#REDIRECT [[2CAN040805, Supplemental to License Amendment Request, Technical Specification Changes Regarding Mode Change Limitations and Associated Bases Using the Consolidated Line Item Improvement Process]]
| number = ML081160053
| issue date = 04/22/2008
| title = Supplemental to License Amendment Request, Technical Specification Changes Regarding Mode Change Limitations and Associated Bases Using the Consolidated Line Item Improvement Process
| author name = Mitchell T G
| author affiliation = Entergy Operations, Inc
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000368
| license number = NPF-006
| contact person =
| case reference number = 2CAN040805
| document type = Letter, Technical Specifications
| page count = 14
| project =
| stage = Supplement
}}
 
=Text=
{{#Wiki_filter:2CAN040805  
 
April 22, 2008 
 
U.S. Nuclear Regulatory Commission
 
Attn: Document Control Desk
 
Washington, DC  20555
 
==SUBJECT:==
Supplemental to License Amendment Request Technical Specification Changes Regarding Mode Change Limitations and
 
Associated Bases Using the Consolidated Line Item Improvement Process Arkansas Nuclear One, Unit 2
 
Docket No. 50-368
 
License No. NPF-6
 
==REFERENCE:==
: 1. License Amendment Request - Technical Specification Changes Regarding Mode Change Limitations and Associated Bases Using the  
 
Consolidated Line Item Improvement Process (2CAN100701)
 
==Dear Sir or Madam:==
 
By letter dated October 22, 2007 (Reference 1), Entergy Operations, Inc. (Entergy) requested
 
adoption of Technical Specification Task Force (TSTF)-359, Revision 9, for Arkansas Nuclear
 
One, Unit 2 (ANO-2). The proposed amendment would modify Technical Specification (TS) requirements for mode change limitations in Limiting Condition for Operation (LCO) 3.0.4 and
 
Surveillance Requirement (SR) 4.0.4. The modification of these specifications results in
 
changes to various other ANO-2 TSs as described in the attachments to this submittal.
 
On Page 3 of Attachment 1, Page 1 of Attachment 4, and in the markup of the proposed
 
Technical Specification (TS) Bases included in Attachment 5 of the original submittal (Reference 1), statements are made limiting the time in which hot-testing of Pressurizer Safety
 
Valves may be accomplished to 18 hours total. The intent of the TS was to permit up to
 
18 hours to perform this testing for each valve, thus permitting up to a total of 36 hours to
 
complete testing of both valves. The 36-hour allowance is consistent with the allowance
 
provided in TS 3.4.10 of the improved st andard TSs for Combustion Engineering Plants (NUREG 1432, Rev. 3.1). Therefore, following conversation with the NRC on April 21, 2008, Entergy agreed to revising the submittal to change the "summed" or total time permitted to
 
support valve testing at hot conditions to 36 hours.
 
In addition to the above, the NRC requested that consideration be given to removing reference
 
to LCO 3.0.4 in TS 3.8.1, AC Sources, Action A.2. This Action permits the Startup #2
 
Transformer to be removed from service for up to 30 days under certain conditions and contains a statement that LCO 3.0.4 is not applicable to the 30-day allowed outage time, as Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR  72802
 
Tel  479-858-3110 Timothy G. Mitchell Vice President, Operations Arkansas Nuclear One
 
2CAN040805 Page 2 of 3
 
approved by the NRC in ANO-2 TS Amendment 215, dated April 28, 2000. Because the new
 
LCO 3.0.4.b provides an acceptable method of supporting a change in plant mode with the
 
transformer inoperable, Entergy proposes to delete the LCO exception statement from
 
Action A.2. The associated TS Bases page did not discuss LCO 3.0.4 and, therefore, no new
 
or revised TS Bases page is necessary for this change.
 
Based on the above, a revised Page 3 and 4 of Attachment 1, a revised markup of TS page
 
3/4 8-1 of Attachment 2, a revised clean page of TS page 3/4 8-1 of Attachment 3, a revised
 
Page 1 of Attachment 4, and a revised TS Bases page for Pressurizer Safety Valves as
 
contained in the original submittal (Reference 1) are included in Attachments 1, 2, 3, 4, and 5
 
of this supplemental, respectively. The new pages clarify the summed time for hot testing to
 
be no longer than 36 hours and indicate the deletion of the LCO 3.0.4 exception associated
 
with Startup Transformer #2. These pages may be used as replacement pages for those of
 
the original submittal (Reference 1).
 
