ML060240221: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
StriderTol Bot change
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 01/24/2006
| issue date = 01/24/2006
| title = Reactor and Senior Reactor Operator Initial Examinations - North Anna Power Station 05000338-06-301 and 05000339-06-301
| title = Reactor and Senior Reactor Operator Initial Examinations - North Anna Power Station 05000338-06-301 and 05000339-06-301
| author name = Moorman J H
| author name = Moorman J
| author affiliation = NRC/RGN-III/DRS
| author affiliation = NRC/RGN-III/DRS
| addressee name = Christian D A
| addressee name = Christian D
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| addressee affiliation = Virginia Electric & Power Co (VEPCO)
| docket = 05000338, 05000339
| docket = 05000338, 05000339
Line 15: Line 15:
| page count = 4
| page count = 4
}}
}}
See also: [[followed by::IR 05000338/2006301]]
See also: [[see also::IR 05000338/2006301]]


=Text=
=Text=
{{#Wiki_filter:January 24, 2006Virginia Electric and Power CompanyATTN:Mr. David A. ChristianSenior Vice President and
{{#Wiki_filter:January 24, 2006
   Chief Nuclear OfficerInnsbrook Technical Center
Virginia Electric and Power Company
ATTN: Mr. David A. Christian
Senior Vice President and
   Chief Nuclear Officer
Innsbrook Technical Center
5000 Dominion Boulevard
5000 Dominion Boulevard
Glen Allen, VA  23060SUBJECT:REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS -NORTH ANNA POWER STATION  05000338/2006301 AND 0500339/2006301Dear Mr. Christian:
Glen Allen, VA  23060
In a telephone conversation on January 23, 2006, between Mr. Joe Scott, Supervisor of NuclearTraining Operations, and Mr. Mark A. Chitty, Operations Engineer, arrangements were made
SUBJECT:
for the administration of licensing examinations at North Anna Power Station, Units 1 and 2. The written examinations are scheduled to be given on June 2, 2006, and the operating testsare scheduled to be given during the weeks of May 22 and June 5, 2006.  The on-site
REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS -
preparatory week is scheduled for the week of May 1, 2006.As agreed during the telephone conversation, the staff of the U.S. Nuclear RegulatoryCommission will prepare the examinations based on the guidelines in Revision 9, of NUREG-1021, "Operator Licensing Examination Standards for Power Reactors." Your staff will be giventhe opportunity to review the examinations during the week of April 24, 2006.  Your staff will fillin the scenario details (ES-D-2) and the details of the JPMs and will also provide copyingservices for administering the examinations. To meet the above schedule, it will be necessary for your staff to furnish the reference materialidentified in NUREG 1021, ES-201, Attachment 2, "Reference Material Guidelines For InitialLicensing Examinations," by January 31, 2006.  We request that any personal, proprietary,
NORTH ANNA POWER STATION  05000338/2006301 AND 0500339/2006301
Dear Mr. Christian:
In a telephone conversation on January 23, 2006, between Mr. Joe Scott, Supervisor of Nuclear
Training Operations, and Mr. Mark A. Chitty, Operations Engineer, arrangements were made
for the administration of licensing examinations at North Anna Power Station, Units 1 and 2.  
The written examinations are scheduled to be given on June 2, 2006, and the operating tests
are scheduled to be given during the weeks of May 22 and June 5, 2006.  The on-site
preparatory week is scheduled for the week of May 1, 2006.
As agreed during the telephone conversation, the staff of the U.S. Nuclear Regulatory
Commission will prepare the examinations based on the guidelines in Revision 9, of NUREG-
1021, Operator Licensing Examination Standards for Power Reactors.  Your staff will be given
the opportunity to review the examinations during the week of April 24, 2006.  Your staff will fill
in the scenario details (ES-D-2) and the details of the JPMs and will also provide copying
services for administering the examinations.  
To meet the above schedule, it will be necessary for your staff to furnish the reference material
identified in NUREG 1021, ES-201, Attachment 2, Reference Material Guidelines For Initial
Licensing Examinations, by January 31, 2006.  We request that any personal, proprietary,
sensitive unclassified, or safeguards information in your response be contained in a separate
sensitive unclassified, or safeguards information in your response be contained in a separate
enclosure and appropriately marked.  All materials shall be complete and ready-to-use.  Any
enclosure and appropriately marked.  All materials shall be complete and ready-to-use.  Any
delay in receiving the reference materials, or the submittal of inadequate or incomplete
delay in receiving the reference materials, or the submittal of inadequate or incomplete
materials, may cause the examination to be rescheduled.In order to conduct the requested written examinations and operating tests, it will be necessaryfor your staff to provide adequate space and accommodations in accordance with NUREG1021, ES-402, "Administering Initial Written Examinations," and to make the simulation facilityavailable on the dates noted above.  In accordance with NUREG 1021, ES-302, "AdministeringOperating Tests To Initial License Applicants," your staff should retain the original simulator
materials, may cause the examination to be rescheduled.
performance data (e.g., system pressures, temperatures, and levels) generated during thedynamic operating tests until the examination results are final.
In order to conduct the requested written examinations and operating tests, it will be necessary
VEPCO2Appendix E of NUREG-1021, "Policies and Guidelines For Taking NRC Examinations," containsa number of NRC policies and guidelines that will be in effect while the written examinationsand operating tests are being administered.To permit timely NRC review and evaluation, your staff should submit preliminary reactoroperator and senior reactor operator license applications (Office of Management and Budget
for your staff to provide adequate space and accommodations in accordance with NUREG
1021, ES-402, Administering Initial Written Examinations, and to make the simulation facility
available on the dates noted above.  In accordance with NUREG 1021, ES-302, Administering
Operating Tests To Initial License Applicants, your staff should retain the original simulator
performance data (e.g., system pressures, temperatures, and levels) generated during the
dynamic operating tests until the examination results are final.  
 
