NG-08-0141, Duane Arnold Energy Center, Transmittal of Corrected Sections of the Fourth Ten Year Inservice Inspection Summary Report for Refueling Outage 20: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[NG-08-0141, Transmittal of Corrected Sections of the Fourth Ten Year Inservice Inspection Summary Report for Refueling Outage 20]]
| number = ML080710424
| issue date = 02/28/2008
| title = Duane Arnold Energy Center, Transmittal of Corrected Sections of the Fourth Ten Year Inservice Inspection Summary Report for Refueling Outage 20
| author name = Anderson R L
| author affiliation = FPL Energy Duane Arnold, LLC
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000331
| license number = DPR-049
| contact person =
| case reference number = NG-08-0141
| document type = Inservice/Preservice Inspection and Test Report, Letter
| page count = 5
}}
 
=Text=
{{#Wiki_filter:FPL Energy Duane Arnold, LLC 3277 DAEC Road Palo, Iowa 52324 FPL Energy.Duane Arnodd Energy Center February 28, 2008 NG-08-0141 10 CFR 50.55a U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Duane Arnold Energy Center Docket 50-331 License No. DPR-49 Corrected Sections of the Inservice Inspection Report for RFO 20
 
==Reference:==
: 1. Letter, Gary Van Middlesworth (FPL Energy Duane Arnold) to Document Control Desk (USNRC), Inservice Inspection Report, dated June 12, 2007, NG-07-0492 (ML071710515)
Reference 1 submitted the Inservice Inspection Report in accordance with the requirements of Paragraph IWA-6230 of ASME, Section XI, 1989 Edition/No Addenda (3rd interval), Paragraph IWA-6240 of ASME, Section Xl, 2001 Edition/2003 Addenda (4th interval) and 10 CFR Section 50.55a(g) for Refueling Outage (RFO) 20 for the Duane Arnold Energy Center (DAEC)..A recent review of the RFO 20 Inservice Inspection Report revealed that inaccuracies had entered into the report during its development.
The enclosure to this letter contains the appropriate, corrected replacement sections of the RFO 20 Inservice Inspection Report for the DAEC for the 4th 10-year inspection interval.
Deletions are shown as being lined out and additions are bolded. These replacement sections supersede the corresponding sections in Enclosure 2 of Reference 1.This letter contains no new commitments nor revises any previous commitments.
If you have any questions, please contact Steve Catron at (319) 851-7234.Richard L. And rson Vice President, Duane Arnold Energy Center FPL Energy Duane Arnold, LLC Enclosure 4(Y47 NG-08-0141 February 28, 2008 Page 2 of 2 cc: Administrator, Region III, USNRC Project Manager, DAEC, USNRC Resident Inspector, DAEC, USNRC ENCLOSURE TO NG-08-0141 FOURTH TEN YEAR INSERVICE INSPECTION
 
==SUMMARY==
REPORT Replacement Sections 24 Pages Follow FORM NIS-2 20-07-10 Rev 1 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1. Owners FPL Energy Duane Arnold LLC Name 2.P.O. Box 14000 Juno Beach, FL 33408-0420 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Date Sheet Unit 02/09/07 1 of 2 CWO A73452 Repair Organization to P. 0. No., Job No., etc.3. Work Performed by FPL Energy Name 3277 DAEC Road, Palo, IA 5232 Type Code Symbol Stamp None Authorization No. None 24 Expiration Date None Code Case.4.5.Identification of System: EBB S SR 9 EBB-5-SR-9 (HPCI Pump Discharge Pipe Clar (a) Applicable Construction Code ANSI B31.7 19 69 Edition 70 (b) Applicable Edition of Sect ion XI Utilized for Repairs or Replacements 2001 -A03 Identification of Components Repaired or Replaced and Replacement Components nP, Class 2)Addenda N/A 6.ASME Code Name of Name of Manufacturer Year Built Repaired, Stamped Component Manufacturer Serial No. National Other Identification Replaced, or (YES or Board No. Replacement NO)EB S SP 9 Stud: Supplied Heat #213-1216-C N/A N/A 1973 Replaced No EBB-5-SR-9 through Bechtel Nuts: Dubose Heat: 41978 N/A N/A 2005 Replaced No 4 F + 4 F 4.4 F + 4 4.4 I F -I I + F 7. Description of Work: 8. Tests Conducted:
Replaced missing bolt/nut on EBB S SR 9 EBB-5-SR-9 pipe clamp (ISI Class 2 boundary)Hydrostatic
-Pneumatic F--Nominal Operating Pressure Other = Pressure N/A psi Test Temp N/A 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.3 FORM NIS-2 20-07-10 Rev I FORM NIS-2 (Back)9. Remarks: IIPCI pump discharge pipe clamp, E-BB-S-SR", EBB-5-SR-9 was found to have a missing bolt (two bolt pipe clamp). The missing A-307 bolting was replaced with a SA-193, B7 stud and SA-194, 21 nuts. The material substitution has been evaluated in EMA A73452. A VT-3 examination (P07069) was completed following bolt installation.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement (repair or replacement) conforms to the mles of the ASME Code, Section XL.Type Code Symbol Stamp None Certificate of Authorization No. None Expiration Date N/A signedr' Designee,~a Eng*neering Date February 9th, 2007* "Ownl r6"r or-Owner's Designee, Title-CERTIFICATE OF JNSERVICE INSPECTION L the tmdetsigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by 1-1SB CT of Hartford, Conn. have inspected the components described in this Owner's Report during the period f- .0 -YL/f 6-To _ ) -1 _"c_? , and state that to the best oF my knowledge and beliet the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requhirem.ents of the ASME Code., Section X[.By signing this certificate neither the inspector nor his employer makes any warranty, expressed or implied, conceming dhe examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection,-~~~~~Commiissions Ae L 4/,L Inspector's Signature National Board, State, Province, and Endorsements Date _ _ _ _"7_ ,2007 Rev. 1: Revision was to corre e s pport identification Owner's Designee: Inspector:
