ML16091A053: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
#REDIRECT [[RA-16-001, Duke - 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums]]
| number = ML16091A053
| issue date = 03/31/2016
| title = Duke - 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums
| author name = Nolan M C
| author affiliation = Duke Energy Carolinas, LLC, Duke Energy Progress, Inc
| addressee name =
| addressee affiliation = NRC/Document Control Desk, NRC/NRR
| docket = 05000261, 05000269, 05000270, 05000287, 05000324, 05000325, 05000369, 05000370, 05000400, 05000413, 05000414
| license number = DPR-023, DPR-038, DPR-047, DPR-055, DPR-071, DPR-602, NPF-009, NPF-017, NPF-035, NPF-052, NPF-063
| contact person =
| case reference number = RA-16-0015
| document type = Financial Assurance Document, Letter
| page count = 4
}}
 
=Text=
{{#Wiki_filter:M. Christopher Nolan 526 South Church Street Charlotte, NC 28202 Mailing Address: Mail Code EC2ZF /P.O. Box 1006 Charlotte, NC 28201-1006 704-382-7426
 
March 31, 2016                RA-16-0015            10 CFR 140.21
 
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC  20555-0001
 
Catawba Nuclear Station, Unit Nos. 1 and 2 Docket Nos. 50-413 and 50-414 / Renewed License Nos. NPF-35 and NPF-52
 
McGuire Nuclear Station, Unit Nos. 1 and 2 Docket Nos. 50-369 and 50-370 / Renewed License Nos. NPF-9 and NPF-17
 
Oconee Nuclear Station, Unit Nos. 1, 2 and 3 Docket Nos. 50-269, 50-270, and 50-287 / Renewed License Nos. DPR-38, DPR-47, and DPR-55 Shearon Harris Nuclear Power Plant, Unit No. 1 Docket No. 50-400 / Renewed License No. NPF-63
 
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Docket Nos. 50-325 and 50-324 / Renewed License Nos. DPR-71 and DPR-62
 
H. B. Robinson Steam Electric Plant, Unit No. 2 Docket No. 50-261 / Renewed License No. DPR-23
 
==Subject:==
10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums
 
The requirements of 10 CFR 140.21 include annual submittal of evidence that each licensee maintains a guarantee of payment of deferred premium in the amount of $18.963 million for each reactor it is licensed to operate. Duke Energy Carolinas, LLC and Duke Energy Progress, Inc. maintain nuclear liability endorsements through Marsh USA for the Catawba Nuclear Station (CNS), McGuire Nuclear Station (MNS), Oconee Nuclear Station (ONS), Shearon Harris Nuclear Power Plant (SHNPP), Brunswick Steam Electric Plant (BSEP), and the H.B. Robinson Steam Electric Plant (HBRSEP) under the American Nuclear Insurer's (ANI) Master Policy - Nuclear Energy Liability Insurance (Secondary Financial Protection). This coverage includes a Bond of Payment of Retrospective Premiums and provides the basis for Duke Energy compliance with the provisions of 10 CFR 140.21(a). A certificate of insurance verifying ANI Nuclear Energy Liability insurance was sent by Marsh USA to the USNRC on February 18,
 
2016. 
 
U.S. Nuclear Regulatory Commission March 31, 2016 Page 2 Please address any comments or questions regarding this matter to Art Zaremba at (980) 373-2062.
Sincerely, M. Christopher Nolan Director Nuclear Regulatory Affairs U.S. Nuclear Regulatory Commission March 31, 2016
 
Page 3        xc:  Catherine Haney, Region II Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, Georgia 30303-1257
 
James R. Hall, Project Manager (ONS)
U.S. Nuclear Regulatory Commission 11555 Rockville Pike
 
Rockville, MD 20852-2738 G. E. Miller, Project Manager (CNS and MNS)
U.S. Nuclear Regulatory Commission 11555 Rockville Pike
 
Rockville, MD 20852-2738 Martha Barillas, NRR Project Manager (SHNPP)
U. S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738
 
Dennis Galvin - Project Manager (HBRSEP)
U. S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738
 
A. Hon, NRR Project Manager (BSEP)
U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738
 
Michelle P. Catts USNRC Resident Inspector - BSEP
 
Joe D. Austin USNRC Resident Inspector - SHNPP
 
Kevin Ellis USNRC Resident Inspector - HBRSEP
 
George Hutto USNRC Resident Inspector - CNS U.S. Nuclear Regulatory Commission March 31, 2016
 
