ML090410625: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 02/09/2009
| issue date = 02/09/2009
| title = Reactor and Senior Reactor Operator Initial Examinations - Surry Power Station 05000280/2009301 and 05000281/2009301
| title = Reactor and Senior Reactor Operator Initial Examinations - Surry Power Station 05000280/2009301 and 05000281/2009301
| author name = Widmann M T
| author name = Widmann M
| author affiliation = NRC/RGN-II/DRS/OLB
| author affiliation = NRC/RGN-II/DRS/OLB
| addressee name = Christian D A
| addressee name = Christian D
| addressee affiliation = Dominion
| addressee affiliation = Dominion
| docket = 05000280, 05000281
| docket = 05000280, 05000281
Line 14: Line 14:
| page count = 5
| page count = 5
}}
}}
See also: [[followed by::IR 05000280/2009301]]
See also: [[see also::IR 05000280/2009301]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION  
{{#Wiki_filter:UNITED STATES  
REGION II SAM NUNN ATLANTA FEDERAL CENTER  61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA  30303-8931
NUCLEAR REGULATORY COMMISSION  
  February 9, 2009  
REGION II  
  Mr. David A. Christian Senior Vice President and   Chief Nuclear Officer  
SAM NUNN ATLANTA FEDERAL CENTER   
Innsbrook Technical Center
61 FORSYTH STREET, SW, SUITE 23T85  
5000 Dominion Boulevard  
ATLANTA, GEORGIA  30303-8931  
February 9, 2009  
   
Mr. David A. Christian  
Senior Vice President and
  Chief Nuclear Officer  
Innsbrook Technical Center  
5000 Dominion Boulevard  
Glen Allen, VA  23060  
Glen Allen, VA  23060  
  SUBJECT: NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION - SURRY POWER STATION - 05000280/2009301 AND 05000281/2009301  
   
  Dear Mr. Christian:  
SUBJECT:  
  In a telephone conversation on February 2, 2009, between Mr. David Wilson, Operations  
NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION -  
Training Supervisor, and Mr. Mark Bates, Senior Operations Engineer, arrangements were made for the administration of licensing examinations at the Surry Power Station.  The operating test is scheduled to be administered the week of July 20, 2009.  The written examination is scheduled to be administered the week of July 27, 2009.  The on-site preparatory week is scheduled for the week of June 29, 2009.  
SURRY POWER STATION - 05000280/2009301 AND 05000281/2009301  
   
Dear Mr. Christian:  
   
In a telephone conversation on February 2, 2009, between Mr. David Wilson, Operations  
Training Supervisor, and Mr. Mark Bates, Senior Operations Engineer, arrangements were  
made for the administration of licensing examinations at the Surry Power Station.  The operating  
test is scheduled to be administered the week of July 20, 2009.  The written examination is  
scheduled to be administered the week of July 27, 2009.  The on-site preparatory week is  
scheduled for the week of June 29, 2009.
As agreed during the telephone conversation, the staff of the U.S. Nuclear Regulatory
Commission (NRC) will prepare the written examination and your staff will prepare the operating
test based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing
Examination Standards for Power Reactors."  Your staff will be given the opportunity to review
the written examination during the week of May 29, 2009.  The NRC regional office will discuss
with your staff any changes to the operating test that might be necessary before the tests are
administered.  Your staff has also agreed to make copies of all examination materials that are
necessary for administering the examination.
To meet the above schedule, it will be necessary for your staff to furnish the reference materials
identified in Attachment 3 to ES-201 by February 6, 2009.  The operating test outline will be due
by April 27, 2009 and the operating tests will be due by June 8, 2009.  Pursuant to Title 10,
Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized
representative of the facility licensee shall approve the outline and test before they are
submitted to the NRC for review and approval.  All materials shall be complete and ready-to-
use. 
We request that any personal, proprietary, sensitive unclassified, or safeguards information in
your response be contained in a separate enclosure and appropriately marked.  Any delay in
receiving the required examination and reference materials, or the submittal of inadequate or
incomplete materials, may cause the examinations to be rescheduled.  


As agreed during the telephone conversation, the staff of the U.S. Nuclear Regulatory Commission (NRC) will prepare the written examination and your staff will prepare the operating test based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors."  Your staff will be given the opportunity to review the written examination during the week of May 29, 2009.  The NRC regional office will discuss with your staff any changes to the operating test that might be necessary before the tests are
VEPCO
administered.  Your staff has also agreed to make copies of all examination materials that are necessary for administering the examination.
2
To meet the above schedule, it will be necessary for your staff to furnish the reference materials identified in Attachment 3 to ES-201 by February 6, 2009.  The operating test outline will be due by April 27, 2009 and the operating tests will be due by June 8, 2009.  Pursuant to Title 10, Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized representative of the facility licensee shall approve the outline and test before they are submitted to the NRC for review and approval.  All materials shall be complete and ready-to-use. 
   
