 3 Rem, whic missioning w G-0586 and th te Radiation ted a regulat WR which p around the e eous (airbor tivities do n ndix I, or th limits throug commissioni
: l.
effluent rele he LACBWR art of the G-3 umps are not urbine buildi et of the liqu future Rad dance with onclude that uation in NU ay (which i itions during us pathway c
: y. Routine a onmental Ef ccident analy ntinued durin ided in regu ysis have no d with spent ctive materi nsufficient f a significant ng of radioa evels remain ty and Heal r
874 Rem wi nded and do ch is well bel will meet the he impact is Exposure an tory complia provided an nvirons of th rne) and liq ot exceed th e fuel cycle ghout the co ing is bound ease pathway R site to the 3 circulating t operable. T ing sump us uid waste mo diation Prot 10 CFR 20 t the public e UREG-0586, includes nob g the time of consists of a air samples a ffects of Acc ysis is integ ng shutdown ular updates oted that w t nuclear fue al resulting for any pot t adverse effe actively cont ning at LAC th Programs 8-12 ill be neede ose expecte low the NUR e regulatory considered nd Monitorin ant Radiolog nnual report he site. The quid effluen he concentrat dose limits ourse of the ded by the cr y for the dis Mississippi g water disch The only liq sing an air o onitor, which tection and 0 and 10 CF exposure as which conc ble gas and f the release.
airborne part are collected cidents and D gral to the li n and decom to the D-Pl with consider el now stored from LAC ential event fect on public taminated S CBWR. Wor s for LACB ed to decom ed to compl REG-0586 e y standards o as Small.
ng gical Environ s with asse e REMP prog nt releases d ation limits o of 40 CFR e decommis riteria in NU charge of tre i River is thr harge system quid effluent operated pum h is still oper REMP at FR 50, App a result of d cludes the im d particulate
. Due to pla ticulate only to determin Decommissio icensing des mmissioning.
lan/PSDAR, ration for th d in the ISFS CBWR opera t to result i c health and SCs will in rker safety i BWR which mmission a s lete the dec estimate. As of 10 CFR 2 nmental Mo essments of gram provid during plant of 10 CFR 20 190. Solutio ssioning. C UREG-0586 eated and fil hrough the s
: m. Currently t discharges mp. The ai rable. Conti LACBWR pendix I. RE decommissio mpact is mini e) analysis i ant shutdown and present ne the dose d oning Event sign basis fo
. Post-fuel
, within sec e current sta SI, this analy ation and r in exceeding d safety.
nvolve the h is addressed rely on AL single unit B commissionin s the occupat 20, it is ther onitoring Pro the radiolo des assurance t operations 0, the dose l ons will con Consequently and the imp ltered radioa seal well/dif y, the liquid w at LACBWR ir operated p inued applic R ensures p EMP report oning activit imal.
is subject to n and cessati ts a minor re due to radioa ts or LACBWR accident ana tion Plant age of LACB ysis confirm emaining on g dose limi highest dose d in the Radi LARA princ BWR.
ng is tional refore ogram ogical e that s and limits ntinue y, the pact is active ffuser waste R are pump cation public ts for ties is o the ion of elease active R and alysis Post-BWR s that n the its or rates iation iples.
 
La Cross License T Revision The safe release o During d addition in NURE decommi LACBW potential reduction Deco Prior Radio Operation and servi in the ISF Radio Explo Loss Natur Hum The publ accidents dose con Plan/PSD analysis i 8.6.2.4.
The deco volumes bulk deb are, and implemen the appro and liqui The majo EnergySo and truck transferre se Boiling W Termination n 0 ty of the pu f radioactive decommissio to maintenan EG-0586 ass issioning of WR are bound consequenc n of the total ontamination radioactive oactive deca nal accident ice condition FSI, operatio oactive wast osions and/o of contamin ral phenome an caused ev lic dose cons s during deco nsequences f DAR and res is therefore b Storag ommissionin of low leve ris materials will continu ntation of th opriate segre d radioactiv ority of the olutions disp ked to a ra ed to a rail c Water Reactor Plan ublic is prin e materials d oning, Soluti nce, waste m sociated wit f LACBWR ded by the ces associate l radionuclid n efforts mad waste shipm ay.
s during dec ns. With the onal acciden te transportat or fires assoc nation contro ena, and vents externa sequences re ommissionin from acciden sulted in dos bounding fo ge and Dispo ng of LACB el radioactiv s such as con ue to be disp he Waste Ma egation, clas e wastes.
Class A low posal site in ail trans-load car. Rail an r
cipally relat during decom ons will perf management, th immediat R. Consequ accident eva ed with thos de inventory de before dec ments, and commissioni e spent nucle nts during de tion acciden ciated with e ol, al to LACBW eported in N ng ranged fro nts during L se ranging fr r the decomm osal of Low-BWR has, a e waste, inc ncrete, meta positioned a anagement P ssification, p w level radio Clive, Utah d facility in nd truck shi 8-13 ted to poten mmissioning form decont
, and surveil te dismantlin uently, the p aluation pre se accidents at LACBWR commissioni ng could res ear fuel rem commission
: nts, xplosive and WR.
NUREG-0586 om 0.02 to 0 LACBWR de om 0.027 to missioning o
-Level Radio and will co cluding conta al and asphal as low level rogram and processing, p oactive waste
: h. Waste w n Winona, M ipments are ntial hazards g operations.
tamination an llance activit ng would al potential de sented in N would be l R from:
: ing, sult from equ moved from t ning can be c d/or combus 6 for onsite, 0.96 rem. A ecommission o 0.065 rem.
of LACBWR oactive Wast ontinue to re aminated eq lt. Materials radioactive associated p packaging, s e from LAC will be loade MN where made in acc associated nd dismantle ties. The ac lso be appli ecommission NUREG-0586 less at LAC uipment failu the LACBW categorized a stible materia non-fuel rel An analysis o ning was pr The NURE R.
te equire the d quipment, to s that cannot e waste. Th procedures, S shipment and CBWR will b d into appro the waste c cordance wit with an airb ement of SS cidents discu icable durin ning acciden
: 6. However CBWR due t ure, human e WR site and s as follows:
: als, lated radiolo of potential p rovided in th EG-0586 acc disposal of ools, clothing t be free rele rough the p Solutions en d control of be shipped t opriate conta container wi th Departme borne SCs in ussed ng the nts at r, the to the
: error, stored ogical public he D-cident large g and eased roper nsures solid to the ainers ill be ent of
 
La Cross License T Revision Transpor Waste Co 8.6.2.5.
Followin radiologi remainin (excludin radiologi license w Chapter 6 criteria.
8.6.3. N 8.6.3.1.
The envi within se The LAC existing L to be con slips are onsite ra activities parking a to occur Several s roadways including remediat 636 foot waste str No sign activities comply w regulator In accord onsite are 8.6.3.2.
Only are and licen and dem se Boiling W Termination n 0 rtation (DOT ontrol Speci Radio ng the com ical surveys ng in backfi ng the ISFSI ical conditio will be termi 6 provide th Non-radiolog Onsite ironmental i ection 4.3.1 o CBWR deco LACBWR l nducted with being const ail line will
: s. Containe and equipme in a manner structures su s and rail li g piping and ed, as neces elevation w ream.
nificant env s are anticipa with applica ry requireme dance with t e considered Offsit eas within th nse terminati molition equip Water Reactor Plan T) regulation alist (WCS) ological Crite mpletion of will be perf illed structu I) meets the ns are demo nated, with he methodo gical Effects e Land Use impact assoc of NUREG-0 ommissionin icensed prop hin the LSE tructed. The be modified ers will be u ent/containe similar to w uch as the S ines, will re d tunnels, be ssary. All ot will be remo ironmental ated. In add able United ents.
the guidance d as Small.
te Land Use he existing s ion activitie pment, wast r
ns. If Class facility in A eria for Lice decontamin formed to d ure basemen unrestricted onstrated to b the exceptio ology for de s of Decomm ciated with 0586 to be g ng project is perty previou footprint. S e existing ra d and refurb unloaded an r laydown, s when the faci Switchyard, emain at lic elow the 63 ther systems oved during changes as dition to NRC States Envir e presented (in the Vicin ite licensed es (such as t te container 8-14 s B/C waste Andrews, Tex nse Termina nation, dism emonstrate t nts, any rem use criteria be below the on of the are emonstrating missioning onsite land generically c s located an usly used fo Some onsite ail line supp bished with nd loaded on storage, stag ility was ope Administrat ense termin 6 foot eleva s and compo the decomm ssociated w C requireme ronmental Pr in NUREG-nity) boundary w emporary st s, etc.). Of e is identifie xas.
ation mantlement that the dos maining pipi a specified in e unrestricte ea around th g complianc uses has be onsidered as nd executed or power gen e roads have ported the op a rail spur nsite. Onsi ging and wa erational.
tion Building nation. Sub ation will be onents as we missioning p with the sit ents, decomm rotection Ag
-0586, the p will be used torage and s f the 163.5 a ed, it will b and remed se from resid ing and soi n 10 CFR 20 ed use criteri e ISFSI. LT ce with the een determin s a Small i within the neration; all been refurb peration of t to support d ite activities aste loading g, Crib Hou surface base e radiologica ell as all stru process and te-specific d missioning a gency (USE potential imp to support d staging areas acre site, ab be shipped t diation activ dual radioac ils at LACB 0.1402. Afte ia, the 10 CF TP Chapter 5 unrestricted ned by the N impact.
boundary o work is exp bished. No b the facility.
decommissio s such as ve are and con use as well a ement struct ally assessed uctures abov disposed of decommissio activities wil EPA) and W pacts to land decommissio s for remedi bout 1.5 acre to the
: vities, ctivity BWR er the FR 50 5 and d use
: NRC, of the pected barge The oning ehicle ntinue as all
: tures, d and ve the f as a oning l also WDNR d use oning iation es are
 
La Cross License T Revision located Appropri contamin These m impacts activities Land in t within a Upper M Crosse-B County h water qu located w basin lan some of t The clos north of with a po valley be Decomm the Refu southern traffic en decommi 8.6.3.3.
LACBW Slough t predomin Mississip the react systems.
Water pu to be pro For a di towns an river wat in Lansin river wa 40 miles The LAC well at th Potable w se Boiling W Termination n 0 within the iate isolatio nation from measures will associated w s at LACBW the vicinity five-mile r Mississippi R Bad Axe Riv has establish ality and pro within the B nd use is agri the agricultu sest municip the site, acro opulation of elow the east missioning ac ge at the so end of the ntering or le issioning act Water WR is located tributary ext nant water u ppi River as tor, river wa River wate ulled from on cessed onsit stance of 40 nd cities alon ter for indust ng, Iowa, ab ater for indu downstream CBWR site he site. The water use du Water Reactor Plan fence-enclo on and con the LSE are l also be mo with the us WR.
of the LACB radius, appro River Nation ver Basin Wa hed a Land &
otection of t Bad Axe Riv icultural and ural land to r pality to the oss from the 258 consist tern bluff.
ctivities are n outhern boun site will be aving the si tivities and t r Use d on the shor tends along usage during condensate ater is not c er does supp nsite wells w te and discha 0 miles dow ng the Missis trial purpose bout 15 mile ustrial purpo
: m.
has its own e locations o uring decomm r
osed LSE, ntrol measur ea to the ad onitored to e se of offsite BWR site is oximately o nal Wildlife atershed as a
& Water Res the environm ver Watershe d over 50% o recreational l LACBWR e north-south s of various not being pe ndary of the minimally i te. Consequ the potential res of the Mi the LACBW g the opera cooling wat currently be ply the Low will support arged in acco wnstream of ssippi River es, excluding es downstrea oses betwee n potable wa of all wells missioning o 8-15 where most res will be djacent LAC ensure their e lands are s predomina ne third is e & Fish R a Geographi source Man ment within ed. Approx of the land is land use, sim site is the h running H residences, rformed in a site. Also, impacted du uently, the o impacts to l ississippi Ri WR site for ation of LAC er. With the eing used as w Pressure an decommissi ordance with the site, vir are obtained g the adjacen am of the si en the LAC ater supply, (active and operations is t work is e instituted CBWR prope r effectivene anticipated antly rural an water and b Refuge. WD ic Managem agement Pla this GMU.
imately 36%
s forested. T milar to other village of G Highway 35.
farms, and any land are
, public acce uring decom offsite land land use offs iver. The M r 3,000 feet CBWR was e plant shut d s a cooling nd High Pre ioning tasks h the sites s rtually all m d from groun nt G-3 fossil ite. There a CBWR site provided th abandoned) s not expect expected to to prevent erty as well ess. Thus, n from the d nd undevelo bottomlands DNR has de ment Unit (GM an (18), add The commu
% of the La There is an in r parts of rur Genoa, appr This small a few retail as adjacent t ess to the b mmissioning areas are no site are cons Mississippi Ri t from north s the use of down and fu medium fo essure servic s and this wa tate discharg municipal w und water. T l plant, is th are no other and Prairie hrough a sin
)are illustrat ted to be sig o be condu t the sprea l as offsite a no environm decommissio ped. Of the s included in esignated th MU) and Ve dressing land unity of Gen Crosse-Bad ncreasing sh ral Wisconsi oximately 1 rural comm businesses i to the site or oat launch a by rail and ot affected b sidered Sma iver and its h to south.
f water from uel removed or reactor or ce water sys ater will con ge permits.
water supplie The nearest u he coal-fired r known use e du Chien, ngle groundw ted in Figure nificantly gr ucted.
ad of areas.
mental oning e area n the he La ernon d use, noa is d Axe hift of in.
1 mile munity in the r near at the truck by the all.
Thief The m the from r fuel tems.
ntinue es for use of plant ers of
, WI, water e 8-5.
reater
 
La Cross License T Revision than the solids ho includes tank that Mississip discolora downspo located in to water u 8.6.3.4.
This sect related to ponds, re to the we The env section 4 a Small At LACB its WDN LACBW System (
and WDN reduced erosion decommi demolitio Radiolog (ODCM)
Potential onsite m per year elevation 201 A/B buildings LACBW As the w LACBW No adver decommi quality ar se Boiling W Termination n 0 potable wat olding tank a sanitary h t services th ppi River a ation. Roof outs or throu nside the LS use are cons Water tion evaluat o surface w eservoirs and est and the R vironmental 4.3.3 of NUR impact.
BWR, all no NR permits.
WR which m (WPDES) as NR Wastew through im and sedi issioning, st on will be m gical impact
) limits and l onsite grou onitoring we for radiolog ns. The plan
; MW-202A s in approp WR former pr water from WR, the therm rse impacts issioning ac re bounded b Water Reactor Plan ter use durin and pumpe olding tank he LSE Turb at outfalls.
drains are e gh the norm SE. Conseq sidered Sma r Quality tes potential water and gr d lakes. At Refuge wetlan impact eva REG-0586 ha n-radiologic Water ma meet the Gen s well as LA water Permit mplementatio mentation torm water r monitored and s are minim d assessed th undwater im ells at LACB gical analys nts network A/B; MW-20 riate locatio rocess areas the Missis mal impact to on surface w ctivities. Co by NUREG-r ng plant po ed off by a that services bine Buildin Release ar ither dischar mal effluent r quently, in ac all.
l project eff roundwater.
: LACBWR, nds to the so aluation ass as been dete cal water dis anagement p noa sites W ACBWRs W
. In additio n of approp control d
run-off from d controlled mized throug hrough the mpacts are m BWR. Rep is purposes k of down gr 3A/B; and M ons and qua and potentia ssippi is no o the Mississ water and gr onsequently,
-0586 and co 8-16 wer operatio local state s the Admin ng. Storm reas are per rged to the g release pathw ccordance w fects on tho Surface w the nearby b outh.
ociated with ermined to be charges to th programs an WDNR Wisc WDNR Tier I on, impacts priate Best during dec m active imp if necessary gh adherenc REMP and monitored by resentative g when groun radient wells MW-204A/B antity to in al release poi o longer use sippi River h roundwater a
, the potenti onsidered S ons. Sanita permitted s nistration Bu water runof riodically m ground area way after pro with NUREG ose portions water general bodies of wa th surface a e generally a he Mississip nd practices consin Pollu II Industrial to the Miss Managemen commissionin pacted areas
: y.
ce to Off-sit d the ground y the routin groundwater ndwater con s (five paire B) are situate ntercept and ints.
ed to cool has been elim are expected ial impacts Small.
ary wastes a sanitary was uilding and a ff is diverte monitored fo surrounding ocessing thru G-0586, the p of the natu lly refers to ater are the M and groundw applicable to ppi River are s have been utant Disch Storm Wate sissippi Rive nt Practices ng operati s undergoin te Dose Cal dwater mon ne sampling r samples ar nditions are ed wells: MW ed around th d detect con operating p minated.
d from the im to surface are collected ste hauler.
a sanitary ho ed directly t or oil sheen g the facility u an oil sepa potential im ural environ o streams, ri Mississippi R water quali o LACBWR e controlled u n implement arge Elimin er General P er will be gr (BMP) for ions.
D g remediatio lculation M nitoring prog of 10 perm re obtained t at low and W-200A/B; he key LACB ntamination plant system mplementati and groundw d in a This olding to the n and y thru arator mpacts nment
: ivers, River ty in R with under ted at nation Permit reatly r soil During on or anual gram.
anent twice high MW-BWR from ms at on of water
 
La Cross License T Revision 8.6.3.5.
The envi 0586 has LACBW requirem BMP to m sources s from the Fugitive demolitio controlle Radiation excessive suppressi Demoliti specifica Appropri extended impacted No adver activities considere 8.6.3.6.
The env NUREG-impact.
The aqua House at approxim disturbed decommi fauna in removal Various these aqu included Plans for equipmen Solutions performe se Boiling W Termination n 0 Air Q ironmental i s been determ WR complies ments of the W minimize fu such as the facility.
dust will on of concr d demolition n Protection e or harmfu ion by mistin ion equipme ations which iate Health a d periods of d by exhaust rse impacts
: s. Conseque ed Small.
Aquat vironmental
-0586 has b atic habitat a t the shorel mately 110 fe d during the issioning ac the Mississ of the diffus fresh water uatic enviro 53 species a r the demol nt by barge.
s will contin ed within ap Water Reactor Plan uality impact evalu mined to be g with all app WDNR and ugitive dust d plants dies be generat ete building n and disma n, Environme ul dust emiss ng water wil ent will be h will prev and Safety a operation to emissions.
on air qual ently, the po tic Ecology impact eva been determ at LACBWR line to the feet from the e initial co tivities is no sippi River ser structure, fish specie nments. A and 19 famil lition of stru Consequen nue to main pplicable lim r
uation assoc generally ap plicable Fed the Wiscon during demo sel generator ted from v g structures antlement tec ental, and S sions are no ll be used to operated an vent excessi ssessments a o ensure tha lity are expe tential impa aluation ass mined to be R includes th diffuser stru e shoreline.
nstruction o ot expected and also ne
, which shar es, macro-in 1980 study lies (19).
uctures at L ntly, there is ntain WDNR mits. Protect 8-17 ciated with plicable to L deral and Sta nsin Bureau o olition and d rs are no lon various deco and the exc chniques, wi Safety and H ot generated mitigate du nd maintain ive exhaust and controls at personnel ected from t acts to air qu sociated wit generally ap he area from ucture that Habitats as of the facil to disturb e earby River es a line wit vertebrate p y indicated t LACBWR d no impact to R permits an tion of the n air quality i LACBWR w ate air quali of Air Mana ecommissio nger in serv ommissionin cavation of ith appropria Health staff,
: d. As neces st emissions ned in acco emissions s will also be l and the en the impleme uality are bo th aquatic e pplicable to m the intake extends out ssociated wi lity. Howe existing aqu tributaries, th the G-3 fo populations, that the pop do not inclu o the shorelin nd decomm nearby Refu in section 4 with a Small ity regulatio agement, an ning activiti vice and hav ng activities soil. Care ate assessme will be con ssary, measu
: s.
ordance with from defec e established nvironment a entation of d ounded by N ecology in o LACBWR structure int t into the M ith this area ever, the im uatic habitats streams and ossil station, and vegeta pulation of f ude the remo ne from this missioning op uge wetlands
.3.4 of NUR l impact.
ons, includin d will imple ies. Air emi ve been rem s, including ful planning ents by Solu nducted to en ures such as h manufactu ctive equipm d during exp are not adve decommissio NUREG-0586 section 4.3 R with a Sm tegral to the Mississippi R a were previ mplementatio s, their flora d wetlands.
is not plann ation exist w fish near the oval of was s type of acti perations wi s and habita REG-ng the ement ission moved g the g and utions nsure s dust urers ment.
pected ersely oning 6 and
.5 of mall e Crib River ously on of a and The ned.
within e site ste or ivity.
ill be ats is,
 
La Cross License T Revision and will operation Exotic s reproduc While th rusty cray ones in t conducte the site.
A study macrochi and chan
& Fish R performe subseque fossil sta require a construct aquatic a The pote 0586 and The pote and cons 8.6.3.7.
The envi been dete No know decommi appropria The land the forma from the prevalent operation onsite ha
: addition, that the d to the sou demolitio anticipate se Boiling W Termination n 0 continue to ns.
species can tion or surv here are som yfish, etc.) i the vicinity ed at LACBW of the im irus), freshw nnel catfish (
Refuge Pool ed in 1980.
ent shutdown ation, has fur any operatio tion, demoli areas beyond ential impact d considered ential impact idered to be Terres ironmental im ermined to b wn terrestri issioning pr ate BMPs ar d around LA ation of abo e Mississipp t in surround ns associated abitats for m with the sh direct heavy uth, no direc on activities ed impact to Water Reactor Plan o be a priori n threaten n vival rate, a me known aq n Vernon C of the LAC WR have no mpingement water drum (
(Ictalurus pu 9 navigation It was de n of LACBW rther reduced ons resulting tion, materia d the site bou ts to the aqu to be Smal ts to the aqu Small.
strial Ecolog mpact evalu be generally ial exotic o roject area.
re, and will c ACBWR was out 27 acres pi River. T ding areas.
d with G-1 many plant an hort-term nat construction ct impacts to do not inclu o the shorelin r
ity when pla native spec and diseases quatic invasi ounty, these BWR site (
ot resulted in and entrain (Aplodinotu unctatus), w n areas from etermined th WR and redu d this impac g in any im al and waste undary.
uatic ecology ll.
uatic ecology gy uation of terr applicable to or invasive To minim continue to b s initially dis by filling riv herefore, th Given the e and G-3 as nd animal sp ture of the w n and demo o any off-site ude the remo ne.
8-18 anning onsit cies and ec s or parasite ve species (
e have been n 20). The op n the introdu nment of t s grunniens) within the Up m the operatio hat the impa uced intake o ct. Decomm mpingement e staging or y within the y beyond the restrial ecolo o LACBWR species h ize the intro be followed.
sturbed by th ver edge and he site shore extensive lan s well as LA pecies, inclu work associa lition projec e sensitive sp oval of waste te dismantle cosystems d es they may (e.g. zebra m noted in slou peration and uction of any the fishes,
), gizzard sh pper Mississ on of LACB act was mo operations, l missioning op and entrain transfer ope site bounda e site bounda ogy in sectio R with a Sm have been n oduction of the construct d low forest eline no lon nd disturbanc ACBWR, th uding endang ated with de ct area is sep pecies are an e or equipm ement or wa due to agg y transmit to mussel, curly ughs and lak d decommis y aquatic in such as bl had (Doroso sippi River N BWR and G-st likely ins limited to su perations are nment impa erations will ary are boun ary have als on 4.3.6 of N mall impact.
noted to o f exotic or i tion of the f t areas with nger resemb ce, construc he terrain h gered or inv ecommission parated from nticipated. S ment by barge aste manage gressive gro o native spe y-leaf pondw kes other tha sioning activ nvasive speci luegill (Lep oma cepedia National Wi
-3 was previ significant.
upporting the e not expect acts to fish.
l be perform nded by NUR so been evalu NUREG-058 occur within invasive spe facility, inclu material dre les the shor ction and yea as not supp asive specie ning and the m the Refuge Since the pla e, there is al ement
: owth, ecies.
: weed, an the vities ies to pomis anum) ildlife ously The e G-3 ted to No med in REG-uated 6 has n the
: ecies, uding edged reline ars of ported es. In e fact e area anned so no
 
La Cross License T Revision Best Man spills res The pote Small.
The pote evaluated 8.6.3.8.
The pote and cons A review Endange two spec which LA A m Missi A pla facin No noted due to th the existi River to terrestria presence been not Higgins e Likewise Wisconsi Habitat P limestone township for this p The Pere Species l of falcon protectio delisted hatching decommi falcon re se Boiling W Termination n 0 nagement Pr ulting from ential impac ential impac d and consid Threa ential impact idered Sma w of the U ered, Propos cies are desig ACBWR res mussel specie issippi River ant species, g slopes: Th d adverse im he siting and ing G-3 foss the west and al or aquatic of the Higg ted. A mus eye pearlym e, the Northe in Departme Program (22 e cliffs over ps within Ve plant species egrine Falcon list in 1975 n nesting box n (23). Ove in 1999 (24 efforts. S issioning wi covery effor Water Reactor Plan ractices and equipment o cts to terres cts to the t dered to be atened or End ts to Threa all.
U.S. Fish an sed, and Ca gnated as T sides in:
es, Higgins r: Endanger Northern m hreatened.
mpacts to aqu operation of sil station, th d the rail lin habitats wh gins eye pea ssel survey o mussels were ern monksho ent of Agri
: 2) has noted r creeks and ernon County to be impac n (Falco per and starting xes at its fac erall, Peregr 4); however, Since the G ill not interf rt and popula r
d site proced operation.
strial ecolog terrestrial ec Small.
dangered Sp atened or E nd Wildlife ndidate Spe Threatened eye pearly red.
monkshood uatic species f the LACBW he majority o e and Highw hich may be arlymussel i of the Thief found.
ood has not culture, Tra that the Nor d streams an
: y. This hab cted by decom regrinus) we g in 1993, D cilities, inclu ine Falcon r Dairyland G-3 facility fere with G-ation.
8-19 dures require gy are boun cology beyo pecies Endangered Service lis ecies County or Endang ymussel (La (Aconitum n have been n WR facility, of the licens way 35 to the inhabited by n mussel be f Slough riv been noted ade & Cons rthern monk nd the plant bitat is not p mmissioning ere put on the airyland sup uding at the G restoration p has continue will still c
-3 operation e prompt cle nded by NU ond the site species are sting, the F ty Distributi ered within ampsilis hig noveborance noted during
, as well as t sed site, situ e east, is dev y threatened eds in the vi ver area was on or in the sumer Prote kshoods hab is present i present withi g operations e Wisconsin pported reco G-3 stack, to program effo ed to maint continue ope ns or its stac eanup and re UREG-0586 e boundary e bounded b Federally-Lis ion (21) con n Vernon Co gginsii), with ense), with plant operat the previous uated betwee veloped and d or endange icinity of LA s conducted e vicinity of ections End bitat is leach in the White in or near th n Endangered overy efforts o support ch orts resulted tain the G-3 erations and ck, there is emediation o 6 and consid have also by NUREG-sted Threat ncluded that ounty, the co h habitat in habitat in n tions. In gen G-1 facility en the Missis does not su ered species.
ACBWR ha d in 1978 an LACBWR.
dangered Sp hed sandston estown and he LACBWR d and Threat s with install hick hatching in the bird b nesting site d the LACB no impact t of oil dered been
-0586
: tened, only ounty n the north-
: neral, y, and ssippi upport The as not nd no The pecies e and Stark R site tened lation g and being e and BWR to the
 
La Cross License T Revision 8.6.3.9.
Occupati considere The envi NUREG-impact.
programs also duri are those ergonom Solutions contracto prevent o with fed States Oc Typical following Safet Safet Provi Work speci such Obtai Invol packa Issuin lesson Hold reinfo 8.6.3.10.
A detaile LTP.
8.6.3.11.
LACBW efficient with som se Boiling W Termination n 0 Occup ional issues/
ed Small.
ironmental i
-0586 has b While decom s addressing ing repair an e related to mic, and biolo s is commi or health and occupational eral and sta ccupational H contractor g:
ty training as ty emphasis iding all wor ker training ific worker q as heavy equ ining and rev lving Health ages and par ng periodic ns learned.
ing safety s orce safety e Cost ed discussion Socio WR was shut to operate.
me projects Water Reactor Plan pational Issu safety has b impact evalu been determ mmissioning g worker saf nd refueling o human he ogical hazard itted to dec d safety prog l injuries an ate regulatio Health and S safety pract s a part of th as the first to rkers with a and require qualification uipment dem viewing Safe h and Safet rticipating in safety mess stand-downs events and le n of the site economic Im down in 19 By 1994, so associated r
ues/Safety een evaluate uation assoc mined to be g involves in fety were im outages. T ealth and sa ds. Radiolog commissioni grams to effe d illnesses.
ons including Safety Admi tices and c he site access opic of discu Health and S ed certificati ns. Certain s molition firm fety Data She ty staff in n pre-job wal ages to com s whenever essons learne decommissi mpacts 987 as the sm ome increme with the r 8-20 ed to be boun ciated with generally ap ncreased indu mplemented The occupati afety, includ gical impact ing LACBW ectively cont Contractor g Wisconsin inistration (O communicati s program fo ussion at me Safety bookl ions review specialty sub ms.
eets for chem reviewing lkdowns, wo mmunicate aw serious saf ed site-wide.
ioning proje mall size of ental decomm removal of nded by NU occupationa pplicable to ustrial activi during the ional issues ding impact ts were discu WR safely trol hazards health and s n Departme OSHA) requ ions will in or all employ eetings.
let.
w prior to as bcontractors micals bough and approv ork condition wareness of fety events ect costs is p f the plant d missioning p the RPV i UREG-0586 al issues in o LACBWR ities and safe operation of and safety ts from phy ussed in sect through the in the work safety progr ent of Labor uirements.
nclude actio yees and sub ssignment to are mobiliz ht onsite.
ving decomm n assessmen f significant occur to c presented in did not make planning and in 2007 an and the imp section 4.3.
R with a Sm fety focus, si f the facility impacts ass ysical, chem tion 8.6.2.
e applicatio environmen rams will co r and the U ons such as b-contractors o tasks requ zed, as neces missioning nts and review safety issue ommunicate Chapter 7 o e it economi d activities b d other me pact is 10 of mall imilar y and essed
: mical, on of nt and omply United s the
: s.
uiring
: ssary, work ws.
s and e and of this ically began etallic
 
