| title = Requests That NRC Extends Completion Date of Corrective Action Re Violations Noted in Insp Rept 50-255/93-28 from 930715-1201 | | title = Requests That NRC Extends Completion Date of Corrective Action Re Violations Noted in Insp Rept 50-255/93-28 from 930715-1201 | ||
| author name = | | author name = Slade G | ||
| author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), | | author affiliation = CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.), | ||
| addressee name = | | addressee name = | ||
| Line 14: | Line 14: | ||
| page count = 1 | | page count = 1 | ||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:consumers | {{#Wiki_filter:consumers Power POWERING MICHIGAN'S. PROGRESS. | ||
Power POWERING MICHIGAN'S. | Palisades Nuclear Plant: | ||
PROGRESS . Palisades | 27780 Blue Star Memorial Highway, Covert, Ml 49043 : | ||
Nuclear Plant: 27780 Blue Star Memorial Highway, Covert, Ml 49043 : * July 6, 1993 Nuclear Regulatory | * July 6, 1993 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 GB Slade General Manager DOCKET ~0-255 - LICENSE DPR72~ - | ||
Commission | PALISAD~S PLANT - REPLY TO NOTICE OF VIOLATION; NRC INSPECTION REPORT No.. 92-028 - EXTENSION OF COMPLETION DATE NRC Inspection Report No. 92028, dated january 21, 1993, _forwarded the results of the NRC inspection conducted from December 7 through 18, 1992 in the area of irtservice testing. | ||
Document Control Desk Washington, DC 20555 GB Slade General Manager DOCKET | The inspection report identified an apparent violation of NRC requirements pertaining to inadequate acceptance criteria to verify | ||
-LICENSE | . that the Primary Coolant System (PCS) loop check valves and Low Pressure S~fety Injection (lPSI) check valves were exercised to their full open position. Our reply to the ~otice of Vio.lation was dated February 22, 1993. | ||
- | Corrective action 4, in the reply to the Notice of Violation to avoid futur~ | ||
PLANT -REPLY TO NOTICE OF VIOLATION; | non-compliance, was a verification that the check valve part of th~ ISi program would be reviewed to verify that; (a) all check valves* requiring full flow testing are -included in th_e valve testing program, (b) the correct required flow rates and basis for the flow rate are properly listed for each | ||
NRC INSPECTION | . check valve in the valve testing program, and (c) all test protedures that take.credit for full flow testing state the correct flow rates as acceptance criteria. These actions were proposed to be completed by July 15, 1993 which was the forecast end of the refueling outage. | ||
REPORT No .. 92-028 -EXTENSION | Because of the other work activities ~hich have be~n higher priority, we are extending the forecast cdmpletion date of corrective action 4 in our reply to the Notice of Violation from July 15, 1993 until December 1, 1993. | ||
OF COMPLETION | Specific correctiv~ actions for verification that the PCS and LPSI check valves will go to their full open position during flow testing are on schedule for completion during the ongoing 1993 refueling outage. | ||
DATE NRC Inspection | ~~ | ||
Report No. 92028, dated january 21, 1993, _forwarded | Gerald B Slade General Manager. | ||
the results of the NRC inspection | CC: Administrator, Region Ill Resident Inspector, Palisades 9307140226 930706 PDR ADOCK 05000255 G | ||
conducted | PDR | ||
from December 7 through 18, 1992 in the area of irtservice | \\IJ: | ||
testing. The inspection | ~; | ||
report identified | ?'.*" | ||
an apparent violation | A cMs ENERGY COMPANY | ||
of NRC requirements | *}} | ||
pertaining | |||
to inadequate | |||
acceptance | |||
criteria to verify . that the Primary Coolant System (PCS) loop check valves and Low Pressure | |||
Injection (lPSI) check valves were exercised | |||
to their full open position. | |||
Our reply to the | |||
of Vio.lation | |||
was dated February 22, 1993. Corrective | |||
action 4, in the reply to the Notice of Violation | |||
to avoid | |||
non-compliance, was a verification | |||
that the check valve part of ISi program would be reviewed to verify that; (a) all check valves* requiring | |||
full flow testing are -included | |||
in th_e valve testing program, (b) the correct required flow rates and basis for the flow rate are properly listed for each . check valve in the valve testing program, and (c) all test protedures | |||
that take.credit | |||
for full flow testing state the correct flow rates as acceptance | |||
criteria. | |||
These actions were proposed to be completed | |||
by July 15, 1993 which was the forecast end of the refueling | |||
outage. | |||
have | |||
higher priority, we are extending | |||
the forecast cdmpletion | |||
date of corrective | |||
action 4 in our reply to the Notice of Violation | |||
from July 15, 1993 until December 1, 1993. Specific | |||
actions for verification | |||
that the PCS and LPSI check valves will go to their full open position during flow testing are on schedule for completion | |||
during the ongoing 1993 refueling | |||
outage. Gerald B Slade General Manager . CC: Administrator, Region Ill Resident Inspector, Palisades | |||
9307140226 | |||
930706 PDR ADOCK 05000255 G PDR \IJ: | |||
}} | |||
Latest revision as of 07:55, 6 January 2025
| ML18058B917 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 07/06/1993 |
| From: | Slade G CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9307140226 | |
| Download: ML18058B917 (1) | |
Text
consumers Power POWERING MICHIGAN'S. PROGRESS.
Palisades Nuclear Plant:
27780 Blue Star Memorial Highway, Covert, Ml 49043 :
- July 6, 1993 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 GB Slade General Manager DOCKET ~0-255 - LICENSE DPR72~ -
PALISAD~S PLANT - REPLY TO NOTICE OF VIOLATION; NRC INSPECTION REPORT No..92-028 - EXTENSION OF COMPLETION DATE NRC Inspection Report No. 92028, dated january 21, 1993, _forwarded the results of the NRC inspection conducted from December 7 through 18, 1992 in the area of irtservice testing.
The inspection report identified an apparent violation of NRC requirements pertaining to inadequate acceptance criteria to verify
. that the Primary Coolant System (PCS) loop check valves and Low Pressure S~fety Injection (lPSI) check valves were exercised to their full open position. Our reply to the ~otice of Vio.lation was dated February 22, 1993.
Corrective action 4, in the reply to the Notice of Violation to avoid futur~
non-compliance, was a verification that the check valve part of th~ ISi program would be reviewed to verify that; (a) all check valves* requiring full flow testing are -included in th_e valve testing program, (b) the correct required flow rates and basis for the flow rate are properly listed for each
. check valve in the valve testing program, and (c) all test protedures that take.credit for full flow testing state the correct flow rates as acceptance criteria. These actions were proposed to be completed by July 15, 1993 which was the forecast end of the refueling outage.
Because of the other work activities ~hich have be~n higher priority, we are extending the forecast cdmpletion date of corrective action 4 in our reply to the Notice of Violation from July 15, 1993 until December 1, 1993.
Specific correctiv~ actions for verification that the PCS and LPSI check valves will go to their full open position during flow testing are on schedule for completion during the ongoing 1993 refueling outage.
~~
Gerald B Slade General Manager.