| issue date = 06/14/2018
| issue date = 06/14/2018
| title = Results of Periodic Review of Regulatory Guides (Rg) 1.175, Rg 1.177, and Rg 1.178
| title = Results of Periodic Review of Regulatory Guides (Rg) 1.175, Rg 1.177, and Rg 1.178
| author name = Cheok M C
| author name = Cheok M
| author affiliation = NRC/RES/DRA
| author affiliation = NRC/RES/DRA
| addressee name = Thomas B E
| addressee name = Thomas B
| addressee affiliation = NRC/RES/DE
| addressee affiliation = NRC/RES/DE
| docket =  
| docket =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 14, 2018 MEMORANDUM TO:                 Brian E. Thomas, Director Division of Engineering Office of Nuclear Regulatory Research FROM:                           Michael C. Cheok, Director /RA/
-0001   CONTACT: Anders Gilbertson, RES/DRA/PRB 301-415-1541      June 14, 2018 MEMORANDUM TO:
Division of Risk Analysis Office of Nuclear Regulatory Research
Brian E. Thomas, Director Division of Engineering Office of Nuclear Regulatory Research FROM:   Michael C. Cheok, Director
/RA/ Division of Risk Analysis Office of Nuclear Regulatory Research


==SUBJECT:==
==SUBJECT:==
RESULTS OF PERIODIC REVIEW OF REGULATORY GUIDE S (RG) 1.175, RG 1.177, AND RG 1.178 This memorandum documents the U
RESULTS OF PERIODIC REVIEW OF REGULATORY GUIDES (RG) 1.175, RG 1.177, AND RG 1.178 This memorandum documents the U.S. Nuclear Regulatory Commission (NRC) periodic review of regulatory guide (RG) 1.175, An Approach for Plant-Specific, Risk-Informed Decisionmaking:
.S. Nuclear Regulatory Commission (NRC) periodic review of regulatory guide (RG) 1.175, "An Approach for Plant
Inservice Testing, RG 1.177, An Approach for Plant-Specific, Risk-Informed Decisionmaking:
-Specific, Risk
Technical Specifications, and RG 1.178, An Approach for Plant-Specific Risk-Informed Decisionmaking for Inservice Inspection of Piping. RG 1.175, published in August 1998, describes an acceptable approach for the development of a risk-informed application in support of a change to an inservice testing program. RG 1.177, published in May, 2011, describes methods acceptable to the NRC staff for assessing the nature and impact of proposed technical specification changes by considering engineering issues and applying risk insights. RG 1.178, published in September 2003, describes guidance on acceptable approaches to meeting the existing Section XI requirements for the scope and frequency of inspection of inservice inspection of piping programs. As discussed in Management Directive 6.6, Regulatory Guides, the NRC staff reviews RGs approximately every 10 years to ensure that the RGs continue to provide useful guidance. Documentation of the NRC staff review is enclosed.
-Informed Decisionmaking: Inservice Testing," RG 1.177, "An Approach for Plant
Based on the results of the periodic review, the staff concludes that revisions to RG 1.175, Revision 0, RG 1.177, Revision 1, and RG 1.178, Revision 1, are warranted. The staff plans to develop draft guides for RG 1.175, RG 1.177, and RG 1.178 to revise the guidance on defense in depth consistent with the recently revised defense-in-depth guidance in RG 1.174, Revision 3; implement the decision on DPO-2016-001 related to adoption of the term PRA acceptability; and update the RGs to conform to the latest acceptable RG program guidance. Additionally, the staff will consider whether revised language is needed in RG 1.177 that a) more specifically differentiates between one-time technical specification changes and permanent technical specification changes; and b) addresses the practice of using guidance in RG 1.177 for self-approval activities by licensees (e.g., Risk Initiatives 4B and 5B) as opposed to an application that is submitted to the NRC. It is currently anticipated that the development of these three draft guides will require a total of approximately 0.5 FTE and will not use resources for contracting.
-Specific, Risk
Although many of the changes for these revisions will be the same or very similar across all RG, some changes will be specific to each RG and will require separate effort. As such, this total estimated effort is not equal to the sum of the individual estimates of efforts for each revision.
-Informed Decisionmaking: Technical Specifications ," and RG 1.178, "An Approach for Plant
-Specific Risk
-Informed Decisionmaking for Inservice Inspection of Piping.
" RG 1.175, published in August 1998, describes an acceptable approach for the development of a risk
-informed application in support of a change to an inservice testing program.
RG 1.177, published in May , 2011 , describes methods acceptable to the NRC staff for assessing the nature and impact of proposed technical specification changes by considering engineering issues and applying risk insights.
RG 1.178 , published in September 2003, describes guidance on acceptable approaches to meeting the existing Section XI requirements for the scope and frequency of inspection of inservice inspection of piping programs.
As discussed in Management Directive 6.6, "Regulatory Guides," the NRC staff reviews RGs approximately every 10 years to ensure that the RGs continue to provide useful guidance. Documentation of the NRC staff review is enclosed.
Based on the results of the periodic review, the staff concludes that revision s to RG 1.175, Revision 0, RG 1.17 7, Revision 1 , and RG 1.178, Revision 1, are warranted. The staff plans to develop draft guide s for RG 1.175, RG 1.177, and RG 1.178 to revise the guidance on defense in depth consistent with the recently revised defense
-in-depth guidance in RG 1.174, Revision 3; implement the decision on DPO
-2016-001 related to adoption of the term PRA acceptability; and update the RGs to conform to the latest acceptable RG program guidance. Additionally, the staff will consider whether revised language is needed in RG 1.177 that a) more specifically differentiates between one
-time technical specification changes and permanent technical specification changes; and b) addresses the practice of using guidance in RG 1.177 for self
-approval activities by licensees (e.g., Risk Initiatives 4B and 5B) as opposed to an application that is submitted to the NRC. It is currently anticipated that the development of these three draft guides will require a total of approximately 0.5 FTE and will not use resources for contracting. Although many of the changes for these revisions will be the same or very similar across all RG, some changes will be specific to each RG and will require separate effort. As such, this total estimated effort is not equal to the sum of the individual estimates of efforts for each revision.
The staff expects to submit draft versions of these RGs to the Office of Nuclear Regulatory Research staff for processing by November 2018 and issue it for public comment by the first quarter of the 2019 calendar year.
The staff expects to submit draft versions of these RGs to the Office of Nuclear Regulatory Research staff for processing by November 2018 and issue it for public comment by the first quarter of the 2019 calendar year.


