{{#Wiki_filter:LOCATION:
{{#Wiki_filter:LOCATION: R0 213-238 ELEV UORK ORDER PROBLEM DESCRIPTIW:
R0 213-238 ELEV UORK ORDER PROBLEM DESCRIPTIW:
WOR NO: 33761 DATE: 04/13/98 INIT: JOHN SCHAEFER FLAP DELAMINATION FROM TORUS INTERIOR (BAY 4,11,12 CUD:
WOR NO: 33761 DATE: 04/13/98 INIT: JOHN SCHAEFER FLAP DELAMINATION FROM TORUS INTERIOR (BAY 4,11,12 CUD: MODEL NO: 15,+16). WRK WITH IS1 TO RESOLVE. DRAWING NO: 6202-2DDD SAFETY CLASS: ENVIRONMENTAL QUAL1 FICATIdN:
MODEL NO:
CLASSIFICATION OF UORK: SC-INS PLANNER: EDMUND LUCIANO PROJECT NO: 0127 MTERIAL ACCT NO: 2130-4415-1070 1 WPC wc STOP*T H INK* ACT*REV I EU
15,+16).
* STAR * ****************
WRK WITH I S 1 TO RESOLVE.
***************
DRAWING NO: 6202-2DDD SAFETY CLASS:
c1 --- ---El [I THE OFFICE SUPV SHALL ASSIGN THIS W.O. TO JOB (ST) N0.0127 --- THE VYICE IS JIM CALCHERA THE ACTIVITY SAFETY CLASS IS NNS tl --- THE HOUSEKEEPING ZONE IS IV THIS WORK ORDER IS TO REMOVE DELAMINATION TYPE ---[I 13 [INDICATIONS FROM THE TORUS INTERIOR (BAY 4*11,12, 115 & 16) (SEE NOTES PAGE)  
ENVIRONMENTAL QUAL1 FICATIdN:
--- EMPLOYEE NO: SIGNATURE: DATE COHPLETED:  
CLASSIFICATION OF UORK: SC-INS PLANNER: EDMUND LUCIANO PROJECT NO: 0127 MTERIAL ACCT NO: 2130-4415-1070 1
/ / RECONCILIATION CODE: FAILURE CODE: DOUNTIME : DATE: / / -- SUPERVISOR EMPLOYEE NO: SUPERVISOR REVIEUED:
WPC wc STOP*T H INK* ACT*REV I EU STAR c 1
. .. ..... PREREQUISITES:
---El
I.CONDUCT PRE-JOB BRIEFING PERSON CONTACTED I 3.NOTIFY RP PRIOR TO START OF WRK DUGS : 2 UPC UPC REMOVE DELAMINATION TYPE INDICATIONS FROM THE [TORUS INTERIOR (BAY 4,11,12,15 S 16) BY kECHANICAL RIEANS (e.g. GRINDING UHEEL, FLAPPER UHEEL, etc.) [TO ACHIEVE AN ACCEPTABLE TORUS SURFACE CCONFIGURATIOW FOR UT EXAMINATION.
[ I THE OFFICE SUPV SHALL ASSIGN THIS W.O.
ENSURE CINDICATIOWS ARE APPROXI13ATEl.Y FLUSH UITH THE [SURRWNDING BASE METAL. [****** DO NOT REMOVE BASE METAL ****** 3 WPC WPC JOB SAFETY CHECKLIST REV 6/1/96 SUPERVISIOW:
TO JOB (ST)
XXI Pre-Job Briefing AP 0052 "PRE JOB BRIEFING" XXI Initiate AP 0510 tlConfined Space ProcedurelS I 1 Initiate AP 0512 "Work in Hot Environmentt1 C I Implement other Procedures.
N0.0127 THE VYICE IS J I M CALCHERA THE ACTIVITY SAFETY CLASS I S NNS t l THE HOUSEKEEPING ZONE I S I V THIS WORK ORDER IS TO REMOVE DELAMINATION TYPE  
List in Comnents.
---[I 1 3
XXI RW required XXI Fire Permit required C 1 Chemical Use Permit required XXI Shift Supv approval/notification required XXI Monitor safe work practices XXI Coordinate support with/to VY C 3 Notify Medical Services Coord prior to PERSONAL PROTECTIVE EQUIPMENT:
[INDICATIONS FROM THE TORUS INTERIOR (BAY 4*11,12, 115 & 16) (SEE NOTES PAGE)
MI Hard hats XXI Hearing protection XXI Safety glasses I I Face shields begirning Loud work -- I
EMPLOYEE NO:
.I 3 I
SIGNATURE:
* I -Y A -UT- 1 A 1 WSERVICE INSPECIXUN I PAGE 3 PROCEDURE NUCLEAR SERVICES -______ DIVISION _- I REVISION 11 of 12 1 SUPPLEHEHTAL DATA SHEET y+VwIa--r(&
DATE COHPLETED:  
J.4 7 L Exarni naff on Oetai 1 s/ Sketch: \ EXAHI HER LEVEL .& OATE y/sb't COG. EHG./EXAH AGEHCY DATE QA (Ootf anal 1 @If% !J OATE d/h AHII (Optional)
/  
IS1 COORDINATOR (If ASHE XI Exam) J DATE 4-22-48 PlA- DATE wfi R65\9 FORM 3
/
RECONCILIATION CODE:
FAILURE CODE:
DOUNTIME :
DATE:  
/  
/
SUPERVISOR EMPLOYEE NO:
SUPERVISOR REVIEUED:  
 
