ML111080044: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 13: Line 13:
| page count = 4
| page count = 4
}}
}}
=Text=
{{#Wiki_filter:Licensee: Facilities:
Docket Nos: Date/ Time: Location: Purpose: MN No. 11-003 U.S. NUCLEAR REGUIATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING April 18, 2OII Exelon Generation ComPanY, LLC Limerick Generating Station Units 1 and2 50-352 and 50-353 May 1 8,2011 from 6:00 P.m. to 8:00 P.m.Limerick Township Municipal Building 646 W. Ridge Pike Limerick, PA 19468 (Meeting Room A)The u. s. Nuclear Regulatory commission (NRC) will-meet with the public to discuss the NRC's assessment of safety performance at Limerick Generating Station for 2010, as described in the annual assessment letter OLteO March 4,2011. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant oPerations.
NRC Attendees:
J. Clifford, Deputy Director, Division of Reactor Projecls P. Krohn, Chief, Division of Reactor Projects, Branch 4 E. DiPaolo, Senior Resident lnspector, Limerick public Participation:
This is a Category 3 Meeting. The.public will have an opportunity to communicate with NRC staff following the presentation.
Meeting Contact: Paul G. Krohn, Chief, Projects Branch 4 610-337-5120 E-mail: paul.krohn@nrc.qov The NRC's annual assessment letter regarding Limerick Generating Station performance during 2010 can be found in ADAMS with Accession Number ML110620350.
ADAMS is accessible from the NRC website at: http://nrc.qov/readino-rm/adams.html.
Additional information relative to the NRC's annual assessment process and the safety perfbrmance of Limerick Generating Station can be found on the NRC's website at: http://www.
nrc.qov/NRR/OVERSIGHT/ASSESS/index.
html The NRC's policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 211z,aiplies to this meeting. The policy statement may be foul! ol the NRC website'and contains information regarding visitors and security.The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
lf you need a reasonable accommodation to participatein this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-6y-c"se basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.Attendance by other NRC personnel at this meeting should be made known by May 16,2011, via telephone to the NRC meeting contact.Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.
pleaselonfirm the meeting schedule on the NRC website under public meetings.Approved oy, fq* { -tZ, /4J--PaulG. Krohn, Chief Projects Branch 4 Division of Reactor Projects Distribution via ListServ 2 The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings,'effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://wvuriv.nrc.qov/readinq-rm/doc-collections/commissionlpolicv/67fr36920.htm1, and contains information regarding visitors and security.The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.Attendance by other NRC personnel at this meeting should be made known by May 16,2411, via telephone to the NRC meeting contact.Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, please confirm the meeting schedule on the NRC website under public meetings.Approved by:/RA/Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Distribution: (via email)Executive Director for Operations, OEDO Deputy Executive Director for Reactor Programs, OEDO Director, Offce of Nuclear Reactor Regulation, NRR Deputy Director, Offce of Nuclear Reactor Regulation, NRR Director, Division of Inspection and Regional Support, NRR/DIRS Director, Division of Operating Reactor Licensing, NRR/DORL Asst. General Counsel Materials Litigation and Enforcement, OGC B. Dean. RA D. Lew, DRA D. Roberts, DRP J. Clifford.
DRP C. Miller, DRS P. Wilson, DRS S. Bush-Goddard, Rl OEDO P. Krohn, DRP A. Rosebrook, DRP E. Tones, DRP E. DiPaolo, DRP, SRI N. Sieller, DRP, Rl N. Esch, Resident OA D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA N. McNamara, SLO D. Tifft, sLo V. Lewis, Rl Receptionist K. Heater, DRP (RTDSEDOMAILCENTER)(RIDSEDOMAILCENTER)(RTDSNRROD)(RTDSNRROD)(RTDSNRRDIRS)(RIDSNRRDORL)(RTDSOGCMAILCENTER)
D. Bearde, DRS T. Haverkamp, DNMS G. Matakas, ORA RidsN nPM LimerickResource RidsNnDorlLpl 1 -2Resource ROPReportsResource DOCUMENT NAME: G:\DRP\BRANCH4\Assessment (EOC, MC)\ROP 1 1\201 0 EOC\AAM Notices\LM 2010 AAM Meeting Notice Rev3.docx MLl110800'14 After declaring this document'An Official Agency Record" it g!!! be released to the Public.To rccelve a copy of thle document, lndlcate In the box: 'C' = Copy witrcut athdtmenUenclosure
'E" = Copy wih athdmenUendosure "ll' = No copy CFFICE mmt RI/DRP RI/DRP NAME EDiPaolo/
PGK for PKrohn/ PGK for DATE ul14l11 04t14 tl1 CIAL RECORD COPY 3 Aqenda NRC's Annual Assessment Meeting Limerick Generating Station MaY 18,2011 6:00 p.m. - 8:00 P.m.Limerick Township Municipal Building 646 W. Ridge Pike Limerick, PA 19468 (Meeting Room A)FormalMeetino Introductign Discussion of l-imerick Generating Station performancein2010
""(10 minutes)Discussion of U.S. plant safe operation in light of Japan Event """(10 minutes)NRC to address public questions (as needed)Closing Remarks """' (5 minutes)}}

Revision as of 13:41, 8 August 2018

05/18/2011 Notice of Public Meeting with Exelon Generation Company, LLC, Limerick, Units 1 and 2, to Discuss Nrc'S Assessment of Safety Performance for 03/4/11
ML111080044
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 04/18/2011
From: Krohn P G
Reactor Projects Region 1 Branch 4
To:
Krohn P G
References
Download: ML111080044 (4)