La Cross License T Revision radioactiv complete periodic the ISFSI More ac timefram obtained personne activities increased project an Therefor impact is 8.6.3.12.
The perc Vernon C Crosse) a impact to Decomm transport Highway relative t There is impacted site speci 8.6.3.13.
A review May 201 historical the plant Archeolo which wa Also, as along Hi the USA Upper M Axe. Th first nucl marker a concerns se Boiling W Termination n 0 ve compone ed by 2012.
spikes in w I project) (2 ctive decom me. Some o from outsid el from the lo s will have a d use of the nd workers w e, the socio s considered Enviro centages of County are q and more po o the greater missioning ac t equipment y 35 traversin o rail and tru no reason d by the deco ific impact i Cultur w of the N 5 and the W l sites in Ve
: t. The close ogical Site ne as certified b indicated in ghway 35 in CE Lock an Mississippi. T he third was lear generati t the waysid associated w Water Reactor Plan ents over th Staff size at orkforce hir 5).
mmissioning of the labor de Wisconsi ocal and reg a short-term local craft w with supplie oeconomic i Small.
onmental Ju low-income quite low, a opulated Wi population, ctivities will and debris.
ng north-sou uck transpor to believe ommissionin s considered ral, Historic, National Park Wisconsin H ernon County est historical ear Stoddard by the Nation n NUREG-0 n Vernon Co nd Dam No.
The second, s adjacent to ing plant. In de across Hig with having r
he past 7 ye t the plant ha ring to suppo and struct tasks requi in; however, gional areas m positive ec workforce a es and servic impact is ev ustice e and minor approximatel sconsin coun including sp cause slight The truck t uth by the si rtation as a re that low-in ng project.
d Small.
, and Archeo k Service N Historical So y and no str l site with pr d, WI. locate nal Park Ser 191, the Sta ounty. One i
: 8. It descri
, about 7.5 m o LACBWR n 2009, crew ghway 35 fro a public-acc 8-21 ears. A sm as gradually ort specific tural demoli ire specializ
, some of th surrounding conomic imp and opportun es.
valuated to ity groups w ly 3%, and nties further pecial group t increases i traffic will u ite. There esult of deco ncome and m Per NUREG ological Res National Reg ociety (29) th ructures in th re-historical ed approxima rvice in 1980 ate of Wisco is about a ha ibes the orig miles south o R and comme ws erected a om the site (
cess marker o mall ISFSI f y been reduce project need ition is ant zed skills an he workforc g the site. O pact on the nities for loc be bounded within the V lower than r from the L ps, is expecte in truck traff use existing will be no e ommissionin minority po G-0586 and ources gister of H through May he village o l structural r ately 7 miles 0 (30).
onsin has pla alf mile nort gin of the pr of the plant, emorates th a new, updat (31). This ne on Dairylan facility hold ed as operat ds (e.g. 40 p ticipated in nd equipmen e will be co Overall, the d local comm cal business d by NURE Village of G those in larg LACBWR si ed.
fic to and fro main street environment ng.
opulations w this evaluat Historic Plac y 2015 ident f Genoa or w remnants is s north of th aced three h th of LACBW resent system
, highlights t e plant itsel ted Wisconsi ew location d property.
ding 5 casks tions ceased, personnel sta n the 2016-nt which wi omprised of decommissio munity due t ses to suppor EG-0586 and Genoa as we ge cities (e.
ite (26) (27) om LACBW routes, prim tal justice im will be adve tion, the pote ces (28) thr tified only a within 5 mil the Goose I he LACBWR historical ma WR, overloo m of locks o the Battle of lf as Wiscon in state histo resolved sec s was
, with affing
-2017 ill be f craft oning to the rt the d the ell as
: g. La
. No WR to marily mpact ersely ential rough a few les of Island R site, arkers oking on the f Bad nsins orical curity
 
La Cross License T Revision Dairylan presents or catego Land di primarily Land tha the const station) w erosion c Based on transport impact on 0586 an Archaeol 8.6.3.14.
The envi 0586 has The impa disturban complete removed River. T completi Therefor NUREG-8.6.3.15.
The envi has been LACBW 475 feet north sid south sid hospitals approxim Noise ge equipmen temporar complete experienc se Boiling W Termination n 0 d sent an un the control r orize any par isturbance fo y shipped via at was distur truction and were perform controls and n the historic tation of sys n cultural, h nd based u logical Reso Aesth ironmental i s been determ act of decom nce and dura ed. Once all
, the aesthet The final de on of the dec e, the enviro
-0586 and th Noise ironmental i determined WR is located west of the de and a port de. There ar within 1 m mately 1 mile eneration wi nt. Noise ry and will e, noise level ced during th Water Reactor Plan nused control rod and a re rt of the LAC or the remov a rail.
rbed for proj d demolition med in acco stormwater cal informat stem compon istoric, and a upon this e ources are co hetics impact evalu mined to be g mmissioning ation. These l of the majo tics will imp etermination commission onmental im he impact is impact evalu to be genera d on the sho rail road lin tion of the U re no residen mile. The n e to the north ill primarily associated w occur prim ls in the vici he operation r
l rod to the W eplica fuel as CBWR plant val of large jects beyond of the G-1 ordance wit pollution pr ion presente nents and w archeologica valuation, t onsidered Sm uation assoc generally ap on site aesth impacts are or plant struc prove slightly on usage o ing.
mpact associ considered uation assoc ally applicab ore of the M ne. USACE Upper Missis nces within 1 earest comm h of the plan result from with decomm marily durin inity of the L n of the facili 8-22 Wisconsin H ssembly (32 t as a histori components d the nuclea fossil statio th applicable evention pla ed in NUREG waste, the de al resources.
the potentia mall.
ciated with a plicable to L hetics (e.g. v e temporary ctures and bu y by providi of the decom iated with ae Small.
ciated with n ble to LACB Mississippi R E land and L ssippi River 1,000 feet of munity, the nt.
m demolition missioning a ng daylight LACBWR s ity.
Historical Mu 2); however, ical site.
s will be min ar operationa on and the c e permits an ans.
G-0191 and ecommission
. Consequen al impacts aesthetics in LACBWR w visual skylin and will cea uildings east ing a more o mmissioned esthetics is noise in sect BWR with a River, 300 fe Lock and D National W f the station village of G n activities i and shipment hours. On site will be r useum in Ma there is no nimized as t al areas (e.g onstruction nd included d the current ning will ha ntly, as boun to Cultura n section 4.3 with a Small ne) is limited ase when dec t of the Miss open view o property wi evaluated to tion 4.3.16 o Small imp feet from the Dam No. 8 ar Wildlife & Fi structures a Genoa, Wisc nvolving he t of waste is nce the dec reduced to le adison, WI w objective to the waste w
: g. associated of the G-3 d appropriate approach fo ave no signif nded by NUR al, Historic, 3.15 of NUR l impact.
d in terms of commissioni sissippi Rive of the Missis ill be made o be bounde of NUREG-pact.
e river bank re located o sh Refuge o and no schoo consin is lo eavy constru s intermitten commissionin evels below which o save will be d with fossil e soil or the ficant REG-and REG-f land ing is er are ssippi upon ed by
-0586 k, and on the on the ols or ocated uction nt and ng is those
 
La Cross License T Revision Due to t impacts decommi imposed Therefor NUREG-8.6.3.16.
The envi NUREG-impact.
During th efforts w Low leve disposal
: addition, Texas.
As stated process a and fuel These re destabiliz Therefor bounded 8.6.3.17.
The envi NUREG-impact.
The num than dur increased effect on barge tra support t operation Therefor by NURE 8.6.3.18.
Cumulati impact of se Boiling W Termination n 0 the distance on noise l issioning, S by the Villa e, the envir
-0586 and th Irretri ironmental im
-0586 has b he demolitio will be made el radioactiv site in Clive any Class B d in NUREG are the mater used for con esource com zing.
e, the enviro by NUREG Traffi ironmental i
-0586 has b mber of shipm ing the ope d traffic and n traffic flow affic. The e the operating ns.
e, the enviro EG-0586 and Cumu ive impact is f the action w Water Reactor Plan e of the stat levels durin Solutions agr age of Genoa ronmental i he impact is ievable Reso mpact evalu been determ on and struc
: e. Some me ve waste has e, Utah. Th B/C waste th G-0586, irretr rials used to nstruction m mmitments onmental im G-0586 and th c and Transp impact evalu been determ ments and th ration of th wear and te w or road we xisting barg g G-3 fossil onmental im d the impact ulative Impac s defined the when added r
tion from se ng decomm rees to com
: a.
mpact assoc considered ources uation associ mined to be tural disman etals from th s been and his facility h hat is genera rievable reso decontamin machinery and are conside mpact associ he impact is portation uation assoc mined to be he volume of he facility.
ar on roadw ear. There w ge traffic on station and mpact associ t is considere cts e impact on to other pas 8-23 ensitive rece issioning an mply with a ciated with Small.
iated with irr generally ap ntlement of he site are an will continu has sufficient ated will be s ources that w nate the facili d for transpo ered to be iated with ir considered ciated with t generally ap f waste ship Non-radiolo ways. It is an will be no ra the Thief S are not asso ated with tr ed as Small the environ st, present, a eptors, there nd demoliti any noise li noise is ev retrievable r pplicable to the station, anticipated to ue to be ship t space for t shipped to th would occur ity (e.g., rag ortation of m minor and rretrievable Small.
transportatio pplicable to pped are grea ogical impac nticipated tha adioactive w Slough branc ociated with ransportation
: l.
nment which and reasonab e will be li ion activitie imitations (e valuated to resources in o LACBWR recycling an o be release pped to the the disposal he WCS fac during the d gs, solvents, materials to a are neither resources is on issues in o LACBWR ater during d cts of transp at there will waste shipme ch and the M LACBWR d n is evaluate h results from bly foreseeab imited temp es. During e.g. quiet h be bounde section 4.3.
R with a Sm nd asset reco d as clean s EnergySolu of this wast cility in And decommissio gases, and to and from the r detectable s evaluated section 4.3.
R with a Sm decommissio portation in be no signif ents execute Mississippi R decommissio ed to be bou m the increm ble future act orary g the hours) ed by 18 of mall overy scrap.
utions te. In
: drews, oning ools),
e site.
e nor to be 17 of mall oning clude ficant ed via River oning unded mental tions.
 
La Cross License T Revision The cum decommi terrestria cumulativ Past, pr decommi Mississip resources activities over tim major irr disposal disposal In summ 8.7.
O 8.7.1. F Decomm Hand Work Publi Licen Work Liqui Haza Hand Characte of lead p 8.7.1.1.
The majo are admin Part 2 Part 5 Part 5 Part 6 se Boiling W Termination n 0 mulative impa issioning. T al ecology.
ve impact.
roposed an issioning of ppi river for s listed abo s are not proj e, exceed th retrievable re of low lev and will ther ary, the cum Overview of Federal Requ missioning ac dling, packag ker radiation ic radiation p nse terminati ker health an id and gaseo ardous waste dling and rem rization and aint.
Nucle ority of radio nistered by t 20 - Radiatio 50 - Decomm 51 - Environ 61 - Disposa Water Reactor Plan acts were as hese include Irretrievabl nd future f coal-fired p boating. Th ove were al jected to sig he minor im esource attri vel radioactiv refore have n mulative impa Regulation uirements ctivities that ging, and shi n protection, protection, ion and final nd safety, ous effluent r generation/
moval of asb d removal of ear Regulator ological acti the NRC. A on protection missioning a nmental prot al of radioac r
sessed by fi e surface w le resources foreseeable power plant he individual ll determine gnificantly ac mpact of the ibutable to L ve waste. N no cumulativ act to site re ns Governin are subject t ipment of rad l site release
: releases, disposition,
: estos, f Polychlorin ry Commiss ivities fall un Applicable Ti
: n.
activities.
tection.
ctive waste.
8-24 rst determin water and gro s were also e actions ts and recrea l impacts of ed to be mi ccumulate en individual a LACBWR d No future ac ve effect.
esources is pr g Decommi to federal reg dioactive wa e,
nated Biphen ion nder Title 10 itle 10 regula ning the reso oundwater, o evaluated include co ational use f the LACBW inor. The p nvironmenta activities on decommissio ctivities wil rojected to b issioning Ac gulations inc
: aste, nyls (PCBs) 0 of the Cod ations includ ources affect air quality, d from the onstruction, of the land WR decomm past, present al impacts th n the affecte oning was th ll involve r be minor.
ctivities and clude:
), and Handl de of Federa de:
ted by LACB aquatic eco e perspectiv operation as access t missioning o t and future hat would in ed resources he use of lan radioactive w d Site Releas ling and rem al Regulation BWR
: ology, ve of and to the on the e site
: total,
. The nd for waste se moval n and
 
La Cross License T Revision Part 7 throu Part 7 8.7.1.2.
The Env Federal R Part 6 Parts Part 1 Part 1 Parts Part 2 Part 7 Part 1 8.7.2. F Permits a environm fall unde Wisc Wisc Envir Villa Occu This info intended 8.8.
C As previo decommi site-spe potential predicted (NUREG environm se Boiling W Termination n 0 71 - Packag ugh 174 also 73 - Physica U.S. E vironmental Regulations 61 - Asbesto 122 to 125 -
141 - Safe D 190 - Radiat 260 to 272 -
280 - Under 761 - Toxic 129-132 - C Federal, Stat and approval mental protec r Federal, St onsin Depar onsin Depa ronmental an ge of Genoa upational Saf ormation pro to be all-inc Conclusion ously evalua issioning LA cific in NU environmen d in and wil G-0191, NUR mental chang Water Reactor Plan ing and tran apply).
al Protection Environment Protection A apply as foll os Handling
- National P Drinking Wa tion Protecti
- Resource C rground Stor Substance C Clean Water A te and Loca ls from or no ction purpos tate and loca rtment of Na artment of nd Occupatio a
fety and Hea ovided abov clusive.
ated in the D ACBWR are UREG-0586 ntal impacts ll be bounde REG-0586, a ges associate r
nsportation o n of Plants an tal Protectio Agency (EP lows:
and Remova Pollutant Dis ater Standard ion Standard Conservatio rage Tanks Control Act (
Act al Requirem otifications t ses. Decomm al jurisdiction atural Resour Health Se onal Health, alth Adminis ve is a gene D-Plan/PSDA temporary a have been associated w ed by the p and D-Plan/P ed with decom 8-25 f radioactive nd Materials n Agency PA) regulatio al scharge Elim ds ds for Nuclea n and Recov (TSCA) for ments to state and l missioning a n include, bu rces (WDNR ervices, Div Radiation P stration (OSH eral overview AR, the non-and not signi evaluated a with decomm reviously is PSDAR). T mmissioning e waste (reg ons outlined mination Syst ar Power Op very Act (RC Polychlorina local agenci activities an ut are not lim R) vision of Protection Se HA) w of the ap radiological ificant. The and there is missioning L ssued enviro Therefore, th
: g.
gulations in 4 d in Title 40 tem (NPDES perations CRA) ated Biphen es are requir nd related sit mited to the Public Hea ection pplicable reg l environmen e potential is no significa LACBWR h onmental im here are no n 49 CFR Part 0 of the Cod S) nyls (PCBs) red for safety te operations following:
alth, Burea gulations and ntal impacts sues identifi ant impact.
have already mpact assessm new or signif ts 171 de of y and s that au of d not from ied as The been ments ficant
 
La Cross License T Revision 8.9.
R
: 1.
U C
2
: 2.
D R
: 3.
D S
: 4.
U re C
: 5.
U S
N
: 6.
D D
: 7.
E S
: 8.
E S
: 9.
A
: 10.
H 3
: 11.
U ht
: 12.
D
: 13.
U
: 14.
U ht
: 15.
ht se Boiling W Termination n 0 References U.S. Nuclear Content of Li 011.
Dairyland Po Reactor - Sep Dairyland Po upplement R U.S. Nuclear elated to Ope Cooperative -
U.S. Nuclear tatement (G November 20 Dairyland Po Decommissio EnergySoluti urvey Repor EnergySoluti urvey Repor Atomic Powe Haley & Aldr 0, 2012.
U.S. Census B ttps://www.c Dairyland Po U.S. Fish & W U.S. Army C ttp://www.m ttp://www.ci Water Reactor Plan Regulatory icense Termi wer Compan ptember 1972 wer Coopera Report - Jun Regulatory eration of th
- April 1980 Regulatory EIS) on Dec 002.
wer Coopera oning Activit ons GG-EO-rt for Octobe ons LC-RS-rt for June th er Review, A rich, Hydrog Bureau, 200 census.gov/p wer Coopera Wildlife Serv orps of Engi mvp.usace.ar ity-data.com r
Commission ination Plan ny, DPC-ED
: 2.
ative, Enviro ne 15, 1973.
Commission he La Crosse Commission commissioni ative, LACB ties Report (
-313196-RS er and Novem PN-164017-hru August 2 Atomic Jour geological C 8-2012 Ame programs-su ative - http:/
vice - http://
ineers -
rmy.mil/Miss m/city/Genoa 8-26 n Regulatory s for Nuclea D-3, Environ onmental Re n NUREG-0 Boiling Wa n NUREG-0 ing of Nucle BWR Decom (D-Plan/PSD S-RP-001, LA mber 2014 F
-001, LACB 2015 Field W rnal - Septe onceptual Si erican Comm urveys/acs/ne
//www.dairy www.fws.go sions/Naviga a-Wisconsin.
y Guide 1.17 ar Power Rea nmental Repo eport, La Cro 0191, Final E ater Reactor 0586, Generi ear Facilities mmissioning DAR), Revis ACBWR Ra Field Work -
BWR Radiolo Work - Nove ember 24, 20 ite Model, F munity Surve ews/data-rele ynet.com/ene ov/refuge/Up ation/LocksD
.html.
79, Standard actors, Revis ort - Lacross osse Boiling Environment by Dairylan ic Environm
, Supplemen Plan and Po sion - March adiological C
- November ogical Chara ember 2015.
011.
File No. 3870 ey. (5-year d eases.2012.h ergy_resourc pper_Missis Dams/LockD d Format and sion 1 - June se Boiling W g Water Reac tal Statemen nd Power mental Impact nt 1, Volume ost Shutdown h 2014.
Characterizat r 2015.
acterization 05-001 - Au data sets) -
html.
ces/genoa.ph ssippi_River/
Dam8.aspx.
d e
Water
: ctor, nt t
e 1 -
n tion ugust hp.
/.
 
La Cross License T Revision
: 16.
D P
W
: 17.
D D
: 18.
V
: 19.
M C
D
: 20.
W
: 21.
U C
ht
: 22.
W S
: 23.
D ht
: 24.
W ht
: 25.
H L
: 26.
V re
: 27.
U
: 28.
N
: 29.
W
: 30.
N S
: 31.
D 2
: 32.
W se Boiling W Termination n 0 Dame & Moo otential, La Wisconsin fo Dairyland Po Decommissio Vernon Coun McInterny, M Cooperatives December 19 Wisconsin De http://dnr.w U.S. Fish and Candidate Sp ttp://www.fw Wisconsin De pecies Habit Dairyland Po ttp://www.d Wisconsin De ttp://dnr.wi.g Hubbuch, Ch La Crosse Tri Village of Ge ecords.com/w U.S. Census B National Park Wisconsin Hi National Park ite Ve-502 -
Dairyland Po 009.
Wisconsin Hi Water Reactor Plan ore, Geotech Crosse Boil r Gulf Unite wer Coopera oning Plan, r nty, Land & W Michael. C., I s Genoa Site 980.
epartment of i.gov/lakes/i d Wildlife Se pecies Coun ws.gov/midw epartment of tat Program wer Coopera dairynet.com/
epartment of gov/eek/critt hris, A nuclea ibune - July enoa, Vernon wisconsin/ge Bureau, Vern k Service, Na istorical Soc k Service, Na
- http://nrhp.
wer Coopera istorical Soc r
hnical Investi ing Water R ed Nuclear F ative, LaCro revised Nove Water Resou Impingemen e, Thesis, sub f Natural Re invasives.
ervice, Feder nty Distributi west/endang f Agriculture
- http://datcp ative, Peregr
/environmen f Natural Re ter/bird/falco ar option: A y 15, 2012.
n County, W enoa_data.ht non County, ational Regi ciety - http://
ational Regi focus.nps.go ative, Power ciety, Nuclea 8-27 igation of G Reactor (LAC Fuels Corpor osse Boiling ember 2003.
urce Manage nt and Entrai bmitted to U esources, Aqu rally-Listed ion, April 20 ered/lists/wi e, Trade & C p.wi.gov/Fa rine Falcon R ntal/falcon_p esources, Per on.htm.
fter 25 years WI Public Rec tm.
, Wisconsin ster of Histo
/www.wisco stry of Histo ov/natregsea r for Generat ar Fuel Assem Geology, Seis CBWR) near ration - Octo Water Reac ement Plan -
inment of Fi University of quatic Invasiv Threatened, 015 -
isc-city.html Consumer Pr arms/Endang Restoration program.php regrine Falco s, Genoa rea cords - http:
- http://www oric Places -
onsinhistory.
oric Places, G archresult.do tions, Genoa mbly - http:/
smology and r Genoa, Ver ober 1973.
ctor (LACBW
- February 2 shes at Dairy f Wisconsin-ve Species -
, Endangered
: l.
rotection, En gered_Specie Program -
: p.
on -
actors waste
//www.open w.census.gov http://ww.np org/.
Goose Island
: o.
a Site Updat
//www.wisc d Liquefactio rnon County WR) 2009.
yland Power
-La Crosse -
- Vernon Co d, Proposed ndangered es/index.aspx e gets new ho n-public-v/.
ps.gov/nr/.
d Archeolog te - Decemb onsinhistory on y,
r ounty and
: x.
: ome, gical er y.org.
 
La Cross License T Revision se Boiling W Termination n 0 Water Reactor Plan Fig r
ure 8-1 S
8-28 Site Regionaal Location


