Regulatory Guide 1.49: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 14: Line 14:
| page count = 1
| page count = 1
}}
}}
{{#Wiki_filter:May 1973U.S. ATOMIC ENERGY COMMISSIONREGULATORYDIRECTORATE OF REGULATORY STANDARDSGUIDEREGULATORY GUIDE 1.49POWER LEVELS OF WATER-COOLED NUCLEAR POWER PLANTS
{{#Wiki_filter:May 1973 U.S. ATOMIC ENERGY COMMISSION
REGULATORY
DIRECTORATE
OF REGULATORY  
STANDARDS GUIDE REGULATORY
GUIDE 1.49 POWER LEVELS OF WATER-COOLED  
NUCLEAR POWER PLANTS  


==A. INTRODUCTION==
==A. INTRODUCTION==
It is the policy of the Atomic Energy Commissionto encourage, support, and give priority consideration toactivities leading to greater standardization of nuclearpower plants. In a statement issued on March 5, 1973,implementing that policy, the Commission stated thatthe size of all new plants accepted for licensing review(both those proposed for review as standardized plantsand those proposed for review in connection with aspecific application for a construction permit) would belimited to power levels of less than 3,800 megawattsthermal.Section 50.34 of 10 CFR Part 50 requires that eachapplication for a construction permit include a summarydescription and discussion of the facility with specialattention to, among other things, the design andoperating characteristics at the projected initial licensedpower level. Section 50.34- also requires that theapplication include an analysis and evaluation of themajor structures, systems, and components of thefacility at the projected initial power level and at theultimate power level which is contemplated by theapplicant. This guide describes acceptable maximumpower levels for water-cooled nuclear power plants.
It is the policy of the Atomic Energy Commission to encourage, support, and give priority consideration to activities leading to greater standardization of nuclear power plants. In a statement issued on March 5, 1973, implementing that policy, the Commission stated that the size of all new plants accepted for licensing review (both those proposed for review as standardized plants and those proposed for review in connection with a specific application for a construction permit) would be limited to power levels of less than 3,800 megawatts thermal.Section 50.34 of 10 CFR Part 50 requires that each application for a construction permit include a summary description and discussion of the facility with special attention to, among other things, the design and operating characteristics at the projected initial licensed power level. Section 50.34- also requires that the application include an analysis and evaluation of the major structures, systems, and components of the facility at the projected initial power level and at the ultimate power level which is contemplated by the applicant.
 
This guide describes acceptable maximum power levels for water-cooled nuclear power plants.


==B. DISCUSSION==
==B. DISCUSSION==
The power levels of water-cooled nuclear powerplants have shown a continual increase from about 600megawatts electric in 1965 to slightly above 1,300megawatts electric in 1973. The continual increase in thesize of these plants has resulted in plant designmodifications and a large expenditure of' AEC staffreview effort to assure the maintenance of a consistentlevel of safety. These numerous plant design variations,coupled with the rapidly increasing number ofapplications, have contributed to the steady growth inthe required licensing ieview time to evaluate suchapplications. Until sufficient experience is gained withthe design, construction, and operation of the largerplants, the size of these plants should be limited tocurrent levels.
The power levels of water-cooled nuclear power plants have shown a continual increase from about 600 megawatts electric in 1965 to slightly above 1,300 megawatts electric in 1973. The continual increase in the size of these plants has resulted in plant design modifications and a large expenditure of' AEC staff review effort to assure the maintenance of a consistent level of safety. These numerous plant design variations, coupled with the rapidly increasing number of applications, have contributed to the steady growth in the required licensing ieview time to evaluate such applications.
 
Until sufficient experience is gained with the design, construction, and operation of the larger plants, the size of these plants should be limited to current levels.C. REGULATORY
POSITION The projected initial licensed power level of a water-cooled nuclear power. plant for which a construction permit application is filed pursuant to Section 50.34 of 10 CFR Part 50 should be limited to a reactor core power level of 3,800 megawatts thermal or less. The ultimate power level for which an analysis and evaluation ot the major structures, systems. and components is required should be limited to 4.100 megawatts thermal or les
 
====s. USAEC REGULATORY ====
GUIDES Copies of published guides may be obtained by request indicating the divisions desired to the US. Atomic Energy Commission, Washington, D.C. 20545, Regulatory Guides are issued to describe and make available to the public Attention:
Director of Regulatory Standards.
 
Conments and suggestions for methods acceptable to the AEC Regulatory staff of implementing specific parts of improvements in these guides are encouraged and should be sent to the Secretary the Commission's regulations, to delineate techniques used by the staff in of the Commission, U.S. Atomic Energy Commission, Washington D.C. 20545, evaluating specific problems or postulated accidents, or to provide guidance to Attention:
Chief, Public Proceedings Staff.applicants.
 
Regulatory Guides are not substitutes for regulations and compliance with them is not required.
 
Methods and solutions different from those set out in The guides are issued in the following ten broad divisions:
the guides will be acceptable if they provide a basis for the findings requisite to the issuance or continuance of a permit or license by the Commission.


