ML16111B211: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
#REDIRECT [[RS-16-080, LaSalle County, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 22, List of Effective Pages]]
| number = ML16111B211
| issue date = 04/11/2016
| title = LaSalle County, Units 1 and 2 - Updated Final Safety Analysis Report (Ufsar), Revision 22, List of Effective Pages
| author name =
| author affiliation = Exelon Generation Co, LLC
| addressee name =
| addressee affiliation = NRC/NMSS, NRC/NRR
| docket = 05000373, 05000374, 07200070
| license number = NPF-018, NPF-011
| contact person =
| case reference number = RS-16-080
| package number = ML16111B236
| document type = Updated Final Safety Analysis Report (UFSAR)
| page count = 171
}}
 
=Text=
{{#Wiki_filter:i REV. 14, APRIL 2002 LA SALLE COUNTY STATION UPDATED FINAL SAFETY ANALYSIS REPORT Table of Contents VOLUME I  CHAPTER 1 INTRODUCTION AND GENERAL DESCRIPTION OF PLANT 1.0 Introduction and General Description of Plant  1.1 Introduction  1.2 General Plant Description  1.3 Comparison Tables 1.4 Identification of Agents and Contractors  1.5 Requirements for Further Technical Information - Current  Concerns  1.6 Material Incorporated by Reference CHAPTER 2 SITE CHARACTERISTICS
 
2.0 Site Characteristics  2.1 Geography and Demography  2.2 Nearby Industrial Transportation and Military Facilities  2.3 Meteorology  2.4 Hydrologic Engineering VOLUME II CHAPTER 2 (Continued) SITE CHARACTERISTICS 2.5 Geology, Seismology, an d Geotechnical Engineering Appendix 2.5A  Selected Structures Outside the      200-mile Radius 
 
LSCS-UFSAR Table of Contents (Continued) ii REV. 15, APRIL 2004 VOLUME III
 
CHAPTER 3 DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS  3.0 Design of Structures, Compo nents, Equipment, and Systems  3.1 Conformance with NRC General Design Criteria  3.2 Classification of Structures, Components, and Systems  3.3 Wind and Tornado Loadings  3.4 Water Level (Flood) Design  3.5 Missile Protection  3.6 Protection Against Dynamic Effects Associated with the Postulated Rupture of Piping  3.7 Seismic Design  3.8 Design of Category I Structures 
 
VOLUME IV CHAPTER 3 (Continued) DESIGN OF STRUCTURES, COMPONENTS AND SYSTEMS  3.9 Mechanical Systems and Components  3.10  Seismic Qualification of Se ismic Category I Instrumentation and Electrical Equipment  3.11  Environmental Design of Mechanical and Electrical Equipment Attachment  3.A Deleted Attachment 3.B A Generic Upper Bound ary Probabilistic Analysis of the Effect of Recirculation Pump Missiles on Containment and Equipment in a Typical BWR 5 Mark II General Electric Boiling Water Reactor Nuclear Power Plant Attachment 3.C Category I Concrete Masonry Walls LSCS-UFSAR Table of Contents (Continued) iii REV. 15, APRIL 2004 VOLUME IV - A CHAPTER 4 REACTOR
 
4.0 Reactor  4.1 Summary Description  4.2 Fuel System  4.3 Nuclear Design  4.4 Thermal and Hydraulic Design  4.5 Reactor Materials 4.6 Functional Design of Reactivity Control Systems
 
CHAPTER 5 REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS 5.0 Reactor Coolant System and Connected Systems  5.1 Summary Description  5.2 Integrity of Reactor Coolant Pressure Boundary 5.3 Reactor Vessel  5.4 Component and Subsystem Design VOLUME V  CHAPTER 6 ENGINEERED SAFETY FEATURES
 
6.0 Engineered Safety Features  6.1 Engineered Safety Feature Materials  6.2 Containment Systems  6.3 Emergency Core Cooling Systems  6.4 Habitability Systems  6.5 Fission Product Removal and Control Systems  6.6 Inservice Inspection of ASME Code Class 2 and 3 Components  6.7 Main Steam Isolation Valve Leakage Control System (MSIV-LCS) - Unit 2 deleted, Unit 1 Abandoned in Place  6.8 Main Steam Isolation Valve - Isolated Condenser Leakage Treatment Method Attachment 6.A Annulus Pressurization Attachment 6.B Recirculation System Single-Loop Operation LSCS-UFSAR Table of Contents (Continued) iv REV. 13 VOLUME VI CHAPTER 7 INSTRUMENTATION AND CONTROL SYSTEMS
 