PREREQUISITES:
I.CONDUCT PRE-JOB BRIEFING PERSON CONTACTED I
3.NOTIFY RP PRIOR TO START OF WRK DUGS :
2 UPC UPC REMOVE DELAMINATION TYPE INDICATIONS FROM THE
[TORUS INTERIOR (BAY 4,11,12,15 S 16) BY kECHANICAL RIEANS (e.g.
GRINDING UHEEL, FLAPPER UHEEL, etc.)
[TO ACHIEVE AN ACCEPTABLE TORUS SURFACE CCONFIGURATIOW FOR UT EXAMINATION. ENSURE CINDICATIOWS ARE APPROXI13ATEl.Y FLUSH UITH THE
[SURRWNDING BASE METAL.
[****** DO NOT REMOVE BASE METAL ******
3 WPC WPC JOB SAFETY CHECKLIST REV 6/1/96 SUPERVISIOW:
XXI P r e - J o b B r i e f i n g AP 0052 "PRE JOB BRIEFING" XXI Initiate AP 0510 tlConfined Space ProcedurelS I 1 Initiate AP 0512 "Work in H o t Environmentt1 C I Implement other Procedures. L i s t i n Comnents.
XXI R W required XXI F i r e P e r m i t required C 1 Chemical Use P e r m i t required XXI S h i f t Supv approval/notification required XXI M o n i t o r s a f e work practices XXI C o o r d i n a t e support w i t h / t o VY C 3 N o t i f y M e d i c a l S e r v i c e s Coord prior t o PERSONAL PROTECTIVE EQUIPMENT:
MI H a r d hats XXI H e a r i n g protection XXI S a f e t y glasses I I Face shields begirning Loud w o r k I  
 
.I 3
I I  
-Y A -UT-1 A 1 WSERVICE INSPECIXUN I PAGE 3
PROCEDURE NUCLEAR SERVICES DIVISION
_- I REVISION 11 o f 12 1
SUPPLEHEHTAL DATA SHEET y+VwIa--r(&
J.4 7 L
Exarni n a f f on Oetai 1 s/ Sketch:  
\\
EXAHI HER LEVEL OATE y/sbt COG. EHG./EXAH AGEHCY DATE QA (Ootf anal 1  
@If% !J OATE d/h AHII (Optional)
IS1 COORDINATOR ( I f ASHE X I Exam)
J DATE 4-22-48 PlA-DATE wfi R65\\9 FORM 3  
 
\\
\\
R65\\9 FORH 3 A
1.
 