the LTP The b el ofilled wi t Departmbackfille The str udismantl eAdmLAC BOutf aG-3 C coal wate rElec tPave d plant After all process a and the s s e Boiling W Termination n 0 t or Buildin g te Treatmen t ilation Stac k and Ventila t t e Gas Tank i ne Buildin g Specific Ac t n tenance Eat ris generate d -3 shows t hs and comp o demolished a c tures asso c e medial act i b House, wil l s at depths g removal.
La Cross License T Revision se Boiling W Termination n 0 Water Reactor Plan r
F Chapter 3.
Figure 8-2 8-29 2
o w grade str u th suitable cent of Natu r d , returned t u ctures outs e d an d will r i nistration B BWR Crib H all diffuser d C oal Plant a n barge wash i r systems a n trical Switc h d roadways area. demolition as described s urrounding W ater Reacto r Plan g ,  t Building, k ,  t ion Tunnel s Vault,  g and Turbi n tivity (LSA
Site Ovverview
)Shack. d from dem o h e key LA C onents, oth e and remove d ciated with G ions; theref o l remain int a g reater than F urther info r uctures to r e clean soil, s a r al Resourc e t o grade, se eide of the remain on si Building, inc l H ouse, incl u discharge pi p n d all assoc i i ng station t n d piping, h yar d , and, and the Bu rand remed i in Chapte r open land r  s , n e Office Bu i) Storage B ulition and r e C BWR buil d er than the L d to a depth o G-3 are ex p ore, no reme d a ct and fun c3 foot belo w rmation on t e main in th e a nd and/or o e s (WDNR) e ded an d ap p"LACBW Rte. These i n l uding asso c u ding fire pr o p ing, extend i iated buildi n t o the nort h rlington No r i ation activ i 5 of this L Tareas withi n 8-4 i lding,  u ilding, and emoval oper a dings at the LACBWR A of at least 3 pected to be diation is pl a ctional for G w grade wil l t he approac h e "End Stat e other suitab l regulations p ropriate ero R Site Encl n clude: ciated sanita r o tection pip i i ng 110 feet n gs, wareho u h of the pla n rthern-Santa ities are co m T P, will be p n its license ations will bsite. All o Administrati o feet below g e radiologic a a nned and t h G-3 power o p l be assesse d h to the var i e" such as b l e me d ia, a s. The rest o sion control losure" (LS r y sewer an d ing systems,into the Mi s uses and su p n t and all a sFe rail line m plete, a F i performed t o d boundari e be segregate d o n-site LA C on Building grade. Non e a lly impact e h ese structu r p erations.
A d for radiol o ious buildin basement fo u s allowable o re d areas o n s will be est E) are not d water syst e ssissippi Ri v p port structu r ssociated s a and spur i n i nal Radiati o o demonstra t es, with the d for recycl i C BWR buil d and Crib H e of the buil e d such tha t res, includi n Any contami n ogical impa c n gs is provi d undations wunder Wisc n the site wablishe d. expected t ems and pip i v e r , res, includi n anitary sewe r nto the LAC B on Survey (t e that LAC Bexception o i ng or dings, House, dings t they n g the nated c t and d ed in w ill be onsin w ill be t o be i ng, n g the r and BWR (FRS) B WR of the La Cros s License T Revisio n ISFSI fa 10 CFR 2 dry stor a dry stor a Isolation remediat control mcompro mequipme n access. I there is n survey a r Several s support t supporti n 8.3.R To date, removal RPV inco rFES WVari o RPV , Puri fVari o Chapter 3remediat achieve t 8.4.I m As prev i decomm i associat e b y the p rNU RNU R Chapter 3 schedule footprint s e Boiling W Termination n 0 a cility, co m 2 0.1402. A s age casks an ge within t h and contr o ion activitie measures w mised by t h nt. Open l a I solation an d n o risk of re reas that ha v services suc h t he ISFSI m n g the adjac e R emainin g D several key of the follo w and associ a re monitor g u W stored co m o us system p , and prima r fication, Sea l o us Turbine 3 of this LT ion activiti e t he "End-St a m pacts to t h i ously note d i ssioning o p e d with dec o reviously iss u R EG-0191, a n R EG-0586. 3 of the L T d to be co m). The i d en t W ater Reacto r Plan m ply with s part of the d transferre d e ISFSI unt i ol measures s. These ac t will be imp l h e potential and areas, a c d control m e-contaminat v e been rele a h as sanitar y m onitoring a e nt G-3 foss i Dismantlemdismantle m wing compo n ated reactor uide tubes, e mponents s u p iping and c ry systems s u l Injection a n and auxilia r P provides d es currently b a te" conditi o h e Post-Sh u d , the D-P l p erations at t ommissioni n ued environ m nd T P identifi e m pleted pri o tified activit i r  the radiol odecommiss i d to the ISF il it is transf e will be im p t ivities will lemented t o for re-co n ccess roads a e asures will ion from de ased from th e y sewer serv i a nd security i l station w h ent and De c m ent and dec o n ents: component s etc.), uch as fuel s h components u ch as the C n d Main Ste ry systems.
d etailed des c b eing perfo r on. utdown Dec o l an/PSDAR, the site and n g the site h a mental imp a es the dis m o r to the u n i es are not s 8-5 ogical crite r i oning proc e SI. It is ex p erred to the D p lemented f o be complet e o ensure th e ntamination a nd bounda rremain in ecommissio n e license.
i ces and ele c operations.
hich will re m c ommissio n ommissioni n s (e.g. fuel h rouds, cont r associated ontrol Rod D a m. c riptions of rmed and t h ommissioni n amended concluded t ave already act statemen t mantlement a nrestricted r eignificantly ria for un r ess, all spen t pected that t Department following th ed prior to s t e final rad i as result r ies will be ffect throug h n ing. These c trical servi c  There ar e m ain in plac e n in g Activit i ng activities shrouds, co r ol rods, an d with the F o D rive Mech athe dismant he remainin g n g Activiti ein March 2 that the pot e been postul a t s, specifica l a nd decont a elease of t hdifferent fr o restricted u t nuclea r fu e t his spent f u of Energy (De conclusio n t arting the F i ological c o of access b posted wit hhout FRS a cmeasures a r ce will rema e three pota b e. ies have occur r ntrol ro d s, s d start-up so u o rced Circul a anisms, De clement, dec o g activities t e s Report (P014, descri b e ntial envir oated in, an d lly: amination a c h e site (exc l om those or i use specifi e e l was loade d u el will rem a D OE). n of radiol o FRS process.
onditions ar e b y personn e h signs restr i ctivities an d r e not requi r in in operat i b le wells o n r ed, includi n steam separ a urces, and a tion syste m c ay Heat, Pr i ontaminatio n t o be execu t PSDAR) b ed the pl a onmental i m d will be bo u ctivities th a l uding the I i ginally disc u e d in d into ain in o gical  The e not el or icting d until red in i on to n site n g the ators, m , the imary n and ted to a nned m pacts u nded a t are ISFSI ussed La Cros s License T Revisio n in the D-will be didentifie d provide decomm i 8.5.L 8.5.1.G 8.5.1.1.The site Vernon C 300 feet by fillin g The site 642 feet Mississi p silts) un d sands an d 8.5.1.2.The U.S reliable ctotal po p 744 for Snear the small to w (populat i5 miles s 8.5.1.3.The LA C of the M b ounded north, a n electric p This sta t Genoa, l o within t h The are a and fres h to the G-site, loc a s e Boiling W Termination n 0 -Plan/PSDA d efined duri n d in the D-additional i ssioning.
L a Crosse B o G eo g raph y a Site Llocation an d County, Wi s from the ea s g in river e dis relativel y AMSL b o u ppi River to d erlain by fi n d gravels.
B Popu l. Census B u census data f p ulation in 2 S toddard, lo cplant, loca t w ns west o ion 397), lo outhwest.
Site A C BWR prop e M ississippi R by the Mi s nd a wildlife p ower statio n tion is locat e o cated appr o h e town. Th e a of the Mis s h water fish i-3 station lo a ted approxi m W ater Reacto r Plan R. Althou g n g decomm i-Plan/PSDA R evaluation o ilin g Wat e a nd Demo gr L ocation and d descriptio n s consin, in t s t bank of th e d ge and low y flat with t h u nded by th ethe west.
T ne to mediu m B edrock is e n lation ureau, Ame r f or nearby W 2 013 was 25 cated 7 mile s ted 17 miles o f the plant cated 3 mi l Access, Lan d erty is locat e River. Alth o s sissippi Ri vand fish re f n complete d e d to the s o oximately 1 m e re are no r e s issippi Riv e i ng) and co m cated south m ately 4,00 0 r  gh additiona l i ssioning pl R have be eand info r er Reactor E r aph y Descriptio n n were disc u the Mississi p e Mississip p forest area s he reactor f e railroad tr T he geolog y m sands wit h ncountered a rican Com m W isconsin v i8 for the V i s N of the p l N; and 30 , across the es northwe d and Water ed in the fa r o ugh the sit e ver to the w f uge to the s d in 1969, w outh, adjace n m ile to the n e sidences wi t er adjacent t mmercial ba r of the LA C 0 feet south o 8-6 l details reg a a nning effo r en identifie d rmation re g E nvironme n n ussed in sect i ppi River V p i River. T w s with mate r facilities sta n acks to the y consists p r h some soil s a t approxim a m unity Surv e illages and c illage of G e l ant; 51,522
, 329 for Ve r Mississipp i s t, and Ne w U se r western po r e area is 16 3 west, a rail l i s outh. The s w hich is also nt to the L A n ortheast of t t hin 2,000 f e to the site i s r ge and ship C BWR plant)o f the plant.
arding majo r ts, no sign i d. Subseq u garding the n t Descripti o ion 8.2. Th ealley, with t w enty-seven r ial dredge d nding at ele veast and th rimarily of f s containing a tely 130 fe e e y (ACS) r e cities and V e e noa, locate d for La Cros r non Count y i River, inc w Albin, I A rtion of Ve r 3.5 acres, it ine to the e site include s owned an d A CBWR fa c t he site. A n e et of any L A s used for r e p traffic (e.g
.). There is There is a pr decommis ificant impa uent section s environm e o n  e 163.5 acre t he Reactor acres of the d from the M vations ran g h e riprap on fill material s higher perc e t below gro u e port (11) p r e rnon Count y d 1 mile no rse, the large
: y. There a rluding Ren o A (populat i r non Count yis relativel y e ast, USAC E s G-3, a co a d operated b y cilities. Th e n elementary A CBWR st r e creational
: p. barges of c a public bo p ortion (Po o sioning acti v cts b eyond s in this c h e ntal effec t e site is loca t Building l o site were f o M ississippi R ging from 6the shore o s (fine sandentages of c u nd surface rovides the
: y. The esti m rth of LAC Bst Wisconsi n r e also num o township, ion 513), l o y on the east y isolated a s E property t a l-fired 379 M y Dairyland e closest to w school is l o r ucture. p urposes (b o c oal are deli vat landing o o l 9) of the U v ities those hapter t s of ted in ocated o rmed River. 36 to of the s and c oarse (10). most m ated B WR; n city erous  MN o cated bank s it is t o the M We (12). w n is o cated oating v ered o n the U pper La Cros s License T Revisio n Mississi p for hunt i Genoa Nmile 679 long loc k public a c through Highwa y No. 8. 8.5.2.C The cli m continen triver val l Lock an d of the i nfrom 60 winter m the aver a summer s The ave r range fr o month f o The blu ff winds a t monthly experien c tornado oF3 (max icenter in j 8.5.3.T 8.5.3.1.The site i dissecte d varies b e river lev e Highwa y Prior to c lying w e dredged to const r s e Boiling W Termination n 0 ppi River N a i ng, fishing N ational Fis h.2, is appro x k and dam s ccess to an oNovembe r. y 35 approx i Climate m ate at the L tal climate w l ey location d Dam No. 8 nformation f to 90 o F d u m onths of D e age temper a s eason (15).
r age annual r om 3 to 5 in c or the remai n f s of the Mi s t the site w h average w i ced tornado s o ccurred 27 imum wind j ured one p e T opo g raph y Topo g i s located w d uplands.
F e tween 21/2 a e l. The LA C y 35. Figure constructio ntlands. Th esands from t r uction, the a W ater Reacto r Plan ational Wild l and recreati h Hatchery.x imately 0.
6 s tructure ow o bservation The Stat e imately 1/2 m L a Crosse r with cold w iof the site.
8 site with a f or the past uring the m o e cembe r 20 1ture is appr rainfall is 3 5 ches per mo n n der of the y s sissippi Ri v h ere the va ind speeds
: s. On Apri l.4 miles aw a speeds 158-e rson and ca u , Geolo gy a n g raphy ithin the Mi F rom La Cro and 41/2 mile C BWR site i 8-4 provid e n of the LA C e property g r t he Mississi p area was gr a r  life & Fish R onal activit
: i. Lock an d 6 miles nort h n ed and op eplatfor m , o p e of Wisco n m ile north o r egion of W i nters and h o The USA C a rchived we a year (May onths of Ju n 1 4 to Febru aoximately 2 5.2 inches.
M n th in the s p ear. ver Valley c h lley runs n o are typical l l 30, 1954, a ay from the 216 mph) t o u sed betwe e n d Seismol o ssissippi Ri v sse to Prairi s in width.
is located b e e s a Topogr a CBWR faci l rade was th e ppi River.
D a ded to a re l 8-7 R efuge just s i es (13). Fu r d Dam No.h of the sit e e rated by th e pen from d a n sin also m of the LAC B W isconsin a n o t summers CE maintain s ather infor m 2014 to M a n e through A ary 2015.
C 2 0 o F in the M onthly pre c p ring and su m hannel the w o rth-south a y 6 to 10 m a category F 4 Genoa vill a o rnado that o e n $500,000 ogy ver Valley, w e du Chien,  The valley etween two v a phy Map o f lity, the site en increase d D uring grad e l atively flat s outh of the rther south a 8, located
: e. The da m e USACE (awn to dus k m aintains a BWR site, a nd at the L A and extre m s an active w mation for th e ay 2015) in d A ugust 201 4 C ity data co mwinter mo n cipitation a v m mer seaso n w inds at the L are from th e m ph. The 4 (maximu m a ge center.
o ccurred 6.
6 and $5,000, w here the v aapproximat ewalls rise s valleys on e fthe site. location c o d through th e e manipulat i ground sur f site which h a re public l a on the Mis m is a 110 fe 14). This fa c k during the highway w across fro m A CBWR si t m es influenc e weather stat e Genoa, W dicated tem p 4 and 45 to m piled for G n ths and rea c verages in th e ns and from LACBWR s e north and Genoa, W I m wind speeOn June 5, 6 miles awa y 000 in dam a alley is deep ely 40 mile s s harply 500 e ither side o f o nsisted of m e depositio n i on and site f ace. The r e has limited a a nd areas a n sissippi Ri v et wide, 60 0cility also amonths of w ayside off m Lock and te is typical e d because o ion at the n eI area. A r e peratures ra n-5 o F duri n G enoa show s c hes 72 o F i e Genoa, W I1 to 3 inch e ite. Predo m the south.
I area has r ds 207-260 1980, a cat e y from the v i a ges. ly cut into h s south, the vto 600 feet f the bluff e a m arshes and n of hydraul ipreparation e sulting gra d a ccess n d the v er at 0 feet llows April State Dam  of a of the earby eview n ging n g the s that i n the I area e s per m inant  The r arely mph) e gory illage highly v alley from a st of low-i cally prior d e for La Cros s License T Revisio n the LA C access r o 8.5.3.2.LACB W of the C e of the W b edrock i Generall y to 130 f e Valley. Dreshba cPrecamb r (BGS). A 509 feet river sho 8.5.3.3.Many fa u capable i conditio nin the si t nuclear p any evi d Therefor Seismic a 2008 all 8.5.4.H Hydrolo g Ground w 25 feet B Mississi p the Miss i the west towards ground wfossil st asome pe r flooding.Hydraul ithe shall o structure s e Boiling W Termination n 0 BWR site i s o ad along th e Geol o WR is locate d e ntral Lowl a W isconsin D o i n this regio n y , the local get of glacial These unc o c h Group (r ian crystal l A t the subj e AMSL nea rreline. Seis m u lts have b e i n accordan c n s in the sit e t e region, b u p ower plant d ence of ca p e, capable f a a ctivity (m a occurred ov e Hy drolo gy a g y and hy d w ater beneat h B GS and the ppi River.
T i ssippi Rive r and dischar gthe west b u w ater elevati o a tion, it app e r iods where
. i c conductiv i o w sands th a of the shal l W ater Reacto r Plan s generally f e eastern bo u o gy d on the east a nd Physiog rme and the n dips less t h g eology is d outwash an onsolidated d Upper Ca m line rocks e ect site, the b r the Reacto r m ology een mappe d c e with 10 C e vicinity th a ut investigat isites in the pable faulti n a ulting does a gnitudes ra n er 180 mile s nd H y dro ge d rogeologic a h the site i s water table T herefore, c h r. Groundw g es into the M ut then may on measure m ears that th ethe gradie n ity is influe n at were hyd r l ow soils w o r  flat with gr a u ndary of th e bank of the raphic Prov i western fla n h an 20 feet p d escribed as a d fluvial de p deposits are mbrian). T h e ncountere d bedrock sur f r Building a d in the site C FR 100, A at represent i ons of all o region, in a d n g. Additi o not need to nging from 3 s from the si t e ology al informa t s first enco u aquifer is i n hanges in th e a ter in the s h Mississippi turn and fl o m ents colle c ere is a slig h nts are reve r nced by the s raulically dr e o uld not lik e 8-8 a de level at e site to the r Mississipp i i nce (16).
T nk of the Wi per mile to t h approximat e p osits on th eunderlain b h e Dreshba c d at approx i face is enco u and slopes t o region. N o Appendix A.
hazard to t hf these faul t d dition to s t onally, the a be consider e 3.5 to 5.4) t h t e and did n o t ion was p untered at d e n strong hy d e water tabl e h allow depo R iver. The o w parallel c ted during h t downwar rsed and th i soil structur e e dged, depo ely influenc eapproximat eriprap alon g i River in th e The site is l o i sconsin Ar c h e southwe s ely 15 feet o e east flood p b y flat lying ch Group i imately 65 0 u ntered at a n o approxima t o ne of thes e Per the N h e facility.
N t s during th e tudies for th e area is one o ed in the an a hat has bee n ot impact th e primarily o b e pths rangi n draulic com m e elevation asits and fill m deeper gro uto the rive rroutine sa m r d vertical g i s is likely de and grain sited, and c o e groundwa t ely 639 feet g the river s h e Wisconsi n ocated on th e ch. The sed i s t. f hydraulic f plain of the Msandstone a i s then un d 0 feet belo w n elevation tely 501 fee e faults are N RC, "Ther e Numerous f e course of v e LACBW R of relativel y alysis of thi s n recorded b e plant site o btained fro m n g from app m unication w a re depende n material lik e u ndwater is a r. Based o n m pling in su p gradient. H o due to high size distrib u ompacted o n t er flow dir e AMSL fro m hore. n Driftless s e e southwest imentary str a fill overlyin g M ississippi R and shales o derlain by d w ground s u of approxi m t AMSL ne aconsidered e are no ge o f aults are m a v alidating s e R, have not f y low seis m s site" (17).
etween 197 5 o r operation s m Referen c roximately with the adj nt on the st a ely flows to w also likely t o n a review o p port of th e o wever, the rriver stage s ution. Beca u n site, the in t ection. Ho w m the ection flank a ta or g 100 River of the d ense u rface mately ar the to be o logic a pped everal f ound micity. 5 and s. c e 10. 15 to acent age of wards o flow of the e G-3 r e are s and u se of t ernal w ever, La Cros s License T Revisio nthe nati v anisotro p the hori z these la y The vel o gradient.across t h the grou n range) e v 8.6.E 8.6.1.S The eva lfollows t includes consider e"Large."
evaluati o For tho s evaluati o 1) T N i d 2) A 3) P d 4) A e s e n a d a v t h 5) A A concl uthe level 0586 ev athe form e Table 8-1 LACB W screen t h s e Boiling W Termination n 0 v e sands un d py of the aq u ontal direct iers. o city of gro u  The gradi e h e site it is l i ndwater vel o v en though t h E nvironme n ummar y l uation of t h t he approac hidentificati o e d to be ge n If identifi e o n in NURE G s e environ m o n, a standar d The issue or N UREG-019 d entified in t A pplicable r e otential im pescribed.
A n evaluati o stimate or d nvironment d ditional m i v oided, a d e he resource o A conclusio n usion is deri v of signific a aluation. N o e r G-1 coal/
o 1 was used WR. It is ex c h e issues t W ater Reacto r Plan d erlying the u ifer would i on than in t h undwater fl o ent of the w akely that th e o city across he hydrauli c ntal Effects o h e environm e h and metho d o n of enviro n eric, it is a e d as generi c G-0586 whi c m ental issu d approach iactivity is s 1 and D-Pl a t hese docu m e gulations, p pacts from d e o n is perfo r determine w hconsidering itigation me a etermination or attribute. is reached.
ved from th e ance of the ote that the e o il fueled p o as the ba s cerpted fro m o identify r  hydraulic fi be more pe r he vertical d o w is directl y ater table is e water tabl e the site is c conductivi t o f Decomm i e ntal effects d ology outl inmental iss u a ssigned a s c , the envir o c h conclude s es or dec o i s followed.
summarize d , a n/PSDAR.
ments. ermits, limi t ecommissio n rmed. Thi s h ether the a the availa b a sures that cis made as e evaluation impacts. S i environment a o wer plant w s is for the m Table 6.1 o site-specifi c 8-9 fi ll would li k rmeable an d d irection. T h y related to influenced b e has a very also relativ e t y could sup p i ssionin g  (or impact s i ned and de s ues as eithe r ignificance onmental i m s that the o v ommissioni n It is summ a including a Note that m t s or other r e ning activiti e s includes ctivity is li k b le informat i c an be take nto whether steps sum m ite-specific i al impacts o w as not cons isite specifi c of NUREG-0 c issues.
D k ely provid e d have a hig h his decrease s both the h y b y the topo g low gradie n e ly slow (i.
e port faster fl s) of the de c scribed in N r generic or level of eit h mpact is con s verall impac t ng activitie s arized as fol l a summary o m any deco m e gulatory re q es relating t oanalysis an kely to mak e ion. If an i m n are evalu athe impact i m arized abo v issues are n o f the operat i idered in thi s c environ m e 0586. The f Decommiss i e sufficient h er hydraul i s the vertic a ydraulic con g raphy and w n t. Therefo r e., in the in c flow. commission i N UREG-058 6site-specifi c her "Small,"s idered to b e t significanc e s that req u l ows:  of the impa c mmissioning quirements a o the enviro n n d professio n e a noticea b m pact is li k ated. If an i is likely to s ve. The con ot bounded i ng G-3 coa l s review. e ntal impac t f irst step in i oning acti vstructure th a i c conductiv al transport w ductivity a n with the flat re, it is likel y c hes and fe e i ng of LAC B 6. This app r c. If the is s" "Moderat e e bounded b e is "Small.
"uire site-sp e c ts as repor t activities a r are identifie d nmental iss u nal judgme ble impact o k ely, existin g impact can n s eriously da m n clusion ide n by the NU R l power pla n t assessme nthis proces s vities speci f a t the v ity in within nd the areas y that e t/day BWR roach s ue is e ," or b y the " e cific ted in r e not d. u e are nt to on the g and n ot be m age ntifies R EG-n t and nt for s is to fic to La Cros s License T Revisio n LACB Widentifie d evaluati oOffs i 35 y eAqu a sensi tTerr e of se nThre a threa tEnvi r 35 y eCult u histo r 8.6.2.R 8.6.2.1.During d in accor d of the R a exposur e 2,000 m r also be mprogram Radiatio nmaterial s In Augu s of the st a 1994 wi t allowed levels at


Protecti o exposur e significa nremoval (SSCs). s e Boiling W Termination n 0 WR are then
L L
: d. The scr e o n: te land use a ears, since t h a tic ecology tive areas.
R La Crosse Boilin License Termin Revision 0 ng Water React ation Plan or Figure 8-3 8-30 LACBWR Buildings
estrial Ecolo nsitive area s a tened and t ened and e n ronmental J ears. ural and Hi ric landmar k R adiolo g ica l Occu p decommissi o dance with t h a diation Pro es and main t rem/yr Tota l m aintained Aand proce d n Work Per m s incorporat e st 1987, Dai r abilized and t h the com mfor the dec athe facility
.on Program e during th e n t contribut o and packa g W ater Reacto r Plan reviewed a e ening iden t activities: c h h e FES was i affected by g y affected b s. endangered n dangered s p J ustice: cha n storic Reso u k designatio n l Effects of D pational Ra d o ning, Solut i h e license s p tection Pro g tain occupa t l Effective D A s Low As R dures will e mits (RWP) e effective r a r yland plac edefueled fa c mencement o ay of most
: s. This dela y and ALAR A e decommis s ors to occup ging of rem a r  and the acti v tified the f o h anges in de m i ssue d. activities b e by activitie s species: c h pecies that h n ges in de m u rce impac t n s and other Decommiss i d iation Expo ions will co n pecification s g ram are to tional work e D ose Equiv a Reasonably A ensure that involving p o a diological c ed LACBW R c ility). LA C of incremen t short-lived r y, combine d A measures , s ioning of L ational dos e a ining Reac 8-10 v ities that m o llowing po mographics e yond the o p s beyond the hanges in l o have occurre d m ographics t s beyond t cultural res o i onin g sure ntinue to i m s and the re q control radi a e r exposure s a lent (TEDE A chievable (work spec i otential ra d i a controls. R in a SAF S CBWR rema i t al decomm i radionuclide s d with the e f , minimized LACBWR t from remaitor Buildin g m ay requir e otential area s and zoning t p erational ar e operationa l o cal flora a n d in the pas t and socio e t he operati o ources. mplement a R q uirements o ation hazar d s to less th a E). Dose to (ALARA). i fications, d a tion expos u S TOR condi tined in a fu l i ssioning ac t s , which su b ffective imp l the actual t o date. It ining disma n g Structure s e site-specif i s for additi o t hat have oc ea; changes l area; chan g n d fauna a n t 35 years.
economic s t onal areas; c R adiation Pr of 10 CFR 2 0 ds, avoid ac c an the admi n workers an d The LACB W designs, wo r u re or handl i t ion (a peri o l ly SAFST O t ivities. T h b sequently rlementation and project eis anticipat e ntlement act i s, Systems, i c evaluatio n o nal site-sp e curred in th e in designat i g es in desig n n d designati o t atus in the c hanges in otection Pr o 0. The obje c cidental rad i nistrative li m d the public WR work c o r k package s i ng of radio a o d of safe st o O R conditio n h is period o f r educed rad i of the Rad i e d radiation ed that the ivities will band Compo n are e cific e past ion of nation o n of past local ogram c tives iation m it of must o ntrol s and active orage n until f time i ation iation dose most be the o nents La Cros s License T Revisio n Table 8 Secti o8.6.2    8.6.3.1 8.6.3.2 8.6.3.3 8.6.3.4  8.6.3.5 8.6.3.6  8.6.3.7  8.6.3.8 8.6.3.9 8.6.3.18.6.3.1 28.6.3.1 3  8.6.3.1 48.6.3.1 58.6.3.1 68.6.3.1 78.6.3.1 88.6.3.1 98.6.3.2 0 s e Boiling W Termination n 0 8-1 Sum mPowe o n Radiol o Activit i worker s Activit i Radiol o Onsite l Offsite Water U Water Q Surfac e Groun d Air Qu a Aquati c Activit i Activit i Terrest r Activit i Activit i Threat e Occup a1 Socioe c 2 Enviro n 3 Cultur a Activit i Activit i 4 Aesthe t 5 Noise 6 Irretrie v 7 Traffic 8 ISFSI c 9 VCC c oimpact s 0 Rail li n offsite) W ater Reacto r Plan m ar y of the r Facilities Envir o o gical ies resulting i s ies resulting i o gical Accid e l and use acti v land use acti v U se Q uality e water d wate r a lity c Ecology ies within th e ies beyond th rial Ecology ies within th e i es beyond th ened and End a ational Issues c onomic nmental Justi c al and Histori c ies within th e ies beyond th t ics v able Resour c and Transpo r construction:
l o nstruction f o s (onsite) ne upgrade an d r  Environm e onmental Iss u in occupation i n dose to the e nts v ities v ities e operational a e operational e operational a e operational a ngered Spe c c e c Resource I m e operational a e operational ces r tation land use imp a or the ISFSI:
l d extension (o 8-11 e ntal Impac t u e al dose to public a rea area a rea area c ies mpacts a rea area acts (onsite) land use o nsite and ts from De c NURE G 0586 (GEIS) Yes Yes Yes Yes No Yes  Yes Yes Yes  Yes No  Yes No No Yes Yes No  Yes No Yes Yes Yes Yes No No No commission i G-) Impa c Small Small Small Small Site-speSmall  Small Small Small  Small Site-spe Small Site-spe Site-speSmall Small Site-spe Small Site-speSmall Small Small Small Site-spe Site-spe Site-spe i n g Nuclea r c t Significan ccific cific cific cific cific cific cific cific cific r c e La Cros s License T Revisio nNUREG-The cur restimate d dose for b ounded 8.6.2.2.Dairylan (REMP) environ m the radi o decomm iof 10 C F to adher e public d o consider e The onl y liquid w a piping" wcollectio n through t discharg eof the cprotectio LACB W bounded The gas emeteoro l noble ga s or expos u gaseous r 8.6.2.3.
Decom mthis anal y conduct e Fuel Ac c decomm ithe min i LACB W otherwis e The dec o and cont Protecti o s e Boiling W Termination n 0 -0586 esti m rent occupa t d to be 130.
3 the decom m by NURE G Offsi t d implemen t at LACB W m ent in and a o active gas e i ssioning ac t FR 50, Appe n e to these l ose from de c ed as "Smal l y authorized aste from t h w hich is a p a n system p u t he East T u e s to the inl e c u rrent and n in accor WR to date c oby the eval u e ous pathw a l ogical cond i s, the gaseo u u re pathwa y releases. Envir o m issioning a c y sis has co n e d and prov i cident Anal y i ssioning an dmal radioa c WR site is i n e involving a ommissioni namination l e o n and Safe t W ater Reacto r Plan m ated that 1, tional expe n 3 Rem, whi c missioning w G-0586 and t h t e Radiation t ed a regula t WR which p a round the e e ous (airbo r t ivities do n ndix I, or th limits throu g commission i l." effluent rel e h e LACBW R art of the G-3 umps are no t urbine build i et of the liq ufuture Ra ddance with o nclude tha t u ation in N U a y (which i i tions durin g u s pathway c y. Routine a onmental E f ccident anal y n tinued duri n i ded in reg u y sis" have n o d with spen t ctive materi n sufficient f a significan t n g of radio a evels remai n t y and Heal r  874 Rem w i n ded and d o c h is well be l will meet th e h e impact is Exposure a n tory compli a p rovided a n nvirons of t h r ne) and li qot exceed t h e fuel cycle ghout the c o i ng is boun d ease pathwa y R site to the 3 circulatin g t operable.
T ing sump u s u id waste m o diation Pro t 10 CFR 2 0 t the public e UREG-0586, i ncludes no b g the time o f consists of a a i r samples a ffects of Ac c ysis is inte g n g shutdow n u lar updates o ted that "
w t nuclear fu eal resulting for any pot t adverse ef fe a ctively con t n ing at LA C t h Program s 8-12 i ll be need e o se expecte l ow the NU R e regulator yconsidered nd Monitori n a nt Radiolo g n nual report he site. Th e q uid efflue n he concentra tdose limits o urse of th e ded by the c r y for the dis Mississipp i g water disc h T he only li q s ing an air o onitor, whic h tection and 0 and 10 C F exposure as which con c ble gas an d f the release.
airborne par t are collected c idents and D gral to the l i n and deco m to the D-P l with conside r e l now store d from LA C e ntial even t fe ct on publi c t aminated S CBWR. Wo r s for LAC B e d to deco m ed to comp l R EG-0586 e y standards oas "Small."
n g g ical Enviro n s with ass e e REMP pro g n t releases d ation limits oof 40 CFR e decommi s riteria in N Ucharge of tr e i River is th r h arge syste m q uid effluen t operated pu m h is still ope r REMP at FR 50, Ap pa result of d c ludes the i m d particulat
: e. Due to pl a ticulate only to determi n Decommissi o i censing de s mmissioning
.l an/PSDAR , ration for th d in the ISF S C BWR oper a t to result i c health an dSCs will i n r ker safety i B WR which m mission a s l ete the de c estimate. A s of 10 CFR 2 nmental Mo essments of gram provi d d uring plan t of 10 CFR 2 0 190. Soluti o s sioning.
C U REG-0586 e ated and fi l h rough the "
s m. Currentl y t discharges m p. The a i r able. Cont i LACBW R pendix I. R E decommissi o mpact is min i e) analysis i a nt shutdow n and presen t n e the dose d oning Even t s ign basis f
: o. Post-fuel
, within sece current st a S I, this anal y ation and r i n exceedin g d safety."
nvolve the h is addresse d rely on A L s ingle unit B c ommissioni n s the occupa t 2 0, it is the r o nitoring Pr othe radiol o des assuranc e t operation s 0 , the dose l o ns will co n C onsequentl yand the imp ltered radio a seal well/di f y , the liquid wat LACBW R ir operated p i nue d appli c R ensures p EMP repor t o ning activi t imal. is subject t o n and cessat i ts a minor r e d ue to radio a t s o r LACBW Raccident an a tion "Plant a ge of LAC B ysis confirmemaining o n g dose lim i h ighest dose d in the Rad i L ARA princ BWR. ng is t ional r efore ogram o gical e that s and limits n tinue y , the pact is active ffuser w aste R are pump cation p ublic ts for ties is o the i on of elease active R and alysis Post-BWR s that n the its or rates iation iples.
La Cros s License T Revisio n The safe release o During d addition in NUR E decomm i LACB W potential