7.0 Instrumentation and Control Systems  7.1 Introduction  7.2 Reactor Protection System Instrumentation and Control  7.3 Engineered Safety Feature Systems  7.4 Systems Required for Safe Shutdown  7.5 Safety-Related Display Instrumentation 7.6 Other Instrumentation Systems Required for Safety  7.7 Control Systems Not Required for Safety 7.8 Status Displays ATTACHMENT  7.A Analysis of Conformance of Instrumentation and Control Systems with IEEE Criteria
 
CHAPTER 8 ELECTRIC POWER 8.0 Electric Power  8.1 Introduction  8.2 Offsite Power System  8.3 Onsite Power Systems  8.4 Other Electrical Features and Requirements for Safety 
 
VOLUME VII CHAPTER 9 AUXILIARY SYSTEMS 9.0 Auxiliary Systems  9.1 Fuel Storage and Handling  9.2 Water Systems  9.3 Process Auxiliaries 9.4 Heating, Ventilation, and Air Conditioning  9.5 Other Auxiliary Systems CHAPTER 10 STEAM AND POWER CONVERSION SYSTEM 10.0  Steam and Power Conversion System  10.1  Summary Description 10.2  Turbine Generator  10.3  Main Steam Supply System  10.4  Other Features of Steam and Power Conversion System LSCS-UFSAR Table of Contents (Continued) v REV. 13 CHAPTER 11 RADIOACTIVE WASTE MANAGEMENT
 
11.0  Radioactive Waste Management  11.1  Source Terms  11.2  Liquid Waste Management Systems  11.3  Gaseous Waste Management Systems  11.4  Solid Waste Management System  11.5  Process and Effluent Radiological Monitoring and Sampling Systems  CHAPTER 12 RADIATION PROTECTION 12.0  Radiation Protection  12.1  Ensuring that Occupational Radiation Exposures Are as Low as Reasonably Achievable  12.2  Radiation Sources 12.3  Radiation Protection Design Features  12.4  Dose Assessment  12.5  Health Physics Program VOLUME VIII CHAPTER 13 CONDUCT OF OPERATIONS
 
13.0  Conduct of Operations  13.1  Organizational Structures of Licensee  13.2  Training  13.3  Emergency Planning  13.4  Review and Audit  13.5  Plant Procedures  13.6  Plant Records  13.7  Industrial Security
 
CHAPTER 14 INITIAL TEST PROGRAM 14.0  Initial Test Program LSCS-UFSAR Table of Contents (Continued) vi REV. 15, APRIL 2004 CHAPTER 15 ACCIDENT ANALYSES
 
15.0  Accident Analyses  15.1  Increase in Heat Removal by the Secondary System  15.2  Decrease in Heat Removal by the Secondary System  15.3  Decrease in Reactor C oolant System Flow Rate  15.4  Reactivity and Power Distribution Anomalies  15.5  Increase in Reactor Coolant Inventory  15.6  Decrease in Reactor Coolant Inventory 15.7  Radioactive Release from Subsystems and Components  15.8  Anticipated Transients Without Scram (ATWS)  15.9 Loss of All Alternating Current Power (Station Blackout)  15.A  Unit 1 Cycle 2 Safety Analyses  15.B  Unit 2 Safety Analyses CHAPTER 16 TECHNICAL SPECIFICATIONS
 
16.0  Technical Specifications CHAPTER 17 QUALITY ASSURANCE 17.0  Quality Assurance 
 
APPENDIX A GLOSSARY APPENDIX B CONFORMANCE TO REGULATORY GUIDES APPENDIX C ANALYSIS OF HIGH-ENERGY LINE BREAKS OUTSIDE PRIMARY CONTAINMENT APPENDIX D PLANT NUCLEAR SAFE TY OPERATIONAL ANALYSIS
 
APPENDIX E CONSTRUCTION MATERIAL STANDARDS AND QUALITY CONTROL PROCEDURES APPENDIX F COMPUTER PROGRAMS  F.0 Computer Programs for Structural Analysis and Design  F.1 Concrete  F.2 CSEF-III F.3 DAPS-II F.4 DYNAS F.5 DYNAX
 