The proposed change includes a revised commitment, as described in Attachment 4 of this
 
submittal.
 
If you have any questions or require additional information, please contact Dale James at
 
479-858-4619.
 
I declare under penalty of perjury that the foregoing is true and correct. Executed on
 
April 22, 2008.
 
Sincerely, TGM/dbb Attachments:
: 1. Analysis of Proposed Technical Specification Change - Replacement Pages
: 2. Proposed Technical Specification Changes (mark-up) - Replacement Page
: 3. Revised Technical Specification Pages - Replacement Page
: 4. List of Regulatory Commitments - Replacement Page
: 5. Proposed Technical Specification Bases Changes (mark-up) - Replacement and New Page 2CAN040805 Page 3 of 3
 
cc: Mr. Elmo E. Collins Regional Administrator U. S. Nuclear Regulatory Commission Region IV Office 611 Ryan Plaza Drive, Suite 400 Arlington, TX  76011-8064
 
NRC Senior Resident Inspector Arkansas Nuclear One P. O. Box 310
 
London, AR  72847
 
U. S. Nuclear Regulatory Commission
 
Attn: Mr. Alan B. Wang
 
MS O-7 D1
 
Washington, DC  20555-0001
 
Mr. Bernard R. Bevill
 
Director Division of Radiation 
 
Control and Emergency Management
 
Arkansas Department of Health & Human Services P.O. Box 1437 Slot H-30 Little Rock, AR 72203-1437
 
Attachment 1 2CAN040805 Analysis of Proposed Technical Specification Change -
Replacement Page Attachment to 2CAN040805
 
Page 3 of 7
 
ANO-2 TS REFERENCE DESCRIPTION OF CHANGE 3.0.4 (LCO Applicability)  Changed in accordance with TSTF-359. 4.0.4 (SR Applicability)  Changed in accordance with TSTF-359. 3.3.3.5 (Remote Shutdown Instruments)  Changed in accordance with TSTF-359. 3.3.3.6 (Post Accident Monitoring)  Changed in accordance with TSTF-359. 3.4.3 (Pressurizer Safety Valves)  LCO 3.0.4.c applicability is added to Action "b". Currently, the Action permits suspension of LCO 3.0.4 for the purposes of testing one valve at a time upon entry
 
into or during operation in Mode 3. The TSTF intent is to delete all exceptions to LCO
 
3.0.4 and apply LCO 3.0.4.c where appropriate. Therefore, the LCO 3.0.4 exception
 
is deleted and LCO 3.0.4.c applicability is added. This is an "equivalent" change and
 
is subsequently, risk neutral.
The Action wording is additionally revised in this same paragraph to clarify the LCO exemption in support of valve testing. This wording is "original" TS wording with the
 
exception of the "18 hours," which wa s changed from 12 hours in Amendment 36 by NRC letter dated October 19, 1982 (copy available upon request). The current
 
wording does not clearly exempt the requirements of Action "a" for 18 hours, although
 
this was clearly the intent since Action "a" would only allow 15 minutes to restore valve
 
operability, regardless of the reason for inoperability. The NRC stated in their
 
October 19, 1982 SE that "the current TS 3.4.3 Action Statement 3.4.3.b also provides for suspension of the LCO (emphasis added) for up to 12 hours for entry into and operations in MODE 3 to test and adjust the valves."  However, LCO 3.0.4 does not
 
permit exemption from requirements of Acti on Statements, as currently worded, but only permits entry into a Mode of operation while relying on Action Statements. The
 
additional proposed change to this paragraph acts only to clarify the original intent of
 
the Action exception. Therefore, this change is administrative in nature and involves
 
no additional plant risk. A markup of the Bases is provided in Attachment 5, which
 
includes additional clarification to ensure that the summed time of both valves being
 
individually inoperable in Mode 3 does not exceed 36 hours, consistent with the
 
improved standard TSs of NUREG 1432, Rev. 3.1. These Bases will be revised upon
 
approval of this amendment under the requirements of 10 CFR 50.59.
 
