{{#Wiki_filter:'*' Dominion Resources Services, Inc. Innsbrook Technical Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 May 2, 2016 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Serial No.: NLOS/MLW: Docket Nos.: License Nos.: DOMINION NUCLEAR CONNECTICUT, INC. (DNC) VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION) MILLSTONE POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1AND2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY ISSUE SUMMARY 2015-16 PLANNED LICENSING ACTION SUBMITTALS 16-023 R4 50-336/423 50-338/339 50-280/281 DPR-65 NPF-49 NPF-4/7 DPR-32/37 In response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2015-16, Revision 1, "Planned Licensing Actions Submittals for All Power Reactor Licensees," Attachments 1 through 3 provide the requested information on proposed planned licensing action submittals for the next three calendar years for Millstone (MPS), North Anna (NAPS) and Surry (SPS) Power Stations. Neither DNC nor Dominion currently have power uprates planned in the nextfive years. The information in the attachments is being voluntarily provided to assist the NRC in planning for the necessary resources during the budget process. Alterations to the planned licensing actions in Attachments 1 through 3 will be communicated to the appropriate NRC Project Managers as they occur. If you have any questions concerning this information, please contact Michael Whitlock at (804) 273-3123. Sincerely, Mark D. Sartain Vice President -Nuclear Engineering Dominion Nuclear Connecticut, Inc. Virginia Electric and Power Company Attachment 1: Table of Estimated Licensing Actions for Millstone Power Station Attachment 2: Table of Estimated Licensing Actions for North Anna Power Station Attachment 3: Table of Estimated Licensing Actions for Surry Power Station Commitments made in this letter: None   
{{#Wiki_filter:'*' Dominion  
cc: U. S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd. Suite 100 King of Prussia, 19406-2713 U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 R. V. Guzman U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pike Rockville, MD 20852-2738 K. R. Cotton-Gross U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Dr. V. Sreenivas U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station Serial No. 16-023 Docket Nos.: 50-336/423 50-338/339 50-280/281 Page 2 of 2   
Resources  
*./ ATTACHMENT 1 Serial No. 16-023 Docket Nos.: 50-336/423 Table of Estimated Licensing Actions for Millstone Power Station MILLSTONE POWER STATION -UNITS 2 & 3 DOMINION NUCLEA.R CONNECTICUT, INC.   
Services,  
Table of Estimated Licensing Actions Millstone Power Station Units 2 and 3 Docket Nos: 50-336/50-423 TSTF Number, If Projected Submittal Outage Outage Related Can the NRC staff Proprietary Plant Name and Unit Number(*) Licensing Action Type Licensing Action Description/Title make the lnfonnallon C-ta any Date Related? Date public? lnfonnatlon Millstone Power Station Unit 2 and 3 Relief Request Relief Requests RR-04-23 and IR-03-28 to use UT in lieu of RT. 04/2016 Yes 102017 Yes No Millstone Power Station Unit 2 License Amendment LAR for Large Break LOCA Reanalysis 05/2016 Yes 402016 Yes Yes Millstone Power Station Unit 3 Exemptions Exemption for AXIOM Lead Test Assembly 07/2016 Yes 402017 Yes No Millstone Power Station Unit 2 License Amendment LAR to Revise MPS2 TS 3.8.1.1 to add a required ACTION that 09/2016 Yes 402017 Yes No would reduce shutdown risk at MPS3. (RSST) Millstone Power Station Unit 3 License Amendment LAR to Add New TS 3/4.7.15 for Main Feedwater Isolation, 12/2016 No Yes No Regulating, and Bypass Valves Millstone Power Station Unit 2 License Amendment Extension of Type A ILRT Interval to 15 Years. Revise TS for 10/2017 Yes 402018 Yes No Containment Leakage Rate Testing Requirements Millstone Power Station Units 2 and 3 License Amendment LAR for Electrical Cross-Tie Connection 2017 No Yes No Millstone Power Station Unit 3 License Amendment TSTF-556 LAR for Resolution of Open Phase Condition Bulletin 2012-01 -2017 No Yes No Design Vulnerability in electric power system Millstone Power Station Unit 2 License Amendment LAR to Revise SR 4.6.2.1.2.b to Increase RBCCW Minimum 2017 No Yes No Flow Rate to CAR Coolers from >500 gpm to >1700 gpm Millstone Power Station Unit 3 License Amendment TSTF-374 Modify TS requirements for EDG fuel oil testing 2017 No Yes No Millstone Power Station Units 2 and 3 License Amendment TSTF-552 Diesel Generator Frequency and Voltage Surveillance 2018 No Yes No Requirements. WCAP-17308-NP. Measurement Uncertainty Recapture (MUR) -Recovery of a Millstone Power Station Unit 2 License Amendment portion of the 2% measurements Uncertainty Required by 2018 No Yes No Rono Millstone Power Station Unit 2 License Amendment Delete Item 8 (Containment Water Level Narrow Range) from 2018 No Yes No Table 3.3-11 of TS 3.3.3.8 Millstone Power Station Unit 3 License Amendment Extension of Type A ILRT Interval to 15 Years. Revise TS for 10/2019 Yes 402020 Yes No Containment Leakage Rate Testing Requirements Page 1of1   