LSCS-UFSAR Table of Contents (Continued) via REV. 15, APRIL 2004 F.6 EASE F.7 EMBANK F.8 INDIA F.9 SETTLE F.10 KALSHEL F.11 LAFD F.12 MESHG F.13 PLFEM-II F.14 QUAD4 F.15 RGS F.16 SEPOL F.17 SHAKE F.18 SLOPE F.19 SLSAP F.20 SOR-III F.21 SSANA F.22 STAND F.23 STRESS F.24 STRUDL-II F.25 TEMCO F.26 WARLOC F.27 PIPSYS F.28 PENAN F.29 FAST F.30 REFERENCES
 
LSCS-UFSAR Table of Contents (Continued) vii REV. 15, APRIL 2004 APPENDIX G REACTOR RECIRCULATION SYSTEM
 
G.0 Reactor Recirculation System  G.1 Introduction  G.2 Recirculation System Design Description  G.3 System Design Evaluations  G.4 Testing  G.5 Recirculation Pump Trip and Flow Control Features  G.6 Transient Analysis G.7 References ATTACHMENT  G.A REACTOR RECIRCULATION SYSTEM DESIGN DRAWINGS ATTACHMENT  G.B FAILURE MODES AN D EFFECTS ANALYSES 
 
VOLUME IX APPENDIX H DELETED - Moved to Fire Protection Report (FPR)
APPENDIX I INFORMATION RELEVANT TO KEEPING LEVELS OF RADIOACTIVITY IN EFFLUENTS TO UNRESTRICTED AREAS AS LOW AS REASONABLY ACHIEVABLE APPENDIX J ANALYSIS OF THE EFFECTS OF MODERATE ENERGY LINE THROUGH WALL LEAKAGE CRACKS OUTSIDE PRIMARY CONTAINMENT J.0 Introduction  J.1 Moderate Energy Lines  J.2 Plant Areas and Equipment Affected by MELB  J.3 Spray Shield  J.4 Effects of Flooding  J.5 Conclusion APPENDIX K INTERIM OFFSITE POWER ARRANGEMENT LSCS-UFSAR Table of Contents (Continued) viii REV. 19, APRIL 2012 APPENDIX L REQUIREMENTS RESULTING FROM TMI-2 ACCIDENT
 
APPENDIX M ENVIRONMENTAL QUALIFICATION OF ELECTRICAL EQUIPMENT APPENDIX N INTERIM SECONDARY CONTAINMENT APPENDIX O CONTROL OF HEAVY LOADS
 
i REV. 14, APRIL 2002 LA SALLE COUNTY STATION UPDATED FINAL SAFETY ANALYSIS REPORT Table of Contents VOLUME I  CHAPTER 1 INTRODUCTION AND GENERAL DESCRIPTION OF PLANT 1.0 Introduction and General Description of Plant  1.1 Introduction  1.2 General Plant Description  1.3 Comparison Tables 1.4 Identification of Agents and Contractors  1.5 Requirements for Further Technical Information - Current  Concerns  1.6 Material Incorporated by Reference CHAPTER 2 SITE CHARACTERISTICS
 
2.0 Site Characteristics  2.1 Geography and Demography  2.2 Nearby Industrial Transportation and Military Facilities  2.3 Meteorology  2.4 Hydrologic Engineering VOLUME II CHAPTER 2 (Continued) SITE CHARACTERISTICS 2.5 Geology, Seismology, an d Geotechnical Engineering Appendix 2.5A  Selected Structures Outside the      200-mile Radius 
 
LSCS-UFSAR Table of Contents (Continued) ii REV. 15, APRIL 2004 VOLUME III
 
CHAPTER 3 DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT, AND SYSTEMS  3.0 Design of Structures, Compo nents, Equipment, and Systems  3.1 Conformance with NRC General Design Criteria  3.2 Classification of Structures, Components, and Systems  3.3 Wind and Tornado Loadings  3.4 Water Level (Flood) Design  3.5 Missile Protection  3.6 Protection Against Dynamic Effects Associated with the Postulated Rupture of Piping  3.7 Seismic Design  3.8 Design of Category I Structures 
 