C(3 _Date: .i,0 Date: -a5  3 FORM NIS-2 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI.Owners FPL Energy Duane Arnold LLC Name 2.3.4.5.P.O. Box 14000 Juno Beach, FL 33408-0420 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Work Performed by FPL Energy Name 3277 DAEC Road, Palo, IA 52324 Identification of System: HPCI (Class 2)Date Sheet Unit 03/19/07 1 of 2 20-07-15 Rev. 1 Code Case.MWO 1137685 Repair Organization to P. 0. No., Job No., etc.Type Code Symbol Stamp Authorization No.Expiration Date None None None (a) Applicable Construction Code ANSI B31.7 Class II 19 69 Edition 1970 (b) Applicable Edition of Se ction XI Utilized for Repairs or Replacements 2001-A03 Addenda N/A 6. Identification ot Components Repaired or Re laced and Re lacement Components ASME Code Name of Name of Manufacturer Year Built Repaired, Stamped Component Manufacturer Serial No. National Other Identification Replaced, pr (YES or Board No. Replacemint NO)EBB-5-SR-10 NUCOR Heat#6106099 N/A Plate, /' A572 Gr. 50 2006 Replacement No NUCOR Ht #1612382 N/A Plate. /4" A36 2006 Replacement No NUCOR Ht #6107180 N/A Plate, 'A" A572 Gr 50 2006 Replacement No NUCOR Ht# 4105325 N/A V" A572 Gr. 50 2006 Replacement No Atlas Ht #884616 N/A Tube Steel 5"x5"x3/8" A500 2005 Replacement No GrB Radnor Ht #L40096 N/A Pipe, 10" Sch 40 Al06 Gr B 1992 Replacement No Lisega 362765 N/A Pipe Clamp 2004 Replacement No Lisega 357959 N/A Weld On Bracket 2004 Replacement No Lisega 397079 N/A Adjustable Rigid Strut 2006 Replacement No NUCOR Ht #1612940 N/A Plate, W" A36 2006 Replacement No 7. Description of Work: 8. Tests Conducted:-Install new support EBB-5-SR-10 Hydrostatic
[Pneumatic E-Nominal Operating Pressure Other =Pressure N/A psi Test Temp N/A NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.3 FORM NIS-2 20-07-15 Rev. I FORM NIS-2 (Back)9. Remarks: Added new strut and associated auxviliary steel -This suppocrt wais ungraided ais panrt o-f a nadckaa to ,inride many supports on Feedwater and HPCI in order to resolve inconsistencies between the as-built and as-designed condition.
S .... and attachcdvipping welds were .. ..ee ..fuIy qreýfa e-*.... .. Integrally attached stanchion received a magnetic particle pre-service examination, and a successful VT-3 (P07071) was nprfnrn, nA nr ,'nnl nkt~d cunnrirt 1' flP..CCP -NO i I I V E AIA4 I CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement (repair or replacement) conforms to the rules of the ASME Code, Section XI,'Iype Code Symbol Stamp None Certificate of Autih Non6 Expiration Date NMA Signed 4 ) Program Engineering Date M ..?CA .'ch 2007 Owtner or Owner's Designee, Title CERTIFICATE OF INSERVICE IINSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel. Inspectors and the State or Provintce of Iowa and employed by IHSB CT 0f Hartford, Conn. have inspected the components described in this Owner's Report during the period 1-3/- O-) To 3-,,p -/", -- " , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures dcscrnbed iv this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any mamier for any personal injury or property damnage or a loss of any kind arising from or connected with this inspection.
.. " -,. Commissions
/ d3.c(,v, -r /q -, " Inspector's Signature National Board, State, Province, and Endorsements Date 3 -)-t ,2007 Rev. 1: Revision added discussion in the "Remarks" section for pre-service examination performed on integrally attached pipe stanchion.
Owner's Designee:
., i.i/ /X"-- Date: ,1,/v- o Inspector:
,) hu--- Date: 2- 6D 3 FORM NIS-2 20-07-29 Rev. I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1. Owners FPL Energy Duane Arnold LLC Date 04/04/2007 Name P.O. Box 14000 Juno Beach, FL 33408-0420 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Sheet Unit 1 of 2 2.3.4.5.MWO 1138177 Address Repair Organization to P. 0. No., Job No., etc.Work Performed by FPL Energy Type Code Symbol Stamp None Name Authorization No. None 3277 DAEC Road, Palo, IA 52324 Expiration Date None Identification of System: EBB-5-SR-3 (HPCI Pump Discharge to FW Line -M02312, Class 2)(a) Applicable Construction Code ANSI B31.7 Class 2 19 69 Edition 1970 Addenda N/A Code Case.'(b) Applicable Edition of Sect ion XI Utilized for Repairs or Replacements 2001 -A03 Identification of Comnonents Renaiired or rind Rentlaeement C2omnonent's-------~--
SECd ASME Code Name of Name of Manufacturer Year Built Repaired, Stamped Component Manufacturer Serial No. National Other Identification Replaced, or (YES or Board No. Replacemgnt NO)EBB-5-SR-3 Roanoke Ht # JE7267 N/A 2 1/2" 2 1/2"x3/8" Angle 2006 Replacement No ASTM A36 Lisega 395039-E315 N/A 12" Carbon Steel Rigid strut 2003 Replacement No Lisega 346959 N/A Weld-on Bracket, Carbon Steel 2003 Replacement No 355959 Lisega 363261 N/A 12" Clamp, Carbon Steel 2003 Replacement No Modification of support EBB-5-SR-3 7.8.Description of Work: Tests Conducted:
Hydrostatic
-Other Pressure Pneumatic N/A psi[-] Nominal Operating Pressure Test Temp N/A 0 F Ei--NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.3 FORM NIS-2 20-07-29 Rev. 1 FORM NIS-2 (Back)9. Remarks: On support EBB-5-SR-3 replaced rod assembly with rigid strut assembly.
and r-eplaced auniary steel, base p.,l and anchor bolts. Stiffeners were added to in-place steel. Support was upgraded as part of a package to upgrade many supports on Feedwater and HPCI in order to resolve inconsistencies between the as-built and as-designed condition.