VEPCO
2
Appendix E of NUREG-1021, Policies and Guidelines For Taking NRC Examinations, contains
a number of NRC policies and guidelines that will be in effect while the written examinations
and operating tests are being administered.
To permit timely NRC review and evaluation, your staff should submit preliminary reactor
operator and senior reactor operator license applications (Office of Management and Budget
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first
examination date.  If the applications are not received at least 30 days before the examinationdate, a postponement may be necessary.  Signed applications certifying that all training hasbeen completed should be submitted at least 14 days before the first examination date.This letter contains information collections that are subject to the Paperwork Reduction Act of
examination date.  If the applications are not received at least 30 days before the examination
1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by the Office ofManagement and Budget, approval number 3150-0018, which expires on June 30, 2006.  The
date, a postponement may be necessary.  Signed applications certifying that all training has
been completed should be submitted at least 14 days before the first examination date.
This letter contains information collections that are subject to the Paperwork Reduction Act of
1995 (44 U.S.C. 3501 et seq.).  These information collections were approved by the Office of
Management and Budget, approval number 3150-0018, which expires on June 30, 2006.  The
public reporting burden for this collection of information is estimated to average 50 hours per
public reporting burden for this collection of information is estimated to average 50 hours per
response, including the time for reviewing instructions, gathering and maintaining the data
response, including the time for reviewing instructions, gathering and maintaining the data
Line 42: Line 79:
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at
Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at
BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs,
BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs,
NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.The NRC may not conduct or sponsor, and a person is not required to respond to, a collectionof information unless it displays a currently valid OMB control number.In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will beavailable electronically for public inspection in the NRC Public Document Room or from the
NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
Publicly Available Records (PARS) component of NRC's document system (ADAMS).  ADAMSis accessible from the NRC Web site  at http://www.nrc.gov/reading-rm/adams.html  (the PublicElectronic Reading Room).Thank you for your cooperation in this matter.  Mr. Joe Scott has been advised of the policiesand guidelines referenced in this letter.  If you have any questions regarding the NRC'sexamination procedures and guidelines, please contact Mr. Richard S. Baldwin at (404) 562-
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
4642, (Internet E-mail: rsb2@nrc.gov), or me at (404) 562-4647, (Internet E-mail:jhm2@nrc.gov).Sincerely,/RA By S. Rose For/James H. Moorman, III, ChiefOperation Branch
of information unless it displays a currently valid OMB control number.
Division of Reactor SafetyDocket Nos.:  50-338, 50-339License Nos.:  NPF-4, NPF-7cc:  See next page  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be
VEPCO3cc cont'd:Chris L. Funderburk, Director
available electronically for public inspection in the NRC Public Document Room or from the
Publicly Available Records (PARS) component of NRCs document system (ADAMS).  ADAMS
is accessible from the NRC Web site  at http://www.nrc.gov/reading-rm/adams.html  (the Public
Electronic Reading Room).
Thank you for your cooperation in this matter.  Mr. Joe Scott has been advised of the policies
and guidelines referenced in this letter.  If you have any questions regarding the NRC's
examination procedures and guidelines, please contact Mr. Richard S. Baldwin at (404) 562-
4642, (Internet E-mail: rsb2@nrc.gov), or me at (404) 562-4647, (Internet E-mail:
jhm2@nrc.gov).
Sincerely,
/RA By S. Rose For/
James H. Moorman, III, Chief
Operation Branch
Division of Reactor Safety
Docket Nos.:  50-338, 50-339
License Nos.:  NPF-4, NPF-7
cc:  See next page
 