reductio nDec oPrior Radi o Operatio n and serv i in the IS FRadi oExpl oLoss Natu rHum The pub laccident s dose co n Plan/PS Danalysis i 8.6.2.4.The dec ovolumes b ulk deb are, and impleme nthe appr o and liquiThe maj o Energy S o and truc k transferr e s e Boiling W Termination n 0 ty of the p u f radioactiv e decommissi oto maintena n EG-0586 as s i ssioning o f W R are boun d consequen c n of the tota l ontaminatio nradioactive o active dec a n al acciden t i ce conditio n F SI, operati o o active was t o sions and/
La Cross License T Revision se Boiling W Termination n 0 Water Reactor Plan Fi r
oof contami n ral phenom e an caused e v lic dose con s s during dec o nsequences f D AR and re s i s therefore b Stora g ommissioni nof low lev e ris material s will contin u n tation of t h o priate segr e d radioactiv o rity of the o lutions dis p ked to a r a e d to a rail c W ater Reacto r Plan ublic is prin e materials d oning, Soluti n ce, waste m s ociated wi t f LACBW R d ed by the c es associat e l radionucli d n efforts ma dwaste ship m ay. s during de c ns. With th e o nal accide n te transporta t o r fires asso c n ation contr o e na, an d vents extern a sequences r e ommissioni n from accide n s ulted in do s b ounding fo g e and Disp o n g of LAC B el radioactiv s such as co n u e to be dis p h e Waste M a e gation, cla se wastes. Class A lo w posal site in a il trans-loa d car. Rail a n r  cipally rela t d uring deco m ons will per f management , t h immedia t R. Conseq uaccident ev a e d with tho s d e inventory de before de c m ents, an d commissioni e spent nucl e n ts during de t ion accide n ciated with e ol, al to LACB W e ported in N n g ranged fr o n ts during L s e ranging frr the decom m o sal of Low
igure 8-4 8-31 Topographhical Map
-B WR has, a e waste, in c ncrete, met a p ositioned a anagement P s sification, p w level radi o Clive, Uta h d facility i n n d truck sh i 8-13 t ed to pote n mmissionin g f orm decon t , and survei l te dismantli n uently, the p a luation pre se accidents at LACBW R commission i ng could re s e ar fuel re mcommissio n nts, xplosive an d WR. N UREG-058 6 om 0.02 to 0 LACBWR d e om 0.027 t o missioning o-Level Radi o a nd will c o c luding cont a a l and aspha l as low level rogram and p rocessing, p o active wast e h. Waste w n Winona, M ipments are ntial hazards g operations.
tamination a n llance activi t n g would a l potential d e sented in N would be l R fro m: i ng, sult from eq u moved from t n ing can be c d/or combu s 6 for onsite, 0.96 rem.
A e commissio n o 0.065 rem.
of LACBW R o active Was t o ntinue to r eaminated e q lt. Material s radioactiveassociated p p ackaging, s e from LA C will be loade M N where made in ac c associated nd dismantl e ties. The ac l so be appl i ecommissio n N UREG-058 6 l ess at LA C uipment fail u t he LACB W categorized a stible materi anon-fuel re l A n analysis o ning was p r The NUR E R. te equire the d quipment, t o s that canno t e waste. Th procedures, S shipment an d C BWR will b d into appr o the waste c c ordance wi twith an air b ement of S S cidents disc u i cable duri n n ing accide n 6. Howeve r C BWR due t ure, human e W R site and s a s follows:
a ls, l ated radiol o of potential p r ovided in t h E G-0586 ac c disposal of o ols, clothin g t be free rel e rough the p S olutions e n d control of b e shipped t opriate cont a c ontainer w i t h Departm e borne S Cs in u ssed n g the n ts at r, the to the e rror, stored ogical public h e D-c ident large g and e ased roper n sures solid t o the ainers ill be e nt of La Cros s License T Revisio n Transpo r Waste C o 8.6.2.5.Followi n radiolog iremaini n(excludi n radiolog ilicense w Chapter 6criteria.
8.6.3.N 8.6.3.1.The env i within s e The LA C existing L to b e co nslips are onsite r aactivitie s parking a to occur Several s roadway sincludin gremediat 636 foot waste st r No sig nactivitie scomply w regulato r In accor d onsite ar e 8.6.3.2.Only ar e and lice n and de m s e Boiling W Termination n 0 r tation (DO T o ntrol Speci Radi o n g the co m ical surveys n g in b ackf i n g the ISFS I i cal conditio will be termi 6 provide t h N on-radiolo g Onsit e ironmental i e ction 4.3.1 o CBWR dec o LACBWR l nducted wit h being cons t a il line will
: s. Contain e a nd equipm e in a manner structures s u s and rail l i g piping an d ed, as nece s elevation w r eam. nificant env s are anticip a w ith applic a r y requirem e dance with t e considere d Offsi t e as within t h nse terminat i molition equi p W ater Reacto r Plan T) regulatio nalist (WCS) o logical Crit e m pletion of will be per f illed struct u I) meets the ns are dem o nate d , with he method o gical Effect s e Land Use impact asso c of NUREG-0 ommissioni n icensed pro p hin the LSE tructed. Th e be modifie d ers will be u e nt/containesimilar to w u ch as the S ines, will r e d tunnels, b e ssary. All o t w ill be rem oironmental ated. In ad d able United e nts. t he guidanc e d as "Small.
"te Land Use he existing s ion activiti e pment, was t r  n s. If Clas sfacility in A e ria for Licedecontami n formed to d u re baseme n unrestricted o nstrated to b the excepti o o logy for d e s of Decom m ciated with 0 586 to be g n g project i s perty previo u footprint.
S e existing r a d and refur b u nloaded a n r laydown, s w hen the fac i Switchyard, emain at lic elow the 63 t her system s oved during changes a s dition to NR C States Envi r e presented
" (in the Vici n ite licensed e s (such as t te container 8-14 s B/C wast e A ndrews, Te xnse Termin a n ation, dis memonstrate t n ts, any re muse  criteri a be below th e o n of the ar e emonstratin g missionin g onsite land generically c s located a n usly used f o Some onsite ail line sup p bished with n d loaded o n storage, sta g i lity was op eAdministra tense termi n6 foot elev a s and comp o the decom m s sociated w C requirem e ronmental P rin NUREG-n ity) b oundary wemporary s t s, etc.). O f e is identifi e x as. a tion mantlement t hat the dos m aining pip i a specified i n e unrestricte ea around th g complian c uses has beonsidered a s n d executed or power ge n e roads have p orted the o p a rail spur n site. Onsi g ing and w a erational.
t ion Buildin g nation. Sub ation will be o nents as w e m issioning p w ith the si t e nts, d ecom m rotection A g-0586, the p will be used torage and s f the 163.5 a e d, it will band reme d se from resi d i ng and so i n 10 CFR 2 0 e d use criter ie ISFSI. L T ce with the een determi n s a "Small" i within the n eration; all been refur b p eration of t to support d ite activitie s a ste loading g , Crib Ho u surface bas e e radiologic a e ll as all str u p rocess and te-specific d m issioning a gency (US E potential im p to support d staging area s acre site, a b b e shipped t diation acti v d ual radioa c i ls at LAC B 0.1402. Aft e ia, the 10 C F T P Chapte r 5unrestricte d ned by the N impact. boundary o work is ex p bished. No b the facility.
decommissi o s such as v e are and co n u se as well a ement struc t ally assesse d uctures abo v disposed o f decommissi o a ctivities wil E PA) and W p acts to lan d decommissi o s for remed i bout 1.5 acr e t o the vities, ctivity BWR er the FR 50 5 and d use NRC, of the pected barge  The oning e hicle n tinue a s all tures, d and v e the f as a oning l also W DNR d use o ning i ation es are La Cros s License T Revisio n located Appropr icontami n These mimpacts activitie s Land in t within a Upper M Crosse-B County h water q u located w b asin la nsome of t The clo s north of with a p o valley b e Decom m the Ref u southern traffic e n decomm i 8.6.3.3.LACB W Slough tpredomi n Mississi p the reac tsystems. Water p u to be pr o For a di towns a n river wa t in Lansi n river w a40 miles The LA C well at t h Potable w s e Boiling W Termination n 0 w ithin the i ate isolati o nation from m easures wil lassociated w s at LACB W t he vicinity five-mile r Mississippi R B ad Axe Ri v has establis h ality and pr o within the B n d use is agr i the agricult u sest munici pthe site, acr o o pulation o f elow the eas t m issioning a c ge at the s o end of the n tering or le i ssioning ac t Wate r W R is locate d tributary ex t n ant water u ppi River as tor, river w a River wat e ulled from o n cessed onsi t stance of 4 0 nd cities alo n t er for indus t ng, Iowa, a b ater for ind u downstrea m C BWR site h e site. Th e w ater use d u W ater Reacto r Plan fence-encl o o n and co n the LSE ar e l also be m o w ith the u s W R. of the LAC B radius, appr o River Natio n v er Basin W a h ed a Land &o tection of t B ad Axe Ri v i cultural an d u ral land to r pality to the oss from th e 258 consist t ern bluff.
c tivities are n o uthern bou nsite will be aving the si t ivities and t r Use d on the sho r t ends along u sage durin gcondensate ater is not c er does sup p n site wells w t e and disch a 0 miles do w ng the Missi s t rial purpos e bout 15 mil e u strial purp o m. has its ow n e locations o uring decom m r  o sed LSE, ntrol measu r ea to the a d o nitored to e se of offsit e B WR site i s o ximately o nal Wildlif e a tershed as a& Water Re s t he environ m v er Watersh e d over 50%
o recreational l LACBWR e north-sout hs of various not being p e n dary of theminimally i te. Conseq u the potential res of the M ithe LACB W g the oper a cooling wat c urrently b e p ly the Lo w w ill support arged in acc o wnstream of s sippi River es, excludin g e s downstre a o ses betwe e n potable w a of all wells m issioning o 8-15 where mos t r es will b e djacent LA C e nsure their e lands are s predominane third is e & Fish R a Geograph i s ource Man m ent within e d. Approx of the land i s l and use, si m site is the h running H residences, rformed in a site. Also
, impacted d u uently, the oimpacts to l i ssissippi R i WR site fo r a tion of LA C er. With th e e ing used a s w Pressure a ndecommiss i o rdance wit hthe site, vi rare obtaine d g the adjace n am of the s i e n the LA C a te r supply, (active and o perations i s t work is e instituted C BWR prop e r effectiven eanticipated a ntly r ural a n water and b R efuge. W D i c Manage m agement Pl athis GMU. imately 36
%s forested.
T m ilar to othe rvillage of G H ighway 35.
farms, and a ny land are
, public acc e u ring deco m offsite land l and use off s i ver. The M r 3,000 fee t CBWR wa s e plant shut d s a cooling nd High Pr e i oning task s h the site's s rtually all m d from grou n n t G-3 fossi l i te. There a C BWR site provided t h abandoned)s not expec texpected t o to preven t erty as wel l e ss. Thus, nfrom the d n d undevelo bottomland s D NR has d e m ent Unit (G M a n (18), ad d The comm u% of the La T here is an i n r parts of ru r G enoa, appr This small a few retail as adjacent t ess to the b mmissioning areas are n o s ite are con s M ississippi R i t from nort h s the use o f d own and f umedium f o essure servi c s and this w a tate dischar g m unicipal w und water.
Tl plant, is t h a re no othe r and Prairi e h rough a si n)are illustra t ted to be sig o be cond u t the spre a l as offsite a n o environ m decommissi o ped. Of th e s included i n esignated t h M U) and V e dressing lan d unity of Ge n Crosse-Ba d n creasing s h ral Wiscons ioximately 1rural com m businesses i t o the site o r oat launch a by rail and o t affected b sidered "Sm a ive r and its h to south.
f water fro m u el removed or reactor o r c e water sys a ter will co n ge permits.
w ater suppli e The nearest u h e coal-fired r known us e e du Chien , n gle ground w t ed in Figur e nificantly g r u cted. a d of areas. m ental oning e area n the he La ernon d use, noa is d Axe hift of in. 1 mile m unity i n the r near at the truck by the a ll."  Thief  The m the from r fuel tems. ntinue  e s for u se of plant ers of , WI, w ater e 8-5. r eater La Cros s License T Revisio nthan the solids h o includes tank tha t Mississi p discolor a downsp o located i n to water u 8.6.3.4.This sec trelated t o ponds, r e to the w e The en v section 4a "Small"At LAC Bits WD N LACB WSystem (and WD N reduced erosion decomm idemoliti o Radiolo g (ODCM)Potentia l onsite m per year elevatio n 201 A/B b uilding s LACB W As the w LACB W No adve r decomm i quality a r s e Boiling W Termination n 0 pota b le wa t o lding tank a sanitary h t services t h ppi River a a tion. Roof o uts or throu n side the L S use are con s Wate r tion evalua t o surface w e servoirs an d e st and the R vironmental 4.3.3 of NU R" impact. BWR, all no NR permits.
W R which m (WPDES) a s NR Waste w through i m and sedi i ssioning, s t o n will be m gical impact
) limits an d l onsite gro u onitoring w efor radiolo g n s. The pla n; MW-202 A s in appro p WR former p r water from W R, the ther m rse impacts i ssioning a c r e bounded b W ater Reacto r Plan t er use duri nand pump e olding tank h e LSE Tur b at outfalls.
drains are e gh the nor m S E. Conse q s idered "Sm a r Quality t es potentia l w ater and g r d lakes. At R efuge wetla nimpact ev a R EG-0586 h a n-radiologi c Water m a m eet the Ge n s well as L A water Permit mplementatiomentation t orm water r m onitored an ds are mini m d assessed t h u ndwater i m e lls at LAC B gical analy s n t's networ k A/B; MW-20riate locati o r ocess areas the Missi s m al impact t o on surface w c tivities. C o by NUREG-r  n g plant po ed off by a that service s b ine Buildi n Release a r ither discha r m al effluent r quently, in a c a ll." l project ef f r oundwater.
LACBWR, n ds to the s o aluation ass a s been det e c al water dis anagement p n oa site's W A CBWR's W. In additi o n of appro p control d r un-off fro m d controlled m ized throu g h rough the m pacts are m B WR. Rep is purposes k of down g r 3A/B; and M o ns and qu a and potenti a ssippi is n o o the Missis s w ater and g r o nsequently
,-0586 and c o 8-16 wer operati olocal state s the Admi n ng. Storm r eas are pe r rged to the g release path w c cordance w fects on th o Surface w the nearby b outh. ociated wit h ermined to becharges to t h programs a n WDNR Wis c W DNR Tier I o n, impacts p riate Best d uring dec m active im pif necessar y g h adheren c REMP an d m onitored b y resentative g when grou n radient well s M W-204A/B antity to i n a l release po i o longer us e sippi River h r oundwater a , the potent i o nsidered "
S ons. Sanit apermitted s nistration B u water runo f riodically m ground area w ay after pr o w ith NURE G o se portions w ater genera l b odies of w a th surface a e generally a h e Mississi p n d practice s consin Poll u II Industrial to the Miss Manage m e n c ommissioni n p acted area s y. ce to Off-si t d the groun d y the routin g roundwate r ndwater co n s (five pair e B) are situat e ntercept an d ints. e d to cool h as been eli m are expecte d ial impacts Small." a ry wastes a sanitary wa s uilding and a f f is divert e m onitore d f o surroundin g o cessing thr u G-0586, the p of the nat u lly refers t o a ter are the M a nd ground w a pplicable t o p pi River ar e s have bee n utant DischStorm Wat e sissippi Riv e nt Practices n g operat i s undergoin t e Dose Ca l dwater mo n n e sampling r samples a r n ditions are e d wells: M W e d around t h d detect co n operating p m inate d. d from the i mto surface a re collecte d s te hauler.
a sanitary h o e d directly t o r oil shee n g the facilit y u an oil sep a potential i m u ral enviro n o streams, r i Mississippi R w ater quali o LACBW R e controlled u n implemen targe Elimi n e r General P e r will be g r (BMP) fo r ions. Dg remediati o l culation M n itoring pro gof 10 perm r e obtained t at low and W-200A/B; he key LAC B ntamination plant syste m m plementati and ground w d in a This olding t o the n and y thru arator m pacts nment i vers, River ty in R with u nder t ed at nation Permit reatly r soil D uring o n or anual g ra m. anent twice high MW-BWR from ms at on of w ater La Cros s License T Revisio n 8.6.3.5.The env i 0586 ha s LACB W require m BMP to m sources sfrom the Fugitive demoliti o controll e Radiatio n excessiv e suppress iDemolit i specific a Appropr i extende dimpacte d No adve ractivitie s consider e 8.6.3.6.The en vNUREG-impact.
The aqu a House a t approxi m disturbe d decomm i fauna in removal Various these aq u included Plans fo requipme n Solution s perform e s e Boiling W Termination n 0 Air Q ironmental i s been deter m WR complies ments of the W minimize f u s uch as the facility. dust will o n of concrd demolitio n n Protectio n e or harmf u ion by misti n i on equipm e ations whic h i ate Health a d periods of d by exhaust rse impacts
: s. Consequ e ed "Small."
Aqua t vironmental
-0586 has b atic habitat a t the shore l m ately 110 fe d during th e i ssioning a c the Missis s of the diffu sfresh water u atic enviro 53 species a r the demo l n t by barge.
s will conti n e d within a p W ater Reacto r Plan uality impact eval u m ined to be g with all ap p W DNR and u gitive dust d plant's die s be genera t ete buildin g n and d ism a n, Environm e ul dust emis s n g water wi l e nt will be h will pre v a nd Safety a operation t oemissions.
on air qua l e ntly, the po t ic Ecology impact ev a b een deter m a t LACBW R line to the fe et from th e e initial cotivities is n o s ippi River s er structure
,fish speci enments. A and 19 fami l lition of str u Conseque n nue to mai n p plicable li m r  u ation asso c generally ap plicable Fe dthe Wisco n d uring dem o sel generato r ted from v g structures antlement te c e ntal, and S s ions are n o ll be used to operated a n vent excess issessments a o ensure th a l ity are exp etential imp a aluation as s mined to be R includes t hdiffuser str u e shoreline.
nstruction o o t expected and also n e , which shar es, macro-in 1980 stud y l ies (19).
uctures at L n tly, there is ntain WDN R mits. Protec t 8-17 ciated with plicable to L d eral and St a n sin Bureau o o lition and d r s are no lo n v arious dec oand the ex c c hniques, w i S afety and H o t generate dmitigate du nd maintai n i ve exhaust a nd controls a t personne l ected from t a cts to air q u sociated wi t generally a p h e area fro m ucture that  Habitats a s o f the facil to disturb e e arby River e s a line wit v ertebrate p y indicated t LACBWR d no impact t o R permits a n tion of the nair quality i LACBWR w a te air qual i of Air Man aecommissio nger in ser v ommissioni n c avation of i th appropri a H ealth staff, d. As nece sst emission s n ed in acc oemissions s will also b e l and the e n t he implem e uality are b o t h aquatic e pplicable t o m the intake extends ou t ssociated w i l ity. How e existing aq utributaries, t h the G-3 f o p opulations, t hat the po p d o not incl u o the shoreli n n d decom m n earby Ref u in section 4 with a "Smal l ity regulati o agement, anning activit i v ice and ha v ng activitie ssoil. Care ate assessm e will be co n ssary, meas u s. ordance wit h from defe c e establishe d nvironment a e ntation of d o unded by N ecology in o LACBW R structure in t t into the M i th this are a e ver, the i m u atic habitat sstreams an d o ssil station, and veget a p ulation of f ude the rem o ne from thi s m issioning o p u ge wetland s.3.4 of NU R l" impact.
o ns, includi nd will impl e i es. Air em i v e been re m s , includin g ful plannin g e nts by Sol u n ducted to e n u res such a s h manufact u c tive equip m d during ex p a re not adv e decommissi o N UREG-058 6 section 4.3 R with a "S m tegral to th e Mississippi R a were previ mplementati o s , their flor a d wetlands.
is not plan n ation exist w f ish near th e o val of wa s s type of act i p erations w i s and habit a R EG-n g the ement i ssion moved g the g and u tions nsure s dust u rer's ment. p ected ersely o ning 6 and .5 of mall" e Crib River ously on of a and  The n ed. within e site s te or i vity. ill be ats is, La Cros s License T Revisio n and will operatio n Exotic s reprodu c While t h rusty cra y ones in t conduct e the site.
A stud ymacroch i and cha n& Fish R perform e subsequ efossil st a require a construc t aquatic a The pot e 0586 an d The pot e and cons 8.6.3.7.The env i b een det e No kno w decomm i appropri a The lan dthe form afrom th e prevalen t operatio n onsite h a addition, that the d to the so udemoliti oanticipat e s e Boiling W Termination n 0 continue t o n s. s pecies ca ntion or sur v here are so m yfish, etc.)
i the vicinity e d at LACB W  of the i m irus), fresh w n nel catfish (R efuge Pool e d in 1980.
e nt shutdow n a tion, has fu r a ny operati o tion, demoli a reas beyon d ential impac t d considered ential impac tidered to be Terre s ironmental i m e rmined to b wn terrestr i i ssioning p r a te BMPs a r d around L A a tion of ab o e Mississip p t in surroun d n s associate d abitats for m with the s h direct heav y uth, no dire c on activities e d impact t o W ater Reacto r Plan o be a prior i n threaten n vival rate, a m e known a q n Vernon C of the LAC WR have n o mpingement water drum
((Ictalurus p u 9 navigatio n It was d e n of LACB W rther reduce d ons resultin g tion, materi a d the site bo u t s to the aq uto be "Sma l t s to the aq u"Small."
strial Ecolo g m pact eval u be generally i al exotic o roject area.
re, and will c A CBWR wa s out 27 acres p i Rive r. T ding areas.
d with G-1 m any plant a n hort-term na t constructio n c t impacts t o do not incl u o the shoreli n r  i ty when pl a n ative spe c and disease s q uatic invasi ounty, thes e BWR site (o t resulted i n and entrai n (Aplodinotu u nctatus), w n areas fro m etermined t h WR and red u d this impa c g in any i m al and wast e u ndary. uatic ecolog y l l."  u atic ecolog y g y uation of ter rapplicable t o o r invasive  To minim c ontinue to b s initially di sby filling ri vherefore, t h Given the e and G-3 a s nd animal s p t ure of the w n and demo o any off-sit e u de the rem o n e. 8-18 a nning onsi t c ies and e c s or parasit eve species (e have been n 20). The o p n the introd u nment of t s grunniens
)within the U p m the operati o hat the imp a u ce d intake o c t. Decom m mpingement e staging or y within the y beyond th e r estrial ecol o o LACBW Rspecies h ize the intr o b e followed.
sturbed by t h v er edge an d h e site shor e e xtensive la n s well as L A p ecies, incl u work associ a lition proje c e sensitive s p o val of wast e te dismantl e cosystems d es they ma y (e.g. zebra m n oted in slo u p eration an d u ction of an y the fishes, ), gizzard s h p per Missis s o n of LAC B act was mo o perations, l m issioning o p and entrai n transfer op e site bound a e site bound a o gy in secti o R with a "S m h ave been n oduction o f t he construc t d low fores t eline no lo n n d distu r b an c A CBWR, t h u ding endan gated with d e ct area is se p p ecies are a n e or equip m ement or w a d ue to ag g y transmit t o m ussel, curl y u ghs and la k d decommisy aquatic i nsuch as b l h a d (Doros o sippi River N B WR and G-st likely in s limited to s u p erations ar e nment imp a erations wil l a ry are bou n ary have al s on 4.3.6 of N mall" impact.
n oted to o f exotic or i t ion of the f t areas with nger resembce, constru c h e terrain h g ered or inv ecommissio n parated fro m n ticipated.
S m ent by barg e a ste manag e gressive gr o o native sp e y-leaf pond w kes other th a sioning acti v nvasive spec i luegill (Le p oma cepedi a National W i-3 was previ s ignificant.
u pporting th e e not expec t a cts to fish.
l be perfor m n ded by NU R so been eval u N UREG-058. occur withi n i nvasive sp e f acility, incl umaterial dr eles the sho r c tion and ye aas not sup pasive speci e n ing and th e m the Refug e Since the pl a e , there is al ement owth, ecies. w eed, a n the v ities i es to pomis anum) ildlife ously  The e G-3 ted to  No med in REG-uated 6 has n the e cies, uding e dged reline ars of p orted es. In e fact e area a nned so no La Cros s License T Revisio n Best Ma n spills res The pot e"Small."
The pot e evaluate d 8.6.3.8.
The pot e and cons A revie w Endang e two spe c which L AA m Miss iA pl a facin No note d due to t hthe exist i River to terrestri a presence been no t Higgins e Likewis eWiscons i Habitat Plimeston e townshi pfor this p The Per e Species l of falco n protecti odelisted hatching decomm i falcon re s e Boiling W Termination n 0 nagement P rulting from ential impa c ential impa c d and consi d Thre a ential impac t idered "Sm a w of the U e red, Propo s cies are desi g ACBWR re s m ussel speci e i ssippi Rive r a nt species, g slopes:  T h d adverse i m he siting and i ng G-3 fos sthe west an d a l or aquatic of the Hig g ted. A mu s e ye pearly m e , the North e i n Departm e P rogram (2 2 e cliffs ove r ps within V e p lant species e grine Falco n l ist in 1975 n nesting bo x n (23). Ov e i n 1999 (2 4efforts.
S i ssioning w icovery effo r W ater Reacto r Plan r actices an d equip m ent o cts to terre s cts to the t dered to be "
atened o r En d t s to "Thre a a ll." U.S. Fish a n s ed, and Ca g nated as "
T sides in: es, Higgins r:  Endange r Northern m hreatened.
mpacts to aq u operation o f sil station, t h d the rail linhabitats w h gins eye pe a s sel survey o m ussels were e rn monksh o e nt of Agri
: 2) has noted r creeks an d e rnon Count yto be impa c n (Falco pe rand startin g xes at its fa c erall, Peregr 4); however, Since the G ill not inter f r t and popul a r  d site proce d o peration.
s trial ecolo g t errestrial e cSmall."
d angered S p a tened" or "
E nd Wildlife ndidate Sp e T hreatened" eye pearl y red. monkshood uatic species f the LACB W he majority o e and High w hich may be arlymussel i of the Thie f found. o od has not culture, Tr athat the No r d streams a n y. This ha b c ted by deco m r egrinus) w e g in 1993, D c ilities, incl u i ne Falcon r Dairyland G-3 facility fere with G
-a tion. 8-19 d ures requir e g y are b ou n c ology bey o pecies E ndangered"Service li s e cies' Coun ty or "Endang ymussel (L a (Aconitum n have been n WR facility
, of the licen s way 35 to th einhabited b yn mussel b e f Slough ri v been noted a de & Con s rthern mon k n d the plant b itat is not p mmissionin g e re put on th eairylan d su p uding at the G r estoration p has continu e will still c-3 operatio n e prompt cl e n ded by N U o nd the sit e" species ar e sting, the F ty Distribut iered" withi n ampsilis hi g n oveboranc e n oted during
, as well as t sed site, situ e east, is de v y threatene d eds in the v i v e r area wa s on or in th e sumer Prot e kshood's ha bis present i present with i g operationse Wisconsi n pported rec o G-3 stack, t o program eff oed to maint c ontinue op e ns or its sta c e anup and r e U REG-058 6 e boundary e bounded b Federally-Li s i on (21) co n n Vernon C o g ginsii), wit h e nse), with plant opera t t he previous uated betwe e v eloped and d or endang e icinity of L A s conducte d e vicinity of ection's En d b itat is leac h i n the Whit e i n or near t
: h. n Endangere d overy effort s o support c h o rts resulted t ain the G-3 erations an d ck, there is emediation o 6 and consi d have also b y NUREG-s ted Threa t ncluded that o unty, the c o h habitat i nhabitat in n t ions. In ge n G-1 facilit y e n the Missi s does not s u ered species.
A CBWR h a d in 1978 a n LACBWR. d angered S p h ed sandston e stown and he LACBW R d and Threa t s with instal l h ick hatchin gin the bird b nesting sit e d the LAC Bno impact t of oil dered been -0586 tened, only o unty n the n orth-neral, y , and s sippi u pport  The as not n d no  The pecies e and Stark R site tened lation g and being e and BWR t o the La Cros s License T Revisio n 8.6.3.9.Occupat i consider e The env iNUREG-impact. program s also dur iare thos e ergono m Solution s contract o prevent owith fed States O c Typical followin gSafe tSafe tProv iWor k spec i such Obta iInvo l pack aIssui n lesso nHold reinf o 8.6.3.10.A detail eLTP. 8.6.3.11.LACB W efficient with so m s e Boiling W Termination n 0 Occu p i onal issues/
ed "Small."
ironmental i-0586 has b While deco m s addressin g i ng repair a n e related t o m ic, and biol o s is comm i or health an d o ccupationa l eral and st a c cupational Hcontractor g: t y training a s ty emphasis i ding a ll wo r k er training ific worker qas heavy eq u i ning and re v l ving Healt h a ges and pa r n g periodic n s learned.
ing safety s o rce safety e Cost e d discussio n Socio W R was shut to operate.
m e projects W ater Reacto r Plan pational Iss usafety has b impact eval u b een deter m mmissionin g g worker sa f n d refueling o human h e ogical hazar d i tted to de c d safety pro g l injuries an a te regulati o Health and S safety prac t s a part of t h as the first t o r kers with a and requir e qualificatio n uipment de m viewing Sa fe h and Safe t r ticipating i nsafety mess s tan d-down s e vents and l e n of the site economic I mdown in 1 9 By 1994, s oassociated r  ues/Safety een evaluat e u ation asso c mined to b e g involves i n f ety were i m outages.
T e alth and s a d s. Radiolo g commission i grams to eff e d illnesses.
o ns includin g S afety Adm i tices and c h e site acces s opic of disc u Health and S e d certificat i n s. Certain s molition fir m fe ty Data Sh e ty staff in n pre-job wa l ages to co m s whenever e ssons learn edecommiss i m pacts 9 87 as the s m ome increm e with the r 8-20 e d to be bou n ciated with generally a p n creased ind u mplemented T he occupat i afety, inclu d gical impact i ng LACB W e ctively con t Contractor g Wisconsi n i nistration (O communicat i s program f o ussion at me S afety book l i ons revie w s pecialty su b m s. e ets for che m reviewing l kdowns, w o m municate a wserious sa f ed site-wide
.i oning proj e mall size o f e ntal decom m removal of nded by N Uoccupation a pplicable t o ustrial activ i during the i onal issues ding impac t t s were disc u WR safely trol hazards health and s n Departme O SHA) req u ions will i n o r all emplo y e etings. let. w prior to a s b contractors m icals boug h and appro v o rk conditio n wareness o f f ety events
. ect costs is p f the plant d m issioning p the RPV i U REG-0586 al issues in o LACBW R i ties and sa fe operation o f and safety ts from ph y u ssed in sec tthrough th ein the work safety prog r e nt of Labo r u irements.
nclude acti o y ees and su b ssignment t o are mobili z h t onsite.
v ing decom m n assessme n f significant occur to c presented in did not mak e p lanning an d in 2007 anand the imp section 4.3.
R with a "S m fety focus, s i f the facilit yimpacts ass y sical, che m t ion 8.6.2.
e applicati oenvironme n r a m s will c o r and the U o ns such a s b-contractor s o tasks req u zed, as nece s m issioning n ts and revie wsafety issue ommunicat e Chapte r 7 o e it econom i d activities b d other m e p act is 10 of mall" imilar y and essed mical, o n of n t and omply United s the s. uiring ssary, work w s. s and e and of this ically began etallic La Cros s License T Revisio n radioacti vcomplet e periodic the ISFS I More a ctimefra m obtained personn eactivitie sincrease d project a n Therefor impact i s 8.6.3.12.The per c Vernon C Crosse) aimpact t o Decom mtranspor t Highwa yrelative t There is impacte dsite spec i 8.6.3.13.A revie w May 201 historica l the plan t Archeol o which w a Also, as along Hi the US A Upper M Axe. T h first nuc lmarker a concern s s e Boiling W Termination n 0 ve compon e e d by 2012.
spikes in w I project) (2 ctive deco m me. Some ofrom outsi d el from the l o s will have a d use of the n d workers w e, the soci o s considered Envir o c entages of C ounty are q and more p o o the greater m issioning a c t equipment y 35 traversi n o rail and tr u no reason d by the dec o ific impact i Cultu r w of the N 5 a nd the W l sites in V e t. The clos e ogical Site n e a s certified bindicated i nghway 35 i nCE Lock a n Mississippi.
T h e third wa s l ear gene r at i t the waysi d associated w W ater Reacto r Plan e nts over t hStaff size a t o r kforce hi r 5). mmissioning of the labor de Wiscons i o cal and re g a short-ter mlocal craft w w ith suppli e oeconomic i"Small." onmental J u low-incom e q uite low, a opulated Wi population, c tivities will and debris.
n g north-so u u ck transpo rto believe ommissioni n s considere d ral, Historic
, National Par k W isconsin H e rnon Count y e st historica l e ar Stoddar d b y the Natio n n NUREG-0 n Vernon C o nd Dam No.
T he second , s adjacent t o i ng plant. I n d e across Hi g w ith having r  he past 7 y e t the plant h a r ing to supp oand struc ttasks requ i i n; however
, g ional areas m positive e c w orkforce a e s and servic impact is e v ustice e and mino r approximate l sconsin cou n including s pcause sligh t The truck t u th by the s i rtation as a r ethat low-i n n g project.
d "Small."
, and Arche o k Service N Historical S o y and no st r l site with p r d , WI. locat e n al Park Se r191, the St a o unty. One i 8. It descr i , about 7.5 m o LACBW R n 2009, cre w g hway 35 fr o a public-ac c 8-21 ears. A s m a s graduall y ort specific tural demol i ire speciali z , some of t hsurroundin g conomic im p a nd opportu nes. v aluated to ity groups w l y 3%, and nties furthe r p ecial grou p t increases i traffic will u i te. There e sult of dec o ncome and m Per NURE G o logical Res N ational Re g ociety (29) t h ructures in t h re-historica l e d approxim a r vice in 198 0 ate of Wisc o i s about a h a ibes the ori g m iles south o R and comm e w s erected a om the site (cess marker o m all ISFSI f y been r educ e project nee d i tion is an t zed skills a n h e workforc g the site.
O p act on the nities for lo c be bounde d within the Vlower than r from the L p s, is expect e i n truck traf f use existing will be no e ommissioni n m inority p o G-0586 and ources gister of H t hrough Ma y h e village o l structural rately 7 mile s 0 (30). o nsin has pl a alf mile nor t gin of the p r of the plant,emorates th a new, updat (31). This n e on Dairylan f acility hol ded as opera t ds (e.g. 40 p ticipated i n nd equipme ne will be c o Overall, the d local com m cal business d by NUR E Village of Gthose in lar g LACBWR s i ed. fic to and fr omain street environmen t ng. o pulations w this evalua t Historic Pla c y 2015 iden t f Genoa or w remnants is s north of t h aced three h t h of LACB W resent syste m , highlights t e plant itse l t e d Wiscons i ew location d property.
ding 5 cask s t ions ceased
, personnel st a n the 2016-n t which w i o mprised o f decommissi o m unity due t s es to suppo r E G-0586 an d G enoa as w e ge cities (e.
i te (26) (27)om LACB W routes, pri m tal justice i m will be adv e t ion, the pot e c es (28) th r tified only a within 5 mi lthe Goose I h e LACBW R historical m a W R, overlo o m of locks o the Battle o f lf as Wisco n i n state hist o resolved se c s was , with affing -2017 ill be f craft o ning t o the rt the d the ell as g. La . No WR to marily mpact ersely ential r ough a few l es of Island R site, a rkers oking o n the f Bad n sin's orical c urity La Cros s License T Revisio n Dairylan presents or categ o  Land d iprimaril y Land th a the cons t station) w erosion c Based o ntranspor timpact o n 0586 a n Archaeo l 8.6.3.14.The env i 0586 ha sThe imp a disturba ncomplet eremoved River. Tcompleti ThereforNUREG-8.6.3.15.The env i has been LACB W 475 feet north si d south si d hospital s approxi m Noise g eequipme ntempora rcomplet e experien c s e Boiling W Termination n 0 d sent an u nthe control r o rize any pa r i sturbance f o y shipped vi a a t was distu r t ruction an d w ere perfor m c ontrols and n the histo r i c t ation of sy s n cultural, h n d based u logical Res o Aest h ironmental i s been deter m a ct of deco m n ce and dur a e d. Once al l , the aesthe t T he final d e on of the de c e, the envir o-0586 and t h Nois e ironmental idetermined WR is locate d west of the d e and a por t d e. There a r within 1 m mately 1 mil e e neration w i nt. Noise r y and will e , noise leve l c ed during t h W ater Reacto r Plan n used contro l r od an d a r e rt of the LA C or the remo v a rail. rbed for pro j d demolition m ed in acc ostormwater cal informat stem compo nistoric, and a u pon this e o urces are c o hetics impact eval u m ined to be g mmissioning ation. These l of the maj o t ics will im p etermination c ommissio n onmental i m h e impact is impact eval u to b e gener a d on the sh orail roa d li n tion of the U re no reside n mile. The n e to the nort h ill primarily associated woccur pri m ls in the vic i he operatio n r  l rod to the W e plica fuel a s CBWR plan t v al of large jects beyon d of the G-1 ordance wi t pollution pr i on present e n ents and w a rcheologic a valuation, t o nsidered "S m u ation asso c generally ap on site aest h impacts ar e or plant stru c p rove slightl y on usage oing. mpact assoc iconsidered "uation asso c ally applica b ore of the M n e. USAC E U pper Missi s nces within 1 earest com m h of the pla nresult fro m w ith decom m marily duri n inity of the L n of the facil i 8-22 W isconsin H s sembly (3 2 t as a histori component s d the nucle afossil stati o th applicabl e e vention pl a e d in NURE G w aste, the d e a l resources.
t he potenti a mall." ciated with aplicable to L h etics (e.g.
v e temporary c tures and b u y b y provid i o f the deco m iated with a e"Small." ciated with n b le to LAC B Mississippi R E land and L s sippi River 1,000 feet o f munity, the nt. m demolitio n m issioning a n g daylight LACBWR s i ty. Historical M u 2); however, ical site.
s will be mi n a r operation a o n an d the c e permits a n a ns. G-0191 an d ecommissio n. Conseque n a l impacts aesthetics i n LACBWR w visual skyli n and will ce a uildings eas t ing a more o mmissioned esthetics is n oise in sec t B WR with a "River, 300 f e L ock and D National W f the station village of G n activities i and shipmen t hours. O n site will be r u seum in M athere is no n imized as t a l areas (e.
g onstruction n d include d d the current n ing will h a n tly, as bou n to Cultur a n section 4.
3 with a "Smal l ne) is limite d a se when de c t of the Mis s o pen view o property w ievaluated t otion 4.3.16 o"Small" im p feet from th e Dam No. 8 a r Wildlife & Fi structures a Genoa, Wis c nvolving h e t of waste i s nce the de c reduced to l e adison, WI w objective t o t he waste w g. associate d of the G-3 d appropriat eapproach f o a ve no signi f n ded by NU R al, Historic, 3.15 of NU R l" impact.
d in terms o f commission i sissippi Riv e o f the Missi s ill be made o be bound e of NUREG-p act. e river ban k re located o sh Refuge o a nd no scho o c onsin is l o e avy constr u s intermitte n commissioni n e vels below w hich o save will be d with fossil e soil o r the f icant R EG- and R EG-f land ing is er are ssippi upon e d by -0586 k , and o n the o n the ols or ocated uction nt and n g is those La Cros s License T Revisio n Due to timpacts decomm iimposed ThereforNUREG-8.6.3.16.The env iNUREG-impact.
During t hefforts w Low lev e disposal addition, Texas. As state d process a and fuel These r edestabili z Therefor b ounded 8.6.3.17.The env iNUREG-impact.
The nu m than durincrease d effect o n b arge tr a support t operatio n Therefor by NUR E 8.6.3.18.Cumulat iimpact o f s e Boiling W Termination n 0 t he distanc e on noise l i ssioning, S by the Vill a e, the envi r-0586 and t hIrretr i ironmental i m-0586 has b he demoliti o will be mad e e l radioacti vsite in Cliv e any Class B d in NURE G are the mate r used for co n esource co m zing. e, the envir o by NURE G Traff i ironmental i-0586 has b mber of ship m i ng the ope d traffic and n traffic flo w affic. The e t he operatin g n s. e, the envir o E G-0586 an dCum u ive impact i s f the action w W ater Reacto r Plan e of the sta t l evels duri n S olutions ag r a ge of Geno a ronmental i h e impact is ievable Res o m pact eval u b een deter m o n and struc
: e. Some m e v e waste ha s e , Utah. T h B/C waste t h G-0586, irret r rials used to n struction m mmitments onmental i m G-0586 and t h c and Trans p impact eval u b een deter m ments and t h ration of t h wear and te w or road w e xisting bar g g G-3 fossil onmental i m d the impac t ulative Impa c s defined th e w hen added r  tion from s e ng decomm rees to co m a. mpact asso cconsidered "ources uation assoc i mined to be tural disma n etals from t h s been and his facility h h at is gener a rievable res odecontami n m achinery an d are consid e mpact assoc i h e impact is p ortation uation asso c mined to be he volume o f he facility. ar on road w e ar. There w g e traffic on station and m pact associ t is consider e c ts e impact on to other pa s 8-23 e nsitive rec e issioning a n m ply with a ciated with "Small." iated with ir r generally a p ntlement of h e site are a n will contin u has sufficien t a ted will be s o urces that w nate the facil i d for transp o ered to be iated with i rconsidered ciated with t generally a p f waste shi p Non-radiol o ways. It is a n will be no r athe Thief Sare not asso ated with tr ed as "Smal l the environ s t, present, a e ptors, ther e nd demolit i a ny noise l i noise is e v retrievable r pplicable t o the station, anticipated t o u e to be shi p t space for t s hipped to t h w ould occur ity (e.g., ra g o rtation of mminor and r retrievable "Small." transportati o pplicable t o p ped are gre a ogical impa c nticipated th a adioactive w S lough b ran c ociated with ransportatio n l." nment which a nd reasona b e will be l i ion activiti e imitations (e valuated to r esources in o LACBW R recycling a n o be release p ped to the t he disposal h e WCS fa c during the d gs, solvents, m aterials to aare neithe rresources i s on issues in o LACBW R ater during d cts of trans p at there will waste shipm e c h and the M LACBWR d n is evaluat e h results fro m b ly foreseea b imited temp e s. Durin g e.g. quiet h be bound e section 4.3.
R with a "S m n d asset rec o d as clean s Energy Sol uof this was t c ility in An d decommissi ogases, and t o and from th e r detectabl e s evaluated section 4.3.
R with a "S m decommissi o p ortation in be no signi f e nts execut e M ississippi R decommissi o e d to be bo u m the incre m ble future ac torary g the h ours) ed by 18 of mall" o very scrap. utions te. In drews, oning ools), e site. e nor to be 17 of mall" o ning clude ficant e d via River oning unded m ental t ions.
La Cros s License T Revisio n The cu m decomm iterrestri acumulati v Past, p r decomm i Mississi p resource sactivitie s over timmajor ir r disposal disposal In sum m 8.7.O 8.7.1.F Decom mHan dWor kPubl iLice nWor kLiqu iHaz aHan d Charact e of lead p 8.7.1.1.The maj oare admi nPart 2Part 5Part 5Part 6 s e Boiling W Termination n 0 mulative imp a i ssioning.
T a l ecology.
v e impact.
r oposed a n i ssioning o f ppi river for s listed ab o s are not pro j e , exceed t h r etrievable r eof low le vand will the r ary, the cu m Overview of F ederal Req u m issioning a c d ling, packa g k er radiatio n i c radiation p nse terminat i k er health a n i d and gase o a rdous waste d ling and re m rization an d aint. Nucl e o rity of radi o n istered by t 2 0 - Radiati o 5 0 - Decom m 5 1 - Enviro n 6 1 - Dispos a W ater Reacto r Plan a cts were as hese includ eIrretrievab l nd future f coal-fired p boating. T h o ve were a l jected to si g h e minor i m esource attr i v el radioacti v refore have n mulative imp a Re g ulatio n uirements c tivities that g ing, and sh i n protection, protection, i on and fina l n d safety, o us effluent r generation/
m oval of as b d removal o f ear Regulato r ological act i t he NRC. A o n protectio n m issioning a nmental pro t a l of radioa c r  sessed by fi e surface w l e resource sforeseeabl e p ower plan t h e individua l ll determin e g nificantly a c m pact of the i butable to L ve waste. N no cumulati v a ct to site r e n s Governinare subject t ipment of ra d l site releas e releases, disposition,estos, f Polychlori n ry Commis s ivities fall u n A pplicable T i n. activities.
tection. c tive waste.
8-24 rst determi n w ater and gr o s were als o e actions ts and recre a l impacts o f e d to be m i ccumulate e n individual a LACBWR d N o future a c ve effect.
e sources is p r g Decommi t o federal re g dioactive w a e , nated Biphe n ion nder Title 1 0 i tle 10 regul a n ing the res o o undwater, o evaluate d include c o ational use f the LACB W i nor. The p nvironment a activities o n d ecommissi o ctivities wi l rojected to b i ssionin g A c g ulations in c aste, n yls (PCBs)0 of the Co d ations inclu d o urces affec tair quality, d from th e onstruction, of the land W R decom m p ast, presen t al impacts t h n the affect e o ning was t h ll involve r be minor.
ctivities an d clude: ), and Hand l d e of Fede r a d e: t ed by LAC B aquatic ec o e perspecti v operation as access t m issioning o t and futur e h at would in e d resources he use of la n radioactive w d Site Relea s l ing and re m al Regulatio n BWR ology, ve of and t o the o n the e site total, . The n d for w aste s e m oval n and La Cros s License T Revisio nPart 7 thro uPart 7 8.7.1.2.The En v Federal RPart 6Parts Part 1Part 1Parts Part 2Part 7Part 1 8.7.2.FPermits a environ m fall undeWiscWisc Envi rVillaOcc u This inf o intended 8.8.C As previ o decomm i"site-spe potential predicte d (NURE G environ m s e Boiling W Termination n 0 7 1 - Packag u gh 174 also 7 3 - Physic a U.S. E vironmental R egulations 6 1 - Asbest o 122 to 125
-141 - Safe D 1 90 - Radia t 260 to 272
-2 80 - Unde r 761 - Toxic 1 29-132 - C F ederal, Sta t a nd approva l m ental prote cr Federal, S t onsin Depa r onsin Dep a ronmental a n ge of Geno a u pational Sa f o rmation pr o to be all-in c C onclusion ously evalu a i ssioning L A cific" in N Uenvironme n d in and wi l G-0191, NU R m ental chan g W ater Reacto r Plan ing and tra napply). al Protectio n Environmen tProtection Aapply as fol l os Handling
- National P D rinking W a t ion Protect i- Resource C r ground Sto r Substance C C lean Water A t e and Loc a ls from or n o c tion purpo s t ate and loc a rtment of N a artment of n d Occupati o a f ety and He a o vided abo v clusive. a te d in the D A CBWR are U REG-0586 ntal impacts l l be bound e R EG-0586, a ges associat e r  n sportation o n of Plants a n tal Protectio A gency (E P l ows:  and Remov a Pollutant Di s ater Standar d i on Standar d C onservatio rage Tanks C ontrol Act (A ct a l Require m otifications t s es. Decom m al jurisdictio n a tural Resou r Health S e onal Health, a lth Admini s ve is a gen e D-Plan/PSD A temporary a have been associated w e d by the p a nd D-Plan/
P e d with deco m 8-25 f radioactiv e n d Materials n Agency P A) regulati o a l s charge Eli m d s d s for Nucle a n and Reco v (TSCA) for ments t o state and l m issioning a n include, b u r ces (WDN R ervices, Di v Radiation P s tration (OS H eral overvie w AR, the non-a nd not sign i evaluated a with decom m r eviously is P SDAR). T mmissionin g e waste (reg. ons outline d m ination Sys t a r Power O p v ery Act (R C Polychlorin a l ocal agenci activities a n ut are not li m R) v ision of Protection S e H A) w of the a pradiologica lificant. Th e a nd there is m issioning L ssued envir o Therefore, t h g. g ulations in 4 d in Title 4 0 tem (NPDE S perations CRA) ated Biphe n es are requi r n d related si t m ited to the Public He a ection pplicable re g l environme n e potential is no signific a LACBWR h onmental i m h ere are no n 49 CFR Par t 0 of the Co d S) n yls (PCBs) r ed for safet y t e operation sfollowing:
a lth, Bure a g ulations an d ntal impacts sues identif i ant impact.
h ave already m pact assess m new or signi f t s 171 d e of y and s that au of d not from ied as  The been m ents ficant La Cros s License T Revisio n 8.9.R 1. U C 2 2. D R 3. D S 4. U r e C 5. U S N 6. D D 7. E S 8. E S 9. A 10. H 3 11. U h t 12. D 13. U 14. U h t15. h t s e Boiling W Termination n 0 R eferences U.S. Nuclear C ontent of L i 011. D airylan d Po R eactor - Se p Dairyland Poupplement R U.S. Nuclear elated to Op e C ooperative
-U.S. Nuclear tatement (G November 2 0 Dairyland Po Decommissi o E nergySoluti urvey Repo r E nergySoluti urvey Repo r Atomic Pow e H aley & Ald r 0, 2012.
U.S. Census B t tps://www.
c Dairyland Po U.S. Fish &
W U.S. Army C t tp://www.m t tp://www.c i W ater Reacto r Plan Regulatory i cense Term iwer Compa n ptember 197 2 wer Cooper a R eport - Ju nRegulatory e ration of t h- April 1980Regulatory EIS) on De c 0 02. wer Cooper a o ning Activi t ons GG-EO-rt for Octob e ons LC-RS-r t for June t h e r Review, "
A r ich, Hydro g B ureau, 200 c ensus.gov/
p wer Cooper a Wildlife Ser vorps of Eng i m vp.usace.a r ity-data.co m r  Commissio n i nation Plan n y, DPC-E D 2. a tive, Envir o n e 15, 1973. Commissio n he La Crosse . Commissio n commission i a tive, LAC B ties Report
(-313196-R S e r and Nove m PN-164017-h ru August 2 Atomic Jou r geological C 8-2012 Am e programs-s u ative - http:
/vice - http://
i neers - rmy.mil/Mis s m/city/Geno a 8-26 n Regulator y s for Nucle a D-3, Environ onmental R e n NUREG-0 Boiling W a n NUREG-0 i ng of Nucle B WR Deco m (D-Plan/PS D S-RP-001, L A m ber 2014 F-001, LAC B 2 015 Field W r nal" - Sept e onceptual S i erican Com m u rveys/acs/n e//www.dair y www.fws.g o s ions/Navig a a-Wisconsin
.y Guide 1.1 7 a r Power Re a nmental Rep o e port, La Cr o 0 191, Final E ater Reactor 0 586, Gener i ear Facilities mmissioning D AR), Revi s A CBWR R a Field Work
-B WR Radiol o W ork - Nov e e mber 24, 2 0 ite Model, F m unity Surv e e ws/data-rel e ynet.com/en e o v/refuge/U pation/Locks D.html. 7 9, Standar d actors, Revi s ort - Lacros s o sse Boilin g Environmen t by Dairyla n i c Environ m, Suppleme n Plan and P o s ion - Marc h a diological C- Novembe r o gical Char a ember 2015.
0 11. F ile No. 387 0 ey. (5-year d e ases.2012.
h e rgy_resour c p per_Missi s Dams/Lock D d Format an d s ion 1 - Jun e s e Boiling W g Water Rea c tal Stateme n n d Power mental Impac t n t 1, Volum e o st Shutdow n h 2014. C haracteriza t r 2015. a cterization 0 5-001 - A u d ata sets) -
h tml. c es/genoa.p h s sippi_River
/Dam8.aspx.
d e W ater c tor, n t t e 1 - n t ion u gust h p.  /.
La Cros s License T Revisio n 16. D P W 17. D D 18. V 19. M C D 20. W- 21. U C h t 22. W S 23. D h t 24. W h t 25. H L 26. V r e 27. U 28. N 29. W 30. N S 31. D 2 32. W s e Boiling W Termination n 0 Dame & Mo o otential, La W isconsin fo Dairyland Po Decommissi o V ernon Cou n M cInterny, M C ooperative' s December 1 9 W isconsin D ehttp://dnr.w U.S. Fish an d C andidate S p t tp://www.f w W isconsin D epecies Habi t Dairyland Po t tp://www.d W isconsin D e ttp://dnr.wi.
g H ubbuch, C h L a Crosse Tr i Village of G e ecords.com/
w U.S. Census B National Par k W isconsin H i National Par k ite Ve-502
-Dairyland Po 009. W isconsin H i W ater Reacto r Plan o re, Geotec h Crosse Boil r Gulf Unit e wer Cooper a o ning Plan, r n ty, Land &
W M ichael. C., I s Genoa Sit e 9 80. epartment o f i.gov/lakes/
i d Wildlife S e pecies' Cou n ws.gov/mid w epartment o f tat Program wer Cooper a dairynet.com
/epartment o f g ov/eek/crit t h ris, A nucle a i bune - Jul y e noa, Verno n wisconsin/g e B ureau, Ver n k Service, N a istorical So c k Service, N a- http://nrhp.
wer Cooper a istorical So c r  h nical Invest iing Water R e d Nuclear F a tive, LaCr o r evised Nov e W ater Reso u Impingeme n e , Thesis, su b f Natural R e i nvasives.
ervice, Fede r n ty Distribut i w est/endang f Agricultur e- http://datc p a tive, Pereg r/environme n f Natural R e ter/bird/falc o a r option: A y 15, 2012.
n County, W e noa_data.h t n on County , ational Regi c iety - http:/
/ational Regi focus.nps.g o a tive, Powe r ciety, Nucle a 8-27 i gation of G Reactor (LA C F uels Corpo r osse Boiling ember 2003.
urce Manag e nt and Entrai bmitted to U esources, Aq u rally-Listed i on, April 2 0ered/lists/w i e , Trade &
C p.wi.gov/Fa rine Falcon R ntal/falcon_
p e sources, Pe r on.htm. f ter 25 year s W I Public Re c t m.  , Wisconsin ster of Hist o/www.wisco stry of Hist o o v/natregse a r for Genera t ar Fuel Asse m G eology, Sei s CBWR) nea r r ation - Oct oWater Rea c. ement Plan
-inment of Fi U niversity o f q uatic Invasi vThreatened, 0 15 - i sc-city.htm l Consumer P r arms/Endan g Restoration program.ph p regrine Falc o s , Genoa re a c ords - http:- http://ww w o ric Places -
o nsinhistory.
o ric Places, G a rchresult.d o t ions, Geno a m bly - http:
/s mology an d r Genoa, Ve r o ber 1973.
c tor (LACB W- February 2 shes at Dair y f Wisconsin
-v e Species
-, Endangere d l. r otection, E n gered_Speci eProgram -
: p. o n - a ctor's wast e//www.ope n w.census.go v http://ww.n p org/. G oose Islan d o. a Site Upda t//www.wisc d Liquefacti o r non Count y W R) 2 009. y land Powe r-La Crosse
-- Vernon C o d, Proposed n dangered e s/index.asp x e gets new h o n-public-v/. p s.gov/nr/.
d Archeolo g te - Decemb onsinhistor y o n y , r - o unty and x. ome, g ical er y.org.
La Cros s License T Revisio n s e Boiling W Termination n 0 W ater Reacto r Plan Fi g r  ure 8-1 S 8-28 S ite Re g ion a a l Location