Structural welds were successfully surface examined, and a successful VT-3 (P07073) was performed on EBB-5-SR-3.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement (repair or replaceement) conforms to the rules ofthe A SME, Code, Section XL.Type Code Symbol Stamp None Certificate of Authorization No. None Expiration Date NIA Signed Program Engi.eering Date o 2007"" OVVDr or owner's Designee, Til-e CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a vilid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by ItSB CT of Hartford, Corn, have inspected the components described in this Owner's Report during the period -To /- Ct'- c 7 , and state that to the best of my knowledge and belief, the Owner has performed examinations and taken. cortrettive measures described in this Owner's .Report in accordance with the requirements of the ASME Code, Section X1.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning rho examinations and corrective measures described in this Owner's Report. Furthemiore, neither the Inspector nor his employer shall be liable in any manner for any personal injuy or property damage or a loss of any kind arising From or connected with this inspedtion.
J 'L~- Commissions 6a -/,-_ /:; Inspector's Signature National Board, State, Province, and Endorsements Date t.q-f ,2007 Rev. 1: This revision is to correct ftl Weld-on Bracket Part Number and to delete in the remarks the statement that there was a replacement of auxiliary s late and anchor bolts as these were not replaced.Owner's Designee:
________________________Date:
?J-' 6 9~5~Inspector:
ý c-- C -Date: 3 FORM NIS-2 20-07-30 Rev. 1 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI FPL Energy Duane Arnold LLC Date 04/04/2007
: 1. Owners 2.3.4.5.Name P.O. Box 14000 Juno Beach, FL 33408-0420 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Work Performed by FPL Energy Name 3277 DAEC Road, Palo, IA 52324 Sheet Unit I of 2 MWO 1138179 Repair Organization to P. 0. No., Job No., etc.Type Code Symbol Stamp None Authorization No.Expiration Date None None Identification of System: HPCI (Class 2)(a) Applicable Construction Code ANSI B31.7 Class II 19 69 Edition (b) Applicab le Edition of Section XI Utilized for Repairs or Replacements 200 l-A03 1970 Addenda N/A Code Case.6. Identification of Components Repaired or Re laced and Re lacement Components ASME Code Name of Name of Manufacturer Year Built Repaired, Stamped Component Manufacturer Serial No. National Other Identification Replaced, or (YES or Board No. Replacement NO)EB- 7 SP-R Q Feralloy Heat 9 2418627 N/A Plate Steel, 3/8" A36 2004 Replacement No EBB-5-SR-12 NUCOR Heat # 6106099 N/A 3/4/4" A572 Gr. 50 Plate Steel 2006 Replacement NO Gerdau Heat # V6-3860 N/A A-36 Angle Iron 3"x3"x3/8" 2006 Replacement No Ameristeel Tubular Steel Heat # S60351 N/A Pipe, 8" Sch. 40, A106 Gr B 2005 Replacement No Lisega 395109 N/A Adjustable Rigid Strut 2004 Replacement No Lisega 695953 N/A Load Pin 2004 Replacement No Lisega 355959 N/A Weld-On Bracket 2004 Replacement No 7.8.Description of Work: Tests Conducted:
tviedteatfoo 01 sti ppeRt fztfo a 64-1 Installed new support Elstl-SK-~12-.
Hydrostatic
-Pneumatic
[Nominal Operating Pressure Other = Pressure N/A psi Test Temp N/A OF NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) infomaation in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.(12/82)
This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
FORM NIS-2 20-07-30 Rev. 1 FORM NIS-2 (Back 9. Remarks: H4PCI in erder- to resolye -inconsisteneies-lbeteon the as built And- as d-esigned eonditien.
Shiwtural
.. Ads and atahdiiiRwld eeseesul su"""v exmnd md ..a sueesfl VII 23 _R(VfQ-)f(7094-,ad 12:05 wer vefomdanEB5S 12.Installed new support, EBB-5-SR-12, on HPCI pump discharge line. New support consisted of a rillid strut, an 8". pipe stanchion welded directly to the extrados of a 12" HPCI pump discharge line elbow, and associated structural steal. Pre-service examinations performed on EBB-5-SR-12 included stanchion-to-pipe welds (MT examination) and a final VT-3 examination.
Adjacent springcan hangers EBB-5-H-1 and EBB-5-H-2 were pinned during the installation of EBB-5-SR-12.
Pre-service VT-3s were performed on springcan hangers EBB-5-H-1 and EBB-5-H-2 after unpinning.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code, Section XI.Replacement (repair or replacement)
'T'.pe Code Symbol Stamp Certificate of Authorizatio No.signed None None Expiration Date N/A ProgramEngineering Date esignee, Title " -'2007 I (Owner or Owner's D CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Corm. have.inspected the components described in this Owner's Report duringthe period .9- " To L 1'- t/-c" ,and statethat to thebest of my lnowledge and belief, the Ownerhas performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described.
in this Owner's Report. Furthermore, neither the inspector nor his employer shall be liable in any manner forany personal injury or property damage or a loss of any kind arising from or connected with this inspecLion.
