ML18100B181: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 3: Line 3:
| issue date = 04/17/2018
| issue date = 04/17/2018
| title = Agenda - APR1400 Subcommittee Meeting - April 17-18, 2018
| title = Agenda - APR1400 Subcommittee Meeting - April 17-18, 2018
| author name = Brown C L
| author name = Brown C
| author affiliation = NRC/ACRS
| author affiliation = NRC/ACRS
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket =  
| docket =  
| license number =  
| license number =  
| contact person = Brown C L
| contact person = Brown C
| document type = Meeting Agenda
| document type = Meeting Agenda
| page count = 3
| page count = 3
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:ADVISORY COMMITTEE ON REACTOR SAFEGUARDS APR1400 SUBCOMMITTEE BRIEFING KOREA HYDRO & NUCLEAR POWER CO. DESIGN CERTIFICATION APPLICATION April 17-18, 2018, ROCKVILLE, MD OPEN/CLOSED  
{{#Wiki_filter:ADVISORY COMMITTEE ON REACTOR SAFEGUARDS APR1400 SUBCOMMITTEE BRIEFING KOREA HYDRO & NUCLEAR POWER CO. DESIGN CERTIFICATION APPLICATION April 17-18, 2018, ROCKVILLE, MD OPEN/CLOSED
   - Agenda -  
                                            - Agenda -
Chairman of APR1400 Subcommittee: Professor Ronald Ballinger -
Cognizant ACRS Staff/DFO: Christopher Brown (301-415-7111, Christopher.Brown@nrc.gov)
TOPIC                                PRESENTER              TIME Dr. Ronald Ballinger, 1  Opening Remarks & Objectives                                              8:30 - 8:35 a.m.
ACRS 2  Staff Opening Remarks                            William Ward, NRO        8:35 - 8:40 a.m.
KHNP - Woochong 3  Chapter 15 Transient and Accident Analyses                                8:40 - 9:10 a.m.
Chon 4  Chapter 15 Transient and Accident Analyses      NRC - Shanlai Lu      9:10 - 10:00 a.m.
Section 2.5 - Geology, Seismology, and          KHNP - Youngchul 5                                                                          10:00 - 10:10 a.m.
Geotechnical Engineering                        Kwon 6  Break                                                                  10:10 - 10:25 a.m.
Chapter 3 - Design of Structures, Systems,      KHNP - Geeseok Kim 7                                                                          10:25 - 11:55 a.m.
Components, and Equipment                        Youngchul Kwon 8  Lunch                                                                  11:55 - 12:55 p.m.
NRC/NRO - Jinsuo Nie Chapter 3 - Design of Structures, Systems,      Robert Roche-Rivera 9                                                    Vaughn Thomas 12:55 - 2:25 p.m.
Components, and Equipment (3.7/3.8)
Ata Istar Section 2.5 - Geology, Seismology, and 10                                                    NRC - David Heeszel      2:25 - 2:55 p.m.
Geotechnical Engineering 11   Public Comments (Open)                          ACRS/Public            2:55 - 3:10 p.m.
12  ACRS Discussion (Open)                          ACRS Members            3:10 - 3:15 p.m.
13  Break                                                                    3:15 - 3:30 p.m.
Closed Large-Break Loss of Coolant Accident 14                                                    KHNP - Juhyun Park      3:30 - 4:30 p.m.
(Topical Report)
Closed Large-Break Loss of Coolant Accident 15                                                    NRC - James Gilmore    4:30 - 6:30 p.m.
(Topical Report) 16  Committee discussion                            ACRS Members            6:30 - 6:35 p.m.
17  Adjourn                                                                      6:40 p.m.