...*.. - - e
 
R65\\9 I
3
 
I Surveillance Inspection Report LSPC- \\by -SZ,R-14 Report No.:
l w f i c a t i o n Inspection: (if required):
~
r I
Date:
sl// 319 8
/
Area/Location/Evaluation:
1 OEuS % w ~ g p ( L /
I SA)/
* I 5 Surveillance Performed:
 
Page i of 3 f 2 5.7
 
FORH 3
 
VERMONT YANKEE BAY #:
I---
NOTES :
B1 B2 d
B2 REACTOR 61 DATE: -
INSP. BY:
125.3
 
YA-UT-1 PROCEDURE 9
REVISION 11 o f 12 PAC E aI-/l*
\\
I 1
I 16519 FORH 3 1 2 5 4
 
...I
~
Williams Power Corp.
bJW-V/J-%E-r\\
Report No. :
Surveillance Inspection Report Project:
f l o h I 5+va in X ~ S - ~ G,
Project NO.:
6 o 4 0 Area / Location / Evaluation: \\I T O v V c h ' %&d b b a d Date: 4 is1 Surveillance Performed:
f3lAAp-L
-5 F'[M L n Signature:
Date: 4\\5\\40 I
\\
Recommended Corrective Action:
Signature:
Dale:
REQUIRED ACTIONS COMPLETED OC SUPERVISOR:
P I
q 2 W -
Date:
i Page 1 of 4 1263
 
~
~ __._ -...,....
VERM.ONT YANKEE 92 *I B2 l
BI I B2 B2 4.-i4-7 Y DATE: -
. BAY#:
I&
REACTOR INSP. B Y : P.1.h%
 
X' VERMONT YANKEE i
 
.I_..
L YA-UT-1 I1 o f 12 PROCEDURE 9
NUCLTUR SERVICES DIVISION INSERVICE INSPECTION PAGE Y A N K E E SUPPLEHEHTAL OATA SHEET J-I I
I I
R6 S \\9 FORX 3
 
I.4-...
~
~ _..__
I.,.
I Williams Power Corp.
- \\3.roa5 FM HQ-UPC-JY - S ~ Q L a5 Report No.:
Surveillance Inspection Report Project: d ~ m r s r YAWEC 7 0 ~ ~ s maD/gs@A,6EfL 'INST&.
Project No.:
Results of Surveillance:
Signdun:
Date:
Recommended Corrective Action:
W I
\\
A 5 Page \\ of 1275
 
VERM'ONT YANKEE I
t DATE: d/ar/?s INSP. BY:,2#@---
REACTOR
. BAY#:
NOTES :


\ \ R65\9 -- FORH 3 A 1. . .._ ..-- .. ..-. 
-- _. ._ ...* .. --e R65\9 I 3 
,-."..,I . . , .. . Surveillance Inspection Report .. . - LSPC- \by -SZ,R- 14 Report No.: lwfication Inspection: (if required):
~ r I Date: sl// 319 8 / Area/Location/Evaluation:
1 OEuS %w~gp(L/ I SA)/ *I 5 Surveillance Performed:
#' Page i of 3 f 2 5.7 
..
FORH 3 
. . .- . . . ,.. . . ..
VERMONT YANKEE BAY #: I--- NOTES : . B1 B2 d B2 --*&- REACTOR 61 DATE: - INSP. BY: 125.3 
-- YA-UT-1 PROCEDURE 9 REVISION 11 of 12 PAC E aI-/l* \I 1 I 16519 FORH 3 1254 __ _. - . - . . . . . . . . . . . - . . .. . 
. .. . . , .- .- _.... -. - ... ... ___ . .. --_ .. .I --.. - ~ -- .. .. -. ... .. . .. Williams Power Corp. bJW-V/J-%E-r\ Report No. : Surveillance Inspection Report Project: floh I 5+va in X~S-~G, Project NO.: 6 o 4 0 Area / Location / Evaluation:
\I TOvVch' %&d bbad Date: 4 is1 Surveillance Performed:
f3lAAp-L -5 F'[M L n Signature:
Date: 4\5\40 I \ - Recommended Corrective Action: Signature:
Dale: REQUIRED ACTIONS COMPLETED OC SUPERVISOR:
P I q2W- Date: i Page 1 of 4 1263 .. .. . 
~ ~ __ ._ -. . . , . ... VERM.ONT YANKEE 92 *I -. B2 .. l BI I B2 B2 4 .-i4-7 Y DATE: - . BAY#: I& REACTOR INSP. BY:P .1 .h%z 
, X' VERMONT YANKEE i . 
.. . 
. ---.--- .I_.. L YA-UT-1 I1 of 12 PROCEDURE 9 NUCLTUR SERVICES DIVISION INSERVICE INSPECTION PAGE YANKEE . .-.. SUPPLEHEHTAL OATA SHEET J- I .I I I R6 S \9 FORX 3 
... , I.4-... . . ....... --, " ~.- ... .. . , .. ~ _..__ ..-. ...... - -- _. <. , I ., . I. Williams Power Corp. - \3.roa5 FM HQ- .. UPC- JY - S~QL a5 Report No.: Surveillance Inspection Report Project: d~mrsr YAWEC 70~~s maD/gs@A,6EfL
'INST&. Project No.: Results of Surveillance:
Signdun: Date: Recommended Corrective Action: W I \ A 5 Page \ of 1275 . . . . . . . . . - . . - . . . . - . . - . -. - - . . .. .- - - . - - - - . 
.. -- VERM'ONT YANKEE It DATE: d/ar/?s INSP. BY:,2#@---
REACTOR . BAY#: NOTES :
t NUCLEAR SERVICES DIVISION INSERVLCE INSPECTION  
t NUCLEAR SERVICES DIVISION INSERVLCE INSPECTION  
-0 Examinatfon Details/Sketch:
-0 Examinatfon Details/Sketch:
YA-UT-1 9 PROCEDURE PAGE REVISfON 11 of 12 RS5\9 FORH 3 --}}
YA-UT-1 9
PROCEDURE PAGE REVISfON 11 o f 12 RS5\\9 FORH 3  
--}}