I c t...S----u Intspector's Signature Commnissions 10,_-, q IA2MX, National Board, State, Province, and Endersements Date ,2007 Rev. 1: Revision included the addition of pre-service MT examination of stanchion weld and clarification of actual work Rev. 1: Revision includedl the addition of pre-service MT examination of stanchion weld and clarification of actual work performed in "Remarks" section.Owner's Designee: .I Date: /YJ, Inspcntotr:
.-)O-) Date, -ste FORM NIS-2 20-07-33 Rev, 1 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1. Owners FPL Energy Duane Arnold LLC Name 2.3.4.5.P.O. Box 14000 Juno Beach, FL 33408-0420 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Work Performed by FPL Energy Name 3277 DAEC Road, Palo, IA 52324 Date Sheet Unit 04/04/2007 1 of 2 i MWO 1137680 Repair Organization to P. 0. No., Job No., etc.Type Code Symbol Stamp None Authorization No. None Expiration Date None EýBF 5 SR--14 High Pressure Coolant Injection (Class 2)toentiircauion 01 siystem: rwleeitication-01 Suppoirt A44 (a) Applicable Construction Code ASME B31.7 Class 2 19 69 Edition 1970 Addenda N/A Code Case.(b) Applicable Edition of Sect ion XI Utilized for Repairs or Replacements 200 1-A03 6. Identification of Components Repaired or Replaced and Replacement Components ASME Code Name of Name of Manufacturer Year Built Repaired, Stamped Component Manufacturer Serial No. National Other Identification Replaced, or (YES or Board No. Replacement NO)EBB-5-SR-1 1 Ipsco Ht # B61806 N/A 1" Plate A572 2006 Replacement No lpseo Ht # A6J840 N/A I Y2" Plate A572 2006 Replacement No Lisega Pt # 356959 N/A Bracket SA 675 2004 Replacement No Lisea 2-453271S N/A 12" Pipe Clamp A387 2004 Replacement No Lisega 396259 N/A Adjustable Rigid Strut 82.5 x 2006 Replacement No 1_ 8.8 mm, SA 53S 7. Description of Work: 8. Tests Conducted:
Modification of support on EBB-5-SR-1 I Hydrostatic
-Pneumatic
' Nominal Operating Pressure I--Other = Pressure N/A psi Test Temp N/A 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.3 FORM NlS-2 20-07-33 Rev. I FORM NIS-2 (Back)9. Remarks: Replaced rod assembly with rigid strut assembly.
Replaced base plates and anchor bolts. Weld four shear lugs on pipe above pipe clamp. Support mark number was changed from EBB-5-Il-11 to EBB-5-SR-11. This support was upgraded as part of a package to upgrade many supports on Feedwater and HPCI in order to resolve inconsistencies between the as-built and as-designed condition.
Structural welds -cre successfully surface examined, Four new integrally attached lugs were subject to a magnetic particle pre-service examination and a successful VT-3 (VT-07-084) was performed on completed support, EBB-5-SR-I 1.CERTMIFCATE OF COMPLIANCE We certify that the statements made in the report are correct and ills Replacement (repair or replacement) conforms to the rules of the ASME Code, Section XI.Type Code Symbol Stamp None Certificate of Auuuorizano" _ None Expiration Date NiA Signedwne Prorwe Engineering Date 2007 Owner or Owner's Designee., Title CERTIFICATE OF INSERVIC FINSPECTION I, the iundersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Harttbrd, Conn. have inspected the components described in this Owner's Report during the period - Li 7 To V 4/- o -_ , and state that to the beat of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
--.---' ...Commissions AJ5 ] /4' -Inspector's Signature National Board, State, Provihce, and FudorseuittLs Date cJ-q ,2007 Rev. 1: Revision added discussion in the "Remarks" section for pre-service examination performed on four new integrally attached lugs.Owner's Designee:
_____._,__-
Date: --/ -¢Inspector:
:- .Date: ) --)3 FORM NIS-2 20-07-42 Rev. I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI I Owners FPL Energy Duane Arnold LLC Date 03/23/07-2.3.4.5.Name P.O. Box 14000 Juno Beach, FL 33408-0420 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Work Performed by FPL Energy Name 3277 DAEC Road, Palo, IA 52324 Identification of System: Core Spray (Class 1)Sheet Unit 1 of 2 WO A76710 WO A76710 Repair Organization to P, 0. No., Job No., etc.Type Code Symbol Stamp None Authorization No. None Expiration Date None (a) Applicable Construction Code ANSI B331.7 19 69 Edition 70 (b) Applicable Edition of Sect ion XI Utilized for Repairs or Replacements 200l-A03 Addenda N/A Code Case.r 6. Ildentitication ot Components Repaired or Replaced and Re lacement Components ASME Name of Name of Manufacturer Year Built Repaired, Code Component Manufacturer Serial No. National Other Identification Replaced, or Stamped Board No. Replacement (YES or NO)CSB-FO4 Southwest N/A N/A DLA-8-1-3 1972 Repaired Yes Fabricating and Welding Co.Linear indication found during PSI Examination was reduced to an acceptable size..7.8.Description of Work Tests Conducted:
Hydrostatic Other E-- Pressure[--- Pneumatic F-1 Nominal Operating Pressure N/A psi Test Temp N/A 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size.is 81/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
FORM NIS-2 20-07-42 Rev. 1 FORM NIS-2 (Back)9. Remarks: The weld crown on ISI Weld CSB-F004 was removed to facilitate Ultrasonic examination.
Once the weld crown was removed a Preservice Liquid Penetrant examination was performed to establish a new baseline.
A linear indication was identified during that PSI examination.
The leneth of the indication was 3/16" long (ref.Report PT-07-004).