Chairman of APR1400 Subcommittee:  Professor Ronald Ballinger -
Day 2 - Wednesday, April 18, 2018 TOPIC                               PRESENTER                     TIME 1   Opening Remarks & Objectives                   Ronald Ballinger, ACRS         8:30 - 8:35 a.m.
Cognizant ACRS Staff/DFO:  Christopher Brown (301-415-7111, Christopher.Brown@nrc.gov) TOPIC PRESENTER TIME 1 Opening Remarks & Objectives Dr. Ronald Ballinger, ACRS 8:30 - 8:35 a.m. 2 Staff Opening Remarks William Ward, NRO 8:35 - 8:40 a.m. 3 Chapter 15 Transient and Accident Analyses KHNP - Woochong Chon 8:40 - 9:10 a.m. 4 Chapter 15 Transient and Accident Analyses NRC - Shanlai Lu 9:10 - 10:00 a.m.
2   Staff Opening Remarks                         William Ward, NRO               8:35 - 8:40 a.m.
5 Section 2.5 - Geology, Seismology, and Geotechnical Engineering KHNP - Youngchul Kwon 10:00 - 10:10 a.m.
Chapter 3 - Design of Structures, Systems, 3                                                  NRC - TBD                      8:40 - 9:15 a.m.
6 Break  10:10 - 10:25 a.m.
Components, and Equipment (3.1-3.5, 3.13)
7 Chapter 3 - Design of Structures, Systems, Components, and Equipment KHNP - Geeseok Kim Youngchul Kwon 10:25 - 11:55 a.m.
NRC - Renee Li, NRO Eric Reichelt, NRO Chapter 3 - Design of Structures, Systems,     Tom Scarbrough, NRO 4                                                  Jorge Cintron-Rivera, NRR 9:15 - 10:45 a.m.
8 Lunch  11:55 - 12:55 p.m.
Components, and Equipment (3.6, 3.9-3.12)
9 Chapter 3 - Design of Structures, Systems, Components, and Equipment (3.7/3.8) NRC/NRO - Jinsuo Nie Robert Roche-Rivera Vaughn Thomas Ata Istar12:55 - 2:25 p.m.
Edward Stutzcage, NRO Yuken Wong, NRO 5   Break                                                                       10:45 - 11:00 a.m.
10 Section 2.5 - Geology, Seismology, and Geotechnical Engineering NRC - David Heeszel 2:25 - 2:55 p.m. 11 Public Comments (Open) ACRS/Public 2:55 - 3:10 p.m. 12 ACRS Discussion (Open) ACRS Members 3:10 - 3:15 p.m.
6   Chapter 7 - Instrumentation & Controls (Open) NRC - Deanna Zhang?           11:00 - 11:30 a.m.
13 Break  3:15 - 3:30 p.m.
7   Public Comments (Open)                         ACRS/Public                   11:30 - 11:35 a.m.
14 Closed Large-Break Loss of Coolant Accident (Topical Report)
8   ACRS Discussion (Open)                         ACRS Members                 11:35 - 11:45 a.m.
KHNP - Juhyun Park 3:30 - 4:30 p.m.
9   Lunch                                                                       11:45 - 12:45 p.m.
15 Closed Large-Break Loss of Coolant Accident (Topical Report)
KHNP - Hangbae Kim 10   Closed Chapter 7 - Instrumentation & Controls Warren Odess-Gillet           12:45 - 2:45 p.m.
NRC - James Gilmore 4:30 - 6:30 p.m. 16 Committee discussion ACRS Members 6:30 - 6:35 p.m.
(Westinghouse) 11   Break                                                                         2:45 - 3:00 p.m.
17 Adjourn  6:40 p.m.
NRC - Deanna Zhang 12   Closed Chapter 7 - Instrumentation & Controls                                 3:00 - 5:30 p.m.
 