Attachment to 2CAN040805
 
Page 4 of 7
 
ANO-2 TS REFERENCE DESCRIPTION OF CHANGE 3.4.6.1 (RCS Leak Detection)  Changed in accordance with TSTF-359. 3.4.8 (RCS Specific Activity)  LCO 3.0.4.c applicability added in accordance with TSTF-359. 3.4.12 (Low Temperature Overpressure Protection)  Changes are made consistent with TSTF-359. 3.5.3 (ECCS Subsystem - Shutdown)  Changes are made consistent with TSTF-359. 3.7.1.2 (Emergency Feedwater)  Changes are made consistent with TSTF-359. 3.7.1.5 (Main Steam Isolation Valves)  The STS does not contai n an exemption to LCO 3.0.4 for MSIVs and, therefore, this exemption is deleted, consistent with the intent of TSTF-359. 3.7.6.1 (CREVS)  Changed in accordance with TSTF-359. 3.8.1.1 (AC Sources)  Changes are made consistent with TSTF-359. Note that the STS does not contain an exemption to LCO 3.0.4 for Startup Transformer #2 (see Action A.2) and, therefore, this exemption is deleted, consistent with the intent of TSTF-359.
 
Attachment 2 2CAN040805 Proposed Technical Specification Changes (mark-up) - Replacement Page
 
ARKANSAS - UNIT 2 3/4 8-1 Amendment No. 141
,215 ,234 ,249 ,255 ,    3/4.8 ELECTRICAL POWER SYSTEMS
 
3/4.8.1 A.C. SOURCES
 
LIMITING CONDITION FOR OPERATION
 
3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:
: a. Two physically independent circuits between the offsite transmission network and the onsite Class 1E distribution system and
: b. Two separate and independent diesel generators each with:
: 1. A day fuel tank containing a minimum volume of 300 gallons of fuel,  2. A separate fuel storage system, and
: 3. A separate fuel transfer pump.
 
APPLICABILITY: MODES 1, 2, 3 and 4.
 
ACTION:
NOTE:  Specification 3.0.4.b is not applicable to diesel generators.
: a. With one offsite A.C. circuit of the above required A.C. electrical power sources inoperable, perform the following:
: 1. Demonstrate the OPERABILITY of the remaining offsite A.C. circuit by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour and at least
 
once per 8 hours thereafter, and
: 2. Restore the offsite A.C. circuit to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within
 
the following 30 hours. Startup Transformer No. 2 may be removed from
 
service for up to 30 days as part of a preplanned preventative maintenance
 
schedule. The 30-day allowance may be applied not more than once in a
 
10-year period.
The provisions of Specification 3.0.4 are not applicable to Startup Transformer No. 2 during the 30
-day preventative maintenance period.
 
Attachment 3 2CAN040805 Revised Technical Specification Pages - Replacement Page
 
ARKANSAS - UNIT 2 3/4 8-1 Amendment No. 141
,215 ,234 ,249 ,255 ,    3/4.8 ELECTRICAL POWER SYSTEMS
 
3/4.8.1 A.C. SOURCES
 
LIMITING CONDITION FOR OPERATION
 
3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:
: a. Two physically independent circuits between the offsite transmission network and the onsite Class 1E distribution system and
: b. Two separate and independent diesel generators each with:
: 1. A day fuel tank containing a minimum volume of 300 gallons of fuel,  2. A separate fuel storage system, and
: 3. A separate fuel transfer pump.
 
APPLICABILITY: MODES 1, 2, 3 and 4.
 
ACTION:
NOTE:  Specification 3.0.4.b is not applicable to diesel generators.
: a. With one offsite A.C. circuit of the above required A.C. electrical power sources inoperable, perform the following:
: 1. Demonstrate the OPERABILITY of the remaining offsite A.C. circuit by performing Surveillance Requirement 4.8.1.1.1.a within 1 hour and at least
 
once per 8 hours thereafter, and
: 2. Restore the offsite A.C. circuit to OPERABLE status within 72 hours or be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within
 
the following 30 hours. Startup Transformer No. 2 may be removed from
 
service for up to 30 days as part of a preplanned preventative maintenance
 
schedule. The 30-day allowance may be applied not more than once in a
 
10-year period.
 
