ML083650382: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 5: Line 5:
| author name = Subbaratnam R
| author name = Subbaratnam R
| author affiliation = NRC/NRO/DNRL/NRGA
| author affiliation = NRC/NRO/DNRL/NRGA
| addressee name = Keithline K A
| addressee name = Keithline K
| addressee affiliation = Nuclear Energy Institute (NEI)
| addressee affiliation = Nuclear Energy Institute (NEI)
| docket =  
| docket =  
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:From: Ram Subbaratnam Sent: Tuesday, December 30, 2008 1:42 PM To: Carol Ashley  
{{#Wiki_filter:From:                       Ram Subbaratnam Sent:                       Tuesday, December 30, 2008 1:42 PM To:                         Carol Ashley


==Subject:==
==Subject:==
FW: Summary of Conference Call with NEI/Industry on December 23, 2008 to discuss draft NEI White Paper Attachments: Significance Paper_DRAFT_for_Discussion JMM 02Dec.pdf From: Ram Subbaratnam Sent: Tuesday, December 30, 2008 10:37 AM To: 'KEITHLINE, Kimberly' Cc: Nilesh Chokshi; Clifford Munson; Goutam Bagchi; Dogan Seber; BELL, Russ; 'Cstepp@moment.net'; 'aph@nei.org'  
FW: Summary of Conference Call with NEI/Industry on December 23, 2008 to discuss draft NEI White Paper Attachments:               Significance Paper_DRAFT_for_Discussion JMM 02Dec.pdf From: Ram Subbaratnam Sent: Tuesday, December 30, 2008 10:37 AM To: 'KEITHLINE, Kimberly' Cc: Nilesh Chokshi; Clifford Munson; Goutam Bagchi; Dogan Seber; BELL, Russ; 'Cstepp@moment.net';
'aph@nei.org'


==Subject:==
==Subject:==
Summary of Conference Call with NEI/Industry on December 23, 2008 to discuss draft NEI White Paper MEMORANDUM TO: File FROM: Ram Subbaratnam, Project Manager, NRGA/DNRL/NRO Office of New Reactors, Division of New Reactor Licensing  
Summary of Conference Call with NEI/Industry on December 23, 2008 to discuss draft NEI White Paper MEMORANDUM TO: File FROM: Ram Subbaratnam, Project Manager, NRCA/DNRL/NRO Office of New Reactors, Division of New Reactor Licensing


==SUBJECT:==
==SUBJECT:==
Summary of Conference Call with NEI/Industry on December 23, 2008 to discuss draft NEI White Paper on Significance of Hypothetical Sensitivity Evaluations The purpose of the call was to listen to the industry's proposed methodology on evaluating the significance of sensitivity results performed to decide whether a seismic source needs to be updated or not. This is related to a draft white paper submitted by the industry (see attachment) which was discussed in the call. A representative example (that of W.S. Lee site) was discussed to illustrate this methodology and the significance criteria that uses probabilistic risk assessment that tracks prospective change in seismic core damage frequency (SCDF) using guidelines contained in Regulatory Guide 1.174 (currently being used for operating reactors). After considering all the aspects, the staff indicated that the sole use of the SCDF may not be appropriate due to concerns of slope stability and other seismic hazards such as liquefaction which are site specific. Also the staff indicated that the applicability of RG 1.174 criteria to new reactors will require further explorations.
Summary of Conference Call with NEI/Industry on December 23, 2008 to discuss draft NEI White Paper on Significance of Hypothetical Sensitivity Evaluations The purpose of the call was to listen to the industry's proposed methodology on evaluating the significance of sensitivity results performed to decide whether a seismic source needs to be updated or not. This is related to a draft white paper submitted by the industry (see attachment) which was discussed in the call. A representative example (that of W.S. Lee site) was discussed to illustrate this methodology and the significance criteria that uses probabilistic risk assessment that tracks prospective change in seismic core damage frequency (SCDF) using guidelines contained in Regulatory Guide 1.174 (currently being used for operating reactors). After considering all the aspects, the staff indicated that the sole use of the SCDF may not be appropriate due to concerns of slope stability and other seismic hazards such as liquefaction which are site specific. Also the staff indicated that the applicability of RG 1.174 criteria to new reactors will require further explorations.
The staff further pointed out that rather than using a fixed numerical criterion, assessment of relative changes to the ground motion may be more appropriate to evaluate the engineering significance. Industry indicated that they will consider the discussion and let the staff know about their plans.
The staff further pointed out that rather than using a fixed numerical criterion, assessment of relative changes to the ground motion may be more appropriate to evaluate the engineering significance. Industry indicated that they will consider the discussion and let the staff know about their plans.
The NRC attendees were:
The NRC attendees were:
Line 32: Line 33:
* Cliff Munson
* Cliff Munson
* Goutam Bagchi
* Goutam Bagchi
* Ram Subbaratnam  
* Ram Subbaratnam