Joseph Ashcraft 13   Committee discussion                           ACRS Members                   5:30 - 5:35 p.m.
Day 2 - Wednesday, April 18, 2018 TOPIC PRESENTER TIME 1 Opening Remarks & Objectives Ronald Ballinger, ACRS 8:30 - 8:35 a.m. 2 Staff Opening Remarks William Ward, NRO 8:35 - 8:40 a.m.
14   Adjourn                                                                           5:40 p.m.
3 Chapter 3 - Design of Structures, Systems, Components, and Equipment (3.1-3.5, 3.13) NRC - TBD 8:40 - 9:15 a.m.
4 Chapter 3 - Design of Structures, Systems, Components, and Equipment (3.6, 3.9-3.12) NRC - Renee Li, NRO Eric Reichelt, NRO Tom Scarbrough, NRO Jorge Cintron-Rivera, NRR Edward Stutzcage, NRO Yuken Wong, NRO9:15 - 10:45 a.m.
5 Break 10:45 - 11:00 a.m.6 Chapter 7 - Instrumentation & Controls (Open) NRC - Deanna Zhang? 11:00 - 11:30 a.m.7 Public Comments (Open) ACRS/Public 11:30 - 11:35 a.m.8 ACRS Discussion (Open) ACRS Members 11:35 - 11:45 a.m.
9 Lunch 11:45 - 12:45 p.m.
10 Closed Chapter 7 - Instrumentation & Controls KHNP - Hangbae Kim Warren Odess-Gillet (Westinghouse) 12:45 - 2:45 p.m.
11 Break 2:45 - 3:00 p.m.
12 Closed Chapter 7 - Instrumentation & Controls NRC - Deanna Zhang Joseph Ashcraft 3:00 - 5:30 p.m. 13 Committee discussion ACRS Members 5:30 - 5:35 p.m.
14 Adjourn 5:40 p.m.
Inputs:
Inputs:
Chapter 15: KHNP - 30 min NRC - 45 min LBLOCA: KHNP - 60 min NRC - 120 min (all closed for both)
Chapter 15:   KHNP - 30 min               NRC - 45 min LBLOCA:       KHNP - 60 min               NRC - 120 min         (all closed for both)
Section 2.5: KHNP - 10 min NRC - 35 min Chapter 3: KHNP - 90 min NRC - 90 min (3.7/3.8)
Section 2.5: KHNP - 10 min               NRC - 35 min Chapter 3:   KHNP - 90 min               NRC - 90 min (3.7/3.8)
NRC - 30 min (3.1-3.5, 3.13)       NRC - 90 min (3.6, 3.9-3.12) Chapter 7 KHNP - 120 min NRC - 150 min (all closed for both?)  
NRC - 30 min (3.1-3.5, 3.13)
NRC - 90 min (3.6, 3.9-3.12)
Chapter 7     KHNP - 120 min               NRC - 150 min         (all closed for both?)


Notes:
Notes:

Latest revision as of 10:27, 21 October 2019

Agenda - APR1400 Subcommittee Meeting - April 17-18, 2018
ML18100B181
Person / Time
Issue date: 04/17/2018
From: Charles Brown
Advisory Committee on Reactor Safeguards
To:
Brown C
References
Download: ML18100B181 (3)


Text

ADVISORY COMMITTEE ON REACTOR SAFEGUARDS APR1400 SUBCOMMITTEE BRIEFING KOREA HYDRO & NUCLEAR POWER CO. DESIGN CERTIFICATION APPLICATION April 17-18, 2018, ROCKVILLE, MD OPEN/CLOSED

- Agenda -

Chairman of APR1400 Subcommittee: Professor Ronald Ballinger -

Cognizant ACRS Staff/DFO: Christopher Brown (301-415-7111, Christopher.Brown@nrc.gov)

TOPIC PRESENTER TIME Dr. Ronald Ballinger, 1 Opening Remarks & Objectives 8:30 - 8:35 a.m.

ACRS 2 Staff Opening Remarks William Ward, NRO 8:35 - 8:40 a.m.

KHNP - Woochong 3 Chapter 15 Transient and Accident Analyses 8:40 - 9:10 a.m.

Chon 4 Chapter 15 Transient and Accident Analyses NRC - Shanlai Lu 9:10 - 10:00 a.m.

Section 2.5 - Geology, Seismology, and KHNP - Youngchul 5 10:00 - 10:10 a.m.

Geotechnical Engineering Kwon 6 Break 10:10 - 10:25 a.m.

Chapter 3 - Design of Structures, Systems, KHNP - Geeseok Kim 7 10:25 - 11:55 a.m.

Components, and Equipment Youngchul Kwon 8 Lunch 11:55 - 12:55 p.m.

NRC/NRO - Jinsuo Nie Chapter 3 - Design of Structures, Systems, Robert Roche-Rivera 9 Vaughn Thomas 12:55 - 2:25 p.m.