We request that any personal, proprietary, sensitive unclassified, or safeguards information in your response be contained in a separate enclosure and appropriately marked.  Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.  
In order to conduct the requested written examinations and operating tests, it will be necessary  
VEPCO 2  In order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above.  In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.  
for your staff to provide adequate space and accommodations in accordance with ES-402, and  
 
to make the simulation facility available on the dates noted above.  In accordance with ES-302,  
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.  
your staff should retain the original simulator performance data (e.g., system pressures,  
  To permit timely NRC review and evaluation, your staff should submit preliminary reactor  
temperatures, and levels) generated during the dynamic operating tests until the examination  
operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first examination date.  If the applications are not received at least 30 days before the examination date, a postponement may be necessary.  Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.  
results are final.  
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in  
effect while the written examinations and operating tests are being administered.  
   
To permit timely NRC review and evaluation, your staff should submit preliminary reactor  
operator and senior reactor operator license applications (Office of Management and Budget  
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),  
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first  
examination date.  If the applications are not received at least 30 days before the examination  
date, a postponement may be necessary.  Signed applications certifying that all training has  
been completed should be submitted at least 14 days before the first examination date.  
   
   
This letter contains information collections that are subject to the Paperwork Reduction Act of  
This letter contains information collections that are subject to the Paperwork Reduction Act of  
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under approval number 3150-0018, which expires on June 30, 2009.  The public reporting burden for this collection of information is estimated to average 500 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations,  
1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under  
and completing and reviewing the collection of information.  Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
approval number 3150-0018, which expires on June 30, 2009.  The public reporting burden for  
this collection of information is estimated to average 500 hours per response, including the time  
for reviewing instructions, gathering and maintaining the data needed, writing the examinations,  
and completing and reviewing the collection of information.  Send comments on any aspect of  
this collection of information, including suggestions for reducing the burden, to the Information  
and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,  
Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;  
and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-
0018), Office of Management and Budget, Washington, DC 20503.  
0018), Office of Management and Budget, Washington, DC 20503.  
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
   
   
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS is accessible from the NRC Web site at http://www/nrc.gov/readingrm/adams.html (the Public Electronic Reading Room).
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
VEPCO 3  Thank you for your cooperation in this matter.  Mr. Wilson has been advised of the policies and guidelines referenced in this letter.  If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Mark Bates at (404) 562-4612, (Internet E-mail: Mark.Bates@nrc.gov) or me at (404) 562-4550, (Internet E-mail: Malcolm.Widmann@nrc.gov).  
of information unless it displays a currently valid OMB control number.
      Sincerely,       /RA/  
In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be  
available electronically for public inspection in the NRC Public Document Room or from the  
Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMS  
is accessible from the NRC Web site at http://www/nrc.gov/readingrm/adams.html (the Public  
Electronic Reading Room).  
 
VEPCO  
3  
   
Thank you for your cooperation in this matter.  Mr. Wilson has been advised of the policies and  
guidelines referenced in this letter.  If you have any questions regarding the NRC's examination  
procedures and guidelines, please contact Mr. Mark Bates at (404) 562-4612, (Internet E-mail:  
Mark.Bates@nrc.gov) or me at (404) 562-4550, (Internet E-mail: Malcolm.Widmann@nrc.gov).  
Sincerely,  
/RA/  
Malcolm T. Widmann, Chief
Operations Branch
Division of Reactor Safety
Docket Nos.:  50-280, 50-281
License Nos.:  DPR-32, DPR-37
(cc see page 4)


   
VEPCO
      Malcolm T. Widmann, Chief      Operations Branch
4
      Division of Reactor Safety
   
  Docket Nos.:  50-280, 50-281 License Nos.:  DPR-32, DPR-37
cc:  Gerald T. Bischof  
  (cc see page 4)
Site Vice President  
VEPCO 4  cc:  Gerald T. Bischof Site Vice President Surry Power Station Virginia Electric and Power Company Electronic Mail Distribution  
Surry Power Station  
Virginia Electric and Power Company
Electronic Mail Distribution
Sonny Stanley
Director, Nuclear  Safety and Licensing
Virginia Electric and Power Company  
Electronic Mail Distribution  
Lillian M. Cuoco, Esq.
Senior Counsel
Dominion Resources Services, Inc.
Electronic Mail Distribution
Chris L. Funderburk
Director, Nuclear Licensing &
Operations Support
Virginia Electric and Power Company
Electronic Mail Distribution
Virginia State Corporation Commission
Division of Energy Regulation
P.O. Box 1197
Richmond, VA  23209
Attorney General
Supreme Court Building
900 East Main Street
Richmond, VA  23219
Senior Resident Inspector
Surry Power Station
U.S. Nuclear Regulatory Commission
5850 Hog Island Rd
Surry, VA  23883
   
