ML18088A849: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[RA-18-020, Request for Exemption from 1 O CFR 140.11 (a)(4), Concerning Primary and Secondary Liability Insurance]]
| number = ML18088A849
| issue date = 03/29/2018
| title = Oyster Creek Nuclear Generating Station - Request for Exemption from 1 O CFR 140.11 (a)(4), Concerning Primary and Secondary Liability Insurance
| author name = Gallagher M P
| author affiliation = Exelon Generation Co, LLC
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NMSS, NRC/NRR
| docket = 05000219, 07200015
| license number = DPR-016
| contact person =
| case reference number = RA-18-020
| document type = Letter
| page count = 17
}}
 
=Text=
{{#Wiki_filter:Exelon Generation Michael P. Gallagher Exelon Nuclear Vice President License Renewal and Decommissio n ing RA-18-020 200 Exelon Way Kennett Square, PA 19348 610 765 5958 Office 610 765 5658 Fax www.e x eloncor p.com michael p.gallagher@exelonco r p.co m 10 CFR 140.8 10 CFR 140.11 (a)(4) March 29, 2018 U.S. Nuclear Regulatory Commission A TIN: Document Control Desk Washington, DC 20555-0001
 
==Subject:==
Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16 NRG Docket Nos. 50-219 and 72-15 Request for Exemption from 1 O CFR 140.11 (a)(4), Concerning Primary and Secondary Liability Insurance  
 
==Reference:==
: 1) Letter from Keith R. Jury, Exelon Generation Company, LLC to U.S. Nuclear Regulatory Commission
-"Permanent Cessation of Operations at Oyster Creek Nuclear Generating Station," dated January 7, 2011, (ML 110070507)
: 2) Letter from Michael P. Gallagher, Exelon Generation Company, LLC to U.S. Nuclear Regulatory Commission
-"Certification of Permanent Cessation of Power Operations for Oyster Creek Nuclear Power Station," dated February 14, 2018 (ML 18045A084)
: 3) Letter from Michael P. Gallagher, (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission
-"Request for Exemption from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E," dated August 22, 2017 (ML 17234A082)
Pursuant to 10 CFR 140.8, "Specific exemptions," Exelon Generation Company, LLC (Exelon) requests a permanent exemption from 10 CFR 140.11 (a)(4) for Oyster Creek Nuclear Generating Station (OCNGS). 10 CFR 140.11 requires licensees to have and maintain two levels of financial protection against off-site liability for each nuclear reactor which is licensed to operate, designed for the production of electrical energy, and has a rated capacity of 100,000 kilowatts electric (kWe) or more. The two levels of financial protection are as follows:
* Primary insurance coverage of $450,000,000 from private sources; and,
* Secondary financial protection in the form of private liability insurance available under an industry retrospective rating plan.
U.S. Nuclear Regulatory Commission OCNGS Request for Exemption Docket Nos. 50-219 and 72-15 March 29, 2018 Page2 Exelon is requesting an exemption to 1 O CFR 140.11 (a)(4) for OCNGS that would reduce the required level of primary off-site liability insurance to $100,000,000 and eliminate the requirement for OCNGS to carry secondary financial protection.
The exemption request is provided in the attachment to this letter. On January 7, 2011, Exelon informed the U.S. Nuclear Regulatory Commission (NRC) that OCNGS will permanently cease power operations by December 31, 2019 (Reference 1 ). On February 2, 2018, Exelon announced that it now plans to retire OCNGS no later than October 31, 2018, at the end of the current two-year operating cycle. Exelon informed the NRC of this change in Reference
: 2. Once OCNGS permanently ceases operations and submits the certifications required by 1 O CFR 50.82(a)(1
)(i) and (ii), pursuant to 1 O CFR 50.82(a)(2), the 1 O CFR 50 license for OCNGS will no longer authorize operation of the reactor or placement or retention of fuel in the reactor vessel. The underlying purpose of 1 O CFR 140.11 (a)(4) is to require sufficient liability insurance to ensure adequate funding of any claims resulting from a potential nuclear incident or precautionary evacuation associated with an individual power reactor. However, the regulation does not take into consideration the reduced potential for, and consequences of, such nuclear incidents at permanently shutdown facilities.
The OCNGS facility is a single reactor site and the reactor will be permanently shut down no later than October 31, 2018 (Reference 2). The proposed exemption would allow a reduction in the level of financial protection against off-site liability at OCNGS to a level that is commensurate with the permanently defueled status of the facility and the underlying purpose of the rule. Exelon has performed an analysis for OCNGS showing that 12 months after shutdown provides sufficient decay of the spent fuel stored in the spent fuel pool (SFP) such that there is a significant reduction in risk from SFP draining events. This reduction in risk supports the basis for the 1 O CFR 140.8 "Specific exemptions," provided in the attachment to this letter. The analysis related to the 12-month decay time was provided with Reference
: 3. Based on the projected OCNGS cessation of operations which is expected no later than the end of October 2018 (Reference 2), the decay period of 12 months will occur in October 2019. Therefore, Exelon is requesting approval of this exemption request by August 1, 2019, and a 60-day implementation date no later than October 31, 2019. The approval date of August 1, 2019, would permit sufficient time to arrange for the reduced offsite liability insurance coverage allowed by the exemption.