Components, and Equipment (3.7/3.8)

Ata Istar Section 2.5 - Geology, Seismology, and 10 NRC - David Heeszel 2:25 - 2:55 p.m.

Geotechnical Engineering 11 Public Comments (Open) ACRS/Public 2:55 - 3:10 p.m.

12 ACRS Discussion (Open) ACRS Members 3:10 - 3:15 p.m.

13 Break 3:15 - 3:30 p.m.

Closed Large-Break Loss of Coolant Accident 14 KHNP - Juhyun Park 3:30 - 4:30 p.m.

(Topical Report)

Closed Large-Break Loss of Coolant Accident 15 NRC - James Gilmore 4:30 - 6:30 p.m.

(Topical Report) 16 Committee discussion ACRS Members 6:30 - 6:35 p.m.

17 Adjourn 6:40 p.m.

Day 2 - Wednesday, April 18, 2018 TOPIC PRESENTER TIME 1 Opening Remarks & Objectives Ronald Ballinger, ACRS 8:30 - 8:35 a.m.

2 Staff Opening Remarks William Ward, NRO 8:35 - 8:40 a.m.

Chapter 3 - Design of Structures, Systems, 3 NRC - TBD 8:40 - 9:15 a.m.

Components, and Equipment (3.1-3.5, 3.13)

NRC - Renee Li, NRO Eric Reichelt, NRO Chapter 3 - Design of Structures, Systems, Tom Scarbrough, NRO 4 Jorge Cintron-Rivera, NRR 9:15 - 10:45 a.m.

Components, and Equipment (3.6, 3.9-3.12)

Edward Stutzcage, NRO Yuken Wong, NRO 5 Break 10:45 - 11:00 a.m.

6 Chapter 7 - Instrumentation & Controls (Open) NRC - Deanna Zhang? 11:00 - 11:30 a.m.

7 Public Comments (Open) ACRS/Public 11:30 - 11:35 a.m.

8 ACRS Discussion (Open) ACRS Members 11:35 - 11:45 a.m.

9 Lunch 11:45 - 12:45 p.m.

KHNP - Hangbae Kim 10 Closed Chapter 7 - Instrumentation & Controls Warren Odess-Gillet 12:45 - 2:45 p.m.

(Westinghouse) 11 Break 2:45 - 3:00 p.m.

NRC - Deanna Zhang 12 Closed Chapter 7 - Instrumentation & Controls 3:00 - 5:30 p.m.

Joseph Ashcraft 13 Committee discussion ACRS Members 5:30 - 5:35 p.m.

14 Adjourn 5:40 p.m.

Inputs:

Chapter 15: KHNP - 30 min NRC - 45 min LBLOCA: KHNP - 60 min NRC - 120 min (all closed for both)

Section 2.5: KHNP - 10 min NRC - 35 min Chapter 3: KHNP - 90 min NRC - 90 min (3.7/3.8)

NRC - 30 min (3.1-3.5, 3.13)

NRC - 90 min (3.6, 3.9-3.12)

Chapter 7 KHNP - 120 min NRC - 150 min (all closed for both?)

Notes:

  • During the meeting, use 301-415-7360 to contact anyone in the ACRS Office.
  • Presentation time should not exceed 50 percent of the total time allocated for a given item. The remaining 50 percent of the time is reserved for discussion.
  • Thirty five (35) hard copies of each presentation or handout should be provided to the Designated Federal Official (DFO) / ACRS Contact 30 minutes before the meeting.
  • 10 full page colored copies for the ACRS members and the court reporter.
  • One (1) electronic copy of each presentation should be e-mailed to the DFO / ACRS Contact 1 day before the meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the DFO / ACRS Contact with a CD containing each presentation at least 30 minutes before the meeting.
  • A telephone bridge line 1-866-822-3032, pass code 8272423# has been established to allow members of the public and stakeholders to listen in to the open portion of the meeting. Such participants may ask questions at a designated time at the end of the meeting only.
  • The Subcommittee chairman may decide to close the meeting to the public if sensitive unclassified information (proprietary, security, or personnel related) needs to be discussed.