CAP 47392 was written. WO A76710 was written to remove the indication.
The indication was reduced to an acceptable size (Ref. --B-342--24 IWB-3113) with a remaining wall thickness of 0.439" (Minimum wall of 0.4378 was allowed).
A final PT (ref. Report PT-07-009) was performed with the final length of indication being 0.080" which was calculated as acceptable.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this conforms to the rules of the ASME Code, Section XI.Repaired (repair or replacement)
Type Code Symbol Stamp None Certificate of At#Wzation No. None Expiration Date Signed  1Supervisor, Materials/Inspection Date NIA 2007 d4er or Owner's Designee, Title CERTfIVICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board orBoiler and Pressure Vessel i1nspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Conn. have inspected the components described in this Owner's Report during the period .,)- If -Q7 to 3_ -? __-_ _ -"_) , and state that to the best of my knowledge and belief, the Owner has perfbrmed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector.
nor his employer shall be liable in arty manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.L... .... Commissions IV.? b:L3 -.,vj.e 1. (inspector's Signature National Board, State, Province, and Endorsements Date 3 7,2007 Rev. 1: This revision is to correct the reference of IWB-3122.3 to IWB-3113 which is the correct reference for a Preservice Surface Examination.
Owner's Designee:
6 ef' Date:_________________
I .V Date: 1ý -d5-08 Inspector:
FORM NIS-2 20-07-43 Rev. I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI I Owners FPL Energy Duane Arnold LLC Name 2.3.4.5.P.O. Box 14000 Juno Beach, FL 33408-0420 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Work Performed by FPL Energy Name 3277 DAEC Road, Palo, IA 52324 Date Sheet Unit 03/23/07 1 of 2 1 WO 1136700, 1136429, 1137975, 1136439, 1138812, 1136427, 1136428,1136699 Repair Organization to P. 0. No., Job No., etc.Type Code Symbol Stamp Authorization No.Expiration Date None None None Identification of System: Control Rod Drive (Class 2)(a) Applicable Construction Code ASME VIII 19 68 Edition N/A Addenda N/A Code Case.(b) Applicable Edition of Sect ion XI Utilized for Repairs or Replacements 2001-A03 6. Identification of Components Repaired or Replaced and Replacement Components ASME Name of Name of Manufacturer Year Built Repaired, Code Component Manufacturer Serial No. National Other Identification Replaced, or Stamped Board No. Replacement (YES or__NO)1S220(30-27)
General Electric S/N C0277 N/A HCU Accumulator 1979 Replacement Yes IS220(34-23)
General Electric S/N CO 173 N/A HCU Accumulator 1978 Replacement Yes IS220(26-43)
General Electric SIN 1307 N/A HCU Accumulator 1975 Replacement Yes IS220(10-35)
General Electric S/N C0238 N/A HCU Accumulator 1979 Replacement Yes 1 S220(22-3
: 1) General Electric S/N C0278 N/A HCU Accumulator 1979 Replacement Yes 1S220(02-23)
General Electric S/N C0165 N/A HCU Accumulator 1978 Replacement Yes 1S220(10-31)
General Electric S/N CO169 N/A HCU Accumulator 1978 Replacement Yes IS220(14-27)
General Electric S/N C0252 N/A HCU Accumulator 1979 Replacement Yes 7. Description of Work: 8. Tests Conducted:
Replaced HCU Accumulators at 30-27, 34-23, 26-43, 10-35, 22-31, 02-23, 10-31, 14-27 locations.
Hydrostatic
-Pneumatic
--] Nominal Operating Pressure Other = Pressure 1010 psi Test Temp 225.9 O NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
FORM NIS-2 20-07-43 Rev. 1 FORM NIS-2 (Back)9. Remarks: Replaced HCU Accumulators at 30-27, 34-23, 26-43, 10-35. 22-31, 02-23, 10-31, 14-27 locations.
A Visual Examination for leakage (VT-2) was performed during the Class 1 System Leakage Test and found acceptable.
CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement (repair or replacement) conforms to the ru'les of thbe ASME Code, Section X1.TIvpe Code Symbol Stamp None Ctrtificate of Aut uzrtion No. None Expiration Date N/A Signed O2(-eer6o SOPervisorMaterialsnspection Date T2007 OVAf -or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the utndersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vssel Inspectors and the State or Province of Iowa and employed by -SB3 CT of Hartfbod, Comi. have inspected the components described in this Owner's Report during the period ...7-:/- -_oto -, and state tliht to the best of my knowledge and belief; the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his enmployer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, reither the Inspector nor his employer shall be liable in any manner for any personal injury orproperty damage or a loss of any kind arising from or connected with this inspection.
J.3 Commissions ,V... 2c3)q,5v.5.
/ , Inspector's Sigwature National Board, State, Province, and En.dorsements Date Y- 3 ,2007 Rev. 1: This revision is to ominal Operating Pressure Box in Section 8 Tests Conducted Owner's Designee:.
_21- Date: zLLJ ! Io-V -Date: ) S0 Inspector:
FORM NIS-2 20-07-45 Rev. I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI I Owners FPL Energy Duane Arnold LLC Name 2.P.O. Box 14000 Juno Beach, FL 33408-0420 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Date Sheet Unit 04/5/07 1 of 2 1 WO 1137662 Repair Organization to P. 0. No., Job No., etc.3. Work Performed by FPL Energy Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.Expiration Date igh Pressure Coolant Iniection (Class 2)None None None 4.5.Identification of System: H.(a) Applicable Construction Code ANSI B31,7 Class 2 19 69 Edition (b) Applicable E dition of Section XI Utilized for Repairs or Replacements 2001-A03 70 Addenda NIA Code Case, 6. Identification ot Compone ts Repaired or Replaced and Re lacement Components ASME Name of Name of Manufacturer Year Built Repaired, Code Component Manufacturer Serial No. National Other Identification Replaced, or Stamped Board No. Replacement (YES or NO)EBB-005 Bonney Forge Lot 9400 N/A N" 3000 # Half Coupling 2006 Replacement No EBB-005 Consolidated Ht 1335ANB N/A x 12" Sockolet 2006 Replacement No Power Supply 7. Description of Work: 8. Tests Conducted:
Add /" taps to 12" EBB-005 for vent, drain, and PSV2302 for HIPCI Keep Fill piping modification.