Exelon also requests that Indemnity Agreement No. B-37 be amended in October 2019 to (a) delete Article VIII in its entirety and substitute there in the requirements of the exemption permitting a reduction in primary financial protection from $450,000,000 to $100,000,000, and withdrawal from participation in the secondary layer of financial protection; and (b) delete Item 2.a of the Attachment and substitute
"$100,000,000." A "form of" amendment is provided as Attachment
: 2. This letter contains no new regulatory commitments.
U.S. Nuclear Regulatory Commission OCNGS Request for Exemption Docket Nos. 50-219 and 72-15 March 29, 2018 Page3 If you have any questions concerning this submittal, please contact Paul Bonnett at (610) 765-5264. Respectfully, Michael P. Gallagher Vice President, License Renewal & Decommissioning Exelon Generation Company, LLC Attachment(s):
: 1. Request for Exemption from 1 O CFR 140.11 (a)(4), Concerning Primary and Secondary Liability Insurance
: 2. Form of Indemnity Amendment cc: w/ Attachments Regional Administrator
-NRG Region I NRG Senior Resident Inspector
-Oyster Creek Nuclear Generating Station NRG Project Manager, NRR -Oyster Creek Nuclear Generating Station Director, Bureau of Nuclear Engineering
-New Jersey Department of Environmental Protection Mayor of Lacey Township, Forked River, NJ 
 
Attachment 1 Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance
 
Attachment Request for Exemption from 10 CFR 140.11(a)(4) Docket Nos. 50-219 and 72-15 Page A-1 of A-11
: 1. SPECIFIC EXEMPTION REQUEST Pursuant to 10 CFR 140.8, "Specific exemptions," Exelon Generation Company, LLC (Exelon) requests a permanent exemption from 10 CFR 140.11(a)(4) for Oyster Creek Nuclear Generating Station (OCNGS). 10 CFR 140.11(a)(4) requires individual power reactor licensees to have and maintain two levels of financial protection against off-site liability for each nuclear reactor which is licensed to operate, designed for the production of electrical energy, and has a rated capacity of 100,000 kilowatts electric (kWe) or more. The two levels of financial protection are as follows:  Primary insurance coverage of $450,000,000 from private sources; and,  Secondary financial protection in the form of private liability insurance available under an industry retrospective rating plan. The proposed exemption would reduce the required level of primary off-site liability insurance to $100,000,000 and eliminate the requirement for OCNGS to carry secondary financial protection.
10 CFR 140.11(a)(4) reads as follows: (a) Each licensee is required to have and maintain financial protection: (4) In an amount equal to the sum of $450,000,000 and the amount available as secondary financial protection (in the form of private liability insurance available under an industry retrospective rating plan providing for deferred premium charges equal to the pro rata share of the aggregate public liability claims and costs, excluding costs payment of which is not authorized by section 170o.(1)(D) of the Act, in excess of that covered by primary financial protection) for each nuclear reactor which is licensed to operate and which is designed for the production of electrical energy and has a rated capacity of 100,000 electrical kilowatts or more: Provided, however, that under such a plan for deferred premium charges for each nuclear reactor that is licensed to operate, no more than
$121,255,000 with respect to any nuclear incident (plus any surcharge assessed under subsection 170o.(1)(E) of the Act) and no more than $18,963,000 per incident within one calendar year shall be charged. Except that, where a person is authorized to operate a combination of 2 or more nuclear reactors located at a single site, each of which has a rated capacity of 100,000 or more electrical kilowatts but not more than 300,000 electrical kilowatts with a combined rated capacity of not more than 1,300,000 electrical kilowatts, each such combination of reactors shall be considered to be a single nuclear reactor for the sole purpose of assessing the applicable financial protection required under this section. Exemption from 10 CFR 140.11(a)(4) is requested in order to allow reduced offsite liability insurance coverage commensurate with the significantly reduced risks associated with the permanently defueled condition. Exelon has performed an analysis indicating that irradiated fuel decay for 12 months after shutdown provides sufficient time for operators to recover spent fuel pool (SFP) water inventory prior to reaching a temperature of 900 degrees Celsius (°C) where oxidation of the spent fuel and cladding could commence. This analysis was submitted in Reference 3. Because OCNGS expects final shutdown to occur no later than the end of October 2018 (Reference 2), 12 months after shutdown will occur in October 2019. The requested approval date of August 1, 2019, will enable Exelon adequate time before October 1, 2019, to arrange for the reduced insurance coverage allowed by the exemption.
