| issue date = 02/18/2009
| issue date = 02/18/2009
| title = VR-COMSECY-08-0041 - Staff Recommendation Related to Reinstatement of the Construction Permits for Bellefonte Nuclear Plant Units 1 and 2
| title = VR-COMSECY-08-0041 - Staff Recommendation Related to Reinstatement of the Construction Permits for Bellefonte Nuclear Plant Units 1 and 2
| author name = Jaczko G B, Klein D E, Lyons P B, Svinicki K L
| author name = Jaczko G, Klein D, Lyons P, Svinicki K
| author affiliation = NRC/Chairman, NRC/OCM, NRC/SECY
| author affiliation = NRC/Chairman, NRC/OCM, NRC/SECY
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:-4.RESPONSE SHEET TO: Annette Vietti-Cook, Secretary CHAIRMAN KLEIN FROM:
{{#Wiki_filter:-4.
RESPONSE SHEET TO:             Annette Vietti-Cook, Secretary FROM:            CHAIRMAN KLEIN


==SUBJECT:==
==SUBJECT:==
COMSECY-08-0041 -STAFF RECOMMENDATION RELATED TO REINSTATEMENT OF THE CONSTRUCTION PERMITS FOR BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 Approved xx Disapproved xx Abstain Not Participating
COMSECY-08-0041 -STAFF RECOMMENDATION RELATED TO REINSTATEMENT OF THE CONSTRUCTION PERMITS FOR BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 Approved     xx       Disapproved       xx Abstain Not Participating _
_COMMENTS: Below Attached Xx None~4/Lc~Q SIGNATURE/5/o 5 DATE Entered on "STARS" Yes !J--No ___I Chairman Klein's Comments on COMSECY-08-0041 STAFF RECOMMENDATION RELATED TO REINSTATEMENT OF THE CONSTRUCTION PERMITS OF BELLEFONTE NUCLEAR PLANT UNITS I AND 2 I would like to thank the staff for providing this insightful paper to assist the Commission in making an informed decision regarding TVA's request for reinstatement of the Bellefonte construction permits (CP). Based upon my review, I approve the staff's request to proceed with the review of TVA's request, and I approve the reinstatement of the CPs if the staff concludes that TVA's request is acceptable.
COMMENTS:         Below       Attached Xx None
However, I disapprove the proposal for concurrent placement of the facility in a deferred plant status; instead, I support the sequential approach for placing the facility in a deferred plant status, as proposed by Commissioner Svinicki.By letter dated August 26, 2008, supplemented on September 25, 2008, TVA requested that the CPs for Bellefonte Units 1 and 2 be reinstated, to allow the return of the plants to deferred status and resume preservation and maintenance activities.
                                        ~4/Lc~Q SIGNATURE
TVA stated that this would allow them to determine whether completion of construction and operation of the units would be a viable option.The staff, in COMSECY-08-0041, requests Commission authorization to review and take action on TVA's request. As proposed, if the staff were to find the request acceptable, it would prepare an order reinstating the construction permits with the concurrent placement of the facility in a deferred plant status.I believe that the chronology of the staff's proposed path forward is problematic.
                                            /5/o 5I DATE Entered on "STARS" Yes !J--No       ___
If the staff were to find TVA's request acceptable, an order would be issued reinstating the construction permits with the concurrent placement of the facility in a deferred plant status. The Commission Policy Statement on Deferred Plants (52 FR 38007, October 14, 1987) defines a "deferred plant" as a nuclear power plant at which the licensee has ceased construction or reduced activity to a maintenance level, maintains the CP in effect and has not announced termination of the plant. Obviously, the licensee did not maintain the CPs in effect, and secondly, the licensee informed the NRC in 2005 that the facility was in a terminated plant status. More importantly, however, is the fact that Section III.A.3 of the Commission Policy Statement on Deferred Plants, "Maintenance, Preservation and Documentation of Equipment" describes requirements for verification of construction status, retention of records and maintenance and preservation of equipment and materials.
 
TVA informed the NRC in 2005 that project completion activities, including maintenance and preservation of equipment and materials had ceased after October 1, 2005. Thus, placement of the facility in deferred status concurrent with reinstating the CPs would not be consistent with the Commission Policy Statement.
Chairman Klein's Comments on COMSECY-08-0041 STAFF RECOMMENDATION RELATED TO REINSTATEMENT OF THE CONSTRUCTION PERMITS OF BELLEFONTE NUCLEAR PLANT UNITS I AND 2 I would like to thank the staff for providing this insightful paper to assist the Commission in making an informed decision regarding TVA's request for reinstatement of the Bellefonte construction permits (CP). Based upon my review, I approve the staff's request to proceed with the review of TVA's request, and I approve the reinstatement of the CPs if the staff concludes that TVA's request is acceptable. However, I disapprove the proposal for concurrent placement of the facility in a deferred plant status; instead, I support the sequential approach for placing the facility in a deferred plant status, as proposed by Commissioner Svinicki.
Therefore, as an alternative, if the request is found acceptable, the staff should issue an order reinstating the construction permits, which to my understanding will de facto place the facility in"terminated status" as defined in the Commission Policy Statement on Deferred Plants. If TVA, chooses to pursue a deferred plant status, it should be required, as a condition of the order, to take all necessary actions to place the facility in a deferred plant status, consistent with the Commission Policy Statement on Deferred Plants. After those actions have been satisfactorily accomplished and verified by the NRC staff, the Director of NRR has the authority to place the facility in a deferred plant status.l1/1/D 9 D:ale Klein Date TO: FROM:  
By letter dated August 26, 2008, supplemented on September 25, 2008, TVA requested that the CPs for Bellefonte Units 1 and 2 be reinstated, to allow the return of the plants to deferred status and resume preservation and maintenance activities. TVA stated that this would allow them to determine whether completion of construction and operation of the units would be a viable option.
The staff, in COMSECY-08-0041, requests Commission authorization to review and take action on TVA's request. As proposed, if the staff were to find the request acceptable, it would prepare an order reinstating the construction permits with the concurrent placement of the facility in a deferred plant status.
I believe that the chronology of the staff's proposed path forward is problematic. If the staff were to find TVA's request acceptable, an order would be issued reinstating the construction permits with the concurrent placement of the facility in a deferred plant status. The Commission Policy Statement on Deferred Plants (52 FR 38007, October 14, 1987) defines a "deferred plant" as a nuclear power plant at which the licensee has ceased construction or reduced activity to a maintenance level, maintains the CP in effect and has not announced termination of the plant. Obviously, the licensee did not maintain the CPs in effect, and secondly, the licensee informed the NRC in 2005 that the facility was in a terminated plant status. More importantly, however, is the fact that Section III.A.3 of the Commission Policy Statement on Deferred Plants, "Maintenance, Preservation and Documentation of Equipment" describes requirements for verification of construction status, retention of records and maintenance and preservation of equipment and materials. TVA informed the NRC in 2005 that project completion activities, including maintenance and preservation of equipment and materials had ceased after October 1, 2005. Thus, placement of the facility in deferred status concurrent with reinstating the CPs would not be consistent with the Commission Policy Statement.
Therefore, as an alternative, if the request is found acceptable, the staff should issue an order reinstating the construction permits, which to my understanding will de facto place the facility in "terminated status" as defined in the Commission Policy Statement on Deferred Plants. If TVA, chooses to pursue a deferred plant status, it should be required, as a condition of the order, to take all necessary actions to place the facility in a deferred plant status, consistent with the Commission Policy Statement on Deferred Plants. After those actions have been satisfactorily accomplished and verified by the NRC staff, the Director of NRR has the authority to place the facility in a deferred plant status.
l1/1/D 9 D:ale Klein           Date
 
RESPONSE SHEET TO:             Annette Vietti-Cook, Secretary FROM:           COMMISSIONER JACZKO


==SUBJECT:==
==SUBJECT:==
RESPONSE SHEET Annette Vietti-Cook, Secretary COMMISSIONER JACZKO COMSECY-08-0041  
COMSECY-08-0041 - STAFF RECOMMENDATION RELATED TO REINSTATEMENT OF THE CONSTRUCTION PERMITS FOR BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 Approved               E)isapproved    X    Abstain Not Participating _
-STAFF RECOMMENDATION RELATED TO REINSTATEMENT OF THE CONSTRUCTION PERMITS FOR BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 Approved E Not Participating
COMMENTS:         Below       Attached X None SIdWATURE DATE Entered on "STARS" Yes X         No
_COMMENTS:
 