Hydrostatic ii Pneumatic
[-]Nominal Operating Pressure Other[--Pressure 1170 psi -Test Temp 73 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
FORM NIS-2 20-07-45 Rev. 1 FORM NIS-2 (Back)9. Remarks: Added 3/4" taps for vent, drain, and PSV2302 to existing 12" EBB-005 with remaining piping being 3/4". The 3/4" fitting welds to the 12" EBB-005 are the only Section XI activity.
Successfully performed surface exams on welds. Successful VT-2 (report was nerformed with Class I Leak test on MWO 1138785.welds. Successful VT-2 (renort P07095) was nerformed with-Class 1 Leak test-on MWO 1138785.CERTIFICATE OF COMPLIANCE We certitý, that the statements made in the report are correct and this conforms to the rules of the ASME Code, Section X L Replacement (repair or replacement)
Type Cede Symbol Stamp Certificate of Authorization No.Simie dK'd None None Expiration Date NIA Supervisor, Materials/Tspection, Date 6ý2007 nx-er orC-Is Dec; cc Title el- .-CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Coni. have inspected the components described in this Owner's Report during the period 0- o" to C'I/.7 -o --) , and state that to the best of my knowledge and belief, the Owner has pecformed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furlthermore, neither the inspector nor his employer shall be liable in any maimer for any personal injury or property damage or a loss of any kind arising froin or connected with this inspection.
_)S (-- -_.Commissions National Board, State, Province, and Endorsements Inspector's Signature'2-f1 Date ,2007 Rev. 1: Revision removed the reference to the Class I Leak Test Owner's Designee: " 2 _.&t/A , -' Date: Inspector:
Date: ___ -____" __
FORIM NIS-2 20-07-48 Rev. 1 FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI I. Owners FPL Energy Duane Arnold LLC Name Date 2.P.O. Box 14000 Juno Beach, FL 33408-0420 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Sheet Unit 04/06/07 1 of 2 1 WO 1134948 Repair Organization to P. 0. No., Job No., etc.3. Work Performed by FPL Enery Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.Expiration Date None None None 4.5.Identification of System: Main Steam Safety Relief Valve (Class 1)(a) Applicable Construction Code ASME, 111 19 68 Edition W68 Addenda N/A Code Case.(b) Applicable Edition o f Section XI Utilized for Repairs or Replacements 200 J-A03 6. Identification of Compone ts Repaired or Re laced and Replacement Components ASME Name of Name of Manufacturer Year Built Repaired, Code Component Manufacturer Serial No. National Other Identification Replaced, or Stamped Board No. Replacement (YES or Work Order/SUS NO)Main Steam Relief Target Rock S/N 189 N/A PWO 1134948 / 83,04 1976 Replacement Yes Valve Pilot Body-to-Pilot Target Rock Heat Code N/A N/A 1991 Replacement No Bolting (one nut) IN85326 Body-to-Pilot Nova Heat Code N/A P.O. # T14877 1996 Replacement No Bolting (one bolt) DMH 7. Description of Work: 8. Tests Conducted:
Replace pilot on PSV4402 with rebuilt tested spare pilot, S/N 189 (replaced one mounting bolt &nut).Hydrostatic F-1 Pneumatic E-Nominal Operating Pressure Other F--Pressure 1010 psi Test Temp 225.9 ° F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x II in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form, (12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
FORM NIS-2 20-07-48 Rev. I FORM NIS-2 (Back)9. Remarks: Pilot Valve S/N 200 was removed and pilot valve S/N 189 was installed.
Prior to installation S/N 189 was repaired and documented on NIS-2 (20-06-07).
One mounting bolt & nut was replaced during the installation of pilot S/N 189 (VT-1 was performed on replacement nut bolting).