Attachment Request for Exemption from 10 CFR 140.11(a)(4) Docket Nos. 50-219 and 72-15 Page A-2 of A-11
: 2. BACKGROUND The OCNGS site is a single unit facility located near the Atlantic Ocean within the State of New Jersey. The facility site, approximately 152 acres, is in Lacey Township, Ocean County. The OCNGS facility employs a General Electric boiling water reactor nuclear steam supply system licensed to generate 1930 megawatts-thermal. The boiling water reactor and supporting facilities are owned and operated by Exelon. The licensee, Exelon, is the holder of the Oyster Creek Nuclear Generating Station Renewed Facility Operating License No. DPR-16. The license provides, among other things, that the facility is subject to all rules, regulations, and orders of the NRC now or hereafter in effect. By letter dated January 7, 2011 (Reference 1, pursuant to 10 CFR 50.82(a)(1)(i), Exelon notified the U.S. Nuclear Regulatory Commission (NRC) of its intention to permanently cease power operations at OCNGS by December 31, 2019. On February 2, 2018, Exelon announced that it now plans to retire OCNGS in 2018, at the end of the current two-year operating cycle. Exelon informed the NRC of this change in a letter dated February 14, 2018 (Reference 2). Once fuel has been permanently removed from the reactor vessel, Exelon will submit a written certification to the NRC, in accordance with 10 CFR 50.82(a)(1)(ii) that meets the requirements of 10 CFR 50.4(b)(9). Upon docketing of these certifications, the 10 CFR Part 50 license for OCNGS will no longer authorize operation of the reactor or emplacement or retention of fuel into the reactor vessel, as specified in 10 CFR 50.82(a)(2). 3.0 BASIS FOR EXEMPTION REQUEST The underlying purpose of 10 CFR 140.11(a)(4) is to require sufficient liability insurance to ensure adequate funding of any claims resulting from a potential nuclear incident or precautionary evacuation associated with an individual power reactor. The financial protection limits of 10 CFR 140.11 were established to require that licensees maintain sufficient insurance to cover the costs of a nuclear incident at an operating reactor. This regulation does not take into consideration the reduced potential for, and consequences of, such nuclear incidents at permanently shutdown facilities. The OCNGS facility is a single reactor site and the reactor will be permanently shut down and defueled. The proposed exemption would allow a reduction in the level of offsite liability insurance coverage to a level that is commensurate with the planned permanently defueled status of OCNGS and the underlying purpose of the rule. Although the likelihood of an accident at an operating reactor is small, the consequences can be large, in part due to the high temperatures and pressures of the reactor coolant system as well as the inventory of radionuclides. For a permanently shutdown and defueled reactor, nuclear accidents involving the reactor and its associated systems, structures and components are no longer possible. Furthermore, reductions in the probability and consequences of non-operating reactor nuclear incidents are substantially reduced because; 1) the decay heat from the spent fuel decreases over time, which reduces the amount of cooling required to prevent the spent fuel from heating up to a temperature that could compromise the ability of the fuel cladding to retain fission products, and; 2) the relatively short-lived radionuclides contained in the spent fuel, particularly volatile components like iodine and noble gasses, decay away, thus reducing the inventory of radioactive materials available for release. Although the potential for, and consequences of, nuclear accidents decline substantially after a plant permanently defuels its reactor, they are not completely eliminated. There are potential Attachment Request for Exemption from 10 CFR 140.11(a)(4) Docket Nos. 50-219 and 72-15 Page A-3 of A-11 onsite and offsite radiological consequences that could be associated with the onsite storage of the spent fuel in the SFP. In addition, a site with a permanently shutdown and defueled reactor may contain an inventory of radioactive liquids, activated reactor components, and contaminated materials. For purposes of modifying the amount of offsite liability insurance coverage maintained by a permanently shutdown and defueled reactor licensee, the potential radiological consequences of these non-operating reactor nuclear incidents are appropriate to consider, despite their very low probability of occurrence. NRC Proposed Rulemaking The NRC staff has generically evaluated the legal, technical, and policy issues regarding the financial protection requirements for large nuclear power plants that have been permanently shut down. The results of these evaluations were summarized in SECY-96-256 (Reference 5) and the NRC staff recommended course of action was approved by the Commission in a Staff Requirements Memo (SRM) (Reference 6). These documents established the basis for the NRC exercising its discretionary authority to specify an appropriate level of onsite insurance coverage for permanently shutdown nuclear power reactors. In SECY-97-186 (Reference 7), the NRC staff proposed rulemaking for Commission approval that was consistent with SECY-96-256, Option 2. In SECY-97-186, the NRC staff proposed changes to 10 CFR 50.54(w)(1) and 10 CFR 140.1 1(a)(4) that would establish appropriate levels of onsite insurance and offsite liability coverage for plants that are permanently shutdown and defueled and that meet specified facility configurations during permanent shutdown. On October 30, 1997, the NRC published a proposed rulemaking to amend regulations governing liability coverage for permanently shutdown nuclear plants. The proposed rulemaking established four different configurations for permanently shutdown plants that encompassed anticipated spent fuel characteristics and storage modes during the period between permanent shutdown and termination of the license. The rulemaking proposed financial protection requirements for each of the four specified plant configurations, including a configuration where the plant is permanently shutdown, the reactor defueled, and the spent fuel stored in the spent fuel pool is not susceptible to a zircaloy cladding failure or gap release caused by an incipient fuel cladding failure if the pool is accidentally drained. However, the NRC staff rulemaking efforts were suspended prior to issuing the final rule when it was realized that an NRC staff-approved technical basis did not exist for generic decay times after which the zirconium cladding failure concern could be eliminated. The proposed changes to regulations governing onsite insurance coverage were subsequently included in a risk-informed, integrated rulemaking initiative for decommissioning nuclear power plants, which has yet to be acted on. This rulemaking initiative, documented in SECY-00-145 (Reference 9), included onsite insurance coverage requirements based on the proposed decommissioning insurance rulemaking issued on October 30, 1997, as modified to address the public comments received in response to that proposed rulemaking. The modified rulemaking, as incorporated into SECY-00-145, would have allowed the minimum onsite insurance coverage to be reduced to $25 million once the spent fuel in the SFP is no longer thermal-hydraulically capable of sustaining a zirconium fire, based on a plant-specific analysis.