==C. REGULATORY POSITION==
1. Power Reactors 6. Products 2. Research and Test Reactors 7. Transpcrtat,on
The projected initial licensed power level of awater-cooled nuclear power. plant for which aconstruction permit application is filed pursuant toSection 50.34 of 10 CFR Part 50 should be limited to areactor core power level of 3,800 megawatts thermal orless. The ultimate power level for which an analysis andevaluation ot the major structures, systems. andcomponents is required should be limited to 4.100megawatts thermal or less.USAEC REGULATORY GUIDES Copies of published guides may be obtained by request indicating the divisionsdesired to the US. Atomic Energy Commission, Washington, D.C. 20545,Regulatory Guides are issued to describe and make available to the public Attention: Director of Regulatory Standards. Conments and suggestions formethods acceptable to the AEC Regulatory staff of implementing specific parts of improvements in these guides are encouraged and should be sent to the Secretarythe Commission's regulations, to delineate techniques used by the staff in of the Commission, U.S. Atomic Energy Commission, Washington D.C. 20545,evaluating specific problems or postulated accidents, or to provide guidance to Attention: Chief, Public Proceedings Staff.applicants. Regulatory Guides are not substitutes for regulations and compliancewith them is not required. Methods and solutions different from those set out in The guides are issued in the following ten broad divisions:the guides will be acceptable if they provide a basis for the findings requisite tothe issuance or continuance of a permit or license by the Commission. 1. Power Reactors 6. Products2. Research and Test Reactors 7. Transpcrtat,on3. Fuels and Materials Facilities 8. Occupational HealthPublished guides will be revised periodically, as appropriate, to accommodate 4. Environmental and Siting 9. Antitrust Reviewcomments and to reflect new information or experience. 5. Materials and Plant Protection 1
3. Fuels and Materials Facilities  
8. Occupational Health Published guides will be revised periodically, as appropriate, to accommodate  
4. Environmental and Siting 9. Antitrust Review comments and to reflect new information or experience.


===0. General ===
5. Materials and Plant Protection
}}
10. General}}


{{RG-Nav}}
{{RG-Nav}}

Revision as of 09:24, 23 July 2018

Power Levels of Water-Cooled Nuclear Power Plants
ML12298A125
Person / Time
Issue date: 05/31/1973
From:
Office of Nuclear Regulatory Research, US Atomic Energy Commission (AEC)
To:
References
RG-1.049
Download: ML12298A125 (1)


May 1973 U.S. ATOMIC ENERGY COMMISSION

REGULATORY

DIRECTORATE

OF REGULATORY

STANDARDS GUIDE REGULATORY

GUIDE 1.49 POWER LEVELS OF WATER-COOLED

NUCLEAR POWER PLANTS

A. INTRODUCTION

It is the policy of the Atomic Energy Commission to encourage, support, and give priority consideration to activities leading to greater standardization of nuclear power plants. In a statement issued on March 5, 1973, implementing that policy, the Commission stated that the size of all new plants accepted for licensing review (both those proposed for review as standardized plants and those proposed for review in connection with a specific application for a construction permit) would be limited to power levels of less than 3,800 megawatts thermal.Section 50.34 of 10 CFR Part 50 requires that each application for a construction permit include a summary description and discussion of the facility with special attention to, among other things, the design and operating characteristics at the projected initial licensed power level. Section 50.34- also requires that the application include an analysis and evaluation of the major structures, systems, and components of the facility at the projected initial power level and at the ultimate power level which is contemplated by the applicant.

This guide describes acceptable maximum power levels for water-cooled nuclear power plants.

B. DISCUSSION

The power levels of water-cooled nuclear power plants have shown a continual increase from about 600 megawatts electric in 1965 to slightly above 1,300 megawatts electric in 1973. The continual increase in the size of these plants has resulted in plant design modifications and a large expenditure of' AEC staff review effort to assure the maintenance of a consistent level of safety. These numerous plant design variations, coupled with the rapidly increasing number of applications, have contributed to the steady growth in the required licensing ieview time to evaluate such applications.

Until sufficient experience is gained with the design, construction, and operation of the larger plants, the size of these plants should be limited to current levels.C. REGULATORY

POSITION The projected initial licensed power level of a water-cooled nuclear power. plant for which a construction permit application is filed pursuant to Section 50.34 of 10 CFR Part 50 should be limited to a reactor core power level of 3,800 megawatts thermal or less. The ultimate power level for which an analysis and evaluation ot the major structures, systems. and components is required should be limited to 4.100 megawatts thermal or les

s. USAEC REGULATORY

GUIDES Copies of published guides may be obtained by request indicating the divisions desired to the US. Atomic Energy Commission, Washington, D.C. 20545, Regulatory Guides are issued to describe and make available to the public Attention:

Director of Regulatory Standards.

Conments and suggestions for methods acceptable to the AEC Regulatory staff of implementing specific parts of improvements in these guides are encouraged and should be sent to the Secretary the Commission's regulations, to delineate techniques used by the staff in of the Commission, U.S. Atomic Energy Commission, Washington D.C. 20545, evaluating specific problems or postulated accidents, or to provide guidance to Attention:

Chief, Public Proceedings Staff.applicants.

Regulatory Guides are not substitutes for regulations and compliance with them is not required.

Methods and solutions different from those set out in The guides are issued in the following ten broad divisions:

the guides will be acceptable if they provide a basis for the findings requisite to the issuance or continuance of a permit or license by the Commission.

1. Power Reactors 6. Products 2. Research and Test Reactors 7. Transpcrtat,on

3. Fuels and Materials Facilities

8. Occupational Health Published guides will be revised periodically, as appropriate, to accommodate

4. Environmental and Siting 9. Antitrust Review comments and to reflect new information or experience.

5. Materials and Plant Protection

10. General