{{Adams
#REDIRECT [[MNS-15-077, Expedited Seismic Evaluation Process (ESEP) Report (CEUS Sites), Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima..]]
| number = ML15313A153
| issue date = 10/08/2015
| title = Expedited Seismic Evaluation Process (ESEP) Report (CEUS Sites), Response to NRC Request for Information, Per 10CFR50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima..
| author name = Capps S D
| author affiliation = Duke Energy Carolinas, LLC
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000369, 05000370
| license number = NPF-009, NPF-017
| contact person =
| case reference number = MNS-15-077
| document type = Letter, Response to Request for Additional Information (RAI)
| page count = 3
| project =
| stage = Response to RAI
}}
 
=Text=
{{#Wiki_filter:S DUKESteven
: 0. Capps Vice President ENERGYMcGuire Nuclear Station Duke Energy MG01VP I112700 Hagers Ferry Road Huntersville, NC 28078 o: 980.875.4805 f: 980.875.4809 Steven.Capps@duke-energy.corn 10 CFR 50.4 October 08, 2015 Serial: MNS-1 5-077 U.S. Nuclear Regulatory Commission Washington, DC 20555-001 ATTENTION:
Document Control Desk Duke Energy Carolinas, LLC (Duke Energy)McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369 and 50-370 Renewed License Nos. NPF-9 and NPF-17
 
==Subject:==
Expedited Seismic Evaluation Process (ESEP) Report (CEUS Sites), Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
 
==References:==
: 1. NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012, ADAMS Accession No. ML12053A340
: 2. Duke Letter, Expedited Seismic Evaluation Process (ESEP) Report (CEUS Sites), Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated December 17, 2014, ADAMS Accession No. ML1 5005A085 3. NRC Letter, Nuclear Regulatory Commission Plan for the Audit of Duke Energy Carolinas, LLC and Duke Energy Progress, Inc. Interim Evaluations Associated with Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1 -Seismic for: Catawba Nuclear Station, Units 1 and 2; McGuire Nuclear Station, Units 1 and 2; and Oconee Nuclear Station, Units 1, 2 and 3, dated September 2, 2015, ADAMS Accession No. ML15226A185 US Nuclear Regulatory Commission October 08, 2015 Page 2 On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference i to all power reactor licensees and holders of construction permits in active or deferred status. Enclosure 1 of Reference 1 requested that licensees provide interim evaluations and actions taken or planned to address the higher seismic hazard relative to the design basis, as appropriate, prior to completion of the risk evaluation.
Reference 2 provided the Expedited Seismic Evaluation Process (ESEP) Report for MNS Units 1 and 2.On September 15, 2015, an audit of the ESEP interim evaluations associated with the reevaluated seismic hazard for Catawba, McGuire and Oconee was held in Rockville, Maryland.During the audit, the NRC requested that Duke Energy supplement the December 17, 2014, submittal (Reference
: 2) by revising Action #3 in Section 8.4, Table 8-1 of the ESEP report described as "Submit a letter to the NRC confirming implementation of the modifications associated with items 1 and 2 within 60 days following completion of ESEP activities for items 1 and 2" from a planned action to a regulatory commitment.
This letter establishes Action #3 in Section 8.4, Table 8-1 of the ESEP Report as a new regulatory commitment.
Please direct any comments or questions regarding this submittal to George Murphy at (980) 875-5715.I declare under penalty of perjury that the foregoing is true and correct. Executed on October 08, 2015.Sincerely, Steven D. Capps US Nuclear Regulatory Commission October 08, 2015 Page 3 cc w/ Attachments:
C. Haney Administrator, Region II U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 J. Zeiler NRC Senior Resident Inspector McGuire Nuclear Station G. E. Miller, Project Manager U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738 S DUKESteven
: 0. Capps Vice President ENERGYMcGuire Nuclear Station Duke Energy MG01VP I112700 Hagers Ferry Road Huntersville, NC 28078 o: 980.875.4805 f: 980.875.4809 Steven.Capps@duke-energy.corn 10 CFR 50.4 October 08, 2015 Serial: MNS-1 5-077 U.S. Nuclear Regulatory Commission Washington, DC 20555-001 ATTENTION:
Document Control Desk Duke Energy Carolinas, LLC (Duke Energy)McGuire Nuclear Station, Units 1 and 2 Docket Nos. 50-369 and 50-370 Renewed License Nos. NPF-9 and NPF-17
 
==Subject:==
Expedited Seismic Evaluation Process (ESEP) Report (CEUS Sites), Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
 
==References:==
: 1. NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012, ADAMS Accession No. ML12053A340
: 2. Duke Letter, Expedited Seismic Evaluation Process (ESEP) Report (CEUS Sites), Response to NRC Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated December 17, 2014, ADAMS Accession No. ML1 5005A085 3. NRC Letter, Nuclear Regulatory Commission Plan for the Audit of Duke Energy Carolinas, LLC and Duke Energy Progress, Inc. Interim Evaluations Associated with Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1 -Seismic for: Catawba Nuclear Station, Units 1 and 2; McGuire Nuclear Station, Units 1 and 2; and Oconee Nuclear Station, Units 1, 2 and 3, dated September 2, 2015, ADAMS Accession No. ML15226A185 US Nuclear Regulatory Commission October 08, 2015 Page 2 On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued Reference i to all power reactor licensees and holders of construction permits in active or deferred status. Enclosure 1 of Reference 1 requested that licensees provide interim evaluations and actions taken or planned to address the higher seismic hazard relative to the design basis, as appropriate, prior to completion of the risk evaluation.
Reference 2 provided the Expedited Seismic Evaluation Process (ESEP) Report for MNS Units 1 and 2.On September 15, 2015, an audit of the ESEP interim evaluations associated with the reevaluated seismic hazard for Catawba, McGuire and Oconee was held in Rockville, Maryland.During the audit, the NRC requested that Duke Energy supplement the December 17, 2014, submittal (Reference
: 2) by revising Action #3 in Section 8.4, Table 8-1 of the ESEP report described as "Submit a letter to the NRC confirming implementation of the modifications associated with items 1 and 2 within 60 days following completion of ESEP activities for items 1 and 2" from a planned action to a regulatory commitment.
This letter establishes Action #3 in Section 8.4, Table 8-1 of the ESEP Report as a new regulatory commitment.
Please direct any comments or questions regarding this submittal to George Murphy at (980) 875-5715.I declare under penalty of perjury that the foregoing is true and correct. Executed on October 08, 2015.Sincerely, Steven D. Capps US Nuclear Regulatory Commission October 08, 2015 Page 3 cc w/ Attachments:
C. Haney Administrator, Region II U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 J. Zeiler NRC Senior Resident Inspector McGuire Nuclear Station G. E. Miller, Project Manager U.S. Nuclear Regulatory Commission 11555 Rockville Pike Mail Stop 0-8 G9A Rockville, MD 20852-2738}}