Below)isapproved X Abstain Attached X None SIdWATURE DATE No Entered on "STARS" Yes X Commissioner Jaczko's Vote on COMSECY-08-0041 Staff Recommendation Related To Reinstatement of the Construction Permits for Bellefonte Nuclear Plant Units 1 and 2 I disapprove of TVA's request to reinstate its construction permits for the Bellefonte Nuclear Plant (BLN) Units 1 and 2.Currently, TVA does not hold a license for Bellefonte Units 1 or 2. This is a fact; an inconvenient fact, but a fact nonetheless.
Commissioner Jaczko's Vote on COMSECY-08-0041 Staff Recommendation Related To Reinstatement of the Construction Permits for Bellefonte Nuclear Plant Units 1 and 2 I disapprove of TVA's request to reinstate its construction permits for the Bellefonte Nuclear Plant (BLN) Units 1 and 2.
TVA asked for a withdrawal of the construction permits (CPs) in a letter dated April 6, 2006, and was granted the withdrawal of those permits on September 14, 2006. Since the date of withdrawal, valid CPs for Bellefonte Units 1 and 2 thus ceased to exist. Thus, TVA was not subject to any jurisdiction or authority of the NRC for Bellefonte Units 1 and 2. Even TVA itself acknowledges that it is no longer in possession of a valid CP by its very request for the NRC to give them CPs. There is an obvious and easily applied litmus test for this situation, could TVA do any NRC-related activities at the site today;does TVA have any obligations to the NRC related to the site today; and could the NRC require TVA to do anything at the site today or enforce against them if they do not? The answer to each of these questions is clearly "no" and thus, today TVA clearly does not hold any permits for these units.But while no one is denying the existence of this fact, we appear to want to deny the consequences of it. Without permits, TVA is required by the Atomic Energy Act and by the NRC's implementing regulations to apply for a construction permit and to submit an application that satisfies Part 50 or Part 52 requirements.
Currently, TVA does not hold a license for Bellefonte Units 1 or 2. This is a fact; an inconvenient fact, but a fact nonetheless. TVA asked for a withdrawal of the construction permits (CPs) in a letter dated April 6, 2006, and was granted the withdrawal of those permits on September 14, 2006. Since the date of withdrawal, valid CPs for Bellefonte Units 1 and 2 thus ceased to exist. Thus, TVA was not subject to any jurisdiction or authority of the NRC for Bellefonte Units 1 and 2. Even TVA itself acknowledges that it is no longer in possession of a valid CP by its very request for the NRC to give them CPs. There is an obvious and easily applied litmus test for this situation, could TVA do any NRC-related activities at the site today; does TVA have any obligations to the NRC related to the site today; and could the NRC require TVA to do anything at the site today or enforce against them if they do not? The answer to each of these questions is clearly "no" and thus, today TVA clearly does not hold any permits for these units.
To say otherwise  
But while no one is denying the existence of this fact, we appear to want to deny the consequences of it. Without permits, TVA is required by the Atomic Energy Act and by the NRC's implementing regulations to apply for a construction permit and to submit an application that satisfies Part 50 or Part 52 requirements. To say otherwise - to say that a withdrawal does not matter - is saying that not having a permit for over two years is the same as having had a permit for those two years. Certainly, a regulatory agency should, at a minimum, defend its regulations and the need for them. Instead, "reinstating" a non-existent CP clearly does the opposite.
-to say that a withdrawal does not matter -is saying that not having a permit for over two years is the same as having had a permit for those two years. Certainly, a regulatory agency should, at a minimum, defend its regulations and the need for them. Instead, "reinstating" a non-existent CP clearly does the opposite.Moreover, there is an inherent danger in ignoring this obvious fact. Licenses exist for a purpose. We use them to fulfill our statutory mandate of protecting the public health and safety.Granting, granting subject to conditions, or denying licenses is one of our most fundamental regulatory purposes.
Moreover, there is an inherent danger in ignoring this obvious fact. Licenses exist for a purpose. We use them to fulfill our statutory mandate of protecting   the public health and safety.
Yet, rather than recognize that the withdrawn CPs at some point held value, we are now diminishing the value of all CPs.In order to ensure the public health and safety is protected, the agency established a review process for CP applications embodied in Part 50 of the agency's regulations.
Granting, granting subject to conditions, or denying licenses is one   of our most fundamental regulatory purposes. Yet, rather than recognize that the withdrawn     CPs at some point held value, we are now diminishing the value of all CPs.
Those regulations, developed through a formal public rulemaking process, established the regulatory process the agency determined was necessary to ensure public health and safety; and it is upon those regulations that TVA is now required to rely. Regardless of what TVA chooses to call its request, for NRC purposes, its request is an application; and it is an application that fails to meet our regulatory requirements for construction permitapplications.
In order to ensure the public health and safety is protected, the agency established a review process for CP applications embodied in Part 50 of the agency's regulations. Those regulations, developed through a formal public rulemaking process, established the regulatory process the agency determined was necessary to ensure public health and safety; and it is upon those regulations that TVA is now required to rely. Regardless of what TVA chooses to call its request, for NRC purposes, its request is an application; and it is an application that fails to meet our regulatory requirements for construction permitapplications. The appropriate response to TVA, therefore, should have been for the agency to reject the request because it failed to meet the necessary regulatory requirements. When interested members of the public request a hearing, we reject any request that does not satisfy our Part 2 standards that govern hearings. I expect potential licensees to be held to those same standards.
The appropriate response to TVA, therefore, should have been for the agency to reject the request because it failed to meet the necessary regulatory requirements.
TVA's request would have us contemplate a novel and ad hoc process that follows neither the Commission's Policy Statement on Deferred Plants (52 Fed. Reg. 38,077, Oct. 14, 1987) nor the agency's regulations. The Policy Statement establishes a policy for utilities with CPs that
When interested members of the public request a hearing, we reject any request that does not satisfy our Part 2 standards that govern hearings.
 
I expect potential licensees to be held to those same standards.
allows them to continue to maintain their permits, but to delay or terminate construction activities. The Policy Statement provides a framework for plants with CPs in a deferred or terminated status to seek reactivation of their CP. But these facilities continue to have permits.
TVA's request would have us contemplate a novel and ad hoc process that follows neither the Commission's Policy Statement on Deferred Plants (52 Fed. Reg. 38,077, Oct. 14, 1987) nor the agency's regulations.
The Policy Statement clearly defines a terminated plant as, "a nuclear power plant at which the licensee has announced that construction has been permanently stopped, but which still has a valid CP."
The Policy Statement establishes a policy for utilities with CPs that allows them to continue to maintain their permits, but to delay or terminate construction activities.
During their consideration of the Policy Statement, the Commission considered this to be an important point. In their approval of the Policy Statement, the Commission specifically revised the policy to ensure the Commission maintained appropriate oversight of a CP holder that requested terminated status until the license was withdrawn, even if that meant extending the CP expiration date. Specifically, for plant termination the Policy states, "A licensee should inform the Director of NRR when a plant is placed in terminated status., In the event that withdrawal of a CP is sought, the permit holder should provide notice to the NRC staff sufficiently far in advance of the expiration of the CP to permit the staff to determine appropriate terms and conditions. If necessary, a brief extension of the CP may be ordered by the staff to accommodate these determinations. Until withdrawal of the CP is authorized, a permit holder must adhere to the Commission's regulations and the terms of the CP and should submit suitable plans for the termination of site activities, including redress, as provided for under 10 CFR 51.41, for staff approval." (52 Fed. Reg. 38,079)
The Policy Statement provides a framework for plants with CPs in a deferred or terminated status to seek reactivation of their CP. But these facilities continue to have permits.The Policy Statement clearly defines a terminated plant as, "a nuclear power plant at which the licensee has announced that construction has been permanently stopped, but which still has a valid CP." During their consideration of the Policy Statement, the Commission considered this to be an important point. In their approval of the Policy Statement, the Commission specifically revised the policy to ensure the Commission maintained appropriate oversight of a CP holder that requested terminated status until the license was withdrawn, even if that meant extending the CP expiration date. Specifically, for plant termination the Policy states, "A licensee should inform the Director of NRR when a plant is placed in terminated status., In the event that withdrawal of a CP is sought, the permit holder should provide notice to the NRC staff sufficiently far in advance of the expiration of the CP to permit the staff to determine appropriate terms and conditions.
Thus, the policy contemplates an end for the license when there is no longer a need for continued NRC oversight, just as it retains the need for continuing NRC oversight when there is no end. The policy clearly contemplates continued NRC oversight where a license is placed in deferred or terminated status because the policy makes clear that CP holders in either a deferred or terminated status continue to hold valid construction permits. Under the policy statement, a holder of a CP can request its permit be placed in deferred status and a valid CP with continuing obligations that NRC can both require and enforce. A CP holder can move from a deferred status to a terminated status, which again retains the validity of the CP and places continuing obligations on the holder of the permit that NRC can both require and enforce. The next step, should a permit holder choose to continue down the path, is that of a withdrawal of a CP. Once a CP is withdrawn, no valid CP exists and there are no continuing NRC obligations or continuing NRC authority for NRC enforcement.
If necessary, a brief extension of the CP may be ordered by the staff to accommodate these determinations.
Even if somehow this non-existent CP could be recreated to a valid CP in a deferred or terminated status, TVA could not reactivate under the Policy. The Policy provides that a' licensee of a terminated CP that plans to maintain the option of plant reactivation should
Until withdrawal of the CP is authorized, a permit holder must adhere to the Commission's regulations and the terms of the CP and should submit suitable plans for the termination of site activities, including redress, as provided for under 10 CFR 51.41, for staff approval." (52 Fed. Reg. 38,079)Thus, the policy contemplates an end for the license when there is no longer a need for continued NRC oversight, just as it retains the need for continuing NRC oversight when there is no end. The policy clearly contemplates continued NRC oversight where a license is placed in deferred or terminated status because the policy makes clear that CP holders in either a deferred or terminated status continue to hold valid construction permits. Under the policy statement, a holder of a CP can request its permit be placed in deferred status and a valid CP with continuing obligations that NRC can both require and enforce. A CP holder can move from a deferred status to a terminated status, which again retains the validity of the CP and places continuing obligations on the holder of the permit that NRC can both require and enforce. The next step, should a permit holder choose to continue down the path, is that of a withdrawal of a CP. Once a CP is withdrawn, no valid CP exists and there are no continuing NRC obligations or continuing NRC authority for NRC enforcement.
"[d]evelop and implement a preservation and maintenance program for structures, systems, and components important to safety, as well as documentation substantially in accordance with section III.A.3 of this policy statement." (52 Fed. Reg. 38,080). Section III.A.3, in turn, is the section that provides guidance on the "Maintenance, Preservation and Documentation of Equipment" for Deferred Plants. Thus, for the purposes of reinstatement, there is no difference between a deferred and terminated plant. In fact, the policy statement specifically states, "If these provisions are implemented throughout the period of termination, a terminated plant may be reactivated under the same provisions as a deferred plant." Id.
Even if somehow this non-existent CP could be recreated to a valid CP in a deferred or terminated status, TVA could not reactivate under the Policy. The Policy provides that a'licensee of a terminated CP that plans to maintain the option of plant reactivation should"[d]evelop and implement a preservation and maintenance program for structures, systems, and components important to safety, as well as documentation substantially in accordance with section III.A.3 of this policy statement." (52 Fed. Reg. 38,080). Section III.A.3, in turn, is the section that provides guidance on the "Maintenance, Preservation and Documentation of Equipment" for Deferred Plants. Thus, for the purposes of reinstatement, there is no difference between a deferred and terminated plant. In fact, the policy statement specifically states, "If these provisions are implemented throughout the period of termination, a terminated plant may be reactivated under the same provisions as a deferred plant." Id.The Policy Statement clearly places emphasis upon the need for a CP, even a terminated CP, to have a quality assurance (QA) program that is of a continuing nature throughout the period of termination.
The Policy Statement clearly places emphasis upon the need for a CP, even a terminated CP, to have a quality assurance (QA) program that is of a continuing nature throughout the period of termination. It does not provide nor does it suggest that an after-the-fact review of QA records can be an adequate substitute for an ongoing quality assurance program. Quality assurance has been recognized as a fundamental aspect of the agency's public health and safety regime.
It does not provide nor does it suggest that an after-the-fact review of QA records can be an adequate substitute for an ongoing quality assurance program. Quality assurance has been recognized as a fundamental aspect of the agency's public health and safety regime.2 When TVA withdrew its construction permit, it no longer had an ongoing quality assurance program that is required pursuant to Part 50 Appendix A, Criterion 1, and Appendix B. Without such a program, there are many unanswered questions, which TVA would need to address if it were to resume construction:
2
which systems and equipment needed maintenance or preservation; what are the effects of environmental stresses since the withdrawal; how effective will a future quality assurance program be in uncovering inadequate construction and maintenance practices, and other factors such as corrosion, cleanliness and deterioration in hindsight.
 
