ML18088A068: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 03/29/2018 | | issue date = 03/29/2018 | ||
| title = Periodic Review Memo | | title = Periodic Review Memo | ||
| author name = Boyce T | | author name = Boyce T | ||
| author affiliation = NRC/RES/DE/RGDB | | author affiliation = NRC/RES/DE/RGDB | ||
| addressee name = Thomas B | | addressee name = Thomas B | ||
| addressee affiliation = NRC/RES/DE | | addressee affiliation = NRC/RES/DE | ||
| docket = | | docket = | ||
| license number = | | license number = | ||
| contact person = O'Donnell E | | contact person = O'Donnell E | ||
| case reference number = RG-1.143, Rev 2 | | case reference number = RG-1.143, Rev 2 | ||
| package number = ML18088A064 | | package number = ML18088A064 | ||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 29, 2018 | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 29, 2018 MEMORANDUM TO: Brian E. Thomas, Director Division of Engineering Office of Nuclear Regulatory Research FROM: Thomas H. Boyce, Chief /RA/ | ||
Regulatory Guidance and Generic Issues Branch Division of Engineering Office of Nuclear Regulatory Research | |||
MEMORANDUM TO: | |||
/RA/ | |||
==SUBJECT:== | ==SUBJECT:== | ||
RESULTS OF PERIODIC REVIEW OF REGULATORY GUIDE (RG) 1.143, Revision 2 | RESULTS OF PERIODIC REVIEW OF REGULATORY GUIDE (RG) 1.143, Revision 2 This memorandum documents the US Nuclear Regulatory Commission (NRC) periodic review of regulatory guide (RG) 1.143, Revision 2, Design Guidelines for Radioactive Waste Management Systems, Structures and Components installed in Light Water-Cooled Nuclear Power Plants. | ||
The RG, which was last revised in 2001, describes methods that NRC staff considers acceptable for complying with the NRCs regulations in the design, construction, installation, and testing of the structures, systems, and components of radioactive waste management facilities in lightwater-reactor nuclear power plants. As discussed in Management Directive 6. 6 Regulatory Guides, the NRC staff reviews regulatory guides approximately every 10 years to ensure that the guides continue to provide useful guidance. | |||
Based on the results of the periodic review, the staff concludes that a revision to RG 1.143, Revision 2, is warranted. The revision would begin with development and implementation of a plan to update by the first quarter of FY 2020. Completion is projected to be achieved in the third quarter of FY 2020. Following internal processing in NRC the staff expects to release a draft RG for public comment in the fourth quarter of FY 2020. | |||
CONTACT: Edward Stutzcage, NRO/DSEA/RPAC 301-415-5345 | |||
==Enclosure:== | |||
As Stated | |||
As Stated | |||
ML18088A064}} | ML18088A064 OFFICE RES/DE/RGGIB RES/DE/RGGIB SUNSI Review NRO/DSEA/RPAC NRO/DSEA/RPAC RES/DE/RGGIB NAME J. Parks E. ODonnell E. ODonnell E. Stutzcage M. Dudek T. Boyce DATE 3/ 29 /18 3/ 28 /18 3/ 28 /18 3/ 26 /18 3 /26 /18 3/ 29 /18}} |
Latest revision as of 12:56, 21 October 2019
ML18088A068 | |
Person / Time | |
---|---|
Issue date: | 03/29/2018 |
From: | Boyce T NRC/RES/DE/RGDB |
To: | Bernard Thomas NRC/RES/DE |
O'Donnell E | |
Shared Package | |
ML18088A064 | List: |
References | |
RG-1.143, Rev 2 | |
Download: ML18088A068 (2) | |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 March 29, 2018 MEMORANDUM TO: Brian E. Thomas, Director Division of Engineering Office of Nuclear Regulatory Research FROM: Thomas H. Boyce, Chief /RA/
Regulatory Guidance and Generic Issues Branch Division of Engineering Office of Nuclear Regulatory Research
SUBJECT:
RESULTS OF PERIODIC REVIEW OF REGULATORY GUIDE (RG) 1.143, Revision 2 This memorandum documents the US Nuclear Regulatory Commission (NRC) periodic review of regulatory guide (RG) 1.143, Revision 2, Design Guidelines for Radioactive Waste Management Systems, Structures and Components installed in Light Water-Cooled Nuclear Power Plants.
The RG, which was last revised in 2001, describes methods that NRC staff considers acceptable for complying with the NRCs regulations in the design, construction, installation, and testing of the structures, systems, and components of radioactive waste management facilities in lightwater-reactor nuclear power plants. As discussed in Management Directive 6. 6 Regulatory Guides, the NRC staff reviews regulatory guides approximately every 10 years to ensure that the guides continue to provide useful guidance.
Based on the results of the periodic review, the staff concludes that a revision to RG 1.143, Revision 2, is warranted. The revision would begin with development and implementation of a plan to update by the first quarter of FY 2020. Completion is projected to be achieved in the third quarter of FY 2020. Following internal processing in NRC the staff expects to release a draft RG for public comment in the fourth quarter of FY 2020.
CONTACT: Edward Stutzcage, NRO/DSEA/RPAC 301-415-5345
Enclosure:
As Stated
ML18088A064 OFFICE RES/DE/RGGIB RES/DE/RGGIB SUNSI Review NRO/DSEA/RPAC NRO/DSEA/RPAC RES/DE/RGGIB NAME J. Parks E. ODonnell E. ODonnell E. Stutzcage M. Dudek T. Boyce DATE 3/ 29 /18 3/ 28 /18 3/ 28 /18 3/ 26 /18 3 /26 /18 3/ 29 /18