Page 4  John Zeiler USNRC Resident Inspector - MNS
 
Eddy L. Crowe USNRC Resident Inspector - ONS
 
M. Christopher Nolan 526 South Church Street Charlotte, NC 28202 Mailing Address: Mail Code EC2ZF /P.O. Box 1006 Charlotte, NC 28201-1006 704-382-7426
 
March 31, 2016                RA-16-0015            10 CFR 140.21
 
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC  20555-0001
 
Catawba Nuclear Station, Unit Nos. 1 and 2 Docket Nos. 50-413 and 50-414 / Renewed License Nos. NPF-35 and NPF-52
 
McGuire Nuclear Station, Unit Nos. 1 and 2 Docket Nos. 50-369 and 50-370 / Renewed License Nos. NPF-9 and NPF-17
 
Oconee Nuclear Station, Unit Nos. 1, 2 and 3 Docket Nos. 50-269, 50-270, and 50-287 / Renewed License Nos. DPR-38, DPR-47, and DPR-55 Shearon Harris Nuclear Power Plant, Unit No. 1 Docket No. 50-400 / Renewed License No. NPF-63
 
Brunswick Steam Electric Plant, Unit Nos. 1 and 2 Docket Nos. 50-325 and 50-324 / Renewed License Nos. DPR-71 and DPR-62
 
H. B. Robinson Steam Electric Plant, Unit No. 2 Docket No. 50-261 / Renewed License No. DPR-23
 
==Subject:==
10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums  
 
The requirements of 10 CFR 140.21 include annual submittal of evidence that each licensee maintains a guarantee of payment of deferred premium in the amount of $18.963 million for each reactor it is licensed to operate. Duke Energy Carolinas, LLC and Duke Energy Progress, Inc. maintain nuclear liability endorsements through Marsh USA for the Catawba Nuclear Station (CNS), McGuire Nuclear Station (MNS), Oconee Nuclear Station (ONS), Shearon Harris Nuclear Power Plant (SHNPP), Brunswick Steam Electric Plant (BSEP), and the H.B. Robinson Steam Electric Plant (HBRSEP) under the American Nuclear Insurer's (ANI) Master Policy - Nuclear Energy Liability Insurance (Secondary Financial Protection). This coverage includes a Bond of Payment of Retrospective Premiums and provides the basis for Duke Energy compliance with the provisions of 10 CFR 140.21(a). A certificate of insurance verifying ANI Nuclear Energy Liability insurance was sent by Marsh USA to the USNRC on February 18,
 
2016. 
 
U.S. Nuclear Regulatory Commission March 31, 2016 Page 2 Please address any comments or questions regarding this matter to Art Zaremba at (980) 373-2062.
Sincerely, M. Christopher Nolan Director Nuclear Regulatory Affairs U.S. Nuclear Regulatory Commission March 31, 2016
 
Page 3        xc:  Catherine Haney, Region II Administrator U.S. Nuclear Regulatory Commission Marquis One Tower 245 Peachtree Center Avenue NE, Suite 1200 Atlanta, Georgia 30303-1257
 
James R. Hall, Project Manager (ONS)
U.S. Nuclear Regulatory Commission 11555 Rockville Pike
 
Rockville, MD 20852-2738 G. E. Miller, Project Manager (CNS and MNS)
U.S. Nuclear Regulatory Commission 11555 Rockville Pike
 
Rockville, MD 20852-2738 Martha Barillas, NRR Project Manager (SHNPP)
U. S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738
 
Dennis Galvin - Project Manager (HBRSEP)
U. S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738
 
A. Hon, NRR Project Manager (BSEP)
U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852-2738
 
Michelle P. Catts USNRC Resident Inspector - BSEP
 
Joe D. Austin USNRC Resident Inspector - SHNPP
 
Kevin Ellis USNRC Resident Inspector - HBRSEP
 
George Hutto USNRC Resident Inspector - CNS U.S. Nuclear Regulatory Commission March 31, 2016
 
Page 4  John Zeiler USNRC Resident Inspector - MNS
 
Eddy L. Crowe USNRC Resident Inspector - ONS}}

Revision as of 12:38, 8 July 2018