Inc. Innsbrook  
ATTACHMENT 2 Serial No. 16-023 Docket Nos.: 50-338/339 Table of Estimated Licensing Actions for North Anna Power Station NORTH ANNA POWER STATION-UNITS 1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)   
Technical  
Table of Estimated Licensing Actions North Anna Power Station Unit 1 and Unit 2 Docket Nos: 50-338/339 Plant Name and Unit Number(s) North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Unit 1 North Anna Power Station, Units 1 and 2 North Anna Power Station, Unit 1 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 Licensing Action Type License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment Relief Request Relief Request Relief Request License Amendment License Amendment TSTF Number, If any TSTF-522 Licensing Action Description/Title EAL Revision -Fuel clad degradation and fuel clad barrier loss ISFSI License Renewal (for Pad 1 TN-32) Fuel Independent SBLOCA Analysis (TS Reference Change/COLR Mod) Revision to Spent Fuel Criticality Analysis -updated fuel design w/ 5% fuel enrichment LAR for PAD 5.0 and FSLOCA [Large Break] Adds Open Phase Condition (OPC) Isolation System operability and surveillance requirements for mitigation of an OPC Revise the Environmental Protection Plan to Correct CFR References Revise the surveillance requirements for TS 3.7.10 and 3.7.12 for the PREACS and MCR/ESGR Filters to operate them for greater than or equal to 15 minutes. Revise TS 5.5.10 to incorporate the requirements of Regulatory Guide 1.52, revision 3, which requires In-Place Filter Testing/Laboratory Testing to be extended to 24 months. Second Period Limited Examination Relief Request -N1-14-LMT-002 Request to extend the reactor vessel weld examinations by ten years. The PWR Owner's Group analysis by Westinghouse has already been started. N1-14-NDE-008 I N2-14-NDE-003 North Anna Unit 1 Fifth Interval ISi Program Relief Requests LAR to rely on off-site EMT's rather than on-site EMT's LAR to move the Local Emergency Operations Facility (LEOF) to an EOF located at Innsbrook Page 1of1 Projected Submittal Outage Outage Can the NRC staff Proprietary make the lnfonnatlon Comments Date Related? Related Data public? Yes or No Information 07/2016 No Yes No 05/2016 No Yes No 08/2016 No Yes Supports compliance Yes with 10CFR50.46(c) 09/2016 No Yes Yes 2018 No Yes Supports compliance Yes with 10CFR50.46(c) 2nd Otr 2018 01/2017 Yes (NAPS1) Yes No 4th Otr 2020 (NAPS2) 2017 No Yes No 09/2016 No Yes No 2017 No Yes No 07/2016 Yes 102018 Yes No 2018 Yes 302019 Yes No 2017 No Yes No 2017 No Yes No   
Center 5000 Dominion  
ATTACHMENT 3 Serial No. 16-023 Docket Nos.: 50-280/281 Table of Estimated Licensing Actions for Surry Power Station SURRY POWER STATION-UNITS 1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION)   
Boulevard,  
Table of Estimated Licensing Actions Surry Power Station Unit 1 and Unit 2 Docket Nos: 50-280/281 Plant Name and Unit Number(*) Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Licensing Action Type License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment Relief Request License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment TSTF Number, If any TSTF-547 Projected Submittal Licensing Action Description/Title Date Alternate monitoring of rod position with one 05/2016 inoperable rod position indicator Revises Residual Heat Removal (RHR) and Component Cooling (CC) Systems' TS 05/2016 Requirements and adds an RHR Surveillance Revises the Fuel Cladding Barrier Degradation and 06/2016 Loss Emergency Action Level Thresholds Extends the Charging Pump Service Water and MCR/ESGR AC Subsystems Flowpath Allowed 05/2016 Outage Time from 24 to 72 hrs Expands the Primary Grade (PG) Water Lockout TS 05/2016 Requirements Extends the Emergency Service