La Cros s License T Revisio n s e Boiling W Termination n 0 W ater Reacto r Plan r  Figure 8-2 8-29 2 Site O v v erview L L R L a Crosse Boili n License Termin Revision 0 ng Water Reac t ation Plan o r  Figure 8-3 8-30 LACBWR B u u ildin g s La Cros s License T Revisio n s e Boiling W Termination n 0 W ater Reacto r Plan F i r  ig ure 8-4 8-31 Topo g rap h hical Map L L R L a Crosse Boili n License Termin Revision 0 ng Water Reac t ation Plan o r  Figure 8-5 5 Groundwa t 8-32 t er Samplin g W Wells - LACB W WR Site}}
L L
R La Crosse Boilin License Termin Revision 0 ng Water React ation Plan or Figure 8-55 Groundwat 8-32 ter Sampling Wells - LACBW WR Site}}

Latest revision as of 21:51, 9 January 2025

License Termination Plan - Chapter 8, - Supplement to the Environmental Report, Rev 0
ML16200A091
Person / Time
Site: La Crosse  File:Dairyland Power Cooperative icon.png
Issue date: 06/27/2016
From:
LaCrosseSolutions
To:
Office of Nuclear Material Safety and Safeguards
References
Download: ML16200A091 (37)


Text

LA CROSSE BOILING WATER REACTOR LICENSE TERMINATION PLAN CHAPTER 8 SUPPLEMENT TO THE ENVIRONMENTAL REPORT

La Cross License T Revision 8.

Sup 8.1.

8.1.

8.1.

8.2.

8.2.

8.3.

8.4.

8.5.

8.5.

8 8

8 8.5.

8.5.

8 8

8 8.5.4 8.6.

8.6.

8.6.

8 8

8 8

8 8.6.

8 8

8 8

8 8

8 8

8 8

8 8

8 8

8 se Boiling W Termination n 0 plement to t Introduction 1.

Purpos 2.

Backgr Site Locatio 1.

Site De Remaining Impacts to t La Crosse B 1.

Geogra

.5.1.1. Site

.5.1.2. Pop

.5.1.3. Site 2.

Climate 3.

Topogr

.5.3.1. Top

.5.3.2. Geo

.5.3.3. Sei 4.

Hydrol Environmen 1.

Summa 2.

Radiolo

.6.2.1. Occ

.6.2.2. Off

.6.2.3. Env

.6.2.4. Sto

.6.2.5. Rad 3.

Non-ra

.6.3.1. Ons

.6.3.2. Off

.6.3.3. Wa

.6.3.4. Wa

.6.3.5. Air

.6.3.6. Aqu

.6.3.7. Ter

.6.3.8. Thr

.6.3.9. Occ

.6.3.10. Co

.6.3.11. So

.6.3.12. En

.6.3.13. Cu

.6.3.14. Ae

.6.3.15. No Water Reactor Plan the Environm n.................

e.................

round..........

on and Descr escription Af Dismantlem the Post-Shu Boiling Wate aphy and Dem e Location an pulation......

e Access, La e.................

raphy, Geolo pography....

ology..........

smology.....

logy and Hyd ntal Effects o ary..............

ogical Effect cupational R fsite Radiatio vironmental rage and Dis diological Cr adiological E site Land Us fsite Land U ater Use.......

ater Quality.

r Quality.....

uatic Ecolog rrestrial Ecol reatened or E cupational Is ost...............

ocioeconomi nvironmenta ultural, Histo esthetics.....

oise.............

r TABLE O mental Repor ription.........

fter Unrestri ment and Dec utdown Deco er Reactor E mography...

nd Descripti and and Wat ogy and Seis drogeology.

of Decommi ts of Decom Radiation Exp on Exposure Effects of A sposal of Lo riteria for Li Effects of De se.................

se (in the Vi gy.................

logy.............

Endangered ssues/Safety ic Impacts....

al Justice......

oric, and Arc 8-i OF CONTE rt.................

cted Release commissioni ommissionin nvironment ion...............

er Use.........

smology.......

issioning.....

mmissioning.

posure.........

e and Monito Accidents and ow-Level Ra icense Term ecommission icinity)........

Species.......

y...................

cheological R ENTS e..................

ing Activitie ng Activities Description oring............

d Decommis adioactive W mination........

ning.............

Resources...

es.................

Report (PSD n...................

ssioning Eve Waste............

DAR)..........

ents.............

... 8-1

... 8-1

... 8-1

... 8-1

... 8-2

... 8-3

... 8-5

... 8-5

... 8-6

... 8-6

... 8-6

... 8-6

... 8-6

... 8-7

... 8-7

... 8-7

... 8-8

... 8-8

... 8-8

... 8-9

... 8-9

. 8-10

. 8-10

. 8-12

. 8-12

. 8-13

. 8-14

. 8-14

. 8-14

. 8-14

. 8-15

. 8-16

. 8-17

. 8-17

. 8-18

. 8-19

. 8-20

. 8-20

. 8-20

. 8-21

. 8-21

. 8-22

. 8-22

La Cross License T Revision 8

8 8

8.7.

8.7.

8 8

8.7.

8.8.

8.9.

Table 8-1 Figure 8-Figure 8-Figure 8-Figure 8-Figure 8-se Boiling W Termination n 0

.6.3.16. Irr

.6.3.17. Tr

.6.3.18. Cu Overview o 1.

Federal

.7.1.1. Nuc

.7.1.2. U.S 2.

Federal Conclusion References 1

Summa Nuclea

-1 Site Re

-2 Site Ov

-3 LACBW

-4 Topogr

-5 Ground Water Reactor Plan retrievable R raffic and Tr umulative Im of Regulation l Requireme clear Regula S. Environme l, State and L ary of the En ar Power Fac egional Loca verview.......

WR Building raphical Map dwater Samp r

Resources.....

ransportation mpacts..........

ns Governing ents..............

atory Comm ental Protect Local Requi LIST nvironmenta cilities.........

LIST O ation.............

gs................

p..................

pling Wells -

8-ii n..................

g Decommis ission..........

tion Agency rements......

OF TABLE al Impacts fro OF FIGURE

- LACBWR ssioning Act y...................

ES om Decomm RES R Site...........

tivities and S missioning Site Release

. 8-23

. 8-23

. 8-23 8-24

. 8-24

. 8-24

. 8-25

. 8-25

. 8-25

. 8-26

. 8-11

. 8-28

. 8-29

. 8-30

. 8-31

. 8-32

La Cross License T Revision ACS AEC AMSL ALARA BGS BMP BWR DOE DOT D-Plan/

PSDAR EPA ER FESW FRS G-1 G-3 GEIS GMU ISFSI LACBW LSE LTP MWe MWt NPDES NRC ODCM OSHA PCB PSDAR RWP se Boiling W Termination n 0 Amer Atom Above As Lo Below Best M Boilin Depar Depar Decom Enviro Enviro Fuel E Final Genoa Genoa Gener Geogr Indep WR La Cr LACB Licen Megaw Megaw Nation Nucle Off-S Occup Polych Post-S Radia Water Reactor Plan LIST OF ican Commu ic Energy C e Mean Sea ow As Reaso w Ground Su Management ng Water Re rtment of En rtment of Tra mmissioning onmental Pr onmental Re Element Stor Radiation Su a No. 1 Stati a No. 3 Foss ric Environm raphic Mana endent Spen rosse Boiling BWR Site En se Terminati watts Electri watts Therm nal Pollutant ear Regulator ite Dose Cal pational Safe hlorinated B Shutdown D ation Work P r

ACRONYM unity Survey ommission Level onably Achie urface t Practices actor nergy ansportation g Plan/Post S rotection Age eport rage Well urvey ion sil Station mental Impac agement Uni nt Fuel Stora g Water Reac nclosure ion Plan ic mal t Discharge ry Commiss lculation Ma ety and Heal Biphenyl ecommissio Permit 8-iii MS AND AB y

evable n

Shutdown A ency ct Statement it age Installatio ctor Elimination ion anual lth Administ ning Activit BBREVIAT ctivities Rep t

on System tration ties Report TIONS port

La Cross License T Revision RCRA REMP RPV SAFSTO SSC TEDE TSCA USACE USEPA VCC WCS WDNR WPDES se Boiling W Termination n 0 Resou Radio React OR SAFe Struct Total Toxic United United Vertic Waste Wisco Wisco Water Reactor Plan urce Conserv ological Envi or Pressure V STORage tures, System Effective Do Substance C d States Arm d States Env cal Concrete e Control Sp onsin Depart onsin Polluta r

vation and R ironmental M Vessel ms and Comp ose Equivale Control Act my Corps of vironmental P Cask ecialists tment of Nat ant Discharg 8-iv Recovery Act Monitoring P ponents ent Engineers Protection A tural Resour ge Eliminatio t

Program Agency rces on System

La Cross License T Revision

8.