Attachment Request for Exemption from 10 CFR 140.11(a)(4) Docket Nos. 50-219 and 72-15 Page A-4 of A-11 As discussed in the staff response to a question in SECY-00-145 (see "NRC Staff Responses to NEI White Paper Comments on Improving Decommissioning Regulations," page 6, response to Question 3): "The staff believes that full insurance coverage must be maintained for 5 years or until a licensee can show by analysis that its spent fuel pool is no longer vulnerable to such [a zirconium] fire." In addition, as discussed in the staff response to a question in SECY-00-145 (see "NRC Staff Responses to NEI White Paper Comments on Improving Decommissioning Regulations," page 5, response to Question 2): "Since the zirconium fire scenario would be possible for up to several years following shutdown, and since the consequences of such a fire are severe in terms of property damage and land contamination, the staff position is that full onsite liability coverage must be retained for five years or until analysis has indicated that a zirconium fire is no longer possible." In a memorandum dated August 16, 2002 (Reference 10), the NRC Executive Director for Operations provided the NRC Commissioners a status of the regulatory exemptions for plants in decommissioning. This memorandum stated that, "In the absence of any anticipated nuclear power plant decommissionings in the near term, the staff believes that there is no immediate need for moving forward with a majority of the decommissioning regulatory improvement work that is currently planned. Specifically, broad scope regulatory improvements for decommissioning nuclear power plants do not appear to be of sufficient priority given a lack of future licensees that would benefit at this time. Due to higher priorities, resources are being deferred for decommissioning rulemakings that are not currently in progress or not related to security.... If any plants do unexpectedly shutdown permanently, decommissioning regulatory issues would continue to be addressed through the exemption process in a manner similar to current practice."  Thus, the proposed rulemaking process changes for decommissioning plants discussed above were stopped in deference to the exemption process that had been used for previous licensees. In January 2018 NRC issued its "Regulatory Analysis for Regulatory Basis: Regulatory Improvements for Power Reactors Transitioning to Decommissioning" NRC-2015-0070, RIN 3150-AJ59 (Reference 22). In Section 5.8 of this Regulatory Basis document the NRC staff assessed offsite and onsite financial protection requirements and indemnity agreements and proposed alternatives that include an alternative "FP-2." This alternative would involve rulemaking to reduce the primary financial protection requirement in 10 CFR 110.11(a)(4) to $100 million for a reactor that "is defueled and permanently shut down, and spent fuel in the SFP has decayed and cooled sufficiently that it cannot heat up to clad ignition temperature within 10 hours under adiabatic conditions." In Section 8.2.9 of the Regulatory basis document, the NRC staff has recommended alternative FP-2.
 
Attachment Request for Exemption from 10 CFR 140.11(a)(4) Docket Nos. 50-219 and 72-15 Page A-5 of A-11 4. TECHNICAL EVALUATION Section 15 of the OCNGS Updated Final Safety Analysis Report (UFSAR) describes the design basis accidents (DBAs) and transient scenarios applicable to OCNGS during power operations. The most severe postulated accidents for nuclear power plants involve damage to the nuclear reactor core and the release of large quantities of fission products to the reactor coolant system.