In background information to the Commission for its consideration of the Draft Deferred Policy Statement, the staff expected that not only should the quality assurance program for an extended construction delay be similar to that for active construction, but also additional surveillance would be expected.In the original safety evaluation report reviewing the construction permit application, the staff reported its conclusion that TVA's approach for Bellefonte's quality assurance program was acceptable.
When TVA withdrew its construction permit, it no longer had an ongoing quality assurance program that is required pursuant to Part 50 Appendix A, Criterion 1, and Appendix B. Without such a program, there are many unanswered questions, which TVA would need to address if it were to resume construction: which systems and equipment needed maintenance or preservation; what are the effects of environmental stresses since the withdrawal; how effective will a future quality assurance program be in uncovering inadequate construction and maintenance practices, and other factors such as corrosion, cleanliness and deterioration in hindsight. In background information to the Commission for its consideration of the Draft Deferred Policy Statement, the staff expected that not only should the quality assurance program for an extended construction delay be similar to that for active construction, but also additional surveillance would be expected.
However, during the period since the NRC withdrew the construction permit upon TVA's request, TVA has allowed the site to degrade. During its abandonment of the plants, the NRC ceased inspection activity and thus, the extent of ongoing quality assurance activities  
In the original safety evaluation report reviewing the construction permit application, the staff reported its conclusion that TVA's approach for Bellefonte's quality assurance program was acceptable. However, during the period since the NRC withdrew the construction permit upon TVA's request, TVA has allowed the site to degrade. During its abandonment of the plants, the NRC ceased inspection activity and thus, the extent of ongoing quality assurance activities - if any - is unknown.
-if any -is unknown.To briefly recap history, in 2004, the NRC approved TVA's request to reduce its commitment to the quality assurance program. In return, TVA acknowledged that for equipment that it removed from lay-up, ceased maintenance, preservation and documentation, or abandoned, that it may require replacement prior to reactivation in accordance with. the Policy Statement.
To briefly recap history, in 2004, the NRC approved TVA's request to reduce its commitment to the quality assurance program. In return, TVA acknowledged that for equipment that it removed from lay-up, ceased maintenance, preservation and documentation, or abandoned, that it may require replacement prior to reactivation in accordance with. the Policy Statement. However, an important factor of this agreement was that the QA program would continue. NRC inspection reports document that TVA's deferred maintenance declined from about 19,000 activities in 2002, to about 4,500-5,500 activities in 2005, just prior to TVA withdrawing their construction permit. We also know that when TVA withdrew their permit, they informed us that as of October 1, 2005, all lay-up activities and associated inspections had ceased, and no quality-related activities were on going at Bellefonte. Thus, when TVA decided to discontinue lay-up and quality assurance activities without first obtaining agency approval, they no longer adhered to the Commission's regulations and terms for their construction permits.
However, an important factor of this agreement was that the QA program would continue.
Therefore, the certification and pedigree of any QA system have been lost. Although records may remain, the NRC can no longer be assured of the quality of the equipment since the QA program was halted. The potential that undocumented work activities, introduction of unapproved chemicals, corrosion and other unknown degradation may have occurred calls into question the integrity and reliability of safety related structures, systems and components. It is not a trivial matter to merely resume a quality assurance program and preventative maintenance activities. With Bellefonte, the QA program has become invalidated. The most direct way to restore the program is to vet the QA program through the Part 50 Construction Permit process or the Part 52 COL process to be able to have a more formal and transparent consideration of these issues.
NRC inspection reports document that TVA's deferred maintenance declined from about 19,000 activities in 2002, to about 4,500-5,500 activities in 2005, just prior to TVA withdrawing their construction permit. We also know that when TVA withdrew their permit, they informed us that as of October 1, 2005, all lay-up activities and associated inspections had ceased, and no quality-related activities were on going at Bellefonte.
There are also other substantive differences between the manner in which a CP review pursuant to Part 50 or Part 52, and a "reinstatement" review as outlined by the staff, would operate. First, the burden seems to shift from the applicant to the NRC staff. If TVA were required to submit a CP application pursuant to Part 50, it would then rely upon section 50.12 to request exemptions from regulatory requirements it would now be required to comply with that were not required in 1974. The exemption request is a burden clearly placed upon the applicant to demonstrate. On the other hand, if the reinstatement proceeds as TVA envisions, it would
Thus, when TVA decided to discontinue lay-up and quality assurance activities without first obtaining agency approval, they no longer adhered to the Commission's regulations and terms for their construction permits.Therefore, the certification and pedigree of any QA system have been lost. Although records may remain, the NRC can no longer be assured of the quality of the equipment since the QA program was halted. The potential that undocumented work activities, introduction of unapproved chemicals, corrosion and other unknown degradation may have occurred calls into question the integrity and reliability of safety related structures, systems and components.
 
It is not a trivial matter to merely resume a quality assurance program and preventative maintenance activities.
have to identify the regulations that have been promulgated in the interim, and if the staff wanted to impose any of these regulations on the applicant, it is the staff that would have to justify that such requirement meets the backfit test.
With Bellefonte, the QA program has become invalidated.
The staffs argument seems to be that it can ensure all the safety issues are resolved whether the applicant is required to come in with a CP application pursuant to Part 50 or Part 52, or whether it follows the reinstatement process. While I am very confident in our staff's abilities, I am not convinced that we can be certain that all safety issues will in fact be addressed without the broad and wholesale review required by Part 50 or Part 52. I am also confused as to why we would choose an un-established option that shifts the burden to the staff over an established option that keeps the burden, appropriately, upon the applicant. If the resolution of all safety issues is truly equal under either scenario, then there is no rationale for pursuing the path that inappropriately shifts this burden.
The most direct way to restore the program is to vet the QA program through the Part 50 Construction Permit process or the Part 52 COL process to be able to have a more formal and transparent consideration of these issues.There are also other substantive differences between the manner in which a CP review pursuant to Part 50 or Part 52, and a "reinstatement" review as outlined by the staff, would operate. First, the burden seems to shift from the applicant to the NRC staff. If TVA were required to submit a CP application pursuant to Part 50, it would then rely upon section 50.12 to request exemptions from regulatory requirements it would now be required to comply with that were not required in 1974. The exemption request is a burden clearly placed upon the applicant to demonstrate.
I think it is reasonable to argue that Parts 50 or 52 could accommodate the nuances presented by this application. Both the Part 50 and Part 52 processes offer flexibilities that include allowing the applicant to incorporate by reference any material from the original application that continues to be valid (see sections 50.32 and 52.8(b)), and allowing the applicant to request exemptions for any regulation it now might have to meet that it was not required to meet when it had a CP (see sections 50.12, 51.6, and 52.7). I understand the appropriateness of allowing an applicant to pursue an easier process where one is available. But, here, there is no other process and establishing another process just for this case would essentially render a Commission statement that a valid CP does not have any meaning or utility.
On the other hand, if the reinstatement proceeds as TVA envisions, it would have to identify the regulations that have been promulgated in the interim, and if the staff wanted to impose any of these regulations on the applicant, it is the staff that would have to justify that such requirement meets the backfit test.The staffs argument seems to be that it can ensure all the safety issues are resolved whether the applicant is required to come in with a CP application pursuant to Part 50 or Part 52, or whether it follows the reinstatement process. While I am very confident in our staff's abilities, I am not convinced that we can be certain that all safety issues will in fact be addressed without the broad and wholesale review required by Part 50 or Part 52. I am also confused as to why we would choose an un-established option that shifts the burden to the staff over an established option that keeps the burden, appropriately, upon the applicant.
Moreover, following TVA's requested path sets a precedent that may have many unintended and unanticipated consequences. Conceivably, this action could essentially argue for reinstatement of every other withdrawn license, as there is nothing that clearly distinguishes Bellefonte from any of these other instances. Thus, taking this action opens up an entire line of questions that we are simply not prepared to answer.
If the resolution of all safety issues is truly equal under either scenario, then there is no rationale for pursuing the path that inappropriately shifts this burden.I think it is reasonable to argue that Parts 50 or 52 could accommodate the nuances presented by this application.
It is also obvious that the NRC's requirements concerning deferment and terminated status are far from onerous. The Commission allows licensees to extend its CPs basically indefinitely with relatively minor effort, and yet TVA declined that option. We set the bar basically on the ground and now TVA is asking the NRC to lift them over it. By requesting reinstatement, TVA is asking the Commission to allow licensees to choose when they want to comply with the rules, and when they do not; and is asking the NRC to provide TVA regulatory stability while sacrificing it for others. It was not a significant burden on TVA to continue to request extensions and continue quality assurance activities in accordance with the deferred plant policy statement.
Both the Part 50 and Part 52 processes offer flexibilities that include allowing the applicant to incorporate by reference any material from the original application that continues to be valid (see sections 50.32 and 52.8(b)), and allowing the applicant to request exemptions for any regulation it now might have to meet that it was not required to meet when it had a CP (see sections 50.12, 51.6, and 52.7). I understand the appropriateness of allowing an applicant to pursue an easier process where one is available.
Finally, because I believe that the Commission does not have the authority to raise a forfeited permit from the ashes, and that thus, any "reinstatement" of this permit is essentially granting new CPs, I also believe that the agency is required to hold a hearing on the CPs, including a mandatory portion; and that the agency is required to undertake an Environmental Impact Statement (EIS) as opposed to an EA.
But, here, there is no other process and establishing another process just for this case would essentially render a Commission statement that a valid CP does not have any meaning or utility.Moreover, following TVA's requested path sets a precedent that may have many unintended and unanticipated consequences.
The Atomic Energy Act is clear in its requirement that the granting of a CP include an opportunity for a hearing and a mandatory portion of the hearing. See AEA Sec. 189.a.(1)(A).
Conceivably, this action could essentially argue for reinstatement of every other withdrawn license, as there is nothing that clearly distinguishes Bellefonte from any of these other instances.
Limiting an adjudicatory hearing on reinstatement to only a hearing on determining "good cause" is also shortsighted. All of us, including TVA, would benefit from a complete vetting of this situation which we all acknowledge has no precedent. That vetting simply cannot be complete without a hearing that allows for the issues necessary to capture the singularity of this 4
Thus, taking this action opens up an entire line of questions that we are simply not prepared to answer.It is also obvious that the NRC's requirements concerning deferment and terminated status are far from onerous. The Commission allows licensees to extend its CPs basically indefinitely with relatively minor effort, and yet TVA declined that option. We set the bar basically on the ground and now TVA is asking the NRC to lift them over it. By requesting reinstatement, TVA is asking the Commission to allow licensees to choose when they want to comply with the rules, and when they do not; and is asking the NRC to provide TVA regulatory stability while sacrificing it for others. It was not a significant burden on TVA to continue to request extensions and continue quality assurance activities in accordance with the deferred plant policy statement.
 
