ML18232A425: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:**********
{{#Wiki_filter:ADVISORY COMMITTEE ON REACTOR SAFEGUARDS Plant Operations and Fire Protection Subcommittee August 24, 2018 Rockville, MD AGENDA Cognizant ACRS Member: D. Skillman Cognizant Staff Engineer:  K. Howard, Kent.Howard@nrc.gov, 301-415-2989 Item                    Topic                            Presenter(s)            Time Dick Skillman, ACRS 1    Opening Remarks and Objectives                                        1:00 pm - 1:105 pm Mark Thaggard RES/DRA RES/DRA HEAF Presentation Background of current HEAF          4-13          RES/DRA STAFF treatment in PRA
* Mark Henry Salley Definition of HEAF hazard          13-20
* Nicholas Melly      1:05pm - 3:00 pm 2
* Kenneth Hamburger Background of HEAF research        21-26
* Gabriel Taylor program
* Kenn Miller Phase I testing                    27-39 3    Break                                                                3:00 pm - 3:15 pm RES/DRA HEAF Presentation RES/DRA STAFF Generic Issue, IN, PIRT,          40-45 NUREG-IA
* Nicholas Melly
* David Stroup Phase II measurement              46-58 4
* Kenneth Hamburger  3:15 pm - 5:15 pm improvements
* Gabriel Taylor Small-scale research program      59-65
* Mark Henry Salley Public workshop                    66-69 Phase II parameters and testing    70-94 5    Public Comments                            Dick Skillman, ACRS        5:15 pm -5:30 pm 6    Adjourn                                    Dick Skillman, ACRS              5:30 pm


***}}
ACRS Notes:
* Presentation time should not exceed 50 percent of the total time allocated for a given item.
The remaining 50 percent of the time is reserved for discussion.
* Thirty five (35) hard copies (2 B&W slides per page) of each presentation or handout should be provided to the Designated Federal Official 30 minutes before the meeting.
* 10 full page colored copies for the ACRS members and the court reporter.
One (1) electronic copy of each presentation should be emailed to the Designated Federal Official 1 day before the meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the Designated Federal Official with a CD containing each presentation at least 30 minutes before the meeting.}}

Latest revision as of 16:14, 20 October 2019

Agenda - Plant Operations and Fire Protection Subcommittee Meeting - August 24, 2018
ML18232A425
Person / Time
Issue date: 08/20/2018
From: Kent Howard
Advisory Committee on Reactor Safeguards
To:
Howard K
References
Download: ML18232A425 (2)


Text

ADVISORY COMMITTEE ON REACTOR SAFEGUARDS Plant Operations and Fire Protection Subcommittee August 24, 2018 Rockville, MD AGENDA Cognizant ACRS Member: D. Skillman Cognizant Staff Engineer: K. Howard, Kent.Howard@nrc.gov, 301-415-2989 Item Topic Presenter(s) Time Dick Skillman, ACRS 1 Opening Remarks and Objectives 1:00 pm - 1:105 pm Mark Thaggard RES/DRA RES/DRA HEAF Presentation Background of current HEAF 4-13 RES/DRA STAFF treatment in PRA

  • Mark Henry Salley Definition of HEAF hazard 13-20
  • Nicholas Melly 1:05pm - 3:00 pm 2
  • Gabriel Taylor program
  • Kenn Miller Phase I testing 27-39 3 Break 3:00 pm - 3:15 pm RES/DRA HEAF Presentation RES/DRA STAFF Generic Issue, IN, PIRT, 40-45 NUREG-IA
  • Nicholas Melly
  • David Stroup Phase II measurement 46-58 4
  • Gabriel Taylor Small-scale research program 59-65
  • Mark Henry Salley Public workshop 66-69 Phase II parameters and testing 70-94 5 Public Comments Dick Skillman, ACRS 5:15 pm -5:30 pm 6 Adjourn Dick Skillman, ACRS 5:30 pm

ACRS Notes:

  • Presentation time should not exceed 50 percent of the total time allocated for a given item.

The remaining 50 percent of the time is reserved for discussion.

  • Thirty five (35) hard copies (2 B&W slides per page) of each presentation or handout should be provided to the Designated Federal Official 30 minutes before the meeting.
  • 10 full page colored copies for the ACRS members and the court reporter.

One (1) electronic copy of each presentation should be emailed to the Designated Federal Official 1 day before the meeting. If an electronic copy cannot be provided within this timeframe, presenters should provide the Designated Federal Official with a CD containing each presentation at least 30 minutes before the meeting.