A VT-2 was completed on the mechanical connection and found acceptable during Class I leak test.CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement (repair or replacement) conforms to the rules of the ASME Code, Section XL Type Code Symbol Stamp None Certificate of Authorization No. None Expiration Date N/A Signed Z ogramm Engineering Date April 6 2007 Owner or'Owner's Desgnee, Title ii..CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Conn. have inspected the components described in this Owner's Report during the period a -0 0, -to q4- 1b- c/'7 , rnd state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section X1, By signing this certificate neither the 'Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermnore, neither the Inspector nor his employer shall be liable in any manner fir any personal injury or property damage or a loss of any kind arising from or connected with this inspection.)f3 ...- Commissions
/,Us j 3" g4 9 -/. / G f 2--.Inspector's Signature National Board, State, Province, and Endorsements Date Y- 'L ,2007 Rev. 1: Revision added information concerning a replacement bolt.Owner's Designee:
4 -..Inspector:
~ 2 -Date: -/Y-0 Date: d -oP FORM NIS-2 20-07-51 Rev. I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI 1. Owners FPL Energy Duane Arnold LLC Name 2.P.O. Box 14000 Juno Beach, FL 33408-0420 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Date Sheet Unit 04/26/07 1 of 2 1 MWO 1136693 Repair Organization to P. 0. No., Job No., etc.3. Work Performed by FPL Energy Name 3277 DAEC Road, Palo, IA 5232 Type Code Symbol Stamp Authorization No.4 Expiration Date Core Spray, SUS 51.00, (ISI Class 2)None None None 4.5.Identification of System: (a) Applicable Construction Code VALVE -Draft 19 68 Edition No Addenda Pump & Valve Code, Section III PIPE- ANSI B31.7 69 70 (b) Applicable Edition of Sect ion XI Utilized for Repairs or Replacements 200 l-A03 N/A Code Case.N/A 6. Identification of Components Repaired or Re laced and Replacement Components ASME Name of Name of Manufacturer Year Built Repaired, Code Component Manufacturer Serial No. National Other Identification Replaced, or Stamped Board No. Replacement (YES or NO)Core Spray Loop Flowserve BA648 N/A M02132 2007 Replacement Yes"B" Test Bypass Valve Core Spray LooP Consolidated Heat # SX05 12 N/A N/A 2005 Replacement No"B" Test Bypass Power Supply Piping 7. Description of Work: 8. Tests Conducted:
Replaced M02132 and approximately 12" OF 8" piping downstream of M02132.Hydrostatic
-Pneumatic El Nominal Operating Pressure Other Pressure 290 psi Test Temp 73.1 O F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
FORM NIS-2 20-07-51 Rev. 1 FORM NIS-2 (Back)9. Remarks: Replaced M02132 and approximately 12" of 8" piping downstream of M02132. Renlacement was renired due to FAC damage. Replacement materials and installing weld procedure were impact qualified desin specification requirements.
All welding was subject to final acceptance radiography and a system leak test (P07068).
Spring can hanger, HLE-016-H-1 i, was ren...ed &&#xfd; r *inned during valve replacement ad rec'ive .n. VT-1 Y (Pflmlf71 L -,f+. t.. ...anger was unp nneu.CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement (repair or replacement) conforms to the rules of the ASN{kE Code, Section XI.Type Code Symbol Stamp None Certificate of Authorization No. None Signed ~ X,,-6 7 A ~ ,,-Aonr niern Expiration Date Date April 27, N/A 2007-(hOner or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by theNational Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Coan. have inspected the components described in this Owner's Report during the period <?- -/-6-72 to _- -A- o -, and state that. to the best of my knowledge and betief the Owner has performed examinations and taken corrective measures descrtbed in this Owner's Report in accordance with the requirements of the A StIE Code, Section X1.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Purthermore' neither the Taspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arISing from or connected with this inspection.
-_ ..-. Commissions NF- z- /Wk  4 Inspector's Signature Date ,2007 National Board, State, Province, and Endorsements Rev. 1: Revision revised "Remarks" section to accurately describe that springcan hanger was pinned & unpinned, not removed & replaced.Owner's Designee:
.f- &--(, ...\--Inspector:
Date: -v Date: J05-e '
FORM NIS-2 20-07-52 Rev. I FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI.Owners FPL Energy Duane Arnold LLC Name 2.P.O. Box 14000 Juno Beach, FL 33408-0420 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Date Sheet Unit 04/26/07 1 of 2 1 MWO 1136691 Repair Organization to P. 0. No., Job No., etc.3. Work Performed by FPL Energy Name 3277 DAEC Road, Palo, IA 52324 Type Code Symbol Stamp Authorization No.Expiration Date ore Spray, SUS 51.00, (ISI Class 2)None None None 4.5.Identification of System: C N/A Code Case.N/A (a) Applicable Construction Code VALVE -Draft 19 68 Edition Pump & Valve Code, Section III PIPE- ANSI B31.7 69 (b) Applicable Edition of Sect ion XI Utilized for Repairs or Replacements 2001 -A03 No Addenda 70 6. Identification of Components Repaired or Replaced and Replacement Components ASME Name of Name of Manufacturer Year Built Repaired, Code Component Manufacturer Serial No. National Other Identification Replaced, or Stamped Board No. Replacement (YES or NO)Core Spray Loop Flowserve BA649 N/A M02112 2007 Replacement Yes"B" Test Bypass Valve Core Spray LooP Consolidated Heat # SX0512 N/A N/A 2005 Replacement No"B" Test Bypass Power Supply Piping 7. Description of Work: 8. Tests Conducted:
Replaced M02112 and approximately 12" OF 8" piping downstream of M02112.Hydrostatic
-Pneumatic
[-]Nominal Operating Pressure Other = Pressure 305 psi Test Temp 75.4 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items I through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 10017.
FORM NIS-2 20-07-52 Rev. I FORM NIS-2 (Back)9. Remarks: Replaced M02112 and approximately 12" of 8" piping downstream of M02112. Replacement was required due to FAC damage. Replacement materials and installing weld procedure were imoact qualified design=specification requirements.
All welding was subiect to final acceptance radiography and a system leak test (P07066).
Spring can hanger, HLE-0l5-H-14, was rvv.'ed &+/- replaced pinned during valve replacement and received a VT-3 exam (P07065) fo ....n. nm.tallation after hanger was unpinned.CERTTFLCATE OF COMPLIANCE We certify that the statements made in the report are correct and this Replacement (repalz or replacement) conforms to the rules of the ASME Code, Section XI.Type Code Symbol Stamp None Certificate of Authorization No. None Expiration Date N /A Sinned _1,;P9gam Engineering Date April 2 7 th, 2007 Owner-or Owner's Designee, Title/'CERTIFICATE OF INSERVICE INSPECTION f, the undersigned, holding a vaJid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Iowa and employed by HSB CT of Hartford, Conn. have inspected the components described in this Owner's Report during the period d)-i-0 ? to S- taO) ,and state thatto the bestof my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASMVE Code, Section X1.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property datnage or a loss of any kind arising from or connected with this inspection.