Finally, because I believe that the Commission does not have the authority to raise a forfeited permit from the ashes, and that thus, any "reinstatement" of this permit is essentially granting new CPs, I also believe that the agency is required to hold a hearing on the CPs, including a mandatory portion; and that the agency is required to undertake an Environmental Impact Statement (EIS) as opposed to an EA.The Atomic Energy Act is clear in its requirement that the granting of a CP include an opportunity for a hearing and a mandatory portion of the hearing. See AEA Sec. 189.a.(1)(A).
request. Even if we were to assume there was statutory authority allowing us to handle this application differently, to rely upon the fact that an original CP hearing was held in 1974 is not only extremely weak, but that hearing could in no way capture the nuances presented by the current request.
Limiting an adjudicatory hearing on reinstatement to only a hearing on determining "good cause" is also shortsighted.
With respect to the environmental impact statement, the staff proposes performing an environmental assessment instead. But section 51.20(b)(1) of the agency's regulations requires an EIS for issuance of a CP. In addition to the regulatory requirement, there are other reasons to require an EIS here, as well. Although the staff performed an EA the last time the NRC extended the latest date for completion of construction of these CPs, that EA did not address the need for power or alternative energy sources, and the discussion of these topics in the 1974 FES is hopelessly stale. Moreover, these topics need not be addressed in the EIS for the operating licenses, pursuant to Section 51.53(b). A new EIS is the obvious and most direct way for the agency to ensure that the letter and spirit of NEPA is followed.
All of us, including TVA, would benefit from a complete vetting of this situation which we all acknowledge has no precedent.
Ultimately, this is an issue of TVA's creation and one TVA must now fix, not the NRC staff. TVA voluntarily made a business decision to end its CP. Simply wishing it had not done so should not make it so. The agency has established processes that are more than capable of handling the flexibility that may be necessary in reviewing this request and those processes were established with a purpose. There is a path forward for TVA should they choose to comply with agency regulations.
That vetting simply cannot be complete without a hearing that allows for the issues necessary to capture the singularity of this 4 request. Even if we were to assume there was statutory authority allowing us to handle this application differently, to rely upon the fact that an original CP hearing was held in 1974 is not only extremely weak, but that hearing could in no way capture the nuances presented by the current request.With respect to the environmental impact statement, the staff proposes performing an environmental assessment instead. But section 51.20(b)(1) of the agency's regulations requires an EIS for issuance of a CP. In addition to the regulatory requirement, there are other reasons to require an EIS here, as well. Although the staff performed an EA the last time the NRC extended the latest date for completion of construction of these CPs, that EA did not address the need for power or alternative energy sources, and the discussion of these topics in the 1974 FES is hopelessly stale. Moreover, these topics need not be addressed in the EIS for the operating licenses, pursuant to Section 51.53(b).
I want to commend the staff for presenting the Commission their position on reviewing TVA's request for reinstatement. I have no doubt the staff would do an excellent job of reviewing TVA's plans. I also want to commend Joe Williams, the NRC staff reviewer who non-concurred on this staff paper. I am a strong supporter of the non-concurrence program for the reason demonstrated in this instance - the Commission is always best served when the healthy debate surrounding the staffs decision-making is relayed to the Commission transparently. It not only saves the Commission time in recreating similar discussions, but it also informs the Commission, and the public, of just how seriously the NRC staff takes its public health and safety responsibility.
A new EIS is the obvious and most direct way for the agency to ensure that the letter and spirit of NEPA is followed.Ultimately, this is an issue of TVA's creation and one TVA must now fix, not the NRC staff. TVA voluntarily made a business decision to end its CP. Simply wishing it had not done so should not make it so. The agency has established processes that are more than capable of handling the flexibility that may be necessary in reviewing this request and those processes were established with a purpose. There is a path forward for TVA should they choose to comply with agency regulations.
Greýey B. Jaczko       Date 5
I want to commend the staff for presenting the Commission their position on reviewing TVA's request for reinstatement.
 
I have no doubt the staff would do an excellent job of reviewing TVA's plans. I also want to commend Joe Williams, the NRC staff reviewer who non-concurred on this staff paper. I am a strong supporter of the non-concurrence program for the reason demonstrated in this instance -the Commission is always best served when the healthy debate surrounding the staffs decision-making is relayed to the Commission transparently.
RESPONSE SHEET TO:             Annette Vietti-Cook, Secretary FROM:            Commissioner Lyons
It not only saves the Commission time in recreating similar discussions, but it also informs the Commission, and the public, of just how seriously the NRC staff takes its public health and safety responsibility.
Greýey B. Jaczko Date 5 RESPONSE SHEET TO: Annette Vietti-Cook, Secretary Commissioner Lyons FROM:


==SUBJECT:==
==SUBJECT:==
COMSECY-08-0041 -STAFF RECOMMENDATION RELATED TO REINSTATEMENT OF THE CONSTRUCTION PERMITS FOR BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 Approved X in part Not Participating
COMSECY-08-0041 -STAFF RECOMMENDATION RELATED TO REINSTATEMENT OF THE CONSTRUCTION PERMITS FOR BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 Approved X in part           Disapproved  X in part Abstain Not Participating _
_Disapproved X in part Abstain COMMENTS: Below Attached X None 1 / /09 DATE" Entered on "STARS" Yes X No Commissioner Lyons' Comments on COMSECY-08-0041 Staff Recommendation Related to Reinstatement of the Construction Permits for Bellefonte Nuclear Plants I and 2.I approve in part and disapprove in part the staff's recommendation to reinstate the construction permits for Bellefonte Units 1 and 2.I would like to thank the staff for a thorough assessment of this complex issue. I appreciate their efforts. I would also like to note the contribution made by Joseph Williams who, through the Non-Concurrence Process, provided additional thoughts on this issue. The NRC has made a commitment to safety, and the recognition of diverse opinions is a critical component of that commitment.
COMMENTS:         Below       Attached   X   None 1 /     /09 DATE" Entered on "STARS" Yes     X   No
After reviewing the alternatives this issue presents, the staff position that a review of a new construction permit application would largely duplicate the reviews that were conducted previously is well-taken.
 
Thus, I agree with Commissioner Svinicki's comments that the agency can fully accomplish its regulatory role, with no loss of public involvement, through a path that utilizes reinstatement of the construction permits, but to a "terminated plant" status.The reinstatement of the construction permits to "terminated plant" status will allow the licensee to pursue actions that include, but are not limited to, safety reviews, assessments of structures, systems and components, correction of deficiencies, replacement of components, and NRC inspections.
Commissioner Lyons' Comments on COMSECY-08-0041 Staff Recommendation Related to Reinstatement of the Construction Permits for Bellefonte Nuclear Plants I and 2.
These actions should also include the resolution of the ongoing hydrology issues associated with the Bellefonte 3 and 4 COL applications.
I approve in part and disapprove in part the staff's recommendation to reinstate the construction permits for Bellefonte Units 1 and 2.
Because the hydrology issue associated with the Bellefonte 3 and 4 COL applications could impact the entire Bellefonte Site, the impact of this issue on Bellefonte 1 and 2 should be determined prior to returning these units to "deferred plant" status.Additionally, the reinstatement of the construction permits to "terminated plant" status does not in any way pre-judge the outcome of the licensee's evaluations or the NRC's review of the activities necessary to restore "deferred plant" status; rather, it allows the licensee to take the actions necessary to restore Bellefonte 1 and 2 and, if that effort is successfully accomplished, to proceed with construction.
I would like to thank the staff for a thorough assessment of this complex issue. I appreciate their efforts. I would also like to note the contribution made by Joseph Williams who, through the Non-Concurrence Process, provided additional thoughts on this issue. The NRC has made a commitment to safety, and the recognition of diverse opinions is a critical component of that commitment.
The reinstatement of the construction permits to "terminated plant" status does not constitute final Commission approval of the safety of any design feature or specification.
After reviewing the alternatives this issue presents, the staff position that a review of a new construction permit application would largely duplicate the reviews that were conducted previously is well-taken. Thus, I agree with Commissioner Svinicki's comments that the agency can fully accomplish its regulatory role, with no loss of public involvement, through a path that utilizes reinstatement of the construction permits, but to a "terminated plant" status.
With regard to the precedent set by this decision, I believe that this course of action is warranted based on the merits of this situation.
The reinstatement of the construction permits to "terminated plant" status will allow the licensee to pursue actions that include, but are not limited to, safety reviews, assessments of structures, systems and components, correction of deficiencies, replacement of components, and NRC inspections. These actions should also include the resolution of the ongoing hydrology issues associated with the Bellefonte 3 and 4 COL applications. Because the hydrology issue associated with the Bellefonte 3 and 4 COL applications could impact the entire Bellefonte Site, the impact of this issue on Bellefonte 1 and 2 should be determined prior to returning these units to "deferred plant" status.
If similar requests are made, such requests should, likewise, be decided on their individual merits.
Additionally, the reinstatement of the construction permits to "terminated plant" status does not in any way pre-judge the outcome of the licensee's evaluations or the NRC's review of the activities necessary to restore "deferred plant" status; rather, it allows the licensee to take the actions necessary to restore Bellefonte 1 and 2 and, if that effort is successfully accomplished, to proceed with construction. The reinstatement of the construction permits to "terminated plant" status does not constitute final Commission approval of the safety of any design feature or specification.
TO: FROM:  
With regard to the precedent set by this decision, I believe that this course of action is warranted based on the merits of this situation. If similar requests are made, such requests should, likewise, be decided on their individual merits.
 
