ML17341A864: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 6: Line 6:
| number = ML17341A865
| number = ML17341A865
| issue date = 03/15/1981
| issue date = 03/15/1981
| title = Forwards 150-day Response to NRC 810821 & 1218 Questions Re Pressurized Thermal Shock to Reactor Pressure Vessels. Emergency Operating Procedure 20002 (E-2), Loss of Secondary Coolant, Encl.Reactor Integrity Demonstrated
| title = Emergency Operating Procedure 20002 (E-2), Loss of Secondary Coolant.
| author name = HAYS J K
| author name = Hays J
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 22: Line 22:
| issue date = 01/21/1982
| issue date = 01/21/1982
| title = Forwards 150-day Response to NRC 810821 & 1218 Questions Re Pressurized Thermal Shock to Reactor Pressure Vessels. Emergency Operating Procedure 20002 (E-2), Loss of Secondary Coolant, Encl.Reactor Integrity Demonstrated
| title = Forwards 150-day Response to NRC 810821 & 1218 Questions Re Pressurized Thermal Shock to Reactor Pressure Vessels. Emergency Operating Procedure 20002 (E-2), Loss of Secondary Coolant, Encl.Reactor Integrity Demonstrated
| author name = UHRIG R E
| author name = Uhrig R
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name = EISENHUT D G
| addressee name = EISENHUT D G

Latest revision as of 23:07, 6 March 2020

Forwards 150-day Response to NRC 810821 & 1218 Questions Re Pressurized Thermal Shock to Reactor Pressure Vessels. Emergency Operating Procedure 20002 (E-2), Loss of Secondary Coolant, Encl.Reactor Integrity Demonstrated
Date released: 07/31/2018 Download: ML17341A864


Emergency Operating Procedure 20002 (E-2), Loss of Secondary Coolant.
ML17341A865
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 03/15/1981
From: Hays J
FLORIDA POWER & LIGHT CO.
To:
References
Download: ML17341A865 (16)
Forwards 150-day Response to NRC 810821 & 1218 Questions Re Pressurized Thermal Shock to Reactor Pressure Vessels. Emergency Operating Procedure 20002 (E-2), Loss of Secondary Coolant, Encl.Reactor Integrity Demonstrated
ML17341A863
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 01/21/1982
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: EISENHUT D G
Office of Nuclear Reactor Regulation
References
Download: ML17341A863 (73)