Many of the accident scenarios postulated in the UFSAR involve failures or malfunctions of systems which could affect the reactor core. However, based on the notification of permanent cessation of power operations submitted by Exelon pursuant to 10 CFR 50.82(a)(1) (Reference 2), and the planned removal of authorization to operate the reactor or to place or retain fuel in the reactor vessel in accordance with 10 CFR 50.82(a)(2) once it has been certified that all fuel has been permanently removed from the reactor, most of the DBA scenarios postulated in the UFSAR will no longer be possible. The irradiated fuel will be stored in the SFP and the Independent Spent Fuel Storage Installation (ISFSI) until it is shipped off site in accordance with the schedules to be provided in the Post Shutdown Decommissioning Activities Report (PSDAR) and the updated Irradiated Fuel Management Plan. When the reactor is permanently defueled, the SFP and its supporting systems will be dedicated only to spent fuel storage. With the reactor defueled, the reactor vessel assembly and supporting structures and systems are no longer in operation and have no function related to the safe storage and management of irradiated fuel in the SFP. Fuel pool cooling and makeup capabilities function to remove decay heat from spent fuel stored in the fuel pool and to maintain a specified water temperature and level. Accident Analysis Overview  Following the termination of reactor operations at OCNGS and the permanent removal of the fuel from the reactor vessel, the postulated accidents involving failure or malfunction of the reactor and supporting structures, systems and components are no longer applicable. OCNGS' "Request for Exemptions from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E," (Reference 3) provides information on the disposition of accidents and other incidents of concern. A summary of the postulated radiological accidents analyzed for the permanently shutdown and defueled condition of OCNGS is presented below. 1. Consequences of Design Basis Events The postulated design basis accident that will remain applicable to OCNGS in its permanently shut down and defueled condition is the Fuel Handling Accident (FHA) in the Reactor Building where the SFP is located. An analysis based on the FHA was performed to determine the dose to operators in the control room and the public at the Exclusion Area Boundary (EAB) as a function of time after shutdown. The analysis shows that the dose at the EAB 33 days after shutdown (with no credit for containment) is less than 1 rem Total Effective Dose Equivalent (TEDE) and 5 rem Thyroid, which are the Environmental Protection Agency (EPA) Protective Action Guides (PAGs) thresholds for recommended evacuation (Reference 11). Due to the amount of decay assumed (33 days), the results of this analysis may be applied after December 3, 2018, assuming a OCNGS shutdown by October 1, 2018 (Reference 2).
Attachment Request for Exemption from 10 CFR 140.11(a)(4) Docket Nos. 50-219 and 72-15 Page A-6 of A-11 2. Consequences of Beyond Design Basis Events  Hottest Fuel Assembly Adiabatic Heatup - Beyond Design Basis Event The analysis (Reference 21) provided with Reference 3 compares the conditions for the hottest fuel assembly stored in the OCNGS fuel pools to the criteria proposed in SECY-99-168 "Improving Decommissioning Regulations for Nuclear Power Plants" (Reference 19),
applicable to offsite emergency response for the unit in the decommissioning process. This criterion considers the time for the hottest assembly to heat up from 30 degrees Celsius (°C) to 900°C adiabatically. If the heat up time is greater than 10 hours, then offsite emergency preplanning involving the plant is not necessary. Based on the limiting fuel assembly for decay heat and adiabatic heatup analysis presented in the Reference 3 analysis, at 12 months (365 days) after permanent cessation of power operations (12 months decay time), the time for the hottest fuel assembly to reach 900°C is greater than 10 hours after the assemblies have been uncovered. As stated in NUREG-1738, "Technical Study of Spent Fuel Pool Accident Risk at Decommissioning Nuclear Power Plants" (February 2001) (Reference 12), 900°C is an acceptable temperature to use for assessing onset of fission product release under transient conditions (to establish the critical decay time for determining availability of 10 hours to evacuate) if fuel and cladding oxidation occurs in air. Because of the length of time it would take for the adiabatic heatup to occur, there is ample time to respond (10 hours) to any drain down event that might cause such an occurrence by restoring cooling or makeup, or providing spray. As a result, the likelihood that such a scenario would progress to a zirconium fire is not deemed credible. 3. Consequences of Other Analyzed Events Loss of Spent Fuel Pool Cooling OCNGS analyzed a drain down event of the SFP to determine a dose rate curve at the EAB and Control Room. NUREG-0586, "Final Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities," (Reference 20) Supplement 1, Section 4.3.9, identifies that a SFP drain down event is a beyond design basis event. Although the analysis (Reference 21) described above, demonstrated a significant release of radioactive material from the spent fuel is not possible in the absence of water cooling after 365 days (1 year) following permanent cessation of power operations, the potential exists for radiation exposure to an offsite individual in the event that shielding of the fuel is lost. The SFP water and the concrete pool structure serve as radiation shielding. A loss of water shielding above the fuel could increase the offsite radiation levels because of the gamma rays streaming up out of the SFP being scattered back to a receptor at the site boundary. The offsite and Control Room radiological impacts of a postulated complete loss of SFP water were assessed in Calculation C-1302-226-E310-458, "Dose at Exclusion Area Boundary and Control Room Due to Shine from Drained Spent Fuel Pool During SAFSTOR" (Reference 13). It was determined that the gamma radiation dose rate at the EAB would be limited to small fractions of the EPA PAGs.