RESPONSE SHEET TO:             Annette. Vietti-Cook, Secretary FROM:           COMMISSIONER SVINICKI


==SUBJECT:==
==SUBJECT:==
RESPONSE SHEET Annette. Vietti-Cook, Secretary COMMISSIONER SVINICKI COMSECY-08-0041  
COMSECY-08-0041 - STAFF RECOMMENDATION RELATED TO REINSTATEMENT OF THE CONSTRUCTION PERMITS FOR BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 Approved   In-Part     Disapproved    In-Part    Abstain Not Participating COMMENTS:         Beloi       Attached XX None SIU1NATURE I12/&p08 DATE Entered on "STARS" Yes JNo
-STAFF RECOMMENDATION RELATED TO REINSTATEMENT OF THE CONSTRUCTION PERMITS FOR BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 Approved In-Part Not Participating COMMENTS:
 
Beloi Disapproved In-Part Abstain Attached XX None SIU1NATURE I12/&p08 DATE Entered on "STARS" Yes JNo Commissioner Svinicki's Comments on COMSECY-08-0041 Staff Recommendation Related to Reinstatement of the Construction Permits for Bellefonte Nuclear Plant Units 1 and 2 I approve in part and disapprove in part the staff's recommendation to reinstate the construction permits for Bellefonte Units 1 and 2 (CPPR-122 and -123). I propose that the Commission immediately authorize the Director of the Office of Nuclear Reactor Regulation (NRR) to approve the Tennessee Valley Authority (TVA) request to reinstate the construction permits for Bellefonte Units 1 and 2 to terminated plant status and to issue the associated notifications.
Commissioner Svinicki's Comments on COMSECY-08-0041 Staff Recommendation Related to Reinstatement of the Construction Permits for Bellefonte Nuclear Plant Units 1 and 2 I approve in part and disapprove in part the staff's recommendation to reinstate the construction permits for Bellefonte Units 1 and 2 (CPPR-122 and -123). I propose that the Commission immediately authorize the Director of the Office of Nuclear Reactor Regulation (NRR) to approve the Tennessee Valley Authority (TVA) request to reinstate the construction permits for Bellefonte Units 1 and 2 to terminated plant status and to issue the associated notifications. I also propose that the Commission further authorize the Director of NRR to return the Bellefonte units (1, 2, or both) to deferred plant status and resume NRC oversight, but only upon a showing of compliance with the Commission's Policy Statement on Deferred Plants (52 FR 38077, Oct. 14, 1987).
I also propose that the Commission further authorize the Director of NRR to return the Bellefonte units (1, 2, or both) to deferred plant status and resume NRC oversight, but only upon a showing of compliance with the Commission's Policy Statement on Deferred Plants (52 FR 38077, Oct. 14, 1987).The Policy Statement on Deferred Plants defines the meaning of the terms "deferred plant" and"terminated plant" and outlines the procedures to apply to nuclear power plants in such status.Those procedures include the measures to be taken both by construction permit holders and the NRC concerning the physical maintenance of structures and hardware, and also the retention and protection of quality assurance records. The Policy Statement also addresses the applicability of new regulatory requirements that may be implemented during deferral and the processes by which plant construction may be terminated and reactivated.
The Policy Statement on Deferred Plants defines the meaning of the terms "deferred plant" and "terminated plant" and outlines the procedures to apply to nuclear power plants in such status.
As I understand the facts, the relevant history of the Bellafonte Units 1 and 2 construction permits can be briefly summarized as follows:-December 24, 1974, NRC issued Bellefonte construction permits numbered CPPR-122 and-123;-October 14, 1987, NRC issued Policy Statement on Deferred Plants;-July 29, 1988, TVA notified NRC that it placed Bellefonte in deferred plant status;-March 4, 2003, Bellefonte construction permits extended to October 1, 2011 and October 1, 2014;-December 12, 2005, TVA notified NRC that it placed Bellefonte in terminated plant status;-April 6, 2006, TVA requested withdrawal of the Bellefonte construction permits;-September 14, 2006, NRC granted request to withdraw Bellefonte construction permits; and,-August 26, 2008, TVA requested reinstatement of Bellefonte construction permits.Each of the TVA actions after 1987 concerning Bellefonte was in accordance with the Policy Statement on Deferred Plants. TVA's requests for construction permit extensions were timely.Per NRC inspections and audits, Bellefonte programs were properly implemented while in deferred status. TVA's requests to place Bellefonte in terminated plant status and then to withdraw the permits were also in accordance with the Policy Statement.
Those procedures include the measures to be taken both by construction permit holders and the NRC concerning the physical maintenance of structures and hardware, and also the retention and protection of quality assurance records. The Policy Statement also addresses the applicability of new regulatory requirements that may be implemented during deferral and the processes by which plant construction may be terminated and reactivated.
The NRC withdrew the Bellefonte construction permits at TVA's request, and not on a "for cause" basis.The Policy Statement defines a terminated plant as "...a nuclear power plant at which the licensee has announced that construction has been permanently stopped, but which still has a valid construction permit." (52 FR 38078, emphasis added.) Placing the Bellefonte units in terminated plant status, therefore, effectively will result in a limited form of reinstatement.
As I understand the facts, the relevant history of the Bellafonte Units 1 and 2 construction permits can be briefly summarized as follows:
-   December 24, 1974, NRC issued Bellefonte construction permits numbered CPPR-122 and
    -123;
-   October 14, 1987, NRC issued Policy Statement on Deferred Plants;
-   July 29, 1988, TVA notified NRC that it placed Bellefonte in deferred plant status;
-   March 4, 2003, Bellefonte construction permits extended to October 1, 2011 and October 1, 2014;
-   December 12, 2005, TVA notified NRC that it placed Bellefonte in terminated plant status;
-   April 6, 2006, TVA requested withdrawal of the Bellefonte construction permits;
-   September 14, 2006, NRC granted request to withdraw Bellefonte construction permits; and,
-   August 26, 2008, TVA requested reinstatement of Bellefonte construction permits.
Each of the TVA actions after 1987 concerning Bellefonte was in accordance with the Policy Statement on Deferred Plants. TVA's requests for construction permit extensions were timely.
Per NRC inspections and audits, Bellefonte programs were properly implemented while in deferred status. TVA's requests to place Bellefonte in terminated plant status and then to withdraw the permits were also in accordance with the Policy Statement. The NRC withdrew the Bellefonte construction permits at TVA's request, and not on a "for cause" basis.
The Policy Statement defines a terminated plant as "...a nuclear power plant at which the licensee has announced that construction has been permanently stopped, but which still has a valid construction permit." (52 FR 38078, emphasis added.) Placing the Bellefonte units in terminated plant status, therefore, effectively will result in a limited form of reinstatement.
In my view, however, it would be premature to restore Bellefonte all the way to deferred plant status immediately, as defined in that same Policy, Statement which requires, that if a licensee is planning to maintain the option to reactivate a terminated plant, the licensee should:
In my view, however, it would be premature to restore Bellefonte all the way to deferred plant status immediately, as defined in that same Policy, Statement which requires, that if a licensee is planning to maintain the option to reactivate a terminated plant, the licensee should:
Develop and implement a preservation and maintenance program for structures, systems, and components important to safety, as well as documentation substantially in accordance with section III.A.3 of this policy statement.
 
