#REDIRECT [[JAFP-14-0121, James a FitzPatrick Nuclear Power Plant - Extension to Commitment in Flooding Walkdown Report for Restricted Access Equipment]]
| number = ML14303A665
| issue date = 10/30/2014
| title = James a FitzPatrick Nuclear Power Plant - Extension to Commitment in Flooding Walkdown Report for Restricted Access Equipment
| author name = Adner C M
| author affiliation = Entergy Nuclear Northeast, Entergy Nuclear Operations, Inc
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000333
| license number = DPR-059
| contact person =
| case reference number = JAFP-14-0121
| document type = Letter
| page count = 4
}}
 
=Text=
{{#Wiki_filter:JAFP-14-0121  
 
October 30, 2014
 
U.S. Nuclear Regulatory Commission
 
Attention:  Document Control Desk Washington, DC 20555
 
==Subject:==
Extension to Commitment in Flooding Walkdown Report for "Restricted Access" Equipment James A FitzPatrick Nuclear Power Plant  
 
Docket No. 50-333 License No. DPR-059
 
==References:==
: 1. NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012 (ML12053A340) 2. Entergy letter, Flooding Walkdown Report - Entergy's Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Flooding Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, JAFP-12-0135, dated November 27, 2012 3. NEI letter, Generic Template for Closure of Flooding Design Basis Walkdown "Restricted Access" Items, APC 13-13, dated May 13, 2013
 
==Dear Sir or Madam:==
 
James A. FitzPatrick Nuclear Power Plant (JAF) submitted the Flooding Walkdown Report on March 27, 2012, [Reference 2] in response to the NRC Request for Information Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the
 
Fukushima Dai-ichi Accident [Reference 1]. Reference 2 made a commitment to perform inspections of equipment that could not be inspected as identified in section 7.5 of the Flooding Walkdown Report. The Perimeter Drain Pump Pit was classified as restricted access and was scheduled to be inspected by November 1, 2014. Further evaluation of the Perimeter Drain Pump Pit has determined it to be classified as inaccessible. An evaluation of this equipment as inaccessible is in progress and the resolution of open items in section 7.5 of the Flooding Walkdown Report will be included in a submittal prescribed by Reference 3. This letter changes the commitment in Reference 2 by moving the scheduled completion date for performing the inspections and JAF will submit the resolution of the open items to the NRC by December 30, 2014. Entergy Nuclear NortheastEntergy Nuclear Operations, Inc. James A. FitzPatrick NPP P.O. Box 110 Lycoming, NY 13093 Tel 315-342-3840 Chris M. Adner Regulatory Assurance Manager JAFP-14-0121 Page 2 of 2 The Regulatory Commitment identified in the Attachment updates existing commitments from Reference
: 2. Should you have any questions regarding this letter, please contact Chris M. Adner, Regulatory Assurance
: Manager, at (315) 349-6766.
Sincerely, Chris M. Adner Regulatory Assurance Manager CA/mh
 
==Attachment:==
 
Regulatory Commitment cc: Director, Office of Nuclear Reactor Regulation NRC Regional Administrator NRC Resident Inspector NRC Project Manager Ms. Bridget Frymire, NYSPSC President NYSERDA 
 
JAFP-14-0121 ATTACHMENT Regulatory Commitments (1 Page)
JAFP-14-0121 Attachment Regulatory Commitments Page 1 of 1 This table identifies actions discussed in this letter for which Entergy commits to perform. Any other actions discussed in this submittal are described for the NRC's information and are not commitments.
COMMITMENT TYPE (Check one)
SCHEDULED COMPLETION DATE (If Required)
ONE-TIME ACTION CONTINUING COMPLIANCE Entergy will perform inspections of equipment that could not be inspected as identified in Section 7.5 of the Flooding
 
Walkdown Report and submit to the NRC resolution of open items.
X  December 30, 2014}}