S 8.1.

In In accor Regulato Nuclear describin specific d Reactor (

8.1.1. P This cha Report, L describin specific Terminat detailed d between activities The supp predicted Environm (NUREG (GEIS) o LACBWR Plan/PSD to be pe activities 8.1.2. B LACBW Water R U.S. Ato 1973, the April 30, electrical Characte Limited disposal consistin (FESW)

Septemb se Boiling W Termination n 0 Supplemen ntroduction rdance with ory Guide 1.

Power Reac ng any new decommissio (LACBWR)

Purpose apter supplem La Crosse B ng any new decommiss tion Plan (L description o those activ

s.

plement disc d by the Un mental State G-0191) (4);

on Decomm R Decommis DAR) (6). T erformed fro

s.

Background

WR consists eactor (BWR omic Energy e reactor and

, 1987, when l output. T rization Surv dismantlem of the Reac ng of 333 sp to dry cask er 19, 2012.

Water Reactor Plan nt to the E n

h the requi 179, Standa ctors (1), th information oning and si site.

ments the 1 Boiling Water information sioning and LTP). This of the remai vities and th cusses wheth nited States ement related NUREG-05 missioning of ssioning Pla This chapter om time of of a single R) construct Commissio d its fuel we n it was shu The plant w vey for SAF ment activitie ctor Pressur pent fuel ass storage at th On March r

Environme rements of ard Format his chapter p n or signific ite closure a 1972 Dairyla r Reactor (E n or significa d license t supplement, ning decomm he environm her the activ Nuclear Re d to operati 586, Supple f Nuclear F an and Post discusses de submittal o Allis-Chalm ted in 1967 on (AEC). T ere transferre ut down bec was placed i FSTOR was c es were sta re Vessel (R semblies, wa he on-site Ind h 12, 2014, D 8-1 ental Repo f 10 CFR 50 and Conte provides a s cant environm activities per and Power ER) (2), whi ant environm termination

, including r missioning a ment, and the vities and th egulatory Co ion of La C ment 1, Ge Facilities, N t-Shutdown ecommission f this LTP mers designe as a demon The plant wa ed to Dairyl ause of econ in SAFSTO completed in arted in 199 RPV) in Ma as transferre dependent S Dairyland su ort 0.82 (a)(9)(ii ents for Lic supplement mental chan rformed at t Cooperative ich was revi mental chan activities reference to and site clos e likely env heir impacts ommission (

Cross Boiling eneric Envir November 2 Decommissi ning activiti until the co ed 50 megaw nstration rea as commissi land. It was nomic reaso OR on Augu n October 19 94, includin ay 2007. A ed from the pent Fuel St ubmitted a r i)(A) and t ense Termin to the envi nge associat the La Cross e (Dairyland sed on June nges associat presented i o LTP Chap sure activitie vironmental are bounde (NRC) NUR g Water Rea ronmental I 2002 (5); an ioning Activ ies, with a fo ompletion o watt electric actor in conj ioned in Nov s operated by ons due to it ust 7, 1991.

995.

ng the remo ll of the sp Fuel Eleme torage Instal evision of th the guidanc nation Plan ironmental r ted with the se Boiling W d) Environm 15, 1973 (3 ted with the in this Lic pter 3, provi es, the intera impact of d by the im REG-0191, F actor, April Impact State nd the Dairy vities Repor ocus on activ f site restor c (MWe) Bo junction wit vember 1969 y Dairyland ts small size An initial oval and of pent nuclear ent Storage llation (ISFS he LACBW ce of ns for report site-Water mental 3), by e site-cense des a action those mpacts Final 1980 ement yland rt (D-vities ration oiling th the

9. In d until e and l Site ff-site
fuel, Well SI) by WR D-

La Cross License T Revision Plan/PSD character concludin EnergySo Survey R Characte As stated was docu 1987. LA environm support o LACBW noted in 1,155 MW known a LACBW the gene decommi located i that this Elk Rive license te The lates The en dismantle specifica this Supp potential Offsi Aqua Terre Threa Socio Envir 8.2.

S LACBW Mississip south of site locat coordinat se Boiling W Termination n 0 DAR to the N rization was ng on Augu olutions is d Report for O erization Sur d in the D-Pl umented in ACBWR de mental impa of the Augus WR, dated Ap the ER and We WNP-2 as Columbia WR is a much eric environm issioning im n Elk River decommissi er facility wa ermination in st D-Plan/PS vironmental ement activi ally evaluate plement as a environmen te land use a atic ecology estrial ecolog atened and e oeconomic ronmental ju ite Location WR is located ppi River, ab the city of L tion, includin tes for LAC Water Reactor Plan NRC that ac s performed ust 6, 2015.

documented i October and rvey Report f lan/PSDAR, a supplemen ecommission ct not prev st 7, 1991, D pril 21, 1980 d NUREG-0 BWR oper a Generatin h smaller rea mental asse mpact of a sm r, Minnesota ioning was c as another A n 1974 (9).

SDAR docum l impact of ities is SMA d in the GE a basis for m ntal impacts activities as to activiti gy as to activ endangered s ustice n and Descr d in southw bout 1 mile La Crosse, W ng nearby p CBWR are l r

ccounts for t d by Energ The results in two separ d November for June thru

, Review of nt to the En ning and dism viously evalu Decommissio

0. This rev 0586. The rated by Wa ng Station, actor compar essment. N mall 58.2 me a, which was completed sa Allis-Chalme ment (issued f all comple ALL as determ IS. As state meeting the re not determin ies beyond th vities beyond species ription western Wisc south of the WI. The Sit rominent fea longitude 9 8-2 the completi gySolutions s of the site rate reports, L 2014 Field u August 201 f post-operat nvironmental mantlement uated in the oning Order iew included reference B ashington Pu owned and red to WNP-NUREG-0586 egawatt ther s dismantled afely with li ers reactor, a in March 20 eted or plan mined by th ed in the GE equirements ned in the G he operation d the operati consin, in V e Village of te Regional atures such 1o, 13, 53.3 ion of the sp commencin e characteriz LACBWR R d Work (7) 15 Field Wo ating license l Report for activities ha e NRC's En or NUREG d the evalua BWR facilit ublic Power operated b

-2, its impac 6 also prov rmal (MWt) d between 1 ittle risk to w a superheate 014) conclud nned LACB he GEIS. LA EIS, licensee s in 10 CFR GEIS are:

nal area ional area Vernon Coun f Genoa, WI Location gr as highways 35 West a pent fuel tran ng on Octo zation surve adiological and LACBW ork (8).

stage enviro r LACBWR ave resulted nvironmenta G-0191 relate ation of impa ty in NURE r Supply Sy by Energy N cts fall within vided inform BWR demo 971 and 197 workers and d test BWR ded the follo BWR decom ACBWR dec es can rely o 50.83(a)(6)(

nty, on the e and approx aphic (Figur s, rivers and and latitude nsfer. Addit ober 9, 2014 eys performe Characteriz WR Radiolo onmental im dated Dece in no signif al Assessme ed to operati acts against EG-0586 wa ystem (plant Northwest).

n the envelo mation abou onstration re

74. It was n d the public.

R, which ach owing:

mmissioning commissioni on informati (ii). Site-spe east shore o ximately 19 m re 8-1) show d lakes. The 43o, 33, 3 tional 4 and ed by zation ogical mpacts ember ficant ent in ion of those as the t now As ope of ut the eactor noted The ieved g and ing is ion in ecific of the miles ws the e map 6.22

La Cross License T Revision North. T The Reac the cargo 639 feet Mississip filled wit The licen LACBW the plant the la forme the la gener the L the la the pa The Site The site i Mississip Corps of The site Highway Highway currently Mississip 2.4 miles

mussels, 0.75 mile 8.2.1. S This sec decommi defined a piping an 10 CFR 2 The deco buildings structure be remov and floo structure se Boiling W Termination n 0 The site is a ctor Building o-carrying-on Above Me ppi River. T th sand mate nsed site com WR plant com off of Highw and north of er Genoa No and area dir rating station LACBWR pl and area sout arcel of land Overview (F is bordered o ppi River an f Engineers (

is bordere y 35. A B y 35, carries y do not use ppi River Na s from LAC brook trou es south of th ite Descript ction provid issioning and as the config nd open lan 20.1402.

ommissionin s, structures s above a de ved from ba ors in the s:

Water Reactor Plan at mile 678.6 g is approxi nly rail road ean Sea Lev The covered erial dredged mprises a to mprising only way 35. Oth f the LACBW

o. 1 Station (

rectly south n (Genoa N ant, th of G-3, w d to the east o Figure 8-2) i on the north nd Highway (USACE) Ro ed on the w Burlington N commercial this rail lin ational Wild CBWR, is t ut and sturg he LACBWR tion After U des a summ d site closur guration of t nd areas at ng of the Cla and compo epth of 3 fee asements loc End-State.

r 6 on the Mi mately 300

d. The Reac vel (AMSL land consist d from the M tal of 163.5 y 1.5 acres.

her prominen WR plant, w (G-1) coal (a of LACBW No. 3 Fossil S where the ISF of Highway illustrates th h by the Miss

35. The U.

ock Island D west by the Northern-Sa l freight alo

e. The site dlife & Fish the Genoa eon. On th R plant, ther Unrestricted mary of the re activities.

the remainin the time o ass 1 areas o onents) will et below grad cated below This app 8-3 ssissippi Riv feet from th ctor Building L), or 19 fe ted of the riv Mississippi R acres which The site is nt site featur which includ and later oil)

WR, which c Station [G-3 FSI is located 35, across fr e boundary o sissippi Rive

.S. Lock &

District, is lo e Mississipp anta Fe rail ong the easte is bordered h Refuge Poo National Fi he southwes re is a public d Release final cond The End-S ng below gro f license te of the plant include the de (designat the 636 foo proach will ver above th he Mississipp g stands on et above th ver edge and River.

h is owned b accessed by res include:

es the site s

) fueled pow contains an 3]), located d, and from LACBW of the licens er and a narr Dam No. 8, ocated appro pi River an l line, loca ern portion o to the south ol 9 area. F ish Hatchery stern corner c boat launch dition of the State for LA ound backfil ermination m (the on-site demolition, ed as 636 fo ot elevation apply to th he mouth of pi River and filled land a he normal d low forest a by Dairyland y a road on witchyard a wer plant (rem operational approximate WR.

sed site.

row strip of managed b ximately 0.6 nd bordered ated betwee of the site.

h by a segm Further sout y, which ra r of the site hing ramp w e site at th ACBWR dec lled building meeting the e radiologica removal an oot AMSL).

leaving onl he followin f the Ohio R d 475 feet we at an elevati elevation o areas which d, with the a the south si and the site o moved in 19 350 MWe ely 175 feet land betwee by the U.S. A 6 miles upstr on the eas en the site Passenger t ment of the U th, approxim aises endang e, approxim with a parking he conclusio commissioni gs, structure requiremen ally contamin nd disposal o All systems ly concrete ng buildings River.

est of on of f the were actual ide of of the 89),

fossil from en the Army ream.

st by and trains Upper mately gered mately g lot.

on of ing is s and nts of nated of all s will walls s and

La Cross License T Revision React Wast Venti Pipe Wast Turbi Low Main The debr disposal.

Figure 8-structure will be d and struc require re G-3 Crib structure potential the LTP The belo filled wit Departm backfille The stru dismantle Adm LACB Outfa G-3 C coal water Elect Paved plant After all process a and the s se Boiling W Termination n 0 tor Building te Treatment ilation Stack and Ventilat te Gas Tank ine Building Specific Act ntenance Eat ris generated

-3 shows th s and compo demolished a ctures assoc emedial acti b House, will s at depths g removal. F Chapter 3.

ow grade stru th suitable c ent of Natur d, returned t uctures outs ed and will r inistration B BWR Crib H all diffuser d Coal Plant an barge washi r systems an trical Switch d roadways area.

demolition as described surrounding Water Reactor Plan g,

t Building, k,

tion Tunnels Vault, g and Turbin tivity (LSA)

Shack.

d from demo he key LAC onents, othe and removed ciated with G ions; therefo l remain inta greater than Further infor uctures to re clean soil, sa ral Resource to grade, see ide of the remain on si Building, incl House, inclu discharge pip nd all associ ing station t nd piping, hyard, and, and the Bur and remedi in Chapter open land r

s, ne Office Bui

) Storage Bu lition and re CBWR build er than the L d to a depth o G-3 are exp ore, no remed act and func 3 foot below rmation on t emain in the and and/or o es (WDNR) eded and app LACBWR te. These in luding assoc uding fire pro ping, extendi iated buildin to the north rlington Nor iation activi 5 of this LT areas within 8-4 ilding, uilding, and emoval opera dings at the LACBWR A of at least 3 pected to be diation is pla ctional for G w grade will the approach e End State other suitabl regulations propriate ero R Site Encl nclude:

ciated sanitar otection pipi ing 110 feet ngs, warehou h of the plan rthern-Santa ities are com TP, will be p n its license ations will b site. All o Administratio feet below g e radiologica anned and th G-3 power op l be assessed h to the vari e such as b le media, as

. The resto sion control losure (LS ry sewer and ing systems, into the Mis uses and sup nt and all as Fe rail line mplete, a Fi performed to d boundarie be segregated on-site LAC on Building grade. None ally impacte hese structur perations. A d for radiolo ious buildin basement fou s allowable ored areas on s will be est E) are not d water syste ssissippi Riv pport structur ssociated sa and spur in inal Radiatio o demonstrat es, with the d for recycli CBWR build and Crib H e of the buil ed such that res, includin Any contamin ogical impac ngs is provid undations w under Wisc n the site w ablished.

expected t ems and pipi

ver, res, includin anitary sewer nto the LACB on Survey (

te that LACB exception o ing or

dings, House, dings t they ng the nated ct and ded in will be onsin will be to be
ing, ng the r and BWR (FRS)

BWR of the

La Cross License T Revision ISFSI fa 10 CFR 2 dry stora dry stora Isolation remediat control m comprom equipmen access. I there is n survey ar Several s support t supportin 8.3.

R To date, removal RPV incor FESW Vario

RPV, Purif Vario Chapter 3 remediat achieve t 8.4.

Im As previ decommi associate by the pr NUR NUR Chapter 3 schedule footprint se Boiling W Termination n 0 acility, com 20.1402. As age casks an ge within th and contro ion activitie measures w mised by th nt. Open la Isolation and no risk of re reas that hav services such the ISFSI m ng the adjace Remaining D several key of the follow and associa re monitor gu W stored com ous system p

, and primar fication, Seal ous Turbine 3 of this LT ion activitie the End-Sta mpacts to th iously noted issioning op ed with deco reviously issu REG-0191, an REG-0586.

3 of the LT d to be com

). The ident Water Reactor Plan mply with s part of the d transferred e ISFSI unti ol measures

s. These act will be impl he potential and areas, ac d control me

-contaminat ve been relea h as sanitary monitoring a ent G-3 fossi Dismantlem dismantlem wing compon ated reactor uide tubes, e mponents su piping and c ry systems su l Injection an and auxiliar P provides d es currently b ate conditio he Post-Shu d, the D-Pl perations at t ommissionin ued environm nd TP identifie mpleted prio tified activiti r

the radiolo decommissi d to the ISF il it is transfe will be imp tivities will lemented to for re-con ccess roads a easures will ion from de ased from the y sewer servi and security il station wh ent and Dec ment and deco nents:

components etc.),

uch as fuel sh components uch as the C nd Main Ste ry systems.

detailed desc being perfor on.

utdown Deco lan/PSDAR, the site and ng the site ha mental impa es the dism or to the un ies are not s 8-5 ogical criter ioning proce SI. It is exp erred to the D plemented fo be complete o ensure the ntamination and boundar remain in e commission e license.

ices and elec operations.

hich will rem commission ommissionin s (e.g. fuel hrouds, contr associated ontrol Rod D am.

criptions of rmed and th ommissionin amended concluded t ave already act statement mantlement a nrestricted re ignificantly ria for unr ess, all spent pected that t Department following th ed prior to st e final radi as result ries will be ffect through ning. These ctrical servic There are main in place ning Activiti ng activities shrouds, co rol rods, and with the Fo Drive Mecha the dismant he remaining ng Activitie in March 2 that the pote been postula ts, specifical and deconta elease of th different fro restricted u t nuclear fue this spent fu of Energy (D e conclusion tarting the F iological co of access b posted with hout FRS ac measures ar ce will rema e three potab

e.

ies have occurr ntrol rods, s d start-up sou orced Circula anisms, Dec lement, deco g activities t es Report (P 014, describ ential enviro ated in, and lly:

amination ac he site (excl om those ori use specifie el was loaded uel will rema DOE).

n of radiolo FRS process.

onditions are by personne h signs restri ctivities and re not requir in in operati ble wells on red, includin steam separa urces, and ation system cay Heat, Pri ontamination to be execut PSDAR) bed the pla onmental im d will be bou ctivities tha luding the I iginally discu ed in d into ain in ogical The e not el or icting d until red in ion to n site ng the

ators, m, the imary n and ted to anned mpacts unded at are ISFSI ussed

La Cross License T Revision in the D-will be d identified provide decommi 8.5.

L 8.5.1. G 8.5.1.1.

The site Vernon C 300 feet by filling The site 642 feet Mississip silts) und sands and 8.5.1.2.

The U.S reliable c total pop 744 for S near the small tow (populati 5 miles s 8.5.1.3.

The LAC of the M bounded north, an electric p This stat Genoa, lo within th The area and fresh to the G-site, loca se Boiling W Termination n 0

-Plan/PSDA defined durin d in the D-additional issioning.

La Crosse Bo Geography a Site L location and County, Wis from the eas g in river ed is relatively AMSL bou ppi River to derlain by fin d gravels. B Popul

. Census Bu census data f pulation in 2 Stoddard, loc plant, locat wns west o ion 397), lo outhwest.

Site A CBWR prope Mississippi R by the Mis nd a wildlife power station tion is locate ocated appro he town. The a of the Miss h water fishi

-3 station lo ated approxim Water Reactor Plan R. Althoug ng decommi

-Plan/PSDAR evaluation oiling Wate and Demogr Location and d description sconsin, in t st bank of the dge and low y flat with th unded by the the west. T ne to medium Bedrock is en lation ureau, Amer for nearby W 2013 was 25 cated 7 miles ted 17 miles of the plant cated 3 mil Access, Land erty is locate River. Altho ssissippi Riv and fish ref n completed ed to the so oximately 1 m ere are no re sissippi Rive ing) and com cated south mately 4,000 r

gh additional issioning pl R have bee and infor er Reactor E raphy Description n were discu the Mississip e Mississipp forest areas he reactor f e railroad tr The geology m sands with ncountered a rican Comm Wisconsin vi 8 for the Vi s N of the pl N; and 30, across the es northwe d and Water ed in the far ough the site ver to the w fuge to the s d in 1969, w outh, adjacen mile to the n esidences wit er adjacent t mmercial bar of the LAC 0 feet south o 8-6 l details rega anning effor en identified rmation reg Environmen n

ussed in secti ppi River V pi River. Tw s with mater facilities stan acks to the y consists pr h some soils at approxima munity Surve illages and c illage of Ge lant; 51,522

,329 for Ver Mississippi st, and New Use r western por e area is 163 west, a rail li south. The s which is also nt to the LA northeast of t thin 2,000 fe to the site is rge and ship CBWR plant) of the plant.

arding majo rts, no signi

d. Subsequ garding the nt Descriptio ion 8.2. The alley, with t wenty-seven rial dredged nding at elev east and th rimarily of f s containing ately 130 fee ey (ACS) re cities and Ve enoa, located for La Cros rnon County i River, inc w Albin, IA rtion of Ver 3.5 acres, it ine to the e site includes owned and ACBWR fac the site. An eet of any LA s used for re p traffic (e.g.

). There is There is a p r decommis ificant impa uent sections environme on e 163.5 acre the Reactor acres of the d from the M vations rang he riprap on fill materials higher perc et below grou eport (11) pr ernon County d 1 mile nor se, the large

y. There ar luding Reno A (populati rnon County is relatively east, USACE s G-3, a coa d operated by cilities. The n elementary ACBWR str ecreational p

. barges of c a public bo portion (Poo sioning activ cts beyond s in this ch ental effect e site is locat Building lo site were fo Mississippi R ging from 6 the shore o s (fine sand entages of c und surface rovides the

y. The estim rth of LACB st Wisconsin re also num o township, ion 513), lo y on the east y isolated as E property t al-fired 379 M y Dairyland e closest tow school is lo ructure.

purposes (bo coal are deliv at landing o ol 9) of the U vities those hapter ts of ted in ocated ormed River.

36 to of the s and coarse (10).

most mated BWR; n city erous MN ocated bank s it is to the MWe (12).

wn is ocated oating vered on the Upper

La Cross License T Revision Mississip for hunti Genoa N mile 679 long lock public ac through Highway No. 8.

8.5.2. C The clim continent river vall Lock and of the in from 60 winter m the avera summer s The aver range fro month fo The bluff winds at monthly experienc tornado o F3 (maxi center inj 8.5.3. T 8.5.3.1.

The site i dissected varies be river leve Highway Prior to c lying we dredged to constr se Boiling W Termination n 0 ppi River Na ing, fishing National Fish

.2, is approx k and dam s ccess to an o November.

y 35 approxi Climate mate at the L tal climate w ley location d Dam No. 8 nformation f to 90o F du months of De age tempera season (15).

rage annual r om 3 to 5 inc or the remain fs of the Mis t the site wh average wi ced tornados occurred 27 imum wind jured one pe Topography Topog is located w d uplands. F etween 21/2 a el. The LAC y 35. Figure construction tlands. The sands from t ruction, the a Water Reactor Plan ational Wildl and recreati h Hatchery.

ximately 0.6 structure ow observation The State imately 1/2 m La Crosse r with cold wi of the site.

8 site with a for the past uring the mo ecember 201 ture is appr rainfall is 35 ches per mon nder of the y ssissippi Riv here the va ind speeds

s. On April

.4 miles awa speeds 158-erson and cau

, Geology an graphy ithin the Mi From La Cro and 41/2 mile CBWR site i 8-4 provide n of the LAC e property gr the Mississip area was gra r

life & Fish R onal activiti

. Lock and 6 miles north ned and ope platform, op e of Wiscon mile north o region of W inters and ho The USAC archived wea year (May onths of Jun 14 to Februa oximately 2 5.2 inches. M nth in the sp ear.

ver Valley ch lley runs no are typicall l 30, 1954, a ay from the 216 mph) to used betwee nd Seismolo ssissippi Riv sse to Prairi s in width.

is located be es a Topogra CBWR facil rade was the ppi River. D aded to a rel 8-7 Refuge just s ies (13). Fur d Dam No.

h of the site erated by the pen from da nsin also m of the LACB Wisconsin an ot summers CE maintains ather inform 2014 to Ma ne through A ary 2015. C 20o F in the Monthly prec pring and sum hannel the w orth-south a y 6 to 10 m a category F4 Genoa villa ornado that o en $500,000 ogy ver Valley, w e du Chien, The valley etween two v aphy Map of lity, the site en increased During grade latively flat south of the rther south a 8, located

e. The dam e USACE (

awn to dusk maintains a BWR site, a nd at the LA and extrem s an active w mation for the ay 2015) ind August 2014 City data com winter mon cipitation av mmer season winds at the L are from the mph. The 4 (maximum age center.

occurred 6.6 and $5,000, where the va approximate walls rise s valleys on e f the site.

location co d through the e manipulati ground surf site which h are public la on the Mis m is a 110 fe 14). This fac k during the highway w across from ACBWR sit mes influence weather stat e Genoa, W dicated temp 4 and 45 to mpiled for G nths and reac verages in the ns and from LACBWR s e north and Genoa, WI m wind spee On June 5, 6 miles away 000 in dama alley is deep ely 40 miles sharply 500 either side of onsisted of m e deposition ion and site face. The re has limited a and areas an sissippi Riv et wide, 600 cility also a months of wayside off m Lock and te is typical ed because o ion at the ne I area. A re peratures ran

-5o F durin Genoa shows ches 72o F i e Genoa, WI 1 to 3 inche ite. Predom the south.

I area has r ds 207-260 1980, a cate y from the vi ages.

ly cut into h s south, the v to 600 feet f the bluff ea marshes and n of hydrauli preparation esulting grad access nd the ver at 0 feet llows April State Dam of a of the earby eview nging ng the s that in the I area es per minant The rarely mph) egory illage highly valley from ast of low-ically prior de for

La Cross License T Revision the LAC access ro 8.5.3.2.

LACBW of the Ce of the W bedrock i Generally to 130 fe Valley.

Dreshbac Precambr (BGS). A 509 feet river sho 8.5.3.3.

Many fau capable i condition in the sit nuclear p any evid Therefor Seismic a 2008 all 8.5.4. H Hydrolog Groundw 25 feet B Mississip the Missi the west towards groundw fossil sta some per flooding.

Hydrauli the shallo structure se Boiling W Termination n 0 BWR site is oad along the Geolo WR is located entral Lowla Wisconsin Do in this region y, the local g et of glacial These unco ch Group (

rian crystall At the subje AMSL near reline.

Seism ults have be in accordanc ns in the site te region, bu power plant dence of cap e, capable fa activity (ma occurred ove Hydrology a gy and hyd water beneath BGS and the ppi River. T issippi River and discharg the west bu water elevatio ation, it appe riods where ic conductivi ow sands tha of the shall Water Reactor Plan s generally f e eastern bou ogy d on the east and Physiogr me and the n dips less th geology is d outwash an onsolidated d Upper Cam line rocks e ect site, the b r the Reactor mology een mapped ce with 10 C e vicinity tha ut investigati sites in the pable faultin aulting does agnitudes ran er 180 miles nd Hydroge drogeologica h the site is water table Therefore, ch

r. Groundw ges into the M ut then may on measurem ears that the the gradien ity is influen at were hydr low soils wo r

flat with gra undary of the bank of the raphic Provi western flan han 20 feet p described as a d fluvial dep deposits are mbrian). Th encountered bedrock surf r Building a d in the site CFR 100, A at represent ions of all o region, in ad ng. Additio not need to nging from 3 s from the sit eology al informat s first encou aquifer is in hanges in the ater in the sh Mississippi turn and flo ments collec ere is a sligh nts are rever nced by the s raulically dre ould not like 8-8 ade level at e site to the r Mississippi ince (16). T nk of the Wi per mile to th approximate posits on the underlain b he Dreshbac d at approxi face is encou and slopes to region. No Appendix A.

hazard to th f these fault ddition to st onally, the a be considere 3.5 to 5.4) th te and did no tion was p untered at de n strong hyd e water table hallow depo River. The ow parallel cted during ht downwar rsed and thi soil structure edged, depo ely influence approximate riprap along i River in the The site is lo isconsin Arc he southwes ely 15 feet o e east flood p by flat lying ch Group i imately 650 untered at an o approximat one of these Per the N he facility. N ts during the tudies for the area is one o ed in the ana hat has been ot impact the primarily ob epths rangin draulic comm e elevation a sits and fill m deeper grou to the river routine sam rd vertical g is is likely d e and grain sited, and co e groundwat ely 639 feet g the river sh e Wisconsin ocated on the ch. The sedi st.

f hydraulic f plain of the M sandstone a is then und 0 feet below n elevation tely 501 fee e faults are NRC, There Numerous f e course of v e LACBWR of relatively alysis of this n recorded b e plant site o btained from ng from app munication w are dependen material like undwater is a

r. Based on mpling in sup gradient. Ho due to high size distribu ompacted on ter flow dire AMSL from hore.

n Driftless se e southwest imentary stra fill overlying Mississippi R and shales o derlain by d w ground su of approxim t AMSL nea considered e are no geo faults are ma validating se R, have not f y low seism s site (17).

etween 1975 or operations m Referenc roximately with the adj nt on the sta ely flows tow also likely to n a review o pport of the owever, ther river stages ution. Becau n site, the int ection. How m the ection flank ata or g 100 River of the dense urface mately ar the to be ologic apped everal found micity.

5 and

s.

ce 10.

15 to acent age of wards o flow of the e G-3 re are s and use of ternal

wever,

La Cross License T Revision the nativ anisotrop the horiz these lay The velo gradient.

across th the groun range) ev 8.6.

E 8.6.1. S The eval follows t includes considere Large.

evaluatio For thos evaluatio

1)

T N

id

2)

A

3)

P d

4)

A es en ad av th

5)

A A conclu the level 0586 eva the forme Table 8-1 LACBW screen th se Boiling W Termination n 0 ve sands und py of the aqu ontal directi ers.

ocity of grou The gradie he site it is li ndwater velo ven though th Environmen ummary luation of th the approach identificatio ed to be gen If identifie on in NUREG se environm on, a standard The issue or NUREG-019 dentified in t Applicable re otential imp escribed.