If these provisions are implemented throughout the period of termination, a terminated plant may be reactivated under the same provisions as a deferred plant.In the instant case, the licensee developed and implemented programs at Bellefonte consistent with the 1987 Policy Statement but, per the licensee's December 12, 2005 submittal, those programs ceased after October 1, 2005. Absent contemporary NRC on-site inspections of structures, systems, and components important to safety, and reviews of quality assurance records, there presently exists no evidentiary basis to support placing Bellefonte in deferred plant status. Reinstating the Bellefonte construction permits to deferred plant status prior to establishing this basis would circumvent the Policy Statement and, arguably, render meaningless the programs necessary for maintaining deferred plant status.In this uncharted territory, the Commission is well-advised to ensure that its chosen path is clearly articulated and grounded in a reasonable interpretation of its statutory authority under the Atomic Energy Act. As I see it, but for TVA's request to withdraw, the permits in question would be valid today and Bellefonte could be in terminated plant status. This does not lead me to conclude, however, that we should allow TVA to jump immediately to deferred plant status without a demonstration that Bellefonte satisfies what we would have required under the Policy Statement for it to maintain deferred status had the construction permit not been terminated and withdrawn.
Develop and implement a preservation and maintenance program for structures, systems, and components important to safety, as well as documentation substantially in accordance with section III.A.3 of this policy statement. If these provisions are implemented throughout the period of termination, a terminated plant may be reactivated under the same provisions as a deferred plant.
Should physical deficiencies be identified, such as hardware requiring replacement or records requiring reconstitution, I propose that TVA will need to address those items to staff's satisfaction.
In the instant case, the licensee developed and implemented programs at Bellefonte consistent with the 1987 Policy Statement but, per the licensee's December 12, 2005 submittal, those programs ceased after October 1, 2005. Absent contemporary NRC on-site inspections of structures, systems, and components important to safety, and reviews of quality assurance records, there presently exists no evidentiary basis to support placing Bellefonte in deferred plant status. Reinstating the Bellefonte construction permits to deferred plant status prior to establishing this basis would circumvent the Policy Statement and, arguably, render meaningless the programs necessary for maintaining deferred plant status.
In addition, before going forward, TVA must demonstrate that the necessary programs -such as quality assurance  
In this uncharted territory, the Commission is well-advised to ensure that its chosen path is clearly articulated and grounded in a reasonable interpretation of its statutory authority under the Atomic Energy Act. As I see it, but for TVA's request to withdraw, the permits in question would be valid today and Bellefonte could be in terminated plant status. This does not lead me to conclude, however, that we should allow TVA to jump immediately to deferred plant status without a demonstration that Bellefonte satisfies what we would have required under the Policy Statement for it to maintain deferred status had the construction permit not been terminated and withdrawn.
-have been implemented.
Should physical deficiencies be identified, such as hardware requiring replacement or records requiring reconstitution, I propose that TVA will need to address those items to staff's satisfaction. In addition, before going forward, TVA must demonstrate that the necessary programs - such as quality assurance - have been implemented. If on-site inspections confirm that TVA has adequately identified and addressed deficiencies, and implemented the programs necessary for a licensee to maintain deferred plant status under the Policy Statement, the Director of NRR should then place Bellefonte in deferred plant status and resume NRC oversight.
If on-site inspections confirm that TVA has adequately identified and addressed deficiencies, and implemented the programs necessary for a licensee to maintain deferred plant status under the Policy Statement, the Director of NRR should then place Bellefonte in deferred plant status and resume NRC oversight.
Finally, the basis for the agency's actions in this procedurally unique situation must be well-reasoned and thoroughly discussed. To further this goal, public participation in the reinstatement process is not only appropriate, it is vital. I therefore support staff's recommendation that a notice of opportunity for hearing be published in association with reinstatement of the Bellefonte construction permits, and that the scope of the hearing be limited to whether good cause exists for the reinstatement. If TVA decides to pursue an operating license, further hearing rights on safety and environmental matters could be permitted at that time.}}
Finally, the basis for the agency's actions in this procedurally unique situation must be well-reasoned and thoroughly discussed.
To further this goal, public participation in the reinstatement process is not only appropriate, it is vital. I therefore support staff's recommendation that a notice of opportunity for hearing be published in association with reinstatement of the Bellefonte construction permits, and that the scope of the hearing be limited to whether good cause exists for the reinstatement.
If TVA decides to pursue an operating license, further hearing rights on safety and environmental matters could be permitted at that time.}}

Latest revision as of 08:48, 14 November 2019

VR-COMSECY-08-0041 - Staff Recommendation Related to Reinstatement of the Construction Permits for Bellefonte Nuclear Plant Units 1 and 2
ML090500374
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 02/18/2009
From: Jaczko G, Klein D, Peter B. Lyons, Kristine Svinicki
NRC/Chairman, NRC/OCM, NRC/SECY
To:
References
COMSECY-08-0041 VR-COMSECY-08-0041
Download: ML090500374 (13)


Text

-4.

RESPONSE SHEET TO: Annette Vietti-Cook, Secretary FROM: CHAIRMAN KLEIN

SUBJECT:

COMSECY-08-0041 -STAFF RECOMMENDATION RELATED TO REINSTATEMENT OF THE CONSTRUCTION PERMITS FOR BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 Approved xx Disapproved xx Abstain Not Participating _

COMMENTS: Below Attached Xx None

~4/Lc~Q SIGNATURE

/5/o 5I DATE Entered on "STARS" Yes !J--No ___

Chairman Klein's Comments on COMSECY-08-0041 STAFF RECOMMENDATION RELATED TO REINSTATEMENT OF THE CONSTRUCTION PERMITS OF BELLEFONTE NUCLEAR PLANT UNITS I AND 2 I would like to thank the staff for providing this insightful paper to assist the Commission in making an informed decision regarding TVA's request for reinstatement of the Bellefonte construction permits (CP). Based upon my review, I approve the staff's request to proceed with the review of TVA's request, and I approve the reinstatement of the CPs if the staff concludes that TVA's request is acceptable. However, I disapprove the proposal for concurrent placement of the facility in a deferred plant status; instead, I support the sequential approach for placing the facility in a deferred plant status, as proposed by Commissioner Svinicki.

By letter dated August 26, 2008, supplemented on September 25, 2008, TVA requested that the CPs for Bellefonte Units 1 and 2 be reinstated, to allow the return of the plants to deferred status and resume preservation and maintenance activities. TVA stated that this would allow them to determine whether completion of construction and operation of the units would be a viable option.

The staff, in COMSECY-08-0041, requests Commission authorization to review and take action on TVA's request. As proposed, if the staff were to find the request acceptable, it would prepare an order reinstating the construction permits with the concurrent placement of the facility in a deferred plant status.

I believe that the chronology of the staff's proposed path forward is problematic. If the staff were to find TVA's request acceptable, an order would be issued reinstating the construction permits with the concurrent placement of the facility in a deferred plant status. The Commission Policy Statement on Deferred Plants (52 FR 38007, October 14, 1987) defines a "deferred plant" as a nuclear power plant at which the licensee has ceased construction or reduced activity to a maintenance level, maintains the CP in effect and has not announced termination of the plant. Obviously, the licensee did not maintain the CPs in effect, and secondly, the licensee informed the NRC in 2005 that the facility was in a terminated plant status. More importantly, however, is the fact that Section III.A.3 of the Commission Policy Statement on Deferred Plants, "Maintenance, Preservation and Documentation of Equipment" describes requirements for verification of construction status, retention of records and maintenance and preservation of equipment and materials. TVA informed the NRC in 2005 that project completion activities, including maintenance and preservation of equipment and materials had ceased after October 1, 2005. Thus, placement of the facility in deferred status concurrent with reinstating the CPs would not be consistent with the Commission Policy Statement.

Therefore, as an alternative, if the request is found acceptable, the staff should issue an order reinstating the construction permits, which to my understanding will de facto place the facility in "terminated status" as defined in the Commission Policy Statement on Deferred Plants. If TVA, chooses to pursue a deferred plant status, it should be required, as a condition of the order, to take all necessary actions to place the facility in a deferred plant status, consistent with the Commission Policy Statement on Deferred Plants. After those actions have been satisfactorily accomplished and verified by the NRC staff, the Director of NRR has the authority to place the facility in a deferred plant status.

l1/1/D 9 D:ale Klein Date

RESPONSE SHEET TO: Annette Vietti-Cook, Secretary FROM: COMMISSIONER JACZKO

SUBJECT:

COMSECY-08-0041 - STAFF RECOMMENDATION RELATED TO REINSTATEMENT OF THE CONSTRUCTION PERMITS FOR BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 Approved E)isapproved X Abstain Not Participating _

COMMENTS: Below Attached X None SIdWATURE DATE Entered on "STARS" Yes X No

Commissioner Jaczko's Vote on COMSECY-08-0041 Staff Recommendation Related To Reinstatement of the Construction Permits for Bellefonte Nuclear Plant Units 1 and 2 I disapprove of TVA's request to reinstate its construction permits for the Bellefonte Nuclear Plant (BLN) Units 1 and 2.

Currently, TVA does not hold a license for Bellefonte Units 1 or 2. This is a fact; an inconvenient fact, but a fact nonetheless. TVA asked for a withdrawal of the construction permits (CPs) in a letter dated April 6, 2006, and was granted the withdrawal of those permits on September 14, 2006. Since the date of withdrawal, valid CPs for Bellefonte Units 1 and 2 thus ceased to exist. Thus, TVA was not subject to any jurisdiction or authority of the NRC for Bellefonte Units 1 and 2. Even TVA itself acknowledges that it is no longer in possession of a valid CP by its very request for the NRC to give them CPs. There is an obvious and easily applied litmus test for this situation, could TVA do any NRC-related activities at the site today; does TVA have any obligations to the NRC related to the site today; and could the NRC require TVA to do anything at the site today or enforce against them if they do not? The answer to each of these questions is clearly "no" and thus, today TVA clearly does not hold any permits for these units.

But while no one is denying the existence of this fact, we appear to want to deny the consequences of it. Without permits, TVA is required by the Atomic Energy Act and by the NRC's implementing regulations to apply for a construction permit and to submit an application that satisfies Part 50 or Part 52 requirements. To say otherwise - to say that a withdrawal does not matter - is saying that not having a permit for over two years is the same as having had a permit for those two years. Certainly, a regulatory agency should, at a minimum, defend its regulations and the need for them. Instead, "reinstating" a non-existent CP clearly does the opposite.

Moreover, there is an inherent danger in ignoring this obvious fact. Licenses exist for a purpose. We use them to fulfill our statutory mandate of protecting the public health and safety.

Granting, granting subject to conditions, or denying licenses is one of our most fundamental regulatory purposes. Yet, rather than recognize that the withdrawn CPs at some point held value, we are now diminishing the value of all CPs.