==Enclosure:==
==Enclosure:==


As stated
As stated CONTACT: Anders Gilbertson, RES/DRA/PRB 301-415-1541


ML18150A484 OFFICE RES/DRA RES/DRA/PRB RES/DE/RGGIB SUNSI Review RES/DRA/PRB RES/DE/RGGIB RES/DRA NAME J. Parks A. Gilbertson H. Karagiannis H. Karagiannis F. Gonzalez T. Boyce M. Cheok DATE 6/ 7 /1 8 6 / 7 /1 8 6 / 7 /18 6 / 7 /1 8 6 / 8 /1 8 6 / 7 /18 6 / 14 /1 8}}
==SUBJECT:==
RESULTS OF PERIODIC REVIEW OF REGULATORY GUIDES (RG) 1.175, RG 1.177, AND RG 1.178 DISTRIBUTION:
Tom Boyce, RES/DE/RGGIB Jazel Parks, RES/DE/RGGIB H. Karagiannis, RES/DE/RGGIB Michael Franovich, NRR/DRA Russell Felts, NRR/DRA Stacey Rosenberg, NRR/DRA/APLA Greg Casto, NRR/DRA/APLB CJ Fong, NRR/DRA/APHB Sunil Weerakkody, NRR/DRA John Monninger, NRO/DSRA Kevin Coyne, NRO/DSRA Michelle Hayes, NRO/DSRA/SPRA RidsResDEResource ADAMS  Accession No: ML18150A484 OFFICE RES/DRA     RES/DRA/PRB RES/DE/RGGIB SUNSI Review RES/DRA/PRB RES/DE/RGGIB RES/DRA NAME   J. Parks   A. Gilbertson H. Karagiannis H. Karagiannis F. Gonzalez T. Boyce   M. Cheok DATE   6/ 7 /18    6 / 7 /18      6 / 7 /18       6 / 7 /18    6 / 8 /18  6 / 7 /18   6 / 14 /18 OFFICIAL RECORD COPY}}