Other observers:
Other observers:
Line 47: Line 48:
* Don Moore, Southern If You need any further information or assistance on this meeting summary please call me on (301) 415 1478 or e-Mail rxs2@nrc.gov.
* Don Moore, Southern If You need any further information or assistance on this meeting summary please call me on (301) 415 1478 or e-Mail rxs2@nrc.gov.
Thank you.
Thank you.
Ram Subbaratnam Project Manager, NRGA/DNRL/NRO US NRC (301) 415 1478 E-mail Properties Mail Envelope Properties (AC3D8151B0831F4EAFFB2501B87BF9050DFD8F0C1A)  
Ram Subbaratnam Project Manager, NRCA/DNRL/NRO US NRC (301) 415 1478 E-mail Properties Mail Envelope Properties (AC3D8151B0831F4EAFFB2501B87BF9050DFD8F0C1A)


==Subject:==
==Subject:==
FW: Summary of Conference Call with NEI/Industry on December 23, 2008 to discuss draft NEI White Paper  
FW: Summary of Conference Call with NEI/Industry on December 23, 2008 to discuss draft NEI White Paper Sent Date:       12/30/2008 1:41:43 PM Received Date:       12/30/2008 1:41:43 PM From:           Ram Subbaratnam Created By:       Ram.Subbaratnam@nrc.gov Recipients:
 
Sent Date:       12/30/2008 1:41:43 PM Received Date:       12/30/2008 1:41:43 PM From:               Ram Subbaratnam  
 
Created By:         Ram.Subbaratnam@nrc.gov  
 
Recipients:
Carol.Ashley@nrc.gov (Carol Ashley)
Carol.Ashley@nrc.gov (Carol Ashley)
Tracking Status: None  
Tracking Status: None Post Office:
 
HQCLSTR02.nrc.gov Files           Size     Date & Time MESSAGE           284734     12/30/2008 Significance Paper_DRAFT_for_Discussion JMM 02Dec.pdf             270006 Options
Post Office:
HQCLSTR02.nrc.gov  
 
Files               Size       Date & Time  
 
MESSAGE       284734       12/30/2008 Significance Paper_DRAFT_for_Discussion JMM 02Dec.pdf       270006  
 
Options Expiration Date:        Priority:                        olImportanceNormal ReplyRequested:        True
 
Return Notification:        True


Sensitivity:         olNormal Recipients received:}}
Expiration Date:
Priority:            olImportanceNormal ReplyRequested:      True Return Notification:    True Sensitivity:     olNormal Recipients received:}}

Latest revision as of 11:08, 14 November 2019

Summary of Conference Call with Nei/Industry on December 23, 2008 to Discuss Draft NEI White Paper
ML083650382
Person / Time
Issue date: 12/30/2008
From: Subbaratnam R
NRC/NRO/DNRL/NRGA
To: Keithline K
Nuclear Energy Institute
Subbaratam R. 301-415-1478, NGRA/DNRL
Shared Package
ML083650358 List:
References
Download: ML083650382 (1)


