| issue date = 07/06/1993
| issue date = 07/06/1993
| title = Requests That NRC Extends Completion Date of Corrective Action Re Violations Noted in Insp Rept 50-255/93-28 from 930715-1201
| title = Requests That NRC Extends Completion Date of Corrective Action Re Violations Noted in Insp Rept 50-255/93-28 from 930715-1201
| author name = SLADE G B
| author name = Slade G
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.),
| addressee name =  
| addressee name =  
Line 14: Line 14:
| page count = 1
| page count = 1
}}
}}
See also: [[followed by::IR 05000255/1993028]]


=Text=
=Text=
{{#Wiki_filter:consumers  
{{#Wiki_filter:consumers Power POWERING MICHIGAN'S. PROGRESS.
Power POWERING MICHIGAN'S.  
Palisades Nuclear Plant:
PROGRESS . Palisades  
27780 Blue Star Memorial Highway, Covert, Ml 49043 :
Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 : * July 6, 1993 Nuclear Regulatory  
* July 6, 1993 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 GB Slade General Manager DOCKET ~0-255 - LICENSE DPR72~ -
Commission  
PALISAD~S PLANT - REPLY TO NOTICE OF VIOLATION; NRC INSPECTION REPORT No.. 92-028 - EXTENSION OF COMPLETION DATE NRC Inspection Report No. 92028, dated january 21, 1993, _forwarded the results of the NRC inspection conducted from December 7 through 18, 1992 in the area of irtservice testing.
Document Control Desk Washington, DC 20555 GB Slade General Manager DOCKET  
The inspection report identified an apparent violation of NRC requirements pertaining to inadequate acceptance criteria to verify  
-LICENSE  
. that the Primary Coolant System (PCS) loop check valves and Low Pressure S~fety Injection (lPSI) check valves were exercised to their full open position. Our reply to the ~otice of Vio.lation was dated February 22, 1993.
-
Corrective action 4, in the reply to the Notice of Violation to avoid futur~
PLANT -REPLY TO NOTICE OF VIOLATION;  
non-compliance, was a verification that the check valve part of th~ ISi program would be reviewed to verify that; (a) all check valves* requiring full flow testing are -included in th_e valve testing program, (b) the correct required flow rates and basis for the flow rate are properly listed for each  
NRC INSPECTION  
. check valve in the valve testing program, and (c) all test protedures that take.credit for full flow testing state the correct flow rates as acceptance criteria. These actions were proposed to be completed by July 15, 1993 which was the forecast end of the refueling outage.
REPORT No .. 92-028 -EXTENSION  
Because of the other work activities ~hich have be~n higher priority, we are extending the forecast cdmpletion date of corrective action 4 in our reply to the Notice of Violation from July 15, 1993 until December 1, 1993.
OF COMPLETION  
Specific correctiv~ actions for verification that the PCS and LPSI check valves will go to their full open position during flow testing are on schedule for completion during the ongoing 1993 refueling outage.  
DATE NRC Inspection  
~~
Report No. 92028, dated january 21, 1993, _forwarded  
Gerald B Slade General Manager.
the results of the NRC inspection  
CC: Administrator, Region Ill Resident Inspector, Palisades 9307140226 930706 PDR ADOCK 05000255 G
conducted  
PDR  
from December 7 through 18, 1992 in the area of irtservice  
\\IJ:  
testing. The inspection  
~;
report identified  
?'.*"
an apparent violation  
A cMs ENERGY COMPANY  
of NRC requirements  
*}}
pertaining  
to inadequate  
acceptance  
criteria to verify . that the Primary Coolant System (PCS) loop check valves and Low Pressure  
Injection (lPSI) check valves were exercised  
to their full open position.  
Our reply to the  
of Vio.lation  
was dated February 22, 1993. Corrective  
action 4, in the reply to the Notice of Violation  
to avoid  
non-compliance, was a verification  
that the check valve part of ISi program would be reviewed to verify that; (a) all check valves* requiring  
full flow testing are -included  
in th_e valve testing program, (b) the correct required flow rates and basis for the flow rate are properly listed for each . check valve in the valve testing program, and (c) all test protedures  
that take.credit  
for full flow testing state the correct flow rates as acceptance  
criteria.  
These actions were proposed to be completed  
by July 15, 1993 which was the forecast end of the refueling  
outage. . . . Because of the other work activities  
have  
higher priority, we are extending  
the forecast cdmpletion  
date of corrective  
action 4 in our reply to the Notice of Violation  
from July 15, 1993 until December 1, 1993. Specific  
actions for verification  
that the PCS and LPSI check valves will go to their full open position during flow testing are on schedule for completion  
during the ongoing 1993 refueling  
outage. Gerald B Slade General Manager . CC: Administrator, Region Ill Resident Inspector, Palisades  
9307140226  
930706 PDR ADOCK 05000255 G PDR \IJ: . . ?'.*" A cMs ENERGY COMPANY *
}}

Latest revision as of 07:55, 6 January 2025

Requests That NRC Extends Completion Date of Corrective Action Re Violations Noted in Insp Rept 50-255/93-28 from 930715-1201
ML18058B917
Person / Time
Site: Palisades 
Issue date: 07/06/1993
From: Slade G
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9307140226
Download: ML18058B917 (1)


Text

consumers Power POWERING MICHIGAN'S. PROGRESS.

Palisades Nuclear Plant:

27780 Blue Star Memorial Highway, Covert, Ml 49043 :

  • July 6, 1993 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 GB Slade General Manager DOCKET ~0-255 - LICENSE DPR72~ -

PALISAD~S PLANT - REPLY TO NOTICE OF VIOLATION; NRC INSPECTION REPORT No..92-028 - EXTENSION OF COMPLETION DATE NRC Inspection Report No. 92028, dated january 21, 1993, _forwarded the results of the NRC inspection conducted from December 7 through 18, 1992 in the area of irtservice testing.

The inspection report identified an apparent violation of NRC requirements pertaining to inadequate acceptance criteria to verify

. that the Primary Coolant System (PCS) loop check valves and Low Pressure S~fety Injection (lPSI) check valves were exercised to their full open position. Our reply to the ~otice of Vio.lation was dated February 22, 1993.

Corrective action 4, in the reply to the Notice of Violation to avoid futur~

non-compliance, was a verification that the check valve part of th~ ISi program would be reviewed to verify that; (a) all check valves* requiring full flow testing are -included in th_e valve testing program, (b) the correct required flow rates and basis for the flow rate are properly listed for each

. check valve in the valve testing program, and (c) all test protedures that take.credit for full flow testing state the correct flow rates as acceptance criteria. These actions were proposed to be completed by July 15, 1993 which was the forecast end of the refueling outage.

Because of the other work activities ~hich have be~n higher priority, we are extending the forecast cdmpletion date of corrective action 4 in our reply to the Notice of Violation from July 15, 1993 until December 1, 1993.

Specific correctiv~ actions for verification that the PCS and LPSI check valves will go to their full open position during flow testing are on schedule for completion during the ongoing 1993 refueling outage.

~~

Gerald B Slade General Manager.

CC: Administrator, Region Ill Resident Inspector, Palisades 9307140226 930706 PDR ADOCK 05000255 G

PDR

\\IJ:

~;

?'.*"

A cMs ENERGY COMPANY