VEPCO
3
cc cont'd:
Chris L. Funderburk, Director
Nuclear Licensing and
Nuclear Licensing and
   Operations Support
   Operations Support
Virginia Electric and Power Company
Virginia Electric and Power Company
Electronic Mail DistributionJack M. DavisSite Vice President
Electronic Mail Distribution
Jack M. Davis
Site Vice President
North Anna Power Station
North Anna Power Station
Electronic Mail DistributionExecutive Vice PresidentOld Dominion Electric Cooperative
Electronic Mail Distribution
Electronic Mail DistributionCounty AdministratorLouisa County
Executive Vice President
 
Old Dominion Electric Cooperative
Electronic Mail Distribution
County Administrator
Louisa County
P. O. Box 160
P. O. Box 160
Louisa, VA  23093Lillian M. Cuoco, Esq.Senior Counsel
Louisa, VA  23093
Lillian M. Cuoco, Esq.
Senior Counsel
Dominion Resources Services, Inc.
Dominion Resources Services, Inc.
Electronic Mail DistributionAttorney GeneralSupreme Court Building
Electronic Mail Distribution
Attorney General
Supreme Court Building
900 East Main Street
900 East Main Street
Richmond, VA  23219H. Ashley Royal Manager Nuclear Training
Richmond, VA  23219
H. Ashley Royal  
Manager Nuclear Training
North Anna Power Station
North Anna Power Station
P. O. Box 402
P. O. Box 402
Mineral, VA  23117  
Mineral, VA  23117




_________________________OFFICERII:DRSRII:DRSRII:DRPSIGNATURE/RA//RA By SRose for//RA/NAMEMChitty:pmdJMoormanKLandisDATEJanuary 24, 2006January 25, 2006January 25, 2006
_________________________
E-MAIL COPY?   YESNO     YESNO     YESNO     YESNO     YESNO     YESNO
OFFICE
RII:DRS
RII:DRS
RII:DRP
SIGNATURE
/RA/
/RA By SRose for/
/RA/
NAME
MChitty:pmd
JMoorman
KLandis
DATE
January 24, 2006
January 25, 2006
January 25, 2006
E-MAIL COPY?
    YES
NO     YES
NO     YES
NO     YES
NO     YES
NO     YES
NO
}}
}}

Latest revision as of 12:15, 15 January 2025

Reactor and Senior Reactor Operator Initial Examinations - North Anna Power Station 05000338-06-301 and 05000339-06-301
ML060240221
Person / Time
Site: North Anna  
Issue date: 01/24/2006
From: Moorman J
Division of Reactor Safety III
To: Christian D
Virginia Electric & Power Co (VEPCO)
References
50-338/06-301, 50-339/06-301 IR-06-301
Download: ML060240221 (4)


See also: IR 05000338/2006301

Text

January 24, 2006

Virginia Electric and Power Company

ATTN: Mr. David A. Christian

Senior Vice President and

Chief Nuclear Officer

Innsbrook Technical Center

5000 Dominion Boulevard

Glen Allen, VA 23060

SUBJECT:

REACTOR AND SENIOR REACTOR OPERATOR INITIAL EXAMINATIONS -

NORTH ANNA POWER STATION 05000338/2006301 AND 0500339/2006301

Dear Mr. Christian:

In a telephone conversation on January 23, 2006, between Mr. Joe Scott, Supervisor of Nuclear

Training Operations, and Mr. Mark A. Chitty, Operations Engineer, arrangements were made

for the administration of licensing examinations at North Anna Power Station, Units 1 and 2.

The written examinations are scheduled to be given on June 2, 2006, and the operating tests

are scheduled to be given during the weeks of May 22 and June 5, 2006. The on-site

preparatory week is scheduled for the week of May 1, 2006.

