ML14345A855: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Yes (6)Yes (10)Question 2: Are radioactive materials in burials, landfills, fill areas, or other areas where engineered barriers and/or land use controls are potential remedies?Question 3: At present (or known plans) are radioactive materials or devices in soil, buildings, groundwater, or a combination of all three, with potential for future unrestricted release?Figure 1:
{{#Wiki_filter:Proceed to Question 2 Question 1: Is the                                                                                                                                                                      Figure 1:
Military Radium Site Prioritization Diagram  Apply NRC's monitoring approach to all base areas that meet this criteriaApply NRC's monitoring approach to 1 to 2 separate base areas with different land use controls/restrictions that meet this criteria  Have significant NRC comments been generated which point to potential health and safety concerns?Perform monitoring
site on EPAs Stay-informed of                                                                                                                                Military National Priorities        Yes (0)
 
List under EPA activities                                                                                                                                Radium Site oversight?                                                                                                                                                                        Prioritization Diagram No Proceed to Question 2 Question 2: Are radioactive materials in                                                   Apply NRCs Are engineered burials, landfills, fill                                             monitoring approach barriers going to be areas, or other areas                                                   to all base areas used in conjunction where engineered                                                       that meet this with land use barriers and/or land                                                         criteria controls?          Yes use controls are Proceed to Question 3 potential remedies?                                           (10)
reviews on all base areas of the site that require use restrictions and institutional controlsApply NRC's monitoring approach to 2-3 areas/buildings with the most significant contamination (review at least 1 building)  Have significant NRC comments been generated which point to potential health and safety concerns?Perform monitoring
No (8)
 
Control No                          s Only Proceed to Question 3                      Apply NRCs monitoring approach             Have significant            Perform monitoring to 1 to 2 separate             NRC comments                reviews on all base base areas with                 been generated            areas of the site that different land use                which point to                require use controls/restrictions           potential health and            restrictions and that meet this               safety concerns?           institutional controls criteria Question 3: At present                                                    Apply NRCs (or known plans) are                                                monitoring approach           Have significant radioactive materials or                Is there significant to 2-3 areas/             NRC comments                                                              Perform monitoring devices in soil,                      groundwater buildings with the           been generated                                                           reviews on all base buildings, groundwater,        Yes        contamination/
reviews on all base areas/buildings that will be reusedQuestion 4:  Are small amounts of radioactive material in only soil or buildings potentially below screening values with potential for future unrestricted release?   Apply NRC's monitoring approach to the 1 area/building with most significant contamination (review at least 1 building onsite if none in area identified) Have significant NRC/State comments been generated which point to potential health and safety concerns?Perform monitoring
most significant              which point to                                                          areas/buildings that or a combination of all                  environmental three, with potential for                                                 contamination            potential health and                                                          will be reused Proceed to Question 4 transport?        Yes future unrestricted                                                 (review at least 1          safety concerns?
 
(6)          building) release?
reviews on all base areas/buildings that will be reusedIs there significant groundwater contamination/environmental transport?Stay-informed of activities Yes No(4)Yes (0)Note (recognizing that a base will have multiple sites): As part of site prioritization, for each site answer questions 1-4. Sum up the point values associated with questions 1-4 and apply a weighting factor. The sites with the highest point values will be prioritized higher than sites with lower values. Question 1:  Is the site on EPA's National Priorities List under EPA oversight? Stay-informed of activitiesYes (0) Are engineered barriers going to be used in conjunction with land use controls?N o No NoProceed to Question 4Stay-informed of activitiesProceed to Question 4Sum scores and apply weighting factorSum scores and apply weighting factorProceed to Question 3Proceed to Question 3Proceed to Question 2 NoProceed to Question 2 No (8) Controls Only}}
No (4)
No                                Apply NRCs                  Have significant monitoring approach               NRC/State to the 1 area/building                                       Perform monitoring Proceed to Question 4                                                  comments been with most significant                                       reviews on all base generated which contamination (review                                       areas/buildings that at least 1 building           point to potential will be reused onsite if none in area           health and safety identified)                  concerns?
Question 4: Are small Sum scores and apply weighting factor amounts of radioactive material in only soil or Stay-informed of                        Stay-informed of buildings potentially      Yes (0) activities                            activities below screening values with potential                                                                                                                              Note (recognizing that a base will for future unrestricted                                                                                                                              have multiple sites): As part of release?                                                                                                                                    site prioritization, for each site answer questions 1-4. Sum up No                                                                                                                                        the point values associated with questions 1-4 and apply a weighting factor. The sites with Sum scores and apply weighting factor                                                                                                                                    the highest point values will be prioritized higher than sites with lower values.}}

Latest revision as of 19:37, 31 October 2019

Enclosure 2: Military Radium Prioritization Flowchart
ML14345A855
Person / Time
Issue date: 01/13/2015
From:
NRC/NMSS/DDUWP/MDB
To:
References
Download: ML14345A855 (1)


Text

Proceed to Question 2 Question 1: Is the Figure 1:

site on EPAs Stay-informed of Military National Priorities Yes (0)

List under EPA activities Radium Site oversight? Prioritization Diagram No Proceed to Question 2 Question 2: Are radioactive materials in Apply NRCs Are engineered burials, landfills, fill monitoring approach barriers going to be areas, or other areas to all base areas used in conjunction where engineered that meet this with land use barriers and/or land criteria controls? Yes use controls are Proceed to Question 3 potential remedies? (10)

No (8)

Control No s Only Proceed to Question 3 Apply NRCs monitoring approach Have significant Perform monitoring to 1 to 2 separate NRC comments reviews on all base base areas with been generated areas of the site that different land use which point to require use controls/restrictions potential health and restrictions and that meet this safety concerns? institutional controls criteria Question 3: At present Apply NRCs (or known plans) are monitoring approach Have significant radioactive materials or Is there significant to 2-3 areas/ NRC comments Perform monitoring devices in soil, groundwater buildings with the been generated reviews on all base buildings, groundwater, Yes contamination/

most significant which point to areas/buildings that or a combination of all environmental three, with potential for contamination potential health and will be reused Proceed to Question 4 transport? Yes future unrestricted (review at least 1 safety concerns?

(6) building) release?

No (4)

No Apply NRCs Have significant monitoring approach NRC/State to the 1 area/building Perform monitoring Proceed to Question 4 comments been with most significant reviews on all base generated which contamination (review areas/buildings that at least 1 building point to potential will be reused onsite if none in area health and safety identified) concerns?

Question 4: Are small Sum scores and apply weighting factor amounts of radioactive material in only soil or Stay-informed of Stay-informed of buildings potentially Yes (0) activities activities below screening values with potential Note (recognizing that a base will for future unrestricted have multiple sites): As part of release? site prioritization, for each site answer questions 1-4. Sum up No the point values associated with questions 1-4 and apply a weighting factor. The sites with Sum scores and apply weighting factor the highest point values will be prioritized higher than sites with lower values.