   
Sonny Stanley Director, Nuclear  Safety and Licensing Virginia Electric and Power Company Electronic Mail Distribution  
Michael M. Cline
Director  
Virginia Department of Emergency
Services Management
Electronic Mail Distribution  
   
   
Lillian M. Cuoco, Esq. Senior Counsel Dominion Resources Services, Inc. Electronic Mail Distribution
Virginia Electric and Power Company  
Chris L. Funderburk Director, Nuclear Licensing &
ATTN: Mr. Andy T. Barbee
Operations Support Virginia Electric and Power Company Electronic Mail Distribution
Virginia State Corporation Commission
Division of Energy Regulation P.O. Box 1197 Richmond, VA  23209
  Attorney General
Supreme Court Building 900 East Main Street Richmond, VA  23219
Senior Resident Inspector
Surry Power Station U.S. Nuclear Regulatory Commission 5850 Hog Island Rd Surry, VA  23883
   
   
Michael M. Cline Director Virginia Department of Emergency Services Management Electronic Mail Distribution
  Manager of Nuclear Training  
Virginia Electric and Power Company
Surry power Station  
ATTN: Mr. Andy T. Barbee  Manager of Nuclear Training Surry power Station 5570 Hog Island road Surry, VA  23883  
5570 Hog Island road  
Surry, VA  23883


_________________________  X
VEPCO
G   SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRP     SIGNATURE       NAME MBates GMcCoy MWidmann     DATE 02/6/2009 02/6/2009 02/9/2009     E-MAIL COPY?    YES NO    YES NO    YES NO    YES NO    YES NO    YES NO    YES NO
5
Letter to David A. Christian from Malcolm T. Widmann dated February 9, 2009.
SUBJECT:
REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS -
SURRY POWER STATION - 05000280/2009301 AND 05000281/2009301
Distribution:
RIDSNRRDIRS
PUBLIC
S. P. Lingam, NRR (PM:  NA, SUR)
XG  PUBLICLY AVAILABLE
G  NON-PUBLICLY AVAILABLE
G  SENSITIVE
        XG  NON-SENSITIVE
ADAMS:  XG Yes
ACCESSION NUMBER:_________________________  
   
XG   SUNSI REVIEW COMPLETE  
OFFICE  
RII:DRS  
RII:DRS  
RII:DRP  
SIGNATURE  
NAME  
MBates  
GMcCoy  
MWidmann  
DATE  
02/6/2009  
02/6/2009  
02/9/2009  
E-MAIL COPY?  
     YES  
NO    YES  
NO    YES  
NO    YES  
NO    YES  
NO    YES  
NO    YES  
NO  
OFFICIAL
RECORD
COPY          DOCUMENT
NAME:
O:\\SURRY
EXAMINATIONS\\INITIAL
EXAM
2009-
301\\CORRESPONDENCE\\2009 -301 SURRY CORPORATE NOTIFICATION LETTER (MAB) REV 0.DOC
}}
}}

Latest revision as of 13:17, 14 January 2025

Reactor and Senior Reactor Operator Initial Examinations - Surry Power Station 05000280/2009301 and 05000281/2009301
ML090410625
Person / Time
Site: Surry  Dominion icon.png
Issue date: 02/09/2009
From: Widmann M
NRC/RGN-II/DRS/OLB
To: Christian D
Dominion
References
50-280/09-301, 50-281/09-301
Download: ML090410625 (5)


See also: IR 05000280/2009301

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

SAM NUNN ATLANTA FEDERAL CENTER

61 FORSYTH STREET, SW, SUITE 23T85

ATLANTA, GEORGIA 30303-8931

February 9, 2009

Mr. David A. Christian

Senior Vice President and

Chief Nuclear Officer

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA 23060

SUBJECT:

NOTIFICATION OF LICENSED OPERATOR INITIAL EXAMINATION -

SURRY POWER STATION - 05000280/2009301 AND 05000281/2009301

Dear Mr. Christian:

In a telephone conversation on February 2, 2009, between Mr. David Wilson, Operations

Training Supervisor, and Mr. Mark Bates, Senior Operations Engineer, arrangements were

made for the administration of licensing examinations at the Surry Power Station. The operating

test is scheduled to be administered the week of July 20, 2009. The written examination is

scheduled to be administered the week of July 27, 2009. The on-site preparatory week is

scheduled for the week of June 29, 2009.