Text

From: Ram Subbaratnam Sent: Tuesday, December 30, 2008 1:42 PM To: Carol Ashley

Subject:

FW: Summary of Conference Call with NEI/Industry on December 23, 2008 to discuss draft NEI White Paper Attachments: Significance Paper_DRAFT_for_Discussion JMM 02Dec.pdf From: Ram Subbaratnam Sent: Tuesday, December 30, 2008 10:37 AM To: 'KEITHLINE, Kimberly' Cc: Nilesh Chokshi; Clifford Munson; Goutam Bagchi; Dogan Seber; BELL, Russ; 'Cstepp@moment.net';

'aph@nei.org'

Subject:

Summary of Conference Call with NEI/Industry on December 23, 2008 to discuss draft NEI White Paper MEMORANDUM TO: File FROM: Ram Subbaratnam, Project Manager, NRCA/DNRL/NRO Office of New Reactors, Division of New Reactor Licensing

SUBJECT:

Summary of Conference Call with NEI/Industry on December 23, 2008 to discuss draft NEI White Paper on Significance of Hypothetical Sensitivity Evaluations The purpose of the call was to listen to the industry's proposed methodology on evaluating the significance of sensitivity results performed to decide whether a seismic source needs to be updated or not. This is related to a draft white paper submitted by the industry (see attachment) which was discussed in the call. A representative example (that of W.S. Lee site) was discussed to illustrate this methodology and the significance criteria that uses probabilistic risk assessment that tracks prospective change in seismic core damage frequency (SCDF) using guidelines contained in Regulatory Guide 1.174 (currently being used for operating reactors). After considering all the aspects, the staff indicated that the sole use of the SCDF may not be appropriate due to concerns of slope stability and other seismic hazards such as liquefaction which are site specific. Also the staff indicated that the applicability of RG 1.174 criteria to new reactors will require further explorations.

The staff further pointed out that rather than using a fixed numerical criterion, assessment of relative changes to the ground motion may be more appropriate to evaluate the engineering significance. Industry indicated that they will consider the discussion and let the staff know about their plans.

The NRC attendees were:

  • Dorgan Seber
  • Cliff Munson
  • Goutam Bagchi
  • Ram Subbaratnam

Other observers:

  • Adrian Heymer, NEI
  • Kimberly Keithline, NEI
  • John McConaghy, Duke
  • John Thrasher, Duke
  • John Richards, Duke
  • Peter Hastings, Duke
  • Carl Stepp
  • Robin McGuire, Risk Engineering
  • Bob Kennedy, RPK Structural Mechanics Consulting
  • Bob Whorton, SCANA
  • Don Moore, Southern If You need any further information or assistance on this meeting summary please call me on (301) 415 1478 or e-Mail rxs2@nrc.gov.

Thank you.

Ram Subbaratnam Project Manager, NRCA/DNRL/NRO US NRC (301) 415 1478 E-mail Properties Mail Envelope Properties (AC3D8151B0831F4EAFFB2501B87BF9050DFD8F0C1A)

Subject:

FW: Summary of Conference Call with NEI/Industry on December 23, 2008 to discuss draft NEI White Paper Sent Date: 12/30/2008 1:41:43 PM Received Date: 12/30/2008 1:41:43 PM From: Ram Subbaratnam Created By: Ram.Subbaratnam@nrc.gov Recipients:

Carol.Ashley@nrc.gov (Carol Ashley)

Tracking Status: None Post Office:

HQCLSTR02.nrc.gov Files Size Date & Time MESSAGE 284734 12/30/2008 Significance Paper_DRAFT_for_Discussion JMM 02Dec.pdf 270006 Options

Expiration Date:

Priority: olImportanceNormal ReplyRequested: True Return Notification: True Sensitivity: olNormal Recipients received: