ML17207A891: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 6: Line 6:
| number = ML17266A153
| number = ML17266A153
| issue date = 03/07/1980
| issue date = 03/07/1980
| title = Forwards LER 80-008/03L-0
| title = LER 80-008/03L-0:on 800206,discovered SIT Sample Valves for Tanks 1A1,1A2,1B1 & 1B2 Had Been Mislabeled as 1B2,1B1,1A2 & 1A1,respectively,resulting in Missed Surveillance Samplings. Caused by Incorrect Labeling During Installation
| author name = SCHOPPMAN M A
| author name = Schoppman M
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 22: Line 22:
| issue date = 03/07/1980
| issue date = 03/07/1980
| title = Forwards LER 80-008/03L-0
| title = Forwards LER 80-008/03L-0
| author name = SCHMIDT A D
| author name = Schmidt A
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name = OREILLY J P
| addressee name = OREILLY J P

Latest revision as of 11:30, 8 March 2020

Forwards LER 80-008/03L-0
Date released: 01/25/2018 Download: ML17207A891


LER 80-008/03L-0:on 800206,discovered SIT Sample Valves for Tanks 1A1,1A2,1B1 & 1B2 Had Been Mislabeled as 1B2,1B1,1A2 & 1A1,respectively,resulting in Missed Surveillance Samplings. Caused by Incorrect Labeling During Installation
ML17266A153
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/07/1980
From: Schoppman M
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17266A153 (3)
Forwards LER 80-008/03L-0
ML17207A890
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 03/07/1980
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML17207A890 (1)