ML17324A575: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 6: Line 6:
| number = ML17324A579
| number = ML17324A579
| issue date = 12/04/1985
| issue date = 12/04/1985
| title = Forwards Reactor Containment Bldg Integrated Leak Rate Test, Completed on 850830.Test Performed as Specified in Rev 0 to Surveillance Test Procedure **1 Thp 4030 STP.202, ANSI N45.4 - 1972,FSAR & Tech Spec 4.6.1.2
| title = Reactor Containment Bldg Integrated Leak Rate Test.
| author name = CLIMER D
| author name = Climer D
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name =  
| addressee name =  
Line 22: Line 22:
| issue date = 01/08/1986
| issue date = 01/08/1986
| title = Forwards Reactor Containment Bldg Integrated Leak Rate Test, Completed on 850830.Test Performed as Specified in Rev 0 to Surveillance Test Procedure **1 Thp 4030 STP.202, ANSI N45.4 - 1972,FSAR & Tech Spec 4.6.1.2
| title = Forwards Reactor Containment Bldg Integrated Leak Rate Test, Completed on 850830.Test Performed as Specified in Rev 0 to Surveillance Test Procedure **1 Thp 4030 STP.202, ANSI N45.4 - 1972,FSAR & Tech Spec 4.6.1.2
| author name = ALEXICH M P
| author name = Alexich M
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| author affiliation = INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
| addressee name = DENTON H R
| addressee name = DENTON H R

Latest revision as of 07:24, 7 March 2020

Forwards Reactor Containment Bldg Integrated Leak Rate Test, Completed on 850830.Test Performed as Specified in Rev 0 to Surveillance Test Procedure **1 Thp 4030 STP.202, ANSI N45.4 - 1972,FSAR & Tech Spec 4.6.1.2
Date released: 05/31/2018 Download: ML17324A575


Reactor Containment Bldg Integrated Leak Rate Test.
ML17324A579
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 12/04/1985
From: Climer D
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
References
Download: ML17324A579 (323)
Forwards Reactor Containment Bldg Integrated Leak Rate Test, Completed on 850830.Test Performed as Specified in Rev 0 to Surveillance Test Procedure **1 Thp 4030 STP.202, ANSI N45.4 - 1972,FSAR & Tech Spec 4.6.1.2
ML17324A572
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 01/08/1986
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: DENTON H R
Office of Nuclear Reactor Regulation
References
Download: ML17324A572 (4)