VOLUME IV CHAPTER 3 (Continued) DESIGN OF STRUCTURES, COMPONENTS AND SYSTEMS  3.9 Mechanical Systems and Components  3.10  Seismic Qualification of Se ismic Category I Instrumentation and Electrical Equipment  3.11  Environmental Design of Mechanical and Electrical Equipment Attachment  3.A Deleted Attachment 3.B A Generic Upper Bound ary Probabilistic Analysis of the Effect of Recirculation Pump Missiles on Containment and Equipment in a Typical BWR 5 Mark II General Electric Boiling Water Reactor Nuclear Power Plant Attachment 3.C Category I Concrete Masonry Walls LSCS-UFSAR Table of Contents (Continued) iii REV. 15, APRIL 2004 VOLUME IV - A CHAPTER 4 REACTOR
 
4.0 Reactor  4.1 Summary Description  4.2 Fuel System  4.3 Nuclear Design  4.4 Thermal and Hydraulic Design  4.5 Reactor Materials 4.6 Functional Design of Reactivity Control Systems
 
CHAPTER 5 REACTOR COOLANT SYSTEM AND CONNECTED SYSTEMS 5.0 Reactor Coolant System and Connected Systems  5.1 Summary Description  5.2 Integrity of Reactor Coolant Pressure Boundary 5.3 Reactor Vessel  5.4 Component and Subsystem Design VOLUME V  CHAPTER 6 ENGINEERED SAFETY FEATURES
 
6.0 Engineered Safety Features  6.1 Engineered Safety Feature Materials  6.2 Containment Systems  6.3 Emergency Core Cooling Systems  6.4 Habitability Systems  6.5 Fission Product Removal and Control Systems  6.6 Inservice Inspection of ASME Code Class 2 and 3 Components  6.7 Main Steam Isolation Valve Leakage Control System (MSIV-LCS) - Unit 2 deleted, Unit 1 Abandoned in Place  6.8 Main Steam Isolation Valve - Isolated Condenser Leakage Treatment Method Attachment 6.A Annulus Pressurization Attachment 6.B Recirculation System Single-Loop Operation LSCS-UFSAR Table of Contents (Continued) iv REV. 13 VOLUME VI CHAPTER 7 INSTRUMENTATION AND CONTROL SYSTEMS
 
7.0 Instrumentation and Control Systems  7.1 Introduction  7.2 Reactor Protection System Instrumentation and Control  7.3 Engineered Safety Feature Systems  7.4 Systems Required for Safe Shutdown  7.5 Safety-Related Display Instrumentation 7.6 Other Instrumentation Systems Required for Safety  7.7 Control Systems Not Required for Safety 7.8 Status Displays ATTACHMENT  7.A Analysis of Conformance of Instrumentation and Control Systems with IEEE Criteria
 
CHAPTER 8 ELECTRIC POWER 8.0 Electric Power  8.1 Introduction  8.2 Offsite Power System  8.3 Onsite Power Systems  8.4 Other Electrical Features and Requirements for Safety 
 
VOLUME VII CHAPTER 9 AUXILIARY SYSTEMS 9.0 Auxiliary Systems  9.1 Fuel Storage and Handling  9.2 Water Systems  9.3 Process Auxiliaries 9.4 Heating, Ventilation, and Air Conditioning  9.5 Other Auxiliary Systems CHAPTER 10 STEAM AND POWER CONVERSION SYSTEM 10.0  Steam and Power Conversion System  10.1  Summary Description 10.2  Turbine Generator  10.3  Main Steam Supply System  10.4  Other Features of Steam and Power Conversion System LSCS-UFSAR Table of Contents (Continued) v REV. 13 CHAPTER 11 RADIOACTIVE WASTE MANAGEMENT
 
11.0  Radioactive Waste Management  11.1  Source Terms  11.2  Liquid Waste Management Systems  11.3  Gaseous Waste Management Systems  11.4  Solid Waste Management System  11.5  Process and Effluent Radiological Monitoring and Sampling Systems  CHAPTER 12 RADIATION PROTECTION 12.0  Radiation Protection  12.1  Ensuring that Occupational Radiation Exposures Are as Low as Reasonably Achievable  12.2  Radiation Sources 12.3  Radiation Protection Design Features  12.4  Dose Assessment  12.5  Health Physics Program VOLUME VIII CHAPTER 13 CONDUCT OF OPERATIONS
 
13.0  Conduct of Operations  13.1  Organizational Structures of Licensee  13.2  Training  13.3  Emergency Planning  13.4  Review and Audit  13.5  Plant Procedures  13.6  Plant Records  13.7  Industrial Security
 