Latest revision as of 02:53, 15 January 2025

Work Order 98-1108, 04/29/1998, Torus Seam Repair
ML070670415
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 04/29/1998
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
98-1108
Download: ML070670415 (22)


Text

LOCATION: R0 213-238 ELEV UORK ORDER PROBLEM DESCRIPTIW:

WOR NO: 33761 DATE: 04/13/98 INIT: JOHN SCHAEFER FLAP DELAMINATION FROM TORUS INTERIOR (BAY 4,11,12 CUD:

MODEL NO:

15,+16).

WRK WITH I S 1 TO RESOLVE.

DRAWING NO: 6202-2DDD SAFETY CLASS:

ENVIRONMENTAL QUAL1 FICATIdN:

CLASSIFICATION OF UORK: SC-INS PLANNER: EDMUND LUCIANO PROJECT NO: 0127 MTERIAL ACCT NO: 2130-4415-1070 1

WPC wc STOP*T H INK* ACT*REV I EU STAR c 1

---El

[ I THE OFFICE SUPV SHALL ASSIGN THIS W.O.

TO JOB (ST)

N0.0127 THE VYICE IS J I M CALCHERA THE ACTIVITY SAFETY CLASS I S NNS t l THE HOUSEKEEPING ZONE I S I V THIS WORK ORDER IS TO REMOVE DELAMINATION TYPE

---[I 1 3

[INDICATIONS FROM THE TORUS INTERIOR (BAY 4*11,12, 115 & 16) (SEE NOTES PAGE)

EMPLOYEE NO:

SIGNATURE:

DATE COHPLETED:

/

/

RECONCILIATION CODE:

FAILURE CODE:

DOUNTIME :

DATE:

/

/

SUPERVISOR EMPLOYEE NO:

SUPERVISOR REVIEUED:

PREREQUISITES:

I.CONDUCT PRE-JOB BRIEFING PERSON CONTACTED I

3.NOTIFY RP PRIOR TO START OF WRK DUGS :

2 UPC UPC REMOVE DELAMINATION TYPE INDICATIONS FROM THE

[TORUS INTERIOR (BAY 4,11,12,15 S 16) BY kECHANICAL RIEANS (e.g.

GRINDING UHEEL, FLAPPER UHEEL, etc.)

[TO ACHIEVE AN ACCEPTABLE TORUS SURFACE CCONFIGURATIOW FOR UT EXAMINATION. ENSURE CINDICATIOWS ARE APPROXI13ATEl.Y FLUSH UITH THE

[SURRWNDING BASE METAL.

[****** DO NOT REMOVE BASE METAL ******

3 WPC WPC JOB SAFETY CHECKLIST REV 6/1/96 SUPERVISIOW:

XXI P r e - J o b B r i e f i n g AP 0052 "PRE JOB BRIEFING" XXI Initiate AP 0510 tlConfined Space ProcedurelS I 1 Initiate AP 0512 "Work in H o t Environmentt1 C I Implement other Procedures. L i s t i n Comnents.

