ML15103A109: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
#REDIRECT [[L-2015-108, St. Lucie, Units 1 and 2, Environmental Protection Plan Report - 316(b) Related Documentation]]
| number = ML15103A109
| issue date = 03/31/2015
| title = St. Lucie, Units 1 and 2, Environmental Protection Plan Report - 316(b) Related Documentation
| author name = Costanzo C R
| author affiliation = Florida Power & Light Co
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000335, 05000389
| license number =
| contact person =
| case reference number = L-2015-108
| package number = ML15103A114
| document type = Letter
| page count = 2
}}
 
=Text=
{{#Wiki_filter:aPPL.March 31, 2015L-2015-108 10 CFR 50.4EPP 3.2.2U. S. Nuclear Regulatory Commission Attn: Document Control DeskWashington, DC 20555Re: St. Lucie Units 1 and 2Docket Nos. 50-335 and 50-389Environmental Protection Plan Report316(b) Related Documentation Pursuant to Section 3.2.2 of the St. Lucie Environmental Protection Plan, Florida Power &Light Company (FPL) is forwarding the enclosed copy of 316(b) related documentation.
Thematter pertains to the Heated Water Report -February 2015 regarding the Heated Water Planof Study (HWPOS).
Though initially intended to be a two year study, the Florida Department of Environmental Protection (FDEP) approved ending the study early based on a review ofpreliminary data and findings.
Please contact Vince Munne' at (772) 263-2847 if there are any questions on this matter.S'erely,Christopher R. CostanzoSite Vice President St. Lucie PlantCRC/tltEnclosure Florida Power & Light Company6501 S. Ocean Drive, Jensen Beach, FL 34957 St. Lucie Units I and 2Florida Power &L-2015-108 Enclosure St. Lucie PlantState IWW Permit No. FL0002208 Light Company Heated Water Report -February 2015(VPPSL051
& I bound copy)}}

Revision as of 04:53, 9 July 2018