___ ____ ----_- Commissions IV. ,3 J ?) / i 9 __ ..--_.Inspector's Signature National Board, State, Province, and Endorsemnents Dale 5- .,2007 Rev. 1: Revision revised "Remarks" section to accurately describe that springean hanger was pinned & unpinned, not removed & replaced.Owner's Designee:
Z &-1( xxx Date: -"/Y- &,'Inspector:
Inspector:
Date: Date: C? -d -0,&#xfd; FORM NIS-2 20-07-64 Rev. I FORM NIS-2 OWNER'S. REPORT FOR REPAIRS OR REPLACEMENTS As Required by the Provisions of the ASME Code Section XI.Owners FPL Energy Duane Arnold LLC Name 2.P.O. Box 14000 Juno Beach, FL 33408-0420 Address Plant Duane Arnold Energy Center Name 3277 DAEC Road, Palo, IA 52324 Address Date Sheet Unit 05/29/07 1 of 2 MWO 1137248 Repair Organization to P. 0. No., Job No., etc.3. Work Performed by FPL Energy Name 3277 DAEC Road, Palo, IA 52324 4. Identification of System: R 5. (a) Applicable Construction Code Type Code Symbol Stamp Authorization No.Expiration Date HR Drvwell Sp~rav -SUS 49.00 (ISI Class 2)None None None ANSI B31.7 19 69 Edition 71 Addenda 1425, 1426, &1427 Code Case.(b) Applicable Edition of Sect ion XI Utilized for Repairs or Replacements 200 1-A03 6. Identification of Components Repaired or Replaced and Replacement Components ASME Name of Name of Manufacturer Year Built Repaired, Code Component Manufacturer Serial No. National Other Identification Replaced, or Stamped Board No. Replacement (YES or NO)Spring Can Hanger Bergen Power Part 4: V94B N/A Replacement Spring Cans 2007 Replacement No 3400 Type B (QTY -2) for hanger GLE-7-H-17 Snubber Lisega SN: N/A Newly Installed snubbers 2007 Replacement No 305000547/001 (QTY -2) for locations GLE- (new& 007-SS-001
& GLE-007-SS-installation) 305000547/003 002 Yoke Clamps Lisega S/N: A1278-4 N/A Lisega Part#: 362761 2007 Replacement No (QTY-2)Weld End Bracket Lisega S/N: A-3222-4 N/A Lisega Part/i: 354953 2007 Replacement No (QTY-2)Welded Beam Bergen Power N/A N/A Bergen Power Part#: k 114278 2006 Replacement No Attachment (QTY-2)1" Weldless Eye Bergen Power N/A N/A Bergen Power Part#: BP5130 2006 Replacement No Nut (QTY-2)I" X 26" Hanger Cardinal Heat #: 8070063 N/A SA-193 Grade B7 1993 Replacement No Rod (QTY-I)1" X 8" Hanger Cardinal Heat #: 8070063 N/A SA-193 Grade B7 1993 Replacement No Rod (QTY-I)I" Hex Nut (SA- Cardinal Heat #I: Mx2374 N/A N/A 1985 Replacement No 194 Gr 2H)1" Hex Nut (SA- Heat #:KB5607 N/A N/A 1986 Replacement No 194 Gr 21H)1A" Plate (A-36) Dubose Heat#: 1612940 N/A N/A 2006 Replacement No 4"X4"XI/4" Tube Dubose Heat 4: N623852 N/A Trace #: 27439-1 2007 Replacement No Steel r 7. Description of Work: Replaced spring can hanger, GLE-7-H-17, and installed two new snubbers, GLE-007-SS-001
&GLE-007-SS-002.
FORM NIS-2 20-07-64 Rev. 1 8. Tests Conducted:
Hydrostatic
[ Pneumatic
[-] Nominal Operating Pressure Other Pressure N/A psi Test Temp N/A 0 F NOTE: Supplemental sheets in form of lists, sketches, or drawings may be used, provided (1) size is 81/2 in. x 11 in., (2) information in items 1 through 6 on this report is included on each sheet, and (3) each sheet is numbered and the number of sheets is recorded at the top of this form.(12/82) This Form (E00030) may be obtained from the Order Dept., ASME, 345 E. 47th St., New York, NY 100 17.FORM NIS-2 9. Remarks: Replaced spring can hanger, GLE-7-H-1 7, and installed two new snubbers, GLE-007-SS-001
& GLE-007-SS-002 as part of modification for drywell penetration X039A. Snubber-to-building components were site manufactured from materials listed on page #1 on this NIS-2. The replaced spring can hanger and both new snubbers received VT-3 examinations after installation (P07055, 56, & 57).CERTIFICATE OF COMPLIANCE We certify that the statements made in ihe report are correct and this Replacement (repair or replacement) conforms to the rudes of the ASME Code, Section XI.Type Code Symbol Stamp None Certificate of Authorization No. < None Expiration Date N/A Signed / ogram Engineering Date May 29th, 2007 Owner or Owner's Designee, Title CERTIFICATE OF INS ERVICE INSPECTION I, the uadersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province oiv Iowa and employed by HSB CT of Hartford, Conn. have inspected the components described in this Owner's Report during the period /-//- C"7 to b 6? ,and state that to the b-t of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owner's Report in accordance with the requirements of the ASME Code, Section XI.By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective mcasure3 described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any .kind arising from or connected with this inspection.
-_- _ _ _-_ -_-- Commissions me) /193?Qi "v /W'Y G ""'Inspector's Signature National Board, State, Province, and Endorsements Date- =,200-1, Rev. 1: Revision corrected part number for replacement springcan hanger and corrected serial numbers for replacement snubbers.Owner's Designe e _ _ _ _ _ _ __: ..e: Inspector:
Y ' Date: _ _ -____--__I}}