ML13231A020: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[L-13-276, Submittal of Schedule for Loss-Of-Coolant Accident Reanalysis on or Before December 15, 2014]]
| number = ML13231A020
| issue date = 08/19/2013
| title = Submittal of Schedule for Loss-Of-Coolant Accident Reanalysis on or Before December 15, 2014
| author name = Imlay D M
| author affiliation = FirstEnergy Nuclear Operating Co
| addressee name =
| addressee affiliation = NRC/NRR, NRC/Document Control Desk
| docket = 05000346
| license number = NPF-003
| contact person =
| case reference number = L-13-276
| document type = Letter
| page count = 1
}}
 
=Text=
{{#Wiki_filter:FE NOC FirstEnergy Nuclear Operating Company August 19, 2013 L-13-276 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001
 
==SUBJECT:==
Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License No. NPF-3 Loss-of-Coolant Accident Reanalysis Schedule Davis-Besse Nuclear Power Station 5501 N. State Route 2 Oak Harbor, Ohio 43449 10 CFR 50.46 FirstEnergy Nuclear Operating Company (FENOC) hereby submits the schedule for the loss-of-coolant accident (LOCA) reanalysis for the Davis-Besse Nuclear Power Station, Unit No. 1 (DBNPS). On or before December 15, 2014, FENOC is scheduled to complete a LOCA reanalysis for DBNPS. The results of the reanalysis will be communicated to the Nuclear Regulatory Commission (NRC) in accordance with Title 10 of the Code of Federal Regulations, Part 50, Section 50.46. There are no regulatory commitments contained in this letter. If there are any questions or if additional information is required, please contact Mr. Thomas Lentz, Fleet Licensing at (330) 315-6810.
Sincerely, David M. Imlay Director, Site Performance Improvement cc: NRC Region Ill Administrator Nuclear Reactor Regulation Project Manager NRC Resident Inspector Utility Radiological Safety Board}}

Latest revision as of 17:04, 11 April 2019