ML18113A867: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 6: Line 6:
| number = ML18113A869
| number = ML18113A869
| issue date = 02/20/1979
| issue date = 02/20/1979
| title = Forwards LERs 78-033/03X-1 & 78-038/03X-1
| title = LER 78-038/03X-1 on 781030:boric Acid Flow from Boric Acid Tank to Blender Was Interrupted.Caused by Blockage of Crystallized Boron at Elbow in Line 1-CH-356-152
| author name = BAUCOM T L
| author name = Baucom T
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| addressee name =  
| addressee name =  
Line 21: Line 21:
| number = ML18113A868
| number = ML18113A868
| issue date = 02/20/1979
| issue date = 02/20/1979
| title = Forwards LERs 78-033/03X-1 & 78-038/03X-1
| title = LER 78-033/03X-1 on 780926:circulating Water Outlet Valve MOV-CW-200D Failed to Close When Operated Electrically. Caused When Actuator Cam for Shut Torque Switch Became Wedged Against Torque Switch Hold Down Screw
| author name = STEWART W L
| author name = Stewart W
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| addressee name =  
| addressee name =  
Line 37: Line 37:
| issue date = 02/21/1979
| issue date = 02/21/1979
| title = Forwards LERs 78-033/03X-1 & 78-038/03X-1
| title = Forwards LERs 78-033/03X-1 & 78-038/03X-1
| author name = STALLINGS C M
| author name = Stallings C
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| addressee name = OREILLY J P
| addressee name = OREILLY J P

Latest revision as of 15:49, 25 January 2020

Forwards LERs 78-033/03X-1 & 78-038/03X-1
Date released: 12/10/2018 Download: ML18113A867


LER 78-038/03X-1 on 781030:boric Acid Flow from Boric Acid Tank to Blender Was Interrupted.Caused by Blockage of Crystallized Boron at Elbow in Line 1-CH-356-152
ML18113A869
Person / Time
Site: Surry Dominion icon.png
Issue date: 02/20/1979
From: Baucom T
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18113A869 (2)
LER 78-033/03X-1 on 780926:circulating Water Outlet Valve MOV-CW-200D Failed to Close When Operated Electrically. Caused When Actuator Cam for Shut Torque Switch Became Wedged Against Torque Switch Hold Down Screw
ML18113A868
Person / Time
Site: Surry Dominion icon.png
Issue date: 02/20/1979
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18113A868 (2)
Forwards LERs 78-033/03X-1 & 78-038/03X-1
ML18113A866
Person / Time
Site: Surry Dominion icon.png
Issue date: 02/21/1979
From: Stallings C
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18113A866 (1)