ML17171A261: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
#REDIRECT [[L-2017-074, St. Lucie, Unit 1, Updated Final Safety Analysis Report, Amendment No. 28, Chapter 17, Quality Assurance]]
| number = ML17171A261
| issue date = 05/03/2017
| title = St. Lucie, Unit 1, Updated Final Safety Analysis Report, Amendment No. 28, Chapter 17, Quality Assurance
| author name =
| author affiliation = Florida Power & Light Co
| addressee name =
| addressee affiliation = NRC/NRR
| docket = 05000335
| license number = DPR-067
| contact person =
| case reference number = L-2017-074
| package number = ML17172A000
| document type = Updated Final Safety Analysis Report (UFSAR)
| page count = 4
}}
 
=Text=
{{#Wiki_filter:QUALITY ASSURANCE CHAPTER 17 TABLE OF CONTENTS SectionTitlePage17.1QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION 17.1-117.2QUALITY ASSURANCE DURING THE OPERATIONS PHASE 17.2-1 17-i Amendment No. 12, (12/93)
CHAPTER 17 QUALITY ASSURANCE 17.1  QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION This section is not applicable to the FSAR.
17.1-1}}

Revision as of 19:28, 7 July 2018