XXI R W required XXI F i r e P e r m i t required C 1 Chemical Use P e r m i t required XXI S h i f t Supv approval/notification required XXI M o n i t o r s a f e work practices XXI C o o r d i n a t e support w i t h / t o VY C 3 N o t i f y M e d i c a l S e r v i c e s Coord prior t o PERSONAL PROTECTIVE EQUIPMENT:

MI H a r d hats XXI H e a r i n g protection XXI S a f e t y glasses I I Face shields begirning Loud w o r k I

.I 3

I I

-Y A -UT-1 A 1 WSERVICE INSPECIXUN I PAGE 3

PROCEDURE NUCLEAR SERVICES DIVISION

_- I REVISION 11 o f 12 1

SUPPLEHEHTAL DATA SHEET y+VwIa--r(&

J.4 7 L

Exarni n a f f on Oetai 1 s/ Sketch:

\\

EXAHI HER LEVEL OATE y/sbt COG. EHG./EXAH AGEHCY DATE QA (Ootf anal 1

@If% !J OATE d/h AHII (Optional)

IS1 COORDINATOR ( I f ASHE X I Exam)

J DATE 4-22-48 PlA-DATE wfi R65\\9 FORM 3

\\

\\

R65\\9 FORH 3 A

1.

...*.. - - e

R65\\9 I

3

I Surveillance Inspection Report LSPC- \\by -SZ,R-14 Report No.:

l w f i c a t i o n Inspection: (if required):

~

r I

Date:

sl// 319 8

/

Area/Location/Evaluation:

1 OEuS % w ~ g p ( L /

I SA)/

  • I 5 Surveillance Performed:

Page i of 3 f 2 5.7

FORH 3

VERMONT YANKEE BAY #:

I---

NOTES :

B1 B2 d

B2 REACTOR 61 DATE: -

INSP. BY:

125.3

YA-UT-1 PROCEDURE 9

REVISION 11 o f 12 PAC E aI-/l*

\\

I 1

I 16519 FORH 3 1 2 5 4

...I

~

Williams Power Corp.

bJW-V/J-%E-r\\

Report No. :

Surveillance Inspection Report Project:

f l o h I 5+va in X ~ S - ~ G,

Project NO.:

6 o 4 0 Area / Location / Evaluation: \\I T O v V c h ' %&d b b a d Date: 4 is1 Surveillance Performed:

f3lAAp-L

-5 F'[M L n Signature:

Date: 4\\5\\40 I

\\

Recommended Corrective Action:

Signature:

Dale:

REQUIRED ACTIONS COMPLETED OC SUPERVISOR:

P I

q 2 W -

Date:

i Page 1 of 4 1263

~

~ __._ -...,....

VERM.ONT YANKEE 92 *I B2 l

BI I B2 B2 4.-i4-7 Y DATE: -

. BAY#:

I&

REACTOR INSP. B Y : P.1.h%

X' VERMONT YANKEE i

.I_..

L YA-UT-1 I1 o f 12 PROCEDURE 9

NUCLTUR SERVICES DIVISION INSERVICE INSPECTION PAGE Y A N K E E SUPPLEHEHTAL OATA SHEET J-I I

I I

R6 S \\9 FORX 3

I.4-...

~

~ _..__

I.,.

I Williams Power Corp.

- \\3.roa5 FM HQ-UPC-JY - S ~ Q L a5 Report No.:

Surveillance Inspection Report Project: d ~ m r s r YAWEC 7 0 ~ ~ s maD/gs@A,6EfL 'INST&.

Project No.:

Results of Surveillance:

Signdun:

Date:

Recommended Corrective Action:

W I

\\

A 5 Page \\ of 1275

VERM'ONT YANKEE I

t DATE: d/ar/?s INSP. BY:,2#@---

REACTOR

. BAY#:

NOTES :

t NUCLEAR SERVICES DIVISION INSERVLCE INSPECTION

-0 Examinatfon Details/Sketch:

YA-UT-1 9

PROCEDURE PAGE REVISfON 11 o f 12 RS5\\9 FORH 3

--