The EPA PAGs were developed to respond to a mobile airborne plume that could transport and deposit radioactive material over a large area. In contrast, the radiation field formed by gamma scatter from a drained SFP would be stationary rather than moving and would not cause transport or deposition of radioactive materials. The extended period required to Attachment Request for Exemption from 10 CFR 140.11(a)(4) Docket Nos. 50-219 and 72-15 Page A-7 of A-11 exceed the EPA PAG limit of 1 Rem TEDE would allow sufficient time to develop and implement onsite mitigative actions and provide confidence that additional offsite measures could be taken without planning if efforts to reestablish shielding over the fuel are delayed.
: 5. JUSTIFICATION FOR EXEMPTIONS AND SPECIAL CIRCUMSTANCES 10 CFR 140.8 states that the Commission may, upon application by any interested person or upon its own initiative, grant exemptions from the requirements of the regulations of Part 140 which are authorized by law and are otherwise in the public interest. As discussed below, this exemption request satisfies the provisions of Section 140.8.
 
===5.1 Exemptions===
 
A. The exemptions are authorized by law 10 CFR 140.8 allows the NRC to grant exemptions from the requirements of 10 CFR Part 140. The proposed exemption is consistent with the requirements of the Atomic Energy Act of 1954 as amended (Price-Anderson Act), which requires that power reactor licensees maintain some level of public liability financial protection. The NRC has granted exemptions granted to other licensees for insurance reductions of the same regulation being requested here by Exelon and have been previously determined to be authorized by law and granted (see Section 6.0 of this attachment). Additionally, as discussed in USNRC letter to Dominion Nuclear Connecticut, Inc (Reference 14), post-shutdown insurance requirements for decommissioning nuclear power plants were addressed in a letter from the Executive Director for Operations to the Chairman of the Advisory Committee on Reactor Safeguards (ACRS) dated September 17, 2001. The staff and the ACRS agreed that onsite and offsite insurance coverage can be substantially reduced shortly after a facility permanently shuts down. The ACRS also accepted the staff's assessment that the primary insurance level can be reduced to $100 million and that decommissioning licensees be released from participation in the secondary insurance pool. Therefore, the exemption is authorized by law.
B. The exemptions is otherwise in the public interest Approval of the exemption request would result in more efficient use of funds in the OCNGS decommissioning trust fund. The reduction in offsite financial protection from $450 million to $100 million and elimination of the requirement to participate in the secondary insurance pool would continue to require a level of financial protection commensurate with the underlying purpose of the rule while eliminating an unnecessary financial burden. Therefore, the proposed exemption is otherwise in the public interest. 6.0 PRECEDENT The exemption request for 10 CFR 140.11(a)(4) is consistent with exemption requests that recently have been issued by the NRC for other nuclear power reactor facilities beginning decommissioning. Specifically, the NRC granted similar exemptions to Entergy Nuclear Operations, Inc., for Vermont Yankee (Reference 15); to Duke Energy Florida, Inc. for Crystal River Unit 3 (Reference 16); and to Southern California Edison Company for SONGS, Units 1, 2, and 3 (Reference 17); and to Dominion Energy Kewaunee, Inc. for KPS (Reference 18).
Attachment Request for Exemption from 10 CFR 140.11(a)(4) Docket Nos. 50-219 and 72-15 Page A-8 of A-11 Similar to the current request, these precedents each resulted in exemptions from the requirements in 10 CFR 140.11(a)(4). 7.0 ENVIRONMENTAL ASSESSMENT The proposed exemption meets the eligibility criterion for categorical exclusion set forth in 10 CFR 51.22(c)(25), because the proposed exemption involves: (i) no significant hazards consideration; (ii) no significant change in the types or significant increase in the amounts of any effluents that may be released offsite; (iii) no significant increase in individual or cumulative public or occupational radiation exposure; (iv) no significant construction impact; (v) no significant increase in the potential for or consequences from radiological accidents; and (vi) the requirements from which the exemption is sought involve: (H) surety, insurance or indemnity requirements. Therefore, pursuant to 10 CFR 51.22(b), no environmental impact statement or environmental assessment need be prepared in connection with the proposed exemption. (i) No Significant Hazards Consideration Determination Exelon has evaluated the proposed exemption to determine whether or not a significant hazards consideration is involved by focusing on the three standards set forth in 10 CFR 50.92 as discussed below: 1. Does the proposed exemption involve a significant increase in the probability or consequences of an accident previously evaluated? Response: No. The proposed exemptions have no effect on structures, systems, and components (SSCs) and no effect on the capability of any plant SSC to perform its design function.