In order to ensure the public health and safety is protected, the agency established a review process for CP applications embodied in Part 50 of the agency's regulations. Those regulations, developed through a formal public rulemaking process, established the regulatory process the agency determined was necessary to ensure public health and safety; and it is upon those regulations that TVA is now required to rely. Regardless of what TVA chooses to call its request, for NRC purposes, its request is an application; and it is an application that fails to meet our regulatory requirements for construction permitapplications. The appropriate response to TVA, therefore, should have been for the agency to reject the request because it failed to meet the necessary regulatory requirements. When interested members of the public request a hearing, we reject any request that does not satisfy our Part 2 standards that govern hearings. I expect potential licensees to be held to those same standards.

TVA's request would have us contemplate a novel and ad hoc process that follows neither the Commission's Policy Statement on Deferred Plants (52 Fed. Reg. 38,077, Oct. 14, 1987) nor the agency's regulations. The Policy Statement establishes a policy for utilities with CPs that

allows them to continue to maintain their permits, but to delay or terminate construction activities. The Policy Statement provides a framework for plants with CPs in a deferred or terminated status to seek reactivation of their CP. But these facilities continue to have permits.

The Policy Statement clearly defines a terminated plant as, "a nuclear power plant at which the licensee has announced that construction has been permanently stopped, but which still has a valid CP."

During their consideration of the Policy Statement, the Commission considered this to be an important point. In their approval of the Policy Statement, the Commission specifically revised the policy to ensure the Commission maintained appropriate oversight of a CP holder that requested terminated status until the license was withdrawn, even if that meant extending the CP expiration date. Specifically, for plant termination the Policy states, "A licensee should inform the Director of NRR when a plant is placed in terminated status., In the event that withdrawal of a CP is sought, the permit holder should provide notice to the NRC staff sufficiently far in advance of the expiration of the CP to permit the staff to determine appropriate terms and conditions. If necessary, a brief extension of the CP may be ordered by the staff to accommodate these determinations. Until withdrawal of the CP is authorized, a permit holder must adhere to the Commission's regulations and the terms of the CP and should submit suitable plans for the termination of site activities, including redress, as provided for under 10 CFR 51.41, for staff approval." (52 Fed. Reg. 38,079)

Thus, the policy contemplates an end for the license when there is no longer a need for continued NRC oversight, just as it retains the need for continuing NRC oversight when there is no end. The policy clearly contemplates continued NRC oversight where a license is placed in deferred or terminated status because the policy makes clear that CP holders in either a deferred or terminated status continue to hold valid construction permits. Under the policy statement, a holder of a CP can request its permit be placed in deferred status and a valid CP with continuing obligations that NRC can both require and enforce. A CP holder can move from a deferred status to a terminated status, which again retains the validity of the CP and places continuing obligations on the holder of the permit that NRC can both require and enforce. The next step, should a permit holder choose to continue down the path, is that of a withdrawal of a CP. Once a CP is withdrawn, no valid CP exists and there are no continuing NRC obligations or continuing NRC authority for NRC enforcement.

Even if somehow this non-existent CP could be recreated to a valid CP in a deferred or terminated status, TVA could not reactivate under the Policy. The Policy provides that a' licensee of a terminated CP that plans to maintain the option of plant reactivation should

"[d]evelop and implement a preservation and maintenance program for structures, systems, and components important to safety, as well as documentation substantially in accordance with section III.A.3 of this policy statement." (52 Fed. Reg. 38,080).Section III.A.3, in turn, is the section that provides guidance on the "Maintenance, Preservation and Documentation of Equipment" for Deferred Plants. Thus, for the purposes of reinstatement, there is no difference between a deferred and terminated plant. In fact, the policy statement specifically states, "If these provisions are implemented throughout the period of termination, a terminated plant may be reactivated under the same provisions as a deferred plant." Id.

The Policy Statement clearly places emphasis upon the need for a CP, even a terminated CP, to have a quality assurance (QA) program that is of a continuing nature throughout the period of termination. It does not provide nor does it suggest that an after-the-fact review of QA records can be an adequate substitute for an ongoing quality assurance program. Quality assurance has been recognized as a fundamental aspect of the agency's public health and safety regime.

2

When TVA withdrew its construction permit, it no longer had an ongoing quality assurance program that is required pursuant to Part 50 Appendix A, Criterion 1, and Appendix B. Without such a program, there are many unanswered questions, which TVA would need to address if it were to resume construction: which systems and equipment needed maintenance or preservation; what are the effects of environmental stresses since the withdrawal; how effective will a future quality assurance program be in uncovering inadequate construction and maintenance practices, and other factors such as corrosion, cleanliness and deterioration in hindsight. In background information to the Commission for its consideration of the Draft Deferred Policy Statement, the staff expected that not only should the quality assurance program for an extended construction delay be similar to that for active construction, but also additional surveillance would be expected.

In the original safety evaluation report reviewing the construction permit application, the staff reported its conclusion that TVA's approach for Bellefonte's quality assurance program was acceptable. However, during the period since the NRC withdrew the construction permit upon TVA's request, TVA has allowed the site to degrade. During its abandonment of the plants, the NRC ceased inspection activity and thus, the extent of ongoing quality assurance activities - if any - is unknown.

To briefly recap history, in 2004, the NRC approved TVA's request to reduce its commitment to the quality assurance program. In return, TVA acknowledged that for equipment that it removed from lay-up, ceased maintenance, preservation and documentation, or abandoned, that it may require replacement prior to reactivation in accordance with. the Policy Statement. However, an important factor of this agreement was that the QA program would continue. NRC inspection reports document that TVA's deferred maintenance declined from about 19,000 activities in 2002, to about 4,500-5,500 activities in 2005, just prior to TVA withdrawing their construction permit. We also know that when TVA withdrew their permit, they informed us that as of October 1, 2005, all lay-up activities and associated inspections had ceased, and no quality-related activities were on going at Bellefonte. Thus, when TVA decided to discontinue lay-up and quality assurance activities without first obtaining agency approval, they no longer adhered to the Commission's regulations and terms for their construction permits.

Therefore, the certification and pedigree of any QA system have been lost. Although records may remain, the NRC can no longer be assured of the quality of the equipment since the QA program was halted. The potential that undocumented work activities, introduction of unapproved chemicals, corrosion and other unknown degradation may have occurred calls into question the integrity and reliability of safety related structures, systems and components. It is not a trivial matter to merely resume a quality assurance program and preventative maintenance activities. With Bellefonte, the QA program has become invalidated. The most direct way to restore the program is to vet the QA program through the Part 50 Construction Permit process or the Part 52 COL process to be able to have a more formal and transparent consideration of these issues.

There are also other substantive differences between the manner in which a CP review pursuant to Part 50 or Part 52, and a "reinstatement" review as outlined by the staff, would operate. First, the burden seems to shift from the applicant to the NRC staff. If TVA were required to submit a CP application pursuant to Part 50, it would then rely upon section 50.12 to request exemptions from regulatory requirements it would now be required to comply with that were not required in 1974. The exemption request is a burden clearly placed upon the applicant to demonstrate. On the other hand, if the reinstatement proceeds as TVA envisions, it would

have to identify the regulations that have been promulgated in the interim, and if the staff wanted to impose any of these regulations on the applicant, it is the staff that would have to justify that such requirement meets the backfit test.

The staffs argument seems to be that it can ensure all the safety issues are resolved whether the applicant is required to come in with a CP application pursuant to Part 50 or Part 52, or whether it follows the reinstatement process. While I am very confident in our staff's abilities, I am not convinced that we can be certain that all safety issues will in fact be addressed without the broad and wholesale review required by Part 50 or Part 52. I am also confused as to why we would choose an un-established option that shifts the burden to the staff over an established option that keeps the burden, appropriately, upon the applicant. If the resolution of all safety issues is truly equal under either scenario, then there is no rationale for pursuing the path that inappropriately shifts this burden.

I think it is reasonable to argue that Parts 50 or 52 could accommodate the nuances presented by this application. Both the Part 50 and Part 52 processes offer flexibilities that include allowing the applicant to incorporate by reference any material from the original application that continues to be valid (see sections 50.32 and 52.8(b)), and allowing the applicant to request exemptions for any regulation it now might have to meet that it was not required to meet when it had a CP (see sections 50.12, 51.6, and 52.7). I understand the appropriateness of allowing an applicant to pursue an easier process where one is available. But, here, there is no other process and establishing another process just for this case would essentially render a Commission statement that a valid CP does not have any meaning or utility.

Moreover, following TVA's requested path sets a precedent that may have many unintended and unanticipated consequences. Conceivably, this action could essentially argue for reinstatement of every other withdrawn license, as there is nothing that clearly distinguishes Bellefonte from any of these other instances. Thus, taking this action opens up an entire line of questions that we are simply not prepared to answer.

It is also obvious that the NRC's requirements concerning deferment and terminated status are far from onerous. The Commission allows licensees to extend its CPs basically indefinitely with relatively minor effort, and yet TVA declined that option. We set the bar basically on the ground and now TVA is asking the NRC to lift them over it. By requesting reinstatement, TVA is asking the Commission to allow licensees to choose when they want to comply with the rules, and when they do not; and is asking the NRC to provide TVA regulatory stability while sacrificing it for others. It was not a significant burden on TVA to continue to request extensions and continue quality assurance activities in accordance with the deferred plant policy statement.

Finally, because I believe that the Commission does not have the authority to raise a forfeited permit from the ashes, and that thus, any "reinstatement" of this permit is essentially granting new CPs, I also believe that the agency is required to hold a hearing on the CPs, including a mandatory portion; and that the agency is required to undertake an Environmental Impact Statement (EIS) as opposed to an EA.

The Atomic Energy Act is clear in its requirement that the granting of a CP include an opportunity for a hearing and a mandatory portion of the hearing. See AEA Sec. 189.a.(1)(A).

Limiting an adjudicatory hearing on reinstatement to only a hearing on determining "good cause" is also shortsighted. All of us, including TVA, would benefit from a complete vetting of this situation which we all acknowledge has no precedent. That vetting simply cannot be complete without a hearing that allows for the issues necessary to capture the singularity of this 4

request. Even if we were to assume there was statutory authority allowing us to handle this application differently, to rely upon the fact that an original CP hearing was held in 1974 is not only extremely weak, but that hearing could in no way capture the nuances presented by the current request.