CHAPTER 14 INITIAL TEST PROGRAM 14.0  Initial Test Program LSCS-UFSAR Table of Contents (Continued) vi REV. 15, APRIL 2004 CHAPTER 15 ACCIDENT ANALYSES
 
15.0  Accident Analyses  15.1  Increase in Heat Removal by the Secondary System  15.2  Decrease in Heat Removal by the Secondary System  15.3  Decrease in Reactor C oolant System Flow Rate  15.4  Reactivity and Power Distribution Anomalies  15.5  Increase in Reactor Coolant Inventory  15.6  Decrease in Reactor Coolant Inventory 15.7  Radioactive Release from Subsystems and Components  15.8  Anticipated Transients Without Scram (ATWS)  15.9 Loss of All Alternating Current Power (Station Blackout)  15.A  Unit 1 Cycle 2 Safety Analyses  15.B  Unit 2 Safety Analyses CHAPTER 16 TECHNICAL SPECIFICATIONS
 
16.0  Technical Specifications CHAPTER 17 QUALITY ASSURANCE 17.0  Quality Assurance 
 
APPENDIX A GLOSSARY APPENDIX B CONFORMANCE TO REGULATORY GUIDES APPENDIX C ANALYSIS OF HIGH-ENERGY LINE BREAKS OUTSIDE PRIMARY CONTAINMENT APPENDIX D PLANT NUCLEAR SAFE TY OPERATIONAL ANALYSIS
 
APPENDIX E CONSTRUCTION MATERIAL STANDARDS AND QUALITY CONTROL PROCEDURES APPENDIX F COMPUTER PROGRAMS  F.0 Computer Programs for Structural Analysis and Design  F.1 Concrete  F.2 CSEF-III F.3 DAPS-II F.4 DYNAS F.5 DYNAX
 
LSCS-UFSAR Table of Contents (Continued) via REV. 15, APRIL 2004 F.6 EASE F.7 EMBANK F.8 INDIA F.9 SETTLE F.10 KALSHEL F.11 LAFD F.12 MESHG F.13 PLFEM-II F.14 QUAD4 F.15 RGS F.16 SEPOL F.17 SHAKE F.18 SLOPE F.19 SLSAP F.20 SOR-III F.21 SSANA F.22 STAND F.23 STRESS F.24 STRUDL-II F.25 TEMCO F.26 WARLOC F.27 PIPSYS F.28 PENAN F.29 FAST F.30 REFERENCES
 
LSCS-UFSAR Table of Contents (Continued) vii REV. 15, APRIL 2004 APPENDIX G REACTOR RECIRCULATION SYSTEM
 
G.0 Reactor Recirculation System  G.1 Introduction  G.2 Recirculation System Design Description  G.3 System Design Evaluations  G.4 Testing  G.5 Recirculation Pump Trip and Flow Control Features  G.6 Transient Analysis G.7 References ATTACHMENT  G.A REACTOR RECIRCULATION SYSTEM DESIGN DRAWINGS ATTACHMENT  G.B FAILURE MODES AN D EFFECTS ANALYSES 
 
VOLUME IX APPENDIX H DELETED - Moved to Fire Protection Report (FPR)
APPENDIX I INFORMATION RELEVANT TO KEEPING LEVELS OF RADIOACTIVITY IN EFFLUENTS TO UNRESTRICTED AREAS AS LOW AS REASONABLY ACHIEVABLE APPENDIX J ANALYSIS OF THE EFFECTS OF MODERATE ENERGY LINE THROUGH WALL LEAKAGE CRACKS OUTSIDE PRIMARY CONTAINMENT J.0 Introduction  J.1 Moderate Energy Lines  J.2 Plant Areas and Equipment Affected by MELB  J.3 Spray Shield  J.4 Effects of Flooding  J.5 Conclusion APPENDIX K INTERIM OFFSITE POWER ARRANGEMENT LSCS-UFSAR Table of Contents (Continued) viii REV. 19, APRIL 2012 APPENDIX L REQUIREMENTS RESULTING FROM TMI-2 ACCIDENT
 
APPENDIX M ENVIRONMENTAL QUALIFICATION OF ELECTRICAL EQUIPMENT APPENDIX N INTERIM SECONDARY CONTAINMENT APPENDIX O CONTROL OF HEAVY LOADS}}

Revision as of 12:04, 8 July 2018