An evaluatio stimate or d nvironment dditional mi voided, a de he resource o A conclusion usion is deriv of significa aluation. No er G-1 coal/o 1 was used WR. It is exc he issues t Water Reactor Plan derlying the uifer would ion than in th undwater flo ent of the wa kely that the ocity across he hydraulic ntal Effects o he environme h and method on of enviro neric, it is a ed as generic G-0586 whic mental issu d approach i activity is s 1 and D-Pla these docum egulations, p pacts from de on is perfor determine wh considering itigation mea etermination or attribute.

is reached.

ved from the ance of the ote that the e oil fueled po as the bas cerpted from o identify r

hydraulic fi be more per he vertical d ow is directly ater table is e water table the site is c conductivit of Decommi ental effects dology outli nmental issu assigned a s c, the enviro ch concludes es or deco is followed.

summarized, an/PSDAR.

ments.

ermits, limit ecommission rmed. This hether the a the availab asures that c is made as e evaluation impacts. Si environmenta ower plant w sis for the m Table 6.1 o site-specific 8-9 fill would lik rmeable and direction. Th y related to influenced b e has a very also relative ty could supp issioning (or impacts ined and des ues as either ignificance onmental im s that the ov ommissionin It is summa including a Note that m ts or other re ning activitie s includes ctivity is lik ble informati can be taken to whether steps summ ite-specific i al impacts o was not consi site specific of NUREG-0 c issues. D kely provide d have a high his decreases both the hy by the topog low gradien ely slow (i.e port faster fl s) of the dec scribed in N r generic or level of eith mpact is cons verall impact ng activities arized as foll a summary o many decom egulatory req es relating to analysis an kely to make ion. If an im n are evalua the impact i marized abov issues are n of the operati idered in this c environme 0586. The f Decommissi e sufficient her hydrauli s the vertica ydraulic con graphy and w nt. Therefor e., in the inc flow.

commissioni NUREG-0586 site-specific her Small, sidered to be t significance s that requ lows:

of the impac mmissioning quirements a o the environ nd profession e a noticeab mpact is lik ated. If an i is likely to s ve. The con ot bounded ing G-3 coal s review.

ental impact first step in ioning activ structure tha ic conductiv al transport w ductivity an with the flat re, it is likely ches and fee ing of LACB

6. This appr
c. If the iss Moderate e bounded b e is Small.

uire site-spe cts as report activities ar are identified nmental issu nal judgme ble impact o kely, existing impact cann seriously dam nclusion iden by the NUR l power plan t assessmen this process vities specif at the vity in within nd the areas y that et/day BWR roach sue is e, or by the ecific ted in re not

d.

ue are nt to on the g and not be mage ntifies REG-nt and nt for s is to fic to

La Cross License T Revision LACBW identified evaluatio Offsi 35 ye Aqua sensit Terre of sen Threa threat Envir 35 ye Cultu histor 8.6.2. R 8.6.2.1.

During d in accord of the Ra exposure 2,000 mr also be m program Radiation materials In Augus of the sta 1994 wit allowed levels at Protectio exposure significan removal (SSCs).

se Boiling W Termination n 0 WR are then

d. The scre on:

te land use a ears, since th atic ecology tive areas.

estrial Ecolo nsitive areas atened and tened and en ronmental J ears.

ural and Hi ric landmark Radiological Occup decommissio dance with th adiation Pro es and maint rem/yr Total maintained A and proced n Work Perm s incorporate st 1987, Dair abilized and th the comm for the deca the facility.

on Program e during the nt contributo and packag Water Reactor Plan reviewed a eening ident activities: ch he FES was i affected by gy affected b

s.

endangered ndangered sp Justice: chan storic Resou k designation l Effects of D pational Rad oning, Soluti he license sp tection Prog tain occupat l Effective D As Low As R dures will e mits (RWP) e effective ra ryland place defueled fac mencement o ay of most s

. This delay and ALARA e decommiss ors to occup ging of rema r

and the activ tified the fo hanges in dem issued.

activities be by activities species: ch pecies that h nges in dem urce impact ns and other Decommissi diation Expo ions will con pecifications gram are to tional worke Dose Equiva Reasonably A ensure that involving po adiological c ed LACBWR cility). LAC of increment short-lived r y, combined A measures, sioning of L ational dose aining Reac 8-10 vities that m ollowing po mographics eyond the op s beyond the hanges in lo have occurred mographics ts beyond t cultural reso ioning sure ntinue to im s and the req control radia er exposures alent (TEDE Achievable (

work speci otential radia controls.

R in a SAFS CBWR remai tal decommi radionuclides d with the ef

, minimized LACBWR t from remai tor Building may require otential areas and zoning t perational are operational ocal flora an d in the past and socioe the operatio ources.

mplement a R quirements o ation hazard s to less tha E). Dose to (ALARA).

ifications, d ation exposu STOR condit ined in a ful issioning act s, which sub ffective impl the actual to date. It ining disman g Structures e site-specifi s for additio that have oc ea; changes l area; chang nd fauna an t 35 years.

economic st onal areas; c Radiation Pro f 10 CFR 20 ds, avoid acc an the admin workers and The LACBW designs, wor ure or handli tion (a perio lly SAFSTO tivities. Th bsequently r lementation and projecte is anticipate ntlement acti s, Systems, ic evaluation onal site-spe curred in the in designati ges in design nd designatio tatus in the changes in otection Pro

0. The objec cidental radi nistrative lim d the public WR work co rk packages ing of radioa od of safe sto OR condition his period of reduced radi of the Radi ed radiation ed that the ivities will b and Compo n are ecific e past ion of nation on of past local ogram ctives iation mit of must ontrol s and active orage n until f time iation iation dose most be the onents

La Cross License T Revision Table 8 Sectio 8.6.2 8.6.3.1 8.6.3.2 8.6.3.3 8.6.3.4 8.6.3.5 8.6.3.6 8.6.3.7 8.6.3.8 8.6.3.9 8.6.3.1 8.6.3.12 8.6.3.13 8.6.3.14 8.6.3.15 8.6.3.16 8.6.3.17 8.6.3.18 8.6.3.19 8.6.3.20 se Boiling W Termination n 0 8-1 Summ Powe on Radiolo Activiti workers Activiti Radiolo Onsite l Offsite Water U Water Q Surface Ground Air Qua Aquatic Activiti Activiti Terrestr Activiti Activiti Threate Occupa 1

Socioec 2

Environ 3

Cultura Activiti Activiti 4

Aesthet 5

Noise 6

Irretriev 7

Traffic 8

ISFSI c 9

VCC co impacts 0

Rail lin offsite)

Water Reactor Plan mary of the r Facilities Enviro ogical ies resulting i s

ies resulting i ogical Accide land use activ land use activ Use Quality e water d water ality c Ecology ies within the ies beyond th rial Ecology ies within the ies beyond th ened and Enda ational Issues conomic nmental Justic al and Historic ies within the ies beyond th tics vable Resourc and Transpor construction: l onstruction fo s (onsite) ne upgrade and r

Environme onmental Issu in occupation in dose to the ents vities vities e operational a e operational e operational a e operational angered Spec ce c Resource Im e operational a e operational ces rtation land use impa or the ISFSI: l d extension (o 8-11 ental Impact ue al dose to public area area area area cies mpacts area area acts (onsite) land use onsite and ts from Dec NUREG 0586 (GEIS)

Yes Yes Yes Yes No Yes Yes Yes Yes Yes No Yes No No Yes Yes No Yes No Yes Yes Yes Yes No No No commissioni G-

)

Impac Small Small Small Small Site-spe Small Small Small Small Small Site-spe Small Site-spe Site-spe Small Small Site-spe Small Site-spe Small Small Small Small Site-spe Site-spe Site-spe ing Nuclear ct Significanc cific cific cific cific cific cific cific cific cific r

ce

La Cross License T Revision NUREG-The curr estimated dose for bounded 8.6.2.2.

Dairylan (REMP) environm the radio decommi of 10 CF to adhere public do considere The only liquid wa piping w collection through t discharge of the c protectio LACBW bounded The gase meteorol noble gas or exposu gaseous r 8.6.2.3.

Decomm this analy conducte Fuel Acc decommi the mini LACBW otherwise The deco and cont Protectio se Boiling W Termination n 0

-0586 estim rent occupat d to be 130.3 the decomm by NUREG Offsit d implement at LACBW ment in and a oactive gase issioning act FR 50, Appen e to these l ose from dec ed as Small y authorized aste from th which is a pa n system pu the East Tu es to the inle current and n in accor WR to date co by the evalu eous pathwa logical condi s, the gaseou ure pathway releases.

Enviro missioning ac ysis has con ed and provi cident Analy issioning and mal radioac WR site is in e involving a ommissionin amination le on and Safet Water Reactor Plan mated that 1, tional expen 3 Rem, whic missioning w G-0586 and th te Radiation ted a regulat WR which p around the e eous (airbor tivities do n ndix I, or th limits throug commissioni

l.

effluent rele he LACBWR art of the G-3 umps are not urbine buildi et of the liqu future Rad dance with onclude that uation in NU ay (which i itions during us pathway c

y. Routine a onmental Ef ccident analy ntinued durin ided in regu ysis have no d with spent ctive materi nsufficient f a significant ng of radioa evels remain ty and Heal r

874 Rem wi nded and do ch is well bel will meet the he impact is Exposure an tory complia provided an nvirons of th rne) and liq ot exceed th e fuel cycle ghout the co ing is bound ease pathway R site to the 3 circulating t operable. T ing sump us uid waste mo diation Prot 10 CFR 20 t the public e UREG-0586, includes nob g the time of consists of a air samples a ffects of Acc ysis is integ ng shutdown ular updates oted that w t nuclear fue al resulting for any pot t adverse effe actively cont ning at LAC th Programs 8-12 ill be neede ose expecte low the NUR e regulatory considered nd Monitorin ant Radiolog nnual report he site. The quid effluen he concentrat dose limits ourse of the ded by the cr y for the dis Mississippi g water disch The only liq sing an air o onitor, which tection and 0 and 10 CF exposure as which conc ble gas and f the release.

airborne part are collected cidents and D gral to the li n and decom to the D-Pl with consider el now stored from LAC ential event fect on public taminated S CBWR. Wor s for LACB ed to decom ed to compl REG-0586 e y standards o as Small.

ng gical Environ s with asse e REMP prog nt releases d ation limits o of 40 CFR e decommis riteria in NU charge of tre i River is thr harge system quid effluent operated pum h is still oper REMP at FR 50, App a result of d cludes the im d particulate

. Due to pla ticulate only to determin Decommissio icensing des mmissioning.

lan/PSDAR, ration for th d in the ISFS CBWR opera t to result i c health and SCs will in rker safety i BWR which mmission a s lete the dec estimate. As of 10 CFR 2 nmental Mo essments of gram provid during plant of 10 CFR 20 190. Solutio ssioning. C UREG-0586 eated and fil hrough the s

m. Currently t discharges mp. The ai rable. Conti LACBWR pendix I. RE decommissio mpact is mini e) analysis i ant shutdown and present ne the dose d oning Event sign basis fo

. Post-fuel

, within sec e current sta SI, this analy ation and r in exceeding d safety.

nvolve the h is addressed rely on AL single unit B commissionin s the occupat 20, it is ther onitoring Pro the radiolo des assurance t operations 0, the dose l ons will con Consequently and the imp ltered radioa seal well/dif y, the liquid w at LACBWR ir operated p inued applic R ensures p EMP report oning activit imal.

is subject to n and cessati ts a minor re due to radioa ts or LACBWR accident ana tion Plant age of LACB ysis confirm emaining on g dose limi highest dose d in the Radi LARA princ BWR.

ng is tional refore ogram ogical e that s and limits ntinue y, the pact is active ffuser waste R are pump cation public ts for ties is o the ion of elease active R and alysis Post-BWR s that n the its or rates iation iples.

La Cross License T Revision The safe release o During d addition in NURE decommi LACBW potential reduction Deco Prior Radio Operation and servi in the ISF Radio Explo Loss Natur Hum The publ accidents dose con Plan/PSD analysis i 8.6.2.4.

The deco volumes bulk deb are, and implemen the appro and liqui The majo EnergySo and truck transferre se Boiling W Termination n 0 ty of the pu f radioactive decommissio to maintenan EG-0586 ass issioning of WR are bound consequenc n of the total ontamination radioactive oactive deca nal accident ice condition FSI, operatio oactive wast osions and/o of contamin ral phenome an caused ev lic dose cons s during deco nsequences f DAR and res is therefore b Storag ommissionin of low leve ris materials will continu ntation of th opriate segre d radioactiv ority of the olutions disp ked to a ra ed to a rail c Water Reactor Plan ublic is prin e materials d oning, Soluti nce, waste m sociated wit f LACBWR ded by the ces associate l radionuclid n efforts mad waste shipm ay.

s during dec ns. With the onal acciden te transportat or fires assoc nation contro ena, and vents externa sequences re ommissionin from acciden sulted in dos bounding fo ge and Dispo ng of LACB el radioactiv s such as con ue to be disp he Waste Ma egation, clas e wastes.

Class A low posal site in ail trans-load car. Rail an r

cipally relat during decom ons will perf management, th immediat R. Consequ accident eva ed with thos de inventory de before dec ments, and commissioni e spent nucle nts during de tion acciden ciated with e ol, al to LACBW eported in N ng ranged fro nts during L se ranging fr r the decomm osal of Low-BWR has, a e waste, inc ncrete, meta positioned a anagement P ssification, p w level radio Clive, Utah d facility in nd truck shi 8-13 ted to poten mmissioning form decont

, and surveil te dismantlin uently, the p aluation pre se accidents at LACBWR commissioni ng could res ear fuel rem commission

nts, xplosive and WR.

NUREG-0586 om 0.02 to 0 LACBWR de om 0.027 to missioning o

-Level Radio and will co cluding conta al and asphal as low level rogram and processing, p oactive waste

h. Waste w n Winona, M ipments are ntial hazards g operations.

tamination an llance activit ng would al potential de sented in N would be l R from:

ing, sult from equ moved from t ning can be c d/or combus 6 for onsite, 0.96 rem. A ecommission o 0.065 rem.

of LACBWR oactive Wast ontinue to re aminated eq lt. Materials radioactive associated p packaging, s e from LAC will be loade MN where made in acc associated nd dismantle ties. The ac lso be appli ecommission NUREG-0586 less at LAC uipment failu the LACBW categorized a stible materia non-fuel rel An analysis o ning was pr The NURE R.

te equire the d quipment, to s that cannot e waste. Th procedures, S shipment and CBWR will b d into appro the waste c cordance wit with an airb ement of SS cidents discu icable durin ning acciden

6. However CBWR due t ure, human e WR site and s as follows:
als, lated radiolo of potential p rovided in th EG-0586 acc disposal of ools, clothing t be free rele rough the p Solutions en d control of be shipped t opriate conta container wi th Departme borne SCs in ussed ng the nts at r, the to the
error, stored ogical public he D-cident large g and eased roper nsures solid to the ainers ill be ent of

La Cross License T Revision Transpor Waste Co 8.6.2.5.

Followin radiologi remainin (excludin radiologi license w Chapter 6 criteria.

8.6.3. N 8.6.3.1.

The envi within se The LAC existing L to be con slips are onsite ra activities parking a to occur Several s roadways including remediat 636 foot waste str No sign activities comply w regulator In accord onsite are 8.6.3.2.

Only are and licen and dem se Boiling W Termination n 0 rtation (DOT ontrol Speci Radio ng the com ical surveys ng in backfi ng the ISFSI ical conditio will be termi 6 provide th Non-radiolog Onsite ironmental i ection 4.3.1 o CBWR deco LACBWR l nducted with being const ail line will

s. Containe and equipme in a manner structures su s and rail li g piping and ed, as neces elevation w ream.

nificant env s are anticipa with applica ry requireme dance with t e considered Offsit eas within th nse terminati molition equip Water Reactor Plan T) regulation alist (WCS) ological Crite mpletion of will be perf illed structu I) meets the ns are demo nated, with he methodo gical Effects e Land Use impact assoc of NUREG-0 ommissionin icensed prop hin the LSE tructed. The be modified ers will be u ent/containe similar to w uch as the S ines, will re d tunnels, be ssary. All ot will be remo ironmental ated. In add able United ents.

the guidance d as Small.

te Land Use he existing s ion activitie pment, wast r

ns. If Class facility in A eria for Lice decontamin formed to d ure basemen unrestricted onstrated to b the exceptio ology for de s of Decomm ciated with 0586 to be g ng project is perty previou footprint. S e existing ra d and refurb unloaded an r laydown, s when the faci Switchyard, emain at lic elow the 63 ther systems oved during changes as dition to NRC States Envir e presented (in the Vicin ite licensed es (such as t te container 8-14 s B/C waste Andrews, Tex nse Termina nation, dism emonstrate t nts, any rem use criteria be below the on of the are emonstrating missioning onsite land generically c s located an usly used fo Some onsite ail line supp bished with nd loaded on storage, stag ility was ope Administrat ense termin 6 foot eleva s and compo the decomm ssociated w C requireme ronmental Pr in NUREG-nity) boundary w emporary st s, etc.). Of e is identifie xas.

ation mantlement that the dos maining pipi a specified in e unrestricte ea around th g complianc uses has be onsidered as nd executed or power gen e roads have ported the op a rail spur nsite. Onsi ging and wa erational.

tion Building nation. Sub ation will be onents as we missioning p with the sit ents, decomm rotection Ag

-0586, the p will be used torage and s f the 163.5 a ed, it will b and remed se from resid ing and soi n 10 CFR 20 ed use criteri e ISFSI. LT ce with the een determin s a Small i within the neration; all been refurb peration of t to support d ite activities aste loading g, Crib Hou surface base e radiologica ell as all stru process and te-specific d missioning a gency (USE potential imp to support d staging areas acre site, ab be shipped t diation activ dual radioac ils at LACB 0.1402. Afte ia, the 10 CF TP Chapter 5 unrestricted ned by the N impact.

boundary o work is exp bished. No b the facility.

decommissio s such as ve are and con use as well a ement struct ally assessed uctures abov disposed of decommissio activities wil EPA) and W pacts to land decommissio s for remedi bout 1.5 acre to the

vities, ctivity BWR er the FR 50 5 and d use
NRC, of the pected barge The oning ehicle ntinue as all
tures, d and ve the f as a oning l also WDNR d use oning iation es are

La Cross License T Revision located Appropri contamin These m impacts activities Land in t within a Upper M Crosse-B County h water qu located w basin lan some of t The clos north of with a po valley be Decomm the Refu southern traffic en decommi 8.6.3.3.

LACBW Slough t predomin Mississip the react systems.

Water pu to be pro For a di towns an river wat in Lansin river wa 40 miles The LAC well at th Potable w se Boiling W Termination n 0 within the iate isolatio nation from measures will associated w s at LACBW the vicinity five-mile r Mississippi R Bad Axe Riv has establish ality and pro within the B nd use is agri the agricultu sest municip the site, acro opulation of elow the east missioning ac ge at the so end of the ntering or le issioning act Water WR is located tributary ext nant water u ppi River as tor, river wa River wate ulled from on cessed onsit stance of 40 nd cities alon ter for indust ng, Iowa, ab ater for indu downstream CBWR site he site. The water use du Water Reactor Plan fence-enclo on and con the LSE are l also be mo with the us WR.

of the LACB radius, appro River Nation ver Basin Wa hed a Land &

otection of t Bad Axe Riv icultural and ural land to r pality to the oss from the 258 consist tern bluff.

ctivities are n outhern boun site will be aving the si tivities and t r Use d on the shor tends along usage during condensate ater is not c er does supp nsite wells w te and discha 0 miles dow ng the Missis trial purpose bout 15 mile ustrial purpo

m.

has its own e locations o uring decomm r

osed LSE, ntrol measur ea to the ad onitored to e se of offsite BWR site is oximately o nal Wildlife atershed as a

& Water Res the environm ver Watershe d over 50% o recreational l LACBWR e north-south s of various not being pe ndary of the minimally i te. Consequ the potential res of the Mi the LACBW g the opera cooling wat currently be ply the Low will support arged in acco wnstream of ssippi River es, excluding es downstrea oses betwee n potable wa of all wells missioning o 8-15 where most res will be djacent LAC ensure their e lands are s predomina ne third is e & Fish R a Geographi source Man ment within ed. Approx of the land is land use, sim site is the h running H residences, rformed in a site. Also, impacted du uently, the o impacts to l ississippi Ri WR site for ation of LAC er. With the eing used as w Pressure an decommissi ordance with the site, vir are obtained g the adjacen am of the si en the LAC ater supply, (active and operations is t work is e instituted CBWR prope r effectivene anticipated antly rural an water and b Refuge. WD ic Managem agement Pla this GMU.

imately 36%

s forested. T milar to other village of G Highway 35.

farms, and any land are

, public acce uring decom offsite land land use offs iver. The M r 3,000 feet CBWR was e plant shut d s a cooling nd High Pre ioning tasks h the sites s rtually all m d from groun nt G-3 fossil ite. There a CBWR site provided th abandoned) s not expect expected to to prevent erty as well ess. Thus, n from the d nd undevelo bottomlands DNR has de ment Unit (GM an (18), add The commu

% of the La There is an in r parts of rur Genoa, appr This small a few retail as adjacent t ess to the b mmissioning areas are no site are cons Mississippi Ri t from north s the use of down and fu medium fo essure servic s and this wa tate discharg municipal w und water. T l plant, is th are no other and Prairie hrough a sin

)are illustrat ted to be sig o be condu t the sprea l as offsite a no environm decommissio ped. Of the s included in esignated th MU) and Ve dressing land unity of Gen Crosse-Bad ncreasing sh ral Wisconsi oximately 1 rural comm businesses i to the site or oat launch a by rail and ot affected b sidered Sma iver and its h to south.

f water from uel removed or reactor or ce water sys ater will con ge permits.

water supplie The nearest u he coal-fired r known use e du Chien, ngle groundw ted in Figure nificantly gr ucted.

ad of areas.

mental oning e area n the he La ernon d use, noa is d Axe hift of in.

1 mile munity in the r near at the truck by the all.

Thief The m the from r fuel tems.

ntinue es for use of plant ers of

, WI, water e 8-5.

reater

La Cross License T Revision than the solids ho includes tank that Mississip discolora downspo located in to water u 8.6.3.4.

This sect related to ponds, re to the we The env section 4 a Small At LACB its WDN LACBW System (

and WDN reduced erosion decommi demolitio Radiolog (ODCM)

Potential onsite m per year elevation 201 A/B buildings LACBW As the w LACBW No adver decommi quality ar se Boiling W Termination n 0 potable wat olding tank a sanitary h t services th ppi River a ation. Roof outs or throu nside the LS use are cons Water tion evaluat o surface w eservoirs and est and the R vironmental 4.3.3 of NUR impact.

BWR, all no NR permits.

WR which m (WPDES) as NR Wastew through im and sedi issioning, st on will be m gical impact

) limits and l onsite grou onitoring we for radiolog ns. The plan

MW-202A s in approp WR former pr water from WR, the therm rse impacts issioning ac re bounded b Water Reactor Plan ter use durin and pumpe olding tank he LSE Turb at outfalls.

drains are e gh the norm SE. Conseq sidered Sma r Quality tes potential water and gr d lakes. At Refuge wetlan impact eva REG-0586 ha n-radiologic Water ma meet the Gen s well as LA water Permit mplementatio mentation torm water r monitored and s are minim d assessed th undwater im ells at LACB gical analys nts network A/B; MW-20 riate locatio rocess areas the Missis mal impact to on surface w ctivities. Co by NUREG-r ng plant po ed off by a that services bine Buildin Release ar ither dischar mal effluent r quently, in ac all.

l project eff roundwater.

LACBWR, nds to the so aluation ass as been dete cal water dis anagement p noa sites W ACBWRs W

. In additio n of approp control d

run-off from d controlled mized throug hrough the mpacts are m BWR. Rep is purposes k of down gr 3A/B; and M ons and qua and potentia ssippi is no o the Mississ water and gr onsequently,

-0586 and co 8-16 wer operatio local state s the Admin ng. Storm reas are per rged to the g release pathw ccordance w fects on tho Surface w the nearby b outh.

ociated with ermined to be charges to th programs an WDNR Wisc WDNR Tier I on, impacts priate Best during dec m active imp if necessary gh adherenc REMP and monitored by resentative g when groun radient wells MW-204A/B antity to in al release poi o longer use sippi River h roundwater a

, the potenti onsidered S ons. Sanita permitted s nistration Bu water runof riodically m ground area way after pro with NUREG ose portions water general bodies of wa th surface a e generally a he Mississip nd practices consin Pollu II Industrial to the Miss Managemen commissionin pacted areas

y.

ce to Off-sit d the ground y the routin groundwater ndwater con s (five paire B) are situate ntercept and ints.

ed to cool has been elim are expected ial impacts Small.

ary wastes a sanitary was uilding and a ff is diverte monitored fo surrounding ocessing thru G-0586, the p of the natu lly refers to ater are the M and groundw applicable to ppi River are s have been utant Disch Storm Wate sissippi Rive nt Practices ng operati s undergoin te Dose Cal dwater mon ne sampling r samples ar nditions are ed wells: MW ed around th d detect con operating p minated.

d from the im to surface are collected ste hauler.

a sanitary ho ed directly t or oil sheen g the facility u an oil sepa potential im ural environ o streams, ri Mississippi R water quali o LACBWR e controlled u n implement arge Elimin er General P er will be gr (BMP) for ions.

D g remediatio lculation M nitoring prog of 10 perm re obtained t at low and W-200A/B; he key LACB ntamination plant system mplementati and groundw d in a This olding to the n and y thru arator mpacts nment

ivers, River ty in R with under ted at nation Permit reatly r soil During on or anual gram.

anent twice high MW-BWR from ms at on of water

La Cross License T Revision 8.6.3.5.

The envi 0586 has LACBW requirem BMP to m sources s from the Fugitive demolitio controlle Radiation excessive suppressi Demoliti specifica Appropri extended impacted No adver activities considere 8.6.3.6.

The env NUREG-impact.

The aqua House at approxim disturbed decommi fauna in removal Various these aqu included Plans for equipmen Solutions performe se Boiling W Termination n 0 Air Q ironmental i s been determ WR complies ments of the W minimize fu such as the facility.

dust will on of concr d demolition n Protection e or harmfu ion by mistin ion equipme ations which iate Health a d periods of d by exhaust rse impacts

s. Conseque ed Small.

Aquat vironmental

-0586 has b atic habitat a t the shorel mately 110 fe d during the issioning ac the Mississ of the diffus fresh water uatic enviro 53 species a r the demol nt by barge.

s will contin ed within ap Water Reactor Plan uality impact evalu mined to be g with all app WDNR and ugitive dust d plants dies be generat ete building n and disma n, Environme ul dust emiss ng water wil ent will be h will prev and Safety a operation to emissions.

on air qual ently, the po tic Ecology impact eva been determ at LACBWR line to the feet from the e initial co tivities is no sippi River ser structure, fish specie nments. A and 19 famil lition of stru Consequen nue to main pplicable lim r

uation assoc generally ap plicable Fed the Wiscon during demo sel generator ted from v g structures antlement tec ental, and S sions are no ll be used to operated an vent excessi ssessments a o ensure tha lity are expe tential impa aluation ass mined to be R includes th diffuser stru e shoreline.

nstruction o ot expected and also ne

, which shar es, macro-in 1980 study lies (19).

uctures at L ntly, there is ntain WDNR mits. Protect 8-17 ciated with plicable to L deral and Sta nsin Bureau o olition and d rs are no lon various deco and the exc chniques, wi Safety and H ot generated mitigate du nd maintain ive exhaust and controls at personnel ected from t acts to air qu sociated wit generally ap he area from ucture that Habitats as of the facil to disturb e earby River es a line wit vertebrate p y indicated t LACBWR d no impact to R permits an tion of the n air quality i LACBWR w ate air quali of Air Mana ecommissio nger in serv ommissionin cavation of ith appropria Health staff,

d. As neces st emissions ned in acco emissions s will also be l and the en the impleme uality are bo th aquatic e pplicable to m the intake extends out ssociated wi lity. Howe existing aqu tributaries, th the G-3 fo populations, that the pop do not inclu o the shorelin nd decomm nearby Refu in section 4 with a Small ity regulatio agement, an ning activiti vice and hav ng activities soil. Care ate assessme will be con ssary, measu
s.

ordance with from defec e established nvironment a entation of d ounded by N ecology in o LACBWR structure int t into the M ith this area ever, the im uatic habitats streams and ossil station, and vegeta pulation of f ude the remo ne from this missioning op uge wetlands

.3.4 of NUR l impact.

ons, includin d will imple ies. Air emi ve been rem s, including ful planning ents by Solu nducted to en ures such as h manufactu ctive equipm d during exp are not adve decommissio NUREG-0586 section 4.3 R with a Sm tegral to the Mississippi R a were previ mplementatio s, their flora d wetlands.

is not plann ation exist w fish near the oval of was s type of acti perations wi s and habita REG-ng the ement ission moved g the g and utions nsure s dust urers ment.

pected ersely oning 6 and

.5 of mall e Crib River ously on of a and The ned.

within e site ste or ivity.

ill be ats is,

La Cross License T Revision and will operation Exotic s reproduc While th rusty cray ones in t conducte the site.

A study macrochi and chan

& Fish R performe subseque fossil sta require a construct aquatic a The pote 0586 and The pote and cons 8.6.3.7.

The envi been dete No know decommi appropria The land the forma from the prevalent operation onsite ha

addition, that the d to the sou demolitio anticipate se Boiling W Termination n 0 continue to ns.

species can tion or surv here are som yfish, etc.) i the vicinity ed at LACBW of the im irus), freshw nnel catfish (

Refuge Pool ed in 1980.

ent shutdown ation, has fur any operatio tion, demoli areas beyond ential impact d considered ential impact idered to be Terres ironmental im ermined to b wn terrestri issioning pr ate BMPs ar d around LA ation of abo e Mississipp t in surround ns associated abitats for m with the sh direct heavy uth, no direc on activities ed impact to Water Reactor Plan o be a priori n threaten n vival rate, a me known aq n Vernon C of the LAC WR have no mpingement water drum (

(Ictalurus pu 9 navigation It was de n of LACBW rther reduced ons resulting tion, materia d the site bou ts to the aqu to be Smal ts to the aqu Small.

strial Ecolog mpact evalu be generally ial exotic o roject area.

re, and will c ACBWR was out 27 acres pi River. T ding areas.

d with G-1 many plant an hort-term nat construction ct impacts to do not inclu o the shorelin r

ity when pla native spec and diseases quatic invasi ounty, these BWR site (

ot resulted in and entrain (Aplodinotu unctatus), w n areas from etermined th WR and redu d this impac g in any im al and waste undary.

uatic ecology ll.

uatic ecology gy uation of terr applicable to or invasive To minim continue to b s initially dis by filling riv herefore, th Given the e and G-3 as nd animal sp ture of the w n and demo o any off-site ude the remo ne.

