SBK-L-11185, Seabrook Station, Submittal of Procedure Er 3.4, Revision 21: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 1: Line 1:
{{Adams
#REDIRECT [[SBK-L-11185, Submittal of Procedure Er 3.4, Revision 21]]
| number = ML11277A021
| issue date = 09/26/2011
| title = Seabrook Station, Submittal of Procedure Er 3.4, Revision 21
| author name = O'Keefe M
| author affiliation = NextEra Energy Seabrook, LLC
| addressee name =
| addressee affiliation = NRC/NMSS, NRC/NRR
| docket = 05000443, 07200063
| license number =
| contact person =
| case reference number = SBK-L-11185
| document report number = ER 3.4, Rev 21
| document type = Emergency Preparedness-Emergency Plan Implementing Procedures, Letter type:SBK
| page count = 3
}}
 
=Text=
{{#Wiki_filter:" N~xTera, ENERGY SEABROOK September 26, 2011 Docket No. 5 0-443 Docket No. 72-63 SBK-L- 11185 United States Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555-0001 Seabrook Station Procedure ER 3.4, Revision 21 In accordance with the requirements of 10 CFR 50, Appendix E, 10 CFR 50.4 and 10 CFR 72.44(f), enclosed is procedure ER 3.4, Seabrook Station News Services Operations, Revision 21. The procedure is used in the implementation of the Seabrook Station Radiological Emergency Plan (SSREP)., The procedure, as changed, does not decrease the effectiveness of the SSREP and the SSREP continues to meet the standards of 10 CFR 50.47(b) and 10 CFR 50, Appendix E. The Resident Inspector copy is provided directly through the NextEra Energy Seabrook, LLC (NextEra) records management system.Enclosure 1 provides a summary of changes to procedures ER 3.4. Enclosure 2 provides a copy of the revised procedure.
Should you have any questions regarding the enclosed revision, please contact me at (603) 773-7745.Sincerely, NextEra Energy Seabrook, LLC Michael O'Keefe Licensing Manager NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874 ft, 5 4I United States Nuclear Regulatory Commission SBK-L-11185
/ Page 2 cc (with enclosures):
S. T. Barr, Region I, Division of Reactor Safety (two copies)G. E. Miller, NRC Project Manager, Project Directorate 1-2 (without SSR.EP)cc (without Enclosure 2): ATTN: Document Control Desk Director, Spent Fuel Storage and Transportation, Office of Nuclear Material Safety and Safeguards Nuclear Regulatory Commission Washington, DC 20555-0001 cc (without enclosures):
NRC Region I Administrator W. J. Raymond, NRC Senior Resident Inspector Enclosure I to SBK-L-11185 Summary of Changes Procedure ER 3.4, Seabrook Station News Services Operations, Rev. 21* Revised Precaution 3.2 to document that Emergency News Manager position holders have the key to the front entrance to the Science & Nature Center.0 Added Precaution 3.3, to ensure Emergency News Managers, Technical Advisors and other support staff note the time of any significant actions on logs and checklists.
* Revised §5.1 to add a caution statement concerning Security management and Incident Commander review and approval of news statements if declaration is due to a security event.0 Revised §5.1 instructions for updating the Medial Line, contact with AP wire service and handling media inquiries.
* Revised §5.1 and 5.2 to add telephone numbers for various contacts.* Revised §5.3 to add instructions for coordination of media presence on site with Security.* On form ER 3.4C, Emergency News Manager Checklist, revised actions to reference revised directions in the procedure.
* Performed biennial review of the procedure.}}

Latest revision as of 17:41, 12 April 2019