Attachment 4 2CAN040805 List of Regulatory Commitments - Replacement Page    to 2CAN040805
 
Page 1 of 1
 
List of Regulatory Commitments The following table identifies those actions committed to by Entergy in this document. Any other
 
statements in this submittal are provided for information purposes and are not considered to be
 
regulatory commitments.
 
COMMITMENT TYPE (Check one)
SCHEDULED COMPLETION DATE (If Required)
ONE-TIME ACTION CONTINUING COMPLIANCE Entergy will establish the Technical Specification Bases for LCO 3.0.4 and
 
SR 4.0.4 as adopted with the applicable
 
license amendment.
To be implemented with amendment Entergy will revise Technical Specification Bases for LCO 3.3.4, Pressurizer Safety
 
Valves, to ensure that the summed time of
 
both valves being individually inoperable in
 
Mode 3 does not exceed 36 hours.
To be implemented with amendment
 
Attachment 5 2CAN040805 Proposed Technical Specification Bases Changes (mark-up) -
Replacement Page ARKANSAS - UNIT 2 B 3/4 4-1 Amendment No.
24 , 29 , 149 , 199  Rev. 1 ,10 , 3/4.4 REACTOR COOLANT SYSTEM BASES  3/4.4.1 REACTOR COOLANT LOOPS AND COOLANT CIRCULATION The plant is designed to operate with both reactor coolant loops and associated reactor coolant pumps in operation, and maintain DNBR above the limits specified by Specification 3.2.4 during
 
all normal operations and anticipated transients.
In MODE 3, a single reactor coolant loop provides sufficient heat removal capability for
 
removing decay heat; however, single failure considerations require that two loops be
 
OPERABLE.
In MODES 4 and 5, a single reactor coolant loop or shutdown cooling loop provides sufficient
 
heat removal capability for removing decay heat; but single failure considerations require that at
 
least two loops be OPERABLE. Thus, if the reactor coolant loops are not OPERABLE, this
 
specification requires two shutdown cooling loops to be OPERABLE.
The operation of one Reactor Coolant Pump or one shutdown cooling pump provides adequate
 
flow to ensure mixing, prevent stratification and produce gradual reactivity changes during boron
 
concentration reductions in the Reactor Coolant System. The reactivity change rate associated
 
with boron reductions will, therefore, be within the capability of operator recognition and control.
3/4.4.2 and 3/4.4.3 SAFETY VALVES The pressurizer code safety valves operate to prevent the RCS from being pressurized above its Safety Limit of 2750 psia. Each safety valve is designed to relieve 453,817 lbs. per hour of
 
saturated steam at 3% overpressure. The relief capacity of a single safety valve is adequate to
 
relieve any overpressure condition which could occur during shutdown.
Two safety valves are required in MODES 1, 2 and
: 3. One safety valve is required in MODE 4 with T c > 220 F. For the remainder of MODES 4, 5 and 6 with the reactor vessel head in place, overpressure protection is provided by the operating procedures and LCO 3.4.12, "Low
 
Temperature Overpressure Protection (LTOP) System".
During operation, all pressurizer code safety valves must be OPERABLE to prevent the RCS
 
from being pressurized above its safety limit of 2750 psia. The combined relief capacity of
 
these valves is sufficient to limit the Reactor Cool ant System pressure to within its Safety Limit of 2750 psia following a complete loss of turbine generator load while operating at RATED
 
THERMAL POWER and assuming no reactor trip until the first Reactor Protective System trip
 
setpoint (Pressurizer Pressure-High) is reached (i.e., no credit is taken for a direct reactor trip
 
on the loss of turbine) and also assuming no operation of the steam dump valves.
Demonstration of the safety valves' lift setting will occur only during shutdown and will be performed in accordance with the provisions of Section XI of the ASME Boiler and Pressure
 
Vessel Code.
The ACTION permits the use of the provisions of LCO 3.0.4.c for entry into Mode 3 and suspension of the requirements of ACTION "a" to support testing of one valve at a time for up to 18 hours per valve in Mode 3. ACTION "a" must be entered if either valve is removed from service for more than 18 hours or if the summed time in which each valve is removed from service for testing in Mode 3 exceeds 36 hours. This allowance permits entry into the applicable MODE(s) while relying on the ACTION and suspends the shutdown requirement for a limited period of time to verify proper valve settings prior to startup.}}