As agreed during the telephone conversation, the staff of the U.S. Nuclear Regulatory

Commission (NRC) will prepare the written examination and your staff will prepare the operating

test based on the guidelines in Revision 9, Supplement 1, of NUREG-1021, "Operator Licensing

Examination Standards for Power Reactors." Your staff will be given the opportunity to review

the written examination during the week of May 29, 2009. The NRC regional office will discuss

with your staff any changes to the operating test that might be necessary before the tests are

administered. Your staff has also agreed to make copies of all examination materials that are

necessary for administering the examination.

To meet the above schedule, it will be necessary for your staff to furnish the reference materials

identified in Attachment 3 to ES-201 by February 6, 2009. The operating test outline will be due

by April 27, 2009 and the operating tests will be due by June 8, 2009. Pursuant to Title 10,

Section 55.40(b)(3), of the Code of Federal Regulations (10 CFR 55.40(b)(3)), an authorized

representative of the facility licensee shall approve the outline and test before they are

submitted to the NRC for review and approval. All materials shall be complete and ready-to-

use.

We request that any personal, proprietary, sensitive unclassified, or safeguards information in

your response be contained in a separate enclosure and appropriately marked. Any delay in

receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

VEPCO

2

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with ES-402, and

to make the simulation facility available on the dates noted above. In accordance with ES-302,

your staff should retain the original simulator performance data (e.g., system pressures,

temperatures, and levels) generated during the dynamic operating tests until the examination

results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in

effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by OMB, under

approval number 3150-0018, which expires on June 30, 2009. The public reporting burden for

this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time

for reviewing instructions, gathering and maintaining the data needed, writing the examinations,

and completing and reviewing the collection of information. Send comments on any aspect of

this collection of information, including suggestions for reducing the burden, to the Information

and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission,

Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;

and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-

0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS

is accessible from the NRC Web site at http://www/nrc.gov/readingrm/adams.html (the Public

Electronic Reading Room).

VEPCO

3

Thank you for your cooperation in this matter. Mr. Wilson has been advised of the policies and

guidelines referenced in this letter. If you have any questions regarding the NRC's examination

procedures and guidelines, please contact Mr. Mark Bates at (404) 562-4612, (Internet E-mail:

Mark.Bates@nrc.gov) or me at (404) 562-4550, (Internet E-mail: Malcolm.Widmann@nrc.gov).

Sincerely,

/RA/

Malcolm T. Widmann, Chief

Operations Branch

Division of Reactor Safety

Docket Nos.: 50-280, 50-281

License Nos.: DPR-32, DPR-37

(cc see page 4)

VEPCO

4

cc: Gerald T. Bischof

Site Vice President

Surry Power Station

Virginia Electric and Power Company

Electronic Mail Distribution

Sonny Stanley

Director, Nuclear Safety and Licensing

Virginia Electric and Power Company

Electronic Mail Distribution

Lillian M. Cuoco, Esq.

Senior Counsel

Dominion Resources Services, Inc.

Electronic Mail Distribution

Chris L. Funderburk

Director, Nuclear Licensing &

Operations Support

Virginia Electric and Power Company

Electronic Mail Distribution

Virginia State Corporation Commission

Division of Energy Regulation

P.O. Box 1197

Richmond, VA 23209

Attorney General

Supreme Court Building

900 East Main Street

Richmond, VA 23219

Senior Resident Inspector

Surry Power Station

U.S. Nuclear Regulatory Commission

5850 Hog Island Rd

Surry, VA 23883

Michael M. Cline

Director

Virginia Department of Emergency

Services Management

Electronic Mail Distribution

Virginia Electric and Power Company

ATTN: Mr. Andy T. Barbee

Manager of Nuclear Training

Surry power Station

5570 Hog Island road

Surry, VA 23883

VEPCO

5

Letter to David A. Christian from Malcolm T. Widmann dated February 9, 2009.

SUBJECT:

REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS -

SURRY POWER STATION - 05000280/2009301 AND 05000281/2009301

Distribution:

RIDSNRRDIRS

PUBLIC

S. P. Lingam, NRR (PM: NA, SUR)

XG PUBLICLY AVAILABLE

G NON-PUBLICLY AVAILABLE

G SENSITIVE

XG NON-SENSITIVE

ADAMS: XG Yes

ACCESSION NUMBER:_________________________

XG SUNSI REVIEW COMPLETE

OFFICE

RII:DRS

RII:DRS

RII:DRP

SIGNATURE

NAME

MBates

GMcCoy

MWidmann

DATE

02/6/2009

02/6/2009

02/9/2009

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO

OFFICIAL

RECORD

COPY DOCUMENT

NAME:

O:\\SURRY

EXAMINATIONS\\INITIAL

EXAM

2009-

301\\CORRESPONDENCE\\2009 -301 SURRY CORPORATE NOTIFICATION LETTER (MAB) REV 0.DOC