Text

Licensee: Facilities:

Docket Nos: Date/ Time: Location: Purpose: MN No.11-003 U.S. NUCLEAR REGUIATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING April 18, 2OII Exelon Generation ComPanY, LLC Limerick Generating Station Units 1 and2 50-352 and 50-353 May 1 8,2011 from 6:00 P.m. to 8:00 P.m.Limerick Township Municipal Building 646 W. Ridge Pike Limerick, PA 19468 (Meeting Room A)The u. s. Nuclear Regulatory commission (NRC) will-meet with the public to discuss the NRC's assessment of safety performance at Limerick Generating Station for 2010, as described in the annual assessment letter OLteO March 4,2011. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant oPerations.

NRC Attendees:

J. Clifford, Deputy Director, Division of Reactor Projecls P. Krohn, Chief, Division of Reactor Projects, Branch 4 E. DiPaolo, Senior Resident lnspector, Limerick public Participation:

This is a Category 3 Meeting. The.public will have an opportunity to communicate with NRC staff following the presentation.

Meeting Contact: Paul G. Krohn, Chief, Projects Branch 4 610-337-5120 E-mail: paul.krohn@nrc.qov The NRC's annual assessment letter regarding Limerick Generating Station performance during 2010 can be found in ADAMS with Accession Number ML110620350.

ADAMS is accessible from the NRC website at: http://nrc.qov/readino-rm/adams.html.

Additional information relative to the NRC's annual assessment process and the safety perfbrmance of Limerick Generating Station can be found on the NRC's website at: http://www.

nrc.qov/NRR/OVERSIGHT/ASSESS/index.

html The NRC's policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 211z,aiplies to this meeting. The policy statement may be foul! ol the NRC website'and contains information regarding visitors and security.The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

lf you need a reasonable accommodation to participatein this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-6y-c"se basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.Attendance by other NRC personnel at this meeting should be made known by May 16,2011, via telephone to the NRC meeting contact.Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.

pleaselonfirm the meeting schedule on the NRC website under public meetings.Approved oy, fq* { -tZ, /4J--PaulG. Krohn, Chief Projects Branch 4 Division of Reactor Projects Distribution via ListServ 2 The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings,'effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://wvuriv.nrc.qov/readinq-rm/doc-collections/commissionlpolicv/67fr36920.htm1, and contains information regarding visitors and security.The NRC provides reasonable accommodation to individuals with disabilities where appropriate.

lf you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.9., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.Attendance by other NRC personnel at this meeting should be made known by May 16,2411, via telephone to the NRC meeting contact.Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances, please confirm the meeting schedule on the NRC website under public meetings.Approved by:/RA/Paul G. Krohn, Chief Projects Branch 4 Division of Reactor Projects Distribution: (via email)Executive Director for Operations, OEDO Deputy Executive Director for Reactor Programs, OEDO Director, Offce of Nuclear Reactor Regulation, NRR Deputy Director, Offce of Nuclear Reactor Regulation, NRR Director, Division of Inspection and Regional Support, NRR/DIRS Director, Division of Operating Reactor Licensing, NRR/DORL Asst. General Counsel Materials Litigation and Enforcement, OGC B. Dean. RA D. Lew, DRA D. Roberts, DRP J. Clifford.

DRP C. Miller, DRS P. Wilson, DRS S. Bush-Goddard, Rl OEDO P. Krohn, DRP A. Rosebrook, DRP E. Tones, DRP E. DiPaolo, DRP, SRI N. Sieller, DRP, Rl N. Esch, Resident OA D. Screnci, PAO N. Sheehan, PAO R. Barkley, ORA N. McNamara, SLO D. Tifft, sLo V. Lewis, Rl Receptionist K. Heater, DRP (RTDSEDOMAILCENTER)(RIDSEDOMAILCENTER)(RTDSNRROD)(RTDSNRROD)(RTDSNRRDIRS)(RIDSNRRDORL)(RTDSOGCMAILCENTER)

D. Bearde, DRS T. Haverkamp, DNMS G. Matakas, ORA RidsN nPM LimerickResource RidsNnDorlLpl 1 -2Resource ROPReportsResource DOCUMENT NAME: G:\DRP\BRANCH4\Assessment (EOC, MC)\ROP 1 1\201 0 EOC\AAM Notices\LM 2010 AAM Meeting Notice Rev3.docx MLl110800'14 After declaring this document'An Official Agency Record" it g!!! be released to the Public.To rccelve a copy of thle document, lndlcate In the box: 'C' = Copy witrcut athdtmenUenclosure

'E" = Copy wih athdmenUendosure "ll' = No copy CFFICE mmt RI/DRP RI/DRP NAME EDiPaolo/

PGK for PKrohn/ PGK for DATE ul14l11 04t14 tl1 CIAL RECORD COPY 3 Aqenda NRC's Annual Assessment Meeting Limerick Generating Station MaY 18,2011 6:00 p.m. - 8:00 P.m.Limerick Township Municipal Building 646 W. Ridge Pike Limerick, PA 19468 (Meeting Room A)FormalMeetino Introductign Discussion of l-imerick Generating Station performancein2010

""(10 minutes)Discussion of U.S. plant safe operation in light of Japan Event """(10 minutes)NRC to address public questions (as needed)Closing Remarks """' (5 minutes)