With respect to the environmental impact statement, the staff proposes performing an environmental assessment instead. But section 51.20(b)(1) of the agency's regulations requires an EIS for issuance of a CP. In addition to the regulatory requirement, there are other reasons to require an EIS here, as well. Although the staff performed an EA the last time the NRC extended the latest date for completion of construction of these CPs, that EA did not address the need for power or alternative energy sources, and the discussion of these topics in the 1974 FES is hopelessly stale. Moreover, these topics need not be addressed in the EIS for the operating licenses, pursuant to Section 51.53(b). A new EIS is the obvious and most direct way for the agency to ensure that the letter and spirit of NEPA is followed.

Ultimately, this is an issue of TVA's creation and one TVA must now fix, not the NRC staff. TVA voluntarily made a business decision to end its CP. Simply wishing it had not done so should not make it so. The agency has established processes that are more than capable of handling the flexibility that may be necessary in reviewing this request and those processes were established with a purpose. There is a path forward for TVA should they choose to comply with agency regulations.

I want to commend the staff for presenting the Commission their position on reviewing TVA's request for reinstatement. I have no doubt the staff would do an excellent job of reviewing TVA's plans. I also want to commend Joe Williams, the NRC staff reviewer who non-concurred on this staff paper. I am a strong supporter of the non-concurrence program for the reason demonstrated in this instance - the Commission is always best served when the healthy debate surrounding the staffs decision-making is relayed to the Commission transparently. It not only saves the Commission time in recreating similar discussions, but it also informs the Commission, and the public, of just how seriously the NRC staff takes its public health and safety responsibility.

Greýey B. Jaczko Date 5

RESPONSE SHEET TO: Annette Vietti-Cook, Secretary FROM: Commissioner Lyons

SUBJECT:

COMSECY-08-0041 -STAFF RECOMMENDATION RELATED TO REINSTATEMENT OF THE CONSTRUCTION PERMITS FOR BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 Approved X in part Disapproved X in part Abstain Not Participating _

COMMENTS: Below Attached X None 1 / /09 DATE" Entered on "STARS" Yes X No

Commissioner Lyons' Comments on COMSECY-08-0041 Staff Recommendation Related to Reinstatement of the Construction Permits for Bellefonte Nuclear Plants I and 2.

I approve in part and disapprove in part the staff's recommendation to reinstate the construction permits for Bellefonte Units 1 and 2.

I would like to thank the staff for a thorough assessment of this complex issue. I appreciate their efforts. I would also like to note the contribution made by Joseph Williams who, through the Non-Concurrence Process, provided additional thoughts on this issue. The NRC has made a commitment to safety, and the recognition of diverse opinions is a critical component of that commitment.

After reviewing the alternatives this issue presents, the staff position that a review of a new construction permit application would largely duplicate the reviews that were conducted previously is well-taken. Thus, I agree with Commissioner Svinicki's comments that the agency can fully accomplish its regulatory role, with no loss of public involvement, through a path that utilizes reinstatement of the construction permits, but to a "terminated plant" status.

The reinstatement of the construction permits to "terminated plant" status will allow the licensee to pursue actions that include, but are not limited to, safety reviews, assessments of structures, systems and components, correction of deficiencies, replacement of components, and NRC inspections. These actions should also include the resolution of the ongoing hydrology issues associated with the Bellefonte 3 and 4 COL applications. Because the hydrology issue associated with the Bellefonte 3 and 4 COL applications could impact the entire Bellefonte Site, the impact of this issue on Bellefonte 1 and 2 should be determined prior to returning these units to "deferred plant" status.

Additionally, the reinstatement of the construction permits to "terminated plant" status does not in any way pre-judge the outcome of the licensee's evaluations or the NRC's review of the activities necessary to restore "deferred plant" status; rather, it allows the licensee to take the actions necessary to restore Bellefonte 1 and 2 and, if that effort is successfully accomplished, to proceed with construction. The reinstatement of the construction permits to "terminated plant" status does not constitute final Commission approval of the safety of any design feature or specification.

With regard to the precedent set by this decision, I believe that this course of action is warranted based on the merits of this situation. If similar requests are made, such requests should, likewise, be decided on their individual merits.

RESPONSE SHEET TO: Annette. Vietti-Cook, Secretary FROM: COMMISSIONER SVINICKI

SUBJECT:

COMSECY-08-0041 - STAFF RECOMMENDATION RELATED TO REINSTATEMENT OF THE CONSTRUCTION PERMITS FOR BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 Approved In-Part Disapproved In-Part Abstain Not Participating COMMENTS: Beloi Attached XX None SIU1NATURE I12/&p08 DATE Entered on "STARS" Yes JNo

Commissioner Svinicki's Comments on COMSECY-08-0041 Staff Recommendation Related to Reinstatement of the Construction Permits for Bellefonte Nuclear Plant Units 1 and 2 I approve in part and disapprove in part the staff's recommendation to reinstate the construction permits for Bellefonte Units 1 and 2 (CPPR-122 and -123). I propose that the Commission immediately authorize the Director of the Office of Nuclear Reactor Regulation (NRR) to approve the Tennessee Valley Authority (TVA) request to reinstate the construction permits for Bellefonte Units 1 and 2 to terminated plant status and to issue the associated notifications. I also propose that the Commission further authorize the Director of NRR to return the Bellefonte units (1, 2, or both) to deferred plant status and resume NRC oversight, but only upon a showing of compliance with the Commission's Policy Statement on Deferred Plants (52 FR 38077, Oct. 14, 1987).

The Policy Statement on Deferred Plants defines the meaning of the terms "deferred plant" and "terminated plant" and outlines the procedures to apply to nuclear power plants in such status.

Those procedures include the measures to be taken both by construction permit holders and the NRC concerning the physical maintenance of structures and hardware, and also the retention and protection of quality assurance records. The Policy Statement also addresses the applicability of new regulatory requirements that may be implemented during deferral and the processes by which plant construction may be terminated and reactivated.

As I understand the facts, the relevant history of the Bellafonte Units 1 and 2 construction permits can be briefly summarized as follows:

- December 24, 1974, NRC issued Bellefonte construction permits numbered CPPR-122 and

-123;

- October 14, 1987, NRC issued Policy Statement on Deferred Plants;

- July 29, 1988, TVA notified NRC that it placed Bellefonte in deferred plant status;

- March 4, 2003, Bellefonte construction permits extended to October 1, 2011 and October 1, 2014;

- December 12, 2005, TVA notified NRC that it placed Bellefonte in terminated plant status;

- April 6, 2006, TVA requested withdrawal of the Bellefonte construction permits;

- September 14, 2006, NRC granted request to withdraw Bellefonte construction permits; and,

- August 26, 2008, TVA requested reinstatement of Bellefonte construction permits.

Each of the TVA actions after 1987 concerning Bellefonte was in accordance with the Policy Statement on Deferred Plants. TVA's requests for construction permit extensions were timely.

Per NRC inspections and audits, Bellefonte programs were properly implemented while in deferred status. TVA's requests to place Bellefonte in terminated plant status and then to withdraw the permits were also in accordance with the Policy Statement. The NRC withdrew the Bellefonte construction permits at TVA's request, and not on a "for cause" basis.

The Policy Statement defines a terminated plant as "...a nuclear power plant at which the licensee has announced that construction has been permanently stopped, but which still has a valid construction permit." (52 FR 38078, emphasis added.) Placing the Bellefonte units in terminated plant status, therefore, effectively will result in a limited form of reinstatement.

In my view, however, it would be premature to restore Bellefonte all the way to deferred plant status immediately, as defined in that same Policy, Statement which requires, that if a licensee is planning to maintain the option to reactivate a terminated plant, the licensee should:

Develop and implement a preservation and maintenance program for structures, systems, and components important to safety, as well as documentation substantially in accordance with section III.A.3 of this policy statement. If these provisions are implemented throughout the period of termination, a terminated plant may be reactivated under the same provisions as a deferred plant.

In the instant case, the licensee developed and implemented programs at Bellefonte consistent with the 1987 Policy Statement but, per the licensee's December 12, 2005 submittal, those programs ceased after October 1, 2005. Absent contemporary NRC on-site inspections of structures, systems, and components important to safety, and reviews of quality assurance records, there presently exists no evidentiary basis to support placing Bellefonte in deferred plant status. Reinstating the Bellefonte construction permits to deferred plant status prior to establishing this basis would circumvent the Policy Statement and, arguably, render meaningless the programs necessary for maintaining deferred plant status.

In this uncharted territory, the Commission is well-advised to ensure that its chosen path is clearly articulated and grounded in a reasonable interpretation of its statutory authority under the Atomic Energy Act. As I see it, but for TVA's request to withdraw, the permits in question would be valid today and Bellefonte could be in terminated plant status. This does not lead me to conclude, however, that we should allow TVA to jump immediately to deferred plant status without a demonstration that Bellefonte satisfies what we would have required under the Policy Statement for it to maintain deferred status had the construction permit not been terminated and withdrawn.

Should physical deficiencies be identified, such as hardware requiring replacement or records requiring reconstitution, I propose that TVA will need to address those items to staff's satisfaction. In addition, before going forward, TVA must demonstrate that the necessary programs - such as quality assurance - have been implemented. If on-site inspections confirm that TVA has adequately identified and addressed deficiencies, and implemented the programs necessary for a licensee to maintain deferred plant status under the Policy Statement, the Director of NRR should then place Bellefonte in deferred plant status and resume NRC oversight.

Finally, the basis for the agency's actions in this procedurally unique situation must be well-reasoned and thoroughly discussed. To further this goal, public participation in the reinstatement process is not only appropriate, it is vital. I therefore support staff's recommendation that a notice of opportunity for hearing be published in association with reinstatement of the Bellefonte construction permits, and that the scope of the hearing be limited to whether good cause exists for the reinstatement. If TVA decides to pursue an operating license, further hearing rights on safety and environmental matters could be permitted at that time.