The proposed exemptions would not increase the likelihood of the malfunction of any plant SSC. When the exemptions become effective, there will be no credible events that would result in doses to the public beyond the exclusion area boundary (EAB) that would exceed the Environmental Protection Agency (EPA) Protective Action Guides (PAGs). The probability of occurrence of previously evaluated accidents is not increased, since most previously analyzed accidents will no longer be able to occur and the probability and consequences of the remaining Fuel Handling Accident (FHA) are unaffected by the proposed amendment. Therefore, the proposed exemption does not involve a significant increase in the probability or consequences of an accident previously evaluated. 2. Do the proposed exemptions create the possibility of a new or different kind of accident from any accident previously evaluated? Response: No. The proposed exemption does not involve a physical alteration of the plant. No new or different type of equipment will be installed and there are no physical modifications to existing equipment associated with the proposed exemption. Similarly, the proposed exemption will not physically change any SSCs involved in the mitigation of any accidents. Thus, no new initiators or precursors of a new or different kind of accident Attachment Request for Exemption from 10 CFR 140.11(a)(4) Docket Nos. 50-219 and 72-15 Page A-9 of A-11 are created. Furthermore, the proposed exemption does not create the possibility of a new accident as a result of new failure modes associated with any equipment or personnel failures. No changes are being made to parameters within which the plant is normally operated, or in the setpoints which initiate protective or mitigative actions, and no new failure modes are being introduced. Therefore, the proposed exemption does not create the possibility of a new or different kind of accident from any accident previously evaluated. 3. Do the proposed exemptions involve a significant reduction in a margin of safety? Response: No. The proposed exemption does not alter the design basis or any safety limits for the plant. The proposed exemption does not impact station operation or any plant SSC that is relied upon for accident mitigation. Therefore, the proposed exemption does not involve a significant reduction in a margin of safety. Based on the above, Exelon concludes that the proposed exemption presents no significant hazards consideration, and, accordingly, a finding of "no significant hazards consideration" is justified. (ii) There is no significant change in the types or significant increase in the amounts of any effluents that may be released offsite.
There are no expected changes in the types, characteristics, or quantities of effluents discharged to the environment associated with the proposed exemption. There are no materials or chemicals introduced into the plant that could affect the characteristics or types of effluents released offsite. In addition, the method of operation of waste processing systems will not be affected by the exemption. The proposed exemption will not result in changes to the design basis requirements of SSCs that function to limit or monitor the release of effluents. All the SSCs associated with limiting the release of effluents will continue to be able to perform their functions. Therefore, the proposed exemption will result in no significant change to the types or significant increase in the amounts of any effluents that may be released offsite. (iii) There is no significant increase in individual or cumulative public or occupational radiation exposure.
The proposed exemption does not involve any physical alterations to the plant configuration or any changes to the operation of the facility that could lead to a significant increase in individual or cumulative occupational radiation exposure. (iv) There is no significant construction impact.
No construction activities are associated with the proposed exemption.
Attachment Request for Exemption from 10 CFR 140.11(a)(4) Docket Nos. 50-219 and 72-15 Page A-10 of A-11 (v) There is no significant increase in the potential for or consequences from radiological accidents.
See the no significant hazards considerations discussion in Item (i)(1) above. (vi) The requirements from which exemption is sought involve: (H) surety, insurance or indemnity requirements. The requirements from which the exemption is sought involve financial protection and for the indemnification and limitation of liability of licensees pursuant to Section 170 of the Atomic Energy Act of 1954, as amended and 10 CFR 140.11(a)(4).
: 8. CONCLUSION Pursuant to the provisions of 10 CFR 140.8, Exelon is requesting a permanent exemption from 10 CFR 140.11(a)(4) for OCNGS. Based on the considerations discussed above, the requested exemption is authorized by law and is otherwise in the public interest.
 
==9.0 REFERENCES==
: 1. Letter from Keith R. Jury, (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission - "Permanent Cessation of Operations at Oyster Creek Nuclear Generating Station," dated January 7, 2011, RA-11-007 (ADAMS Accession No. ML110070507) 2. Letter from Michael P. Gallagher, (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission - "Certification of Permanent Cessation of Power Operations for Oyster Creek Nuclear Power Station," dated February 14, 2018 (ML18045A084) 3. Letter from Michael P. Gallagher, (Exelon Generation Company, LLC) to U.S. Nuclear Regulatory Commission - "Request for Exemption from Portions of 10 CFR 50.47 and 10 CFR 50, Appendix E," dated August 22, 2017 (ADAMS Accession No. ML17234A082) 4. Commission Paper, SECY-93-127, "Financial Protection Required of Licensees of Large Nuclear Power Plants During Decommissioning," dated May 10, 1993 (ADAMS Accession No. ML12257A628) 5. Commission Paper, SECY-96-256, "Changes to the Financial Protection Requirements for Permanently Shutdown Nuclear Power Reactors, 10 CFR 50.54(w) and 10 CFR 140.11," dated December 17, 1996 (ADAMS Accession No. ML15062A483) 6. Staff Requirements Memo, "Re: SECY-96-256, Changes to Financial Protection Requirements for Permanently Shutdown Nuclear Power Reactors," dated January 28, 1997 (ADAMS Accession No. ML15062A483) 7. Commission Paper, SECY-97-186, "Changes to the Financial Protection Requirements for Permanently Shutdown Nuclear Power Reactors, 10 CFR 50.54(w) and 10 CFR 140.11," dated August 13, 1997 (ADAMS Accession No. ML992930019) 8. Financial Protection Requirements for Permanently Shutdown Nuclear Power Reactors, 62 FR 58690-58694 (Proposed October 30, 1997) (to be codified 10 CFR Parts 50 and 140)
Attachment Request for Exemption from 10 CFR 140.11(a)(4) Docket Nos. 50-219 and 72-15 Page A-11 of A-11 9. SECY-00-145, "Integrated Rulemaking Plan for Nuclear Power Plant Decommissioning," dated June 28, 2000 (ADAMS Accession No. ML003721626) 10. Memorandum from William D. Travers (NRC) to NRC Commissioners, "Status of Regulatory Exemptions for Decommissioning Plants (WITS 200100085, WITS 199900133, WITS 199900072)," dated August 16, 2002 (ADAMS Accession No. ML030550706) 11. Environmental Protection Agency Protective Action Guides and Planning Guidance for Radiological Incidents, Draft for Interim Use and Public Comment, dated March 2013 12. NUREG-1738, "Technical Study of Spent Fuel Accident Risk at Decommissioning Nuclear Power Plants," dated February 2001 (ADAMS Accession No. ML010430066) 13. C-1302-226-E310-458, Dose at Exclusion Area Boundary and Control Room Due to Shine from Drained Spent Fuel Pool During SAFSTOR," dated June 16, 2017 14. Letter, USNRC to Dominion Nuclear Connecticut, Inc., "Millstone Power Station, Unit 1 - Exemption from Certain Requirements of 10 CFR Part 140 (TAC NO. MA6658)," dated March 30, 2004 15. Vermont Yankee Nuclear Power Station-Exemption from the Requirements of Title 10 of the Code of Federal Regulations, Part 140, Section 140.11(a)(4), Concerning Primary and Secondary Liability Insurance (CAC No. MF3980), dated April 15, 2016 (ADAMS Accession Nos. 16012A144, & ML16012A157) 16. Crystal River Unit 3 Nuclear Generating Plant-Exemption from the Requirements of Title 10 of the Code of Federal Regulations, Part 140, Section 140.11(a)(4) Concerning Primary and Secondary Liability Insurance (TAC No. MF3588), dated April 27, 2015 (ADAMS Accession No. ML14183B338) 17. San Onofre Nuclear Generating -Exemption from the Requirements of Title 10 of the Code of Federal Regulations, Part 50, Section 50.54(w)(1) Concerning Insurance for Post-Accident Site Decontamination, dated January 11, 2018 (ADAMS Accession No. 18. Kewaunee Power Station-Exemption from the Requirements of Title 10 of the Code of Federal Regulations, Part 140, Section 140.11(a)(4) Concerning Primary and Secondary Liability Insurance (TAC No. MF3916), dated March 16, 2015 (ADAMS Accession No.
ML15026A522) 19. Commission Paper, SECY-99-168, "Improving Decommissioning Regulations for Nuclear Power Plants," dated June 30, 1999 (ADAMS Accession No. ML992800087) 20. NUREG-0586, "Final Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities," Supplement 1, published November 2002 21. C-1302-226-E310-457, "Oyster Creek Nuclear Generating Station Zirconium Fire Analysis for Drained Spent Fuel Pool," dated June 19, 2017 22. NRC-2015-0070, RIN 3150-AJ59, "Regulatory Analysis for Regulatory Basis: Regulatory Improvements for Power Reactors Transitioning to Decommissioning," dated January 2018 (ML17332A075)
 
Attachment 2 Form of Indemnity Amendment
 
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 October __, 2019  Docket Nos. 50-219 AMENDMENT TO INDEMNITY AGREEMENT NO. B-37 AMENDMENT NO. 16 Effective October __, 2019, Indemnity Agreement No. B-37, originally between Jersey Central Power & Light Company and the Atomic Energy Commission, dated October 3, 1967, as amended, is hereby further amended as follows: Article VIII of the indemnity agreement is deleted in its entirety wherever it appears in the agreement, and is substituted therein by the requirements of the exemption permitting a reduction in primary financial protection from $450,000,000 to $100,000,000, and withdrawal from participation in the secondary layer of financial protection. Item 2a of the Attachment to the indemnity agreement is deleted in its entirety and the following substituted therefor: Item 2 - Amount of financial protection a. $100,000,000 (From 12:01 a.m., October __, 2019).
 
FOR THE U.S. NUCLEAR REGULATORY COMMISSION Anthony Bowers, Chief Financial Analysis and International Projects Branch Division of Inspection and Regional Support Office of Nuclear Reactor Regulation Accepted ____________ 2019 By ___________________________        [LICENSEE NAME]}}

Latest revision as of 13:05, 5 April 2019