As agreed during the telephone conversation, the staff of the U.S. Nuclear Regulatory

Commission will prepare the examinations based on the guidelines in Revision 9, of NUREG-

1021, Operator Licensing Examination Standards for Power Reactors. Your staff will be given

the opportunity to review the examinations during the week of April 24, 2006. Your staff will fill

in the scenario details (ES-D-2) and the details of the JPMs and will also provide copying

services for administering the examinations.

To meet the above schedule, it will be necessary for your staff to furnish the reference material

identified in NUREG 1021, ES-201, Attachment 2, Reference Material Guidelines For Initial

Licensing Examinations, by January 31, 2006. We request that any personal, proprietary,

sensitive unclassified, or safeguards information in your response be contained in a separate

enclosure and appropriately marked. All materials shall be complete and ready-to-use. Any

delay in receiving the reference materials, or the submittal of inadequate or incomplete

materials, may cause the examination to be rescheduled.

In order to conduct the requested written examinations and operating tests, it will be necessary

for your staff to provide adequate space and accommodations in accordance with NUREG 1021, ES-402, Administering Initial Written Examinations, and to make the simulation facility

available on the dates noted above. In accordance with NUREG 1021, ES-302, Administering

Operating Tests To Initial License Applicants, your staff should retain the original simulator

performance data (e.g., system pressures, temperatures, and levels) generated during the

dynamic operating tests until the examination results are final.

VEPCO

2

Appendix E of NUREG-1021, Policies and Guidelines For Taking NRC Examinations, contains

a number of NRC policies and guidelines that will be in effect while the written examinations

and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor

operator and senior reactor operator license applications (Office of Management and Budget

(OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

and waiver requests (if any)(OMB approval number 3150-0090) at least 30 days before the first

examination date. If the applications are not received at least 30 days before the examination

date, a postponement may be necessary. Signed applications certifying that all training has

been completed should be submitted at least 14 days before the first examination date.

This letter contains information collections that are subject to the Paperwork Reduction Act of

1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of

Management and Budget, approval number 3150-0018, which expires on June 30, 2006. The

public reporting burden for this collection of information is estimated to average 50 hours5.787037e-4 days <br />0.0139 hours <br />8.267196e-5 weeks <br />1.9025e-5 months <br /> per

response, including the time for reviewing instructions, gathering and maintaining the data

needed, writing the examinations, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for

reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S.

Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at

BJS1@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs,

NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection

of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the NRC Public Document Room or from the

Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS

is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public

Electronic Reading Room).

Thank you for your cooperation in this matter. Mr. Joe Scott has been advised of the policies

and guidelines referenced in this letter. If you have any questions regarding the NRC's

examination procedures and guidelines, please contact Mr. Richard S. Baldwin at (404) 562-

4642, (Internet E-mail: rsb2@nrc.gov), or me at (404) 562-4647, (Internet E-mail:

jhm2@nrc.gov).

Sincerely,

/RA By S. Rose For/

James H. Moorman, III, Chief

Operation Branch

Division of Reactor Safety

Docket Nos.: 50-338, 50-339

License Nos.: NPF-4, NPF-7

cc: See next page

VEPCO

3

cc cont'd:

Chris L. Funderburk, Director

Nuclear Licensing and

Operations Support

Virginia Electric and Power Company

Electronic Mail Distribution

Jack M. Davis

Site Vice President

North Anna Power Station

Electronic Mail Distribution

Executive Vice President

Old Dominion Electric Cooperative

Electronic Mail Distribution

County Administrator

Louisa County

P. O. Box 160

Louisa, VA 23093

Lillian M. Cuoco, Esq.

Senior Counsel

Dominion Resources Services, Inc.

Electronic Mail Distribution

Attorney General

Supreme Court Building

900 East Main Street

Richmond, VA 23219

H. Ashley Royal

Manager Nuclear Training

North Anna Power Station

P. O. Box 402

Mineral, VA 23117

_________________________

OFFICE

RII:DRS

RII:DRS

RII:DRP

SIGNATURE

/RA/

/RA By SRose for/

/RA/

NAME

MChitty:pmd

JMoorman

KLandis

DATE

January 24, 2006

January 25, 2006

January 25, 2006

E-MAIL COPY?

YES

NO YES

NO YES

NO YES

NO YES

NO YES

NO