8-18 anning onsit cies and ec s or parasite ve species (

e have been n 20). The op n the introdu nment of t s grunniens) within the Up m the operatio hat the impa uced intake o ct. Decomm mpingement e staging or y within the y beyond the restrial ecolo o LACBWR species h ize the intro be followed.

sturbed by th ver edge and he site shore extensive lan s well as LA pecies, inclu work associa lition projec e sensitive sp oval of waste te dismantle cosystems d es they may (e.g. zebra m noted in slou peration and uction of any the fishes,

), gizzard sh pper Mississ on of LACB act was mo operations, l missioning op and entrain transfer ope site bounda e site bounda ogy in sectio R with a Sm have been n oduction of the construct d low forest eline no lon nd disturbanc ACBWR, th uding endang ated with de ct area is sep pecies are an e or equipm ement or wa due to agg y transmit to mussel, curly ughs and lak d decommis y aquatic in such as bl had (Doroso sippi River N BWR and G-st likely ins limited to su perations are nment impa erations will ary are boun ary have als on 4.3.6 of N mall impact.

noted to o f exotic or i tion of the f t areas with nger resemb ce, construc he terrain h gered or inv ecommission parated from nticipated. S ment by barge aste manage gressive gro o native spe y-leaf pondw kes other tha sioning activ nvasive speci luegill (Lep oma cepedia National Wi

-3 was previ significant.

upporting the e not expect acts to fish.

l be perform nded by NUR so been evalu NUREG-058 occur within invasive spe facility, inclu material dre les the shor ction and yea as not supp asive specie ning and the m the Refuge Since the pla e, there is al ement

owth, ecies.
weed, an the vities ies to pomis anum) ildlife ously The e G-3 ted to No med in REG-uated 6 has n the
ecies, uding edged reline ars of ported es. In e fact e area anned so no

La Cross License T Revision Best Man spills res The pote Small.

The pote evaluated 8.6.3.8.

The pote and cons A review Endange two spec which LA A m Missi A pla facin No noted due to th the existi River to terrestria presence been not Higgins e Likewise Wisconsi Habitat P limestone township for this p The Pere Species l of falcon protectio delisted hatching decommi falcon re se Boiling W Termination n 0 nagement Pr ulting from ential impac ential impac d and consid Threa ential impact idered Sma w of the U ered, Propos cies are desig ACBWR res mussel specie issippi River ant species, g slopes: Th d adverse im he siting and ing G-3 foss the west and al or aquatic of the Higg ted. A mus eye pearlym e, the Northe in Departme Program (22 e cliffs over ps within Ve plant species egrine Falcon list in 1975 n nesting box n (23). Ove in 1999 (24 efforts. S issioning wi covery effor Water Reactor Plan ractices and equipment o cts to terres cts to the t dered to be atened or End ts to Threa all.

U.S. Fish an sed, and Ca gnated as T sides in:

es, Higgins r: Endanger Northern m hreatened.

mpacts to aqu operation of sil station, th d the rail lin habitats wh gins eye pea ssel survey o mussels were ern monksho ent of Agri

2) has noted r creeks and ernon County to be impac n (Falco per and starting xes at its fac erall, Peregr 4); however, Since the G ill not interf rt and popula r

d site proced operation.

strial ecolog terrestrial ec Small.

dangered Sp atened or E nd Wildlife ndidate Spe Threatened eye pearly red.

monkshood uatic species f the LACBW he majority o e and Highw hich may be arlymussel i of the Thief found.

ood has not culture, Tra that the Nor d streams an

y. This hab cted by decom regrinus) we g in 1993, D cilities, inclu ine Falcon r Dairyland G-3 facility fere with G-ation.

8-19 dures require gy are boun cology beyo pecies Endangered Service lis ecies County or Endang ymussel (La (Aconitum n have been n WR facility, of the licens way 35 to the inhabited by n mussel be f Slough riv been noted ade & Cons rthern monk nd the plant bitat is not p mmissioning ere put on the airyland sup uding at the G restoration p has continue will still c

-3 operation e prompt cle nded by NU ond the site species are sting, the F ty Distributi ered within ampsilis hig noveborance noted during

, as well as t sed site, situ e east, is dev y threatened eds in the vi ver area was on or in the sumer Prote kshoods hab is present i present withi g operations e Wisconsin pported reco G-3 stack, to program effo ed to maint continue ope ns or its stac eanup and re UREG-0586 e boundary e bounded b Federally-Lis ion (21) con n Vernon Co gginsii), with ense), with plant operat the previous uated betwee veloped and d or endange icinity of LA s conducted e vicinity of ections End bitat is leach in the White in or near th n Endangered overy efforts o support ch orts resulted tain the G-3 erations and ck, there is emediation o 6 and consid have also by NUREG-sted Threat ncluded that ounty, the co h habitat in habitat in n tions. In gen G-1 facility en the Missis does not su ered species.

ACBWR ha d in 1978 an LACBWR.

dangered Sp hed sandston estown and he LACBWR d and Threat s with install hick hatching in the bird b nesting site d the LACB no impact t of oil dered been

-0586

tened, only ounty n the north-
neral, y, and ssippi upport The as not nd no The pecies e and Stark R site tened lation g and being e and BWR to the

La Cross License T Revision 8.6.3.9.

Occupati considere The envi NUREG-impact.

programs also duri are those ergonom Solutions contracto prevent o with fed States Oc Typical following Safet Safet Provi Work speci such Obtai Invol packa Issuin lesson Hold reinfo 8.6.3.10.

A detaile LTP.

8.6.3.11.

LACBW efficient with som se Boiling W Termination n 0 Occup ional issues/

ed Small.

ironmental i

-0586 has b While decom s addressing ing repair an e related to mic, and biolo s is commi or health and occupational eral and sta ccupational H contractor g:

ty training as ty emphasis iding all wor ker training ific worker q as heavy equ ining and rev lving Health ages and par ng periodic ns learned.

ing safety s orce safety e Cost ed discussion Socio WR was shut to operate.

me projects Water Reactor Plan pational Issu safety has b impact evalu been determ mmissioning g worker saf nd refueling o human he ogical hazard itted to dec d safety prog l injuries an ate regulatio Health and S safety pract s a part of th as the first to rkers with a and require qualification uipment dem viewing Safe h and Safet rticipating in safety mess stand-downs events and le n of the site economic Im down in 19 By 1994, so associated r

ues/Safety een evaluate uation assoc mined to be g involves in fety were im outages. T ealth and sa ds. Radiolog commissioni grams to effe d illnesses.

ons including Safety Admi tices and c he site access opic of discu Health and S ed certificati ns. Certain s molition firm fety Data She ty staff in n pre-job wal ages to com s whenever essons learne decommissi mpacts 987 as the sm ome increme with the r 8-20 ed to be boun ciated with generally ap ncreased indu mplemented The occupati afety, includ gical impact ing LACBW ectively cont Contractor g Wisconsin inistration (O communicati s program fo ussion at me Safety bookl ions review specialty sub ms.

eets for chem reviewing lkdowns, wo mmunicate aw serious saf ed site-wide.

ioning proje mall size of ental decomm removal of nded by NU occupationa pplicable to ustrial activi during the ional issues ding impact ts were discu WR safely trol hazards health and s n Departme OSHA) requ ions will in or all employ eetings.

let.

w prior to as bcontractors micals bough and approv ork condition wareness of fety events ect costs is p f the plant d missioning p the RPV i UREG-0586 al issues in o LACBWR ities and safe operation of and safety ts from phy ussed in sect through the in the work safety progr ent of Labor uirements.

nclude actio yees and sub ssignment to are mobiliz ht onsite.

ving decomm n assessmen f significant occur to c presented in did not make planning and in 2007 an and the imp section 4.3.

R with a Sm fety focus, si f the facility impacts ass ysical, chem tion 8.6.2.

e applicatio environmen rams will co r and the U ons such as b-contractors o tasks requ zed, as neces missioning nts and review safety issue ommunicate Chapter 7 o e it economi d activities b d other me pact is 10 of mall imilar y and essed

mical, on of nt and omply United s the
s.

uiring

ssary, work ws.

s and e and of this ically began etallic

La Cross License T Revision radioactiv complete periodic the ISFSI More ac timefram obtained personne activities increased project an Therefor impact is 8.6.3.12.

The perc Vernon C Crosse) a impact to Decomm transport Highway relative t There is impacted site speci 8.6.3.13.

A review May 201 historical the plant Archeolo which wa Also, as along Hi the USA Upper M Axe. Th first nucl marker a concerns se Boiling W Termination n 0 ve compone ed by 2012.

spikes in w I project) (2 ctive decom me. Some o from outsid el from the lo s will have a d use of the nd workers w e, the socio s considered Enviro centages of County are q and more po o the greater missioning ac t equipment y 35 traversin o rail and tru no reason d by the deco ific impact i Cultur w of the N 5 and the W l sites in Ve

t. The close ogical Site ne as certified b indicated in ghway 35 in CE Lock an Mississippi. T he third was lear generati t the waysid associated w Water Reactor Plan ents over th Staff size at orkforce hir 5).

mmissioning of the labor de Wisconsi ocal and reg a short-term local craft w with supplie oeconomic i Small.

onmental Ju low-income quite low, a opulated Wi population, ctivities will and debris.

ng north-sou uck transpor to believe ommissionin s considered ral, Historic, National Park Wisconsin H ernon County est historical ear Stoddard by the Nation n NUREG-0 n Vernon Co nd Dam No.

The second, s adjacent to ing plant. In de across Hig with having r

he past 7 ye t the plant ha ring to suppo and struct tasks requi in; however, gional areas m positive ec workforce a es and servic impact is ev ustice e and minor approximatel sconsin coun including sp cause slight The truck t uth by the si rtation as a re that low-in ng project.

d Small.

, and Archeo k Service N Historical So y and no str l site with pr d, WI. locate nal Park Ser 191, the Sta ounty. One i

8. It descri

, about 7.5 m o LACBWR n 2009, crew ghway 35 fro a public-acc 8-21 ears. A sm as gradually ort specific tural demoli ire specializ

, some of th surrounding conomic imp and opportun es.

valuated to ity groups w ly 3%, and nties further pecial group t increases i traffic will u ite. There esult of deco ncome and m Per NUREG ological Res National Reg ociety (29) th ructures in th re-historical ed approxima rvice in 1980 ate of Wisco is about a ha ibes the orig miles south o R and comme ws erected a om the site (

cess marker o mall ISFSI f y been reduce project need ition is ant zed skills an he workforc g the site. O pact on the nities for loc be bounded within the V lower than r from the L ps, is expecte in truck traff use existing will be no e ommissionin minority po G-0586 and ources gister of H through May he village o l structural r ately 7 miles 0 (30).

onsin has pla alf mile nort gin of the pr of the plant, emorates th a new, updat (31). This ne on Dairylan facility hold ed as operat ds (e.g. 40 p ticipated in nd equipmen e will be co Overall, the d local comm cal business d by NURE Village of G those in larg LACBWR si ed.

fic to and fro main street environment ng.

opulations w this evaluat Historic Plac y 2015 ident f Genoa or w remnants is s north of th aced three h th of LACBW resent system

, highlights t e plant itsel ted Wisconsi ew location d property.

ding 5 casks tions ceased, personnel sta n the 2016-nt which wi omprised of decommissio munity due t ses to suppor EG-0586 and Genoa as we ge cities (e.

ite (26) (27) om LACBW routes, prim tal justice im will be adve tion, the pote ces (28) thr tified only a within 5 mil the Goose I he LACBWR historical ma WR, overloo m of locks o the Battle of lf as Wiscon in state histo resolved sec s was

, with affing

-2017 ill be f craft oning to the rt the d the ell as

g. La

. No WR to marily mpact ersely ential rough a few les of Island R site, arkers oking on the f Bad nsins orical curity

La Cross License T Revision Dairylan presents or catego Land di primarily Land tha the const station) w erosion c Based on transport impact on 0586 an Archaeol 8.6.3.14.

The envi 0586 has The impa disturban complete removed River. T completi Therefor NUREG-8.6.3.15.

The envi has been LACBW 475 feet north sid south sid hospitals approxim Noise ge equipmen temporar complete experienc se Boiling W Termination n 0 d sent an un the control r orize any par isturbance fo y shipped via at was distur truction and were perform controls and n the historic tation of sys n cultural, h nd based u logical Reso Aesth ironmental i s been determ act of decom nce and dura ed. Once all

, the aesthet The final de on of the dec e, the enviro

-0586 and th Noise ironmental i determined WR is located west of the de and a port de. There ar within 1 m mately 1 mile eneration wi nt. Noise ry and will e, noise level ced during th Water Reactor Plan nused control rod and a re rt of the LAC or the remov a rail.

rbed for proj d demolition med in acco stormwater cal informat stem compon istoric, and a upon this e ources are co hetics impact evalu mined to be g mmissioning ation. These l of the majo tics will imp etermination commission onmental im he impact is impact evalu to be genera d on the sho rail road lin tion of the U re no residen mile. The n e to the north ill primarily associated w occur prim ls in the vici he operation r

l rod to the W eplica fuel as CBWR plant val of large jects beyond of the G-1 ordance wit pollution pr ion presente nents and w archeologica valuation, t onsidered Sm uation assoc generally ap on site aesth impacts are or plant struc prove slightly on usage o ing.

mpact associ considered uation assoc ally applicab ore of the M ne. USACE Upper Missis nces within 1 earest comm h of the plan result from with decomm marily durin inity of the L n of the facili 8-22 Wisconsin H ssembly (32 t as a histori components d the nuclea fossil statio th applicable evention pla ed in NUREG waste, the de al resources.

the potentia mall.

ciated with a plicable to L hetics (e.g. v e temporary ctures and bu y by providi of the decom iated with ae Small.

ciated with n ble to LACB Mississippi R E land and L ssippi River 1,000 feet of munity, the nt.

m demolition missioning a ng daylight LACBWR s ity.

Historical Mu 2); however, ical site.

s will be min ar operationa on and the c e permits an ans.

G-0191 and ecommission

. Consequen al impacts aesthetics in LACBWR w visual skylin and will cea uildings east ing a more o mmissioned esthetics is noise in sect BWR with a River, 300 fe Lock and D National W f the station village of G n activities i and shipment hours. On site will be r useum in Ma there is no nimized as t al areas (e.g onstruction nd included d the current ning will ha ntly, as boun to Cultura n section 4.3 with a Small ne) is limited ase when dec t of the Miss open view o property wi evaluated to tion 4.3.16 o Small imp feet from the Dam No. 8 ar Wildlife & Fi structures a Genoa, Wisc nvolving he t of waste is nce the dec reduced to le adison, WI w objective to the waste w

g. associated of the G-3 d appropriate approach fo ave no signif nded by NUR al, Historic, 3.15 of NUR l impact.

d in terms of commissioni sissippi Rive of the Missis ill be made o be bounde of NUREG-pact.

e river bank re located o sh Refuge o and no schoo consin is lo eavy constru s intermitten commissionin evels below which o save will be d with fossil e soil or the ficant REG-and REG-f land ing is er are ssippi upon ed by

-0586 k, and on the on the ols or ocated uction nt and ng is those

La Cross License T Revision Due to t impacts decommi imposed Therefor NUREG-8.6.3.16.

The envi NUREG-impact.

During th efforts w Low leve disposal

addition, Texas.

As stated process a and fuel These re destabiliz Therefor bounded 8.6.3.17.

The envi NUREG-impact.

The num than dur increased effect on barge tra support t operation Therefor by NURE 8.6.3.18.

Cumulati impact of se Boiling W Termination n 0 the distance on noise l issioning, S by the Villa e, the envir

-0586 and th Irretri ironmental im

-0586 has b he demolitio will be made el radioactiv site in Clive any Class B d in NUREG are the mater used for con esource com zing.

e, the enviro by NUREG Traffi ironmental i

-0586 has b mber of shipm ing the ope d traffic and n traffic flow affic. The e the operating ns.

e, the enviro EG-0586 and Cumu ive impact is f the action w Water Reactor Plan e of the stat levels durin Solutions agr age of Genoa ronmental i he impact is ievable Reso mpact evalu been determ on and struc

e. Some me ve waste has e, Utah. Th B/C waste th G-0586, irretr rials used to nstruction m mmitments onmental im G-0586 and th c and Transp impact evalu been determ ments and th ration of th wear and te w or road we xisting barg g G-3 fossil onmental im d the impact ulative Impac s defined the when added r

tion from se ng decomm rees to com

a.

mpact assoc considered ources uation associ mined to be tural disman etals from th s been and his facility h hat is genera rievable reso decontamin machinery and are conside mpact associ he impact is portation uation assoc mined to be he volume of he facility.

ar on roadw ear. There w ge traffic on station and mpact associ t is considere cts e impact on to other pas 8-23 ensitive rece issioning an mply with a ciated with Small.

iated with irr generally ap ntlement of he site are an will continu has sufficient ated will be s ources that w nate the facili d for transpo ered to be iated with ir considered ciated with t generally ap f waste ship Non-radiolo ways. It is an will be no ra the Thief S are not asso ated with tr ed as Small the environ st, present, a eptors, there nd demoliti any noise li noise is ev retrievable r pplicable to the station, anticipated to ue to be ship t space for t shipped to th would occur ity (e.g., rag ortation of m minor and rretrievable Small.

transportatio pplicable to pped are grea ogical impac nticipated tha adioactive w Slough branc ociated with ransportation

l.

nment which and reasonab e will be li ion activitie imitations (e valuated to resources in o LACBWR recycling an o be release pped to the the disposal he WCS fac during the d gs, solvents, materials to a are neither resources is on issues in o LACBWR ater during d cts of transp at there will waste shipme ch and the M LACBWR d n is evaluate h results from bly foreseeab imited temp es. During e.g. quiet h be bounde section 4.3.

R with a Sm nd asset reco d as clean s EnergySolu of this wast cility in And decommissio gases, and to and from the r detectable s evaluated section 4.3.

R with a Sm decommissio portation in be no signif ents execute Mississippi R decommissio ed to be bou m the increm ble future act orary g the hours) ed by 18 of mall overy scrap.

utions te. In

drews, oning ools),

e site.

e nor to be 17 of mall oning clude ficant ed via River oning unded mental tions.

La Cross License T Revision The cum decommi terrestria cumulativ Past, pr decommi Mississip resources activities over tim major irr disposal disposal In summ 8.7.

O 8.7.1. F Decomm Hand Work Publi Licen Work Liqui Haza Hand Characte of lead p 8.7.1.1.

The majo are admin Part 2 Part 5 Part 5 Part 6 se Boiling W Termination n 0 mulative impa issioning. T al ecology.

ve impact.

roposed an issioning of ppi river for s listed abo s are not proj e, exceed th retrievable re of low lev and will ther ary, the cum Overview of Federal Requ missioning ac dling, packag ker radiation ic radiation p nse terminati ker health an id and gaseo ardous waste dling and rem rization and aint.

Nucle ority of radio nistered by t 20 - Radiatio 50 - Decomm 51 - Environ 61 - Disposa Water Reactor Plan acts were as hese include Irretrievabl nd future f coal-fired p boating. Th ove were al jected to sig he minor im esource attri vel radioactiv refore have n mulative impa Regulation uirements ctivities that ging, and shi n protection, protection, ion and final nd safety, ous effluent r generation/

moval of asb d removal of ear Regulator ological acti the NRC. A on protection missioning a nmental prot al of radioac r

sessed by fi e surface w le resources foreseeable power plant he individual ll determine gnificantly ac mpact of the ibutable to L ve waste. N no cumulativ act to site re ns Governin are subject t ipment of rad l site release

releases, disposition,
estos, f Polychlorin ry Commiss ivities fall un Applicable Ti
n.

activities.

tection.

ctive waste.

8-24 rst determin water and gro s were also e actions ts and recrea l impacts of ed to be mi ccumulate en individual a LACBWR d No future ac ve effect.

esources is pr g Decommi to federal reg dioactive wa e,

nated Biphen ion nder Title 10 itle 10 regula ning the reso oundwater, o evaluated include co ational use f the LACBW inor. The p nvironmenta activities on decommissio ctivities wil rojected to b issioning Ac gulations inc

aste, nyls (PCBs) 0 of the Cod ations includ ources affect air quality, d from the onstruction, of the land WR decomm past, present al impacts th n the affecte oning was th ll involve r be minor.

ctivities and clude:

), and Handl de of Federa de:

ted by LACB aquatic eco e perspectiv operation as access t missioning o t and future hat would in ed resources he use of lan radioactive w d Site Releas ling and rem al Regulation BWR

ology, ve of and to the on the e site
total,

. The nd for waste se moval n and

La Cross License T Revision Part 7 throu Part 7 8.7.1.2.

The Env Federal R Part 6 Parts Part 1 Part 1 Parts Part 2 Part 7 Part 1 8.7.2. F Permits a environm fall unde Wisc Wisc Envir Villa Occu This info intended 8.8.

C As previo decommi site-spe potential predicted (NUREG environm se Boiling W Termination n 0 71 - Packag ugh 174 also 73 - Physica U.S. E vironmental Regulations 61 - Asbesto 122 to 125 -

141 - Safe D 190 - Radiat 260 to 272 -

280 - Under 761 - Toxic 129-132 - C Federal, Stat and approval mental protec r Federal, St onsin Depar onsin Depa ronmental an ge of Genoa upational Saf ormation pro to be all-inc Conclusion ously evalua issioning LA cific in NU environmen d in and wil G-0191, NUR mental chang Water Reactor Plan ing and tran apply).

al Protection Environment Protection A apply as foll os Handling

- National P Drinking Wa tion Protecti

- Resource C rground Stor Substance C Clean Water A te and Loca ls from or no ction purpos tate and loca rtment of Na artment of nd Occupatio a

fety and Hea ovided abov clusive.

ated in the D ACBWR are UREG-0586 ntal impacts ll be bounde REG-0586, a ges associate r

nsportation o n of Plants an tal Protectio Agency (EP lows:

and Remova Pollutant Dis ater Standard ion Standard Conservatio rage Tanks Control Act (

Act al Requirem otifications t ses. Decomm al jurisdiction atural Resour Health Se onal Health, alth Adminis ve is a gene D-Plan/PSDA temporary a have been associated w ed by the p and D-Plan/P ed with decom 8-25 f radioactive nd Materials n Agency PA) regulatio al scharge Elim ds ds for Nuclea n and Recov (TSCA) for ments to state and l missioning a n include, bu rces (WDNR ervices, Div Radiation P stration (OSH eral overview AR, the non-and not signi evaluated a with decomm reviously is PSDAR). T mmissioning e waste (reg ons outlined mination Syst ar Power Op very Act (RC Polychlorina local agenci activities an ut are not lim R) vision of Protection Se HA) w of the ap radiological ificant. The and there is missioning L ssued enviro Therefore, th

g.

gulations in 4 d in Title 40 tem (NPDES perations CRA) ated Biphen es are requir nd related sit mited to the Public Hea ection pplicable reg l environmen e potential is no significa LACBWR h onmental im here are no n 49 CFR Part 0 of the Cod S) nyls (PCBs) red for safety te operations following:

alth, Burea gulations and ntal impacts sues identifi ant impact.

have already mpact assessm new or signif ts 171 de of y and s that au of d not from ied as The been ments ficant

La Cross License T Revision 8.9.

R

1.

U C

2

2.

D R

3.

D S

4.

U re C

5.

U S

N

6.

D D

7.

E S

8.

E S

9.

A

10.

H 3

11.

U ht

12.

D

13.

U

14.

U ht

15.

ht se Boiling W Termination n 0 References U.S. Nuclear Content of Li 011.

Dairyland Po Reactor - Sep Dairyland Po upplement R U.S. Nuclear elated to Ope Cooperative -

U.S. Nuclear tatement (G November 20 Dairyland Po Decommissio EnergySoluti urvey Repor EnergySoluti urvey Repor Atomic Powe Haley & Aldr 0, 2012.

U.S. Census B ttps://www.c Dairyland Po U.S. Fish & W U.S. Army C ttp://www.m ttp://www.ci Water Reactor Plan Regulatory icense Termi wer Compan ptember 1972 wer Coopera Report - Jun Regulatory eration of th

- April 1980 Regulatory EIS) on Dec 002.

wer Coopera oning Activit ons GG-EO-rt for Octobe ons LC-RS-rt for June th er Review, A rich, Hydrog Bureau, 200 census.gov/p wer Coopera Wildlife Serv orps of Engi mvp.usace.ar ity-data.com r

Commission ination Plan ny, DPC-ED

2.

ative, Enviro ne 15, 1973.

Commission he La Crosse Commission commissioni ative, LACB ties Report (

-313196-RS er and Novem PN-164017-hru August 2 Atomic Jour geological C 8-2012 Ame programs-su ative - http:/

vice - http://

ineers -

rmy.mil/Miss m/city/Genoa 8-26 n Regulatory s for Nuclea D-3, Environ onmental Re n NUREG-0 Boiling Wa n NUREG-0 ing of Nucle BWR Decom (D-Plan/PSD S-RP-001, LA mber 2014 F

-001, LACB 2015 Field W rnal - Septe onceptual Si erican Comm urveys/acs/ne

//www.dairy www.fws.go sions/Naviga a-Wisconsin.

y Guide 1.17 ar Power Rea nmental Repo eport, La Cro 0191, Final E ater Reactor 0586, Generi ear Facilities mmissioning DAR), Revis ACBWR Ra Field Work -

BWR Radiolo Work - Nove ember 24, 20 ite Model, F munity Surve ews/data-rele ynet.com/ene ov/refuge/Up ation/LocksD

.html.

79, Standard actors, Revis ort - Lacross osse Boiling Environment by Dairylan ic Environm

, Supplemen Plan and Po sion - March adiological C

- November ogical Chara ember 2015.

011.

File No. 3870 ey. (5-year d eases.2012.h ergy_resourc pper_Missis Dams/LockD d Format and sion 1 - June se Boiling W g Water Reac tal Statemen nd Power mental Impact nt 1, Volume ost Shutdown h 2014.

Characterizat r 2015.

acterization 05-001 - Au data sets) -

html.

ces/genoa.ph ssippi_River/

Dam8.aspx.

d e

Water

ctor, nt t

e 1 -

n tion ugust hp.

/.

La Cross License T Revision

16.

D P

W

17.

D D

18.

V

19.

M C

D

20.

W

21.

U C

ht

22.

W S

23.

D ht

24.

W ht

25.

H L

26.

V re

27.

U

28.

N

29.

W

30.

N S

31.

D 2

32.

W se Boiling W Termination n 0 Dame & Moo otential, La Wisconsin fo Dairyland Po Decommissio Vernon Coun McInterny, M Cooperatives December 19 Wisconsin De http://dnr.w U.S. Fish and Candidate Sp ttp://www.fw Wisconsin De pecies Habit Dairyland Po ttp://www.d Wisconsin De ttp://dnr.wi.g Hubbuch, Ch La Crosse Tri Village of Ge ecords.com/w U.S. Census B National Park Wisconsin Hi National Park ite Ve-502 -

Dairyland Po 009.

Wisconsin Hi Water Reactor Plan ore, Geotech Crosse Boil r Gulf Unite wer Coopera oning Plan, r nty, Land & W Michael. C., I s Genoa Site 980.

epartment of i.gov/lakes/i d Wildlife Se pecies Coun ws.gov/midw epartment of tat Program wer Coopera dairynet.com/

epartment of gov/eek/critt hris, A nuclea ibune - July enoa, Vernon wisconsin/ge Bureau, Vern k Service, Na istorical Soc k Service, Na

- http://nrhp.

wer Coopera istorical Soc r

hnical Investi ing Water R ed Nuclear F ative, LaCro revised Nove Water Resou Impingemen e, Thesis, sub f Natural Re invasives.

ervice, Feder nty Distributi west/endang f Agriculture

- http://datcp ative, Peregr

/environmen f Natural Re ter/bird/falco ar option: A y 15, 2012.

n County, W enoa_data.ht non County, ational Regi ciety - http://

ational Regi focus.nps.go ative, Power ciety, Nuclea 8-27 igation of G Reactor (LAC Fuels Corpor osse Boiling ember 2003.

urce Manage nt and Entrai bmitted to U esources, Aqu rally-Listed ion, April 20 ered/lists/wi e, Trade & C p.wi.gov/Fa rine Falcon R ntal/falcon_p esources, Per on.htm.

fter 25 years WI Public Rec tm.

, Wisconsin ster of Histo

/www.wisco stry of Histo ov/natregsea r for Generat ar Fuel Assem Geology, Seis CBWR) near ration - Octo Water Reac ement Plan -

inment of Fi University of quatic Invasiv Threatened, 015 -

isc-city.html Consumer Pr arms/Endang Restoration program.php regrine Falco s, Genoa rea cords - http:

- http://www oric Places -

onsinhistory.

oric Places, G archresult.do tions, Genoa mbly - http:/

smology and r Genoa, Ver ober 1973.

ctor (LACBW

- February 2 shes at Dairy f Wisconsin-ve Species -

, Endangered

l.

rotection, En gered_Specie Program -

p.

on -

actors waste

//www.open w.census.gov http://ww.np org/.

Goose Island

o.

a Site Updat

//www.wisc d Liquefactio rnon County WR) 2009.

yland Power

-La Crosse -

- Vernon Co d, Proposed ndangered es/index.aspx e gets new ho n-public-v/.

ps.gov/nr/.

d Archeolog te - Decemb onsinhistory on y,

r ounty and

x.
ome, gical er y.org.

La Cross License T Revision se Boiling W Termination n 0 Water Reactor Plan Fig r

ure 8-1 S

8-28 Site Regionaal Location

La Cross License T Revision se Boiling W Termination n 0 Water Reactor Plan r

Figure 8-2 8-29 2

Site Ovverview

L L

R La Crosse Boilin License Termin Revision 0 ng Water React ation Plan or Figure 8-3 8-30 LACBWR Buildings

La Cross License T Revision se Boiling W Termination n 0 Water Reactor Plan Fi r

igure 8-4 8-31 Topographhical Map

L L

R La Crosse Boilin License Termin Revision 0 ng Water React ation Plan or Figure 8-55 Groundwat 8-32 ter Sampling Wells - LACBW WR Site