Latest revision as of 00:38, 21 October 2019

Results of Periodic Review of Regulatory Guides (Rg) 1.175, Rg 1.177, and Rg 1.178
ML18150A502
Person / Time
Issue date: 06/14/2018
From: Michael Cheok
NRC/RES/DRA
To: Bernard Thomas
NRC/RES/DE
Shared Package
ML18150A484 List:
References
RG 1.178, RG-1.175, RG-1.177, RG-1.178
Download: ML18150A502 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 June 14, 2018 MEMORANDUM TO: Brian E. Thomas, Director Division of Engineering Office of Nuclear Regulatory Research FROM: Michael C. Cheok, Director /RA/

Division of Risk Analysis Office of Nuclear Regulatory Research

SUBJECT:

RESULTS OF PERIODIC REVIEW OF REGULATORY GUIDES (RG) 1.175, RG 1.177, AND RG 1.178 This memorandum documents the U.S. Nuclear Regulatory Commission (NRC) periodic review of regulatory guide (RG) 1.175, An Approach for Plant-Specific, Risk-Informed Decisionmaking:

Inservice Testing, RG 1.177, An Approach for Plant-Specific, Risk-Informed Decisionmaking:

Technical Specifications, and RG 1.178, An Approach for Plant-Specific Risk-Informed Decisionmaking for Inservice Inspection of Piping. RG 1.175, published in August 1998, describes an acceptable approach for the development of a risk-informed application in support of a change to an inservice testing program. RG 1.177, published in May, 2011, describes methods acceptable to the NRC staff for assessing the nature and impact of proposed technical specification changes by considering engineering issues and applying risk insights. RG 1.178, published in September 2003, describes guidance on acceptable approaches to meeting the existing Section XI requirements for the scope and frequency of inspection of inservice inspection of piping programs. As discussed in Management Directive 6.6, Regulatory Guides, the NRC staff reviews RGs approximately every 10 years to ensure that the RGs continue to provide useful guidance. Documentation of the NRC staff review is enclosed.

Based on the results of the periodic review, the staff concludes that revisions to RG 1.175, Revision 0, RG 1.177, Revision 1, and RG 1.178, Revision 1, are warranted. The staff plans to develop draft guides for RG 1.175, RG 1.177, and RG 1.178 to revise the guidance on defense in depth consistent with the recently revised defense-in-depth guidance in RG 1.174, Revision 3; implement the decision on DPO-2016-001 related to adoption of the term PRA acceptability; and update the RGs to conform to the latest acceptable RG program guidance. Additionally, the staff will consider whether revised language is needed in RG 1.177 that a) more specifically differentiates between one-time technical specification changes and permanent technical specification changes; and b) addresses the practice of using guidance in RG 1.177 for self-approval activities by licensees (e.g., Risk Initiatives 4B and 5B) as opposed to an application that is submitted to the NRC. It is currently anticipated that the development of these three draft guides will require a total of approximately 0.5 FTE and will not use resources for contracting.

Although many of the changes for these revisions will be the same or very similar across all RG, some changes will be specific to each RG and will require separate effort. As such, this total estimated effort is not equal to the sum of the individual estimates of efforts for each revision.

The staff expects to submit draft versions of these RGs to the Office of Nuclear Regulatory Research staff for processing by November 2018 and issue it for public comment by the first quarter of the 2019 calendar year.

Enclosure:

As stated CONTACT: Anders Gilbertson, RES/DRA/PRB 301-415-1541

SUBJECT:

RESULTS OF PERIODIC REVIEW OF REGULATORY GUIDES (RG) 1.175, RG 1.177, AND RG 1.178 DISTRIBUTION:

Tom Boyce, RES/DE/RGGIB Jazel Parks, RES/DE/RGGIB H. Karagiannis, RES/DE/RGGIB Michael Franovich, NRR/DRA Russell Felts, NRR/DRA Stacey Rosenberg, NRR/DRA/APLA Greg Casto, NRR/DRA/APLB CJ Fong, NRR/DRA/APHB Sunil Weerakkody, NRR/DRA John Monninger, NRO/DSRA Kevin Coyne, NRO/DSRA Michelle Hayes, NRO/DSRA/SPRA RidsResDEResource ADAMS Accession No: ML18150A484 OFFICE RES/DRA RES/DRA/PRB RES/DE/RGGIB SUNSI Review RES/DRA/PRB RES/DE/RGGIB RES/DRA NAME J. Parks A. Gilbertson H. Karagiannis H. Karagiannis F. Gonzalez T. Boyce M. Cheok DATE 6/ 7 /18 6 / 7 /18 6 / 7 /18 6 / 7 /18 6 / 8 /18 6 / 7 /18 6 / 14 /18 OFFICIAL RECORD COPY