Water Pump 06/2016 Allowed Outage Time from 7 to 14 days Adds Open Phase Condition (OPC) Isolation System operability and surveillance requirements 01/2017 for mitigation of an OPC Revises RCS Activity Limits and Dose 06/2016 Consequences for FHA, SGTR, MSLB and LRA TS change to extend ACT to permit replacement of the Reserve Station Service Transformer C and and 03/2017 cable/bus replacement ISi Alternative Request to permit use of CFRP application in buried safety related SW Piping as 07/2016 pressure boundary Administrative change deletes temporary/one-time TS AOTs/Requirements for previously completed 08/2016 chilled water pipe replacement project, and other Revised UFSAR Dose Analyses 09/2016 Fuel Independent SBLOCA Analysis 09/2016 Topical Report DOM-NAF-2 Appendix E (AGORA 12/2016 CHF Correlation) RLBLOCA for Vendor Qualification Program 04/2017 AGORA Vendor Qualification Program Submittal 04/2017 Spent Fuel Poot Criticality Analysis 2018 Full Spectrum LOCA Analysis 2018 Relocation of Leak Testing of Miscellaneous 2018 Radioactive Materails to TRM LAR to rely on off-site EMrs rather than on-site 2017 EMrs LAR to move the Local Emergency Operations 2017 Facility (LEOF) to an EOF located at Innsbrook Page 1of1 Outage Outage Related Can the NRC staff Proprietary make the Information Comments Related? Date public? Yea or No Information No Yes No No Yes No No Yes No No Yes No No Yes No No Yes No Yes 2nd Qtr 2018 (SPS1) Yes No 4th Qtr 2018 (SPS2) No Yes No Yes Yes No 3rd Qtr 2018 Yes Yes No 2nd Qtr 2017 No Yes No No Yes No No Yes Yes No Yes TBD No Yes TBD No Yes TBD No Yes Yes No Yes Yes No Yes No No Yes No No Yes No
2SE, Glen Allen, VA 23060 May 2, 2016 U. S. Nuclear Regulatory  
Commission  
Attention:  
Document  
Control Desk One White Flint North 11555 Rockville  
Pike Rockville,  
MD 20852-2738  
Serial No.: NLOS/MLW:  
Docket Nos.: License Nos.: DOMINION  
NUCLEAR CONNECTICUT,  
INC. (DNC) VIRGINIA  
ELECTRIC  
AND POWER COMPANY (DOMINION)  
MILLSTONE  
POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1AND2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY  
ISSUE SUMMARY 2015-16 PLANNED LICENSING  
ACTION SUBMITTALS  
16-023 R4 50-336/423  
50-338/339  
50-280/281  
DPR-65 NPF-49 NPF-4/7 DPR-32/37  
In response  
to Nuclear Regulatory  
Commission  
(NRC) Regulatory  
Issue Summary 2015-16,  
Revision  
1, "Planned  
Licensing  
Actions Submittals  
for All Power Reactor Licensees,"  
Attachments  
1 through 3 provide the requested  
information  
on proposed  
planned licensing  
action submittals  
for the next three calendar  
years for Millstone  
(MPS), North Anna (NAPS) and Surry (SPS) Power Stations.  
Neither DNC nor Dominion  
currently  
have power uprates planned in the nextfive  
years. The information  
in the attachments  
is being voluntarily  
provided  
to assist the NRC in planning  
for the necessary  
resources  
during the budget process.  
Alterations  
to the planned licensing  
actions in Attachments  
1 through 3 will be communicated  
to the appropriate  
NRC Project Managers  
as they occur. If you have any questions  
concerning  
this information,  
please contact Michael Whitlock  
at (804) 273-3123.  
Sincerely,  
Mark D. Sartain Vice President  
-Nuclear Engineering  
Dominion  
Nuclear Connecticut,  
Inc. Virginia  
Electric  
and Power Company Attachment  
1: Table of Estimated  
Licensing  
Actions for Millstone  
Power Station Attachment  
2: Table of Estimated  
Licensing  
Actions for North Anna Power Station Attachment  
3: Table of Estimated  
Licensing  
Actions for Surry Power Station Commitments  
made in this letter: None   
cc: U. S. Nuclear Regulatory  
Commission  
Region I 2100 Renaissance  
Blvd. Suite 100 King of Prussia,  
19406-2713  
U. S. Nuclear Regulatory  
Commission  
Region II Marquis One Tower 245 Peachtree  
Center Ave., NE, Suite 1200 Atlanta,  
Georgia 30303-1257  
R. V. Guzman U.S. Nuclear Regulatory  
Commission  
One White Flint North Mail Stop 08 C-2 11555 Rockville  
Pike Rockville,  
MD 20852-2738  
K. R. Cotton-Gross  
U.S. Nuclear Regulatory  
Commission  
One White Flint North Mail Stop 08 G-9A 11555 Rockville  
Pike Rockville,  
MD 20852-2738  
Dr. V. Sreenivas  
U. S. Nuclear Regulatory  
Commission  
One White Flint North Mail Stop 08 G-9A 11555 Rockville  
Pike Rockville,  
MD 20852-2738  
NRC Senior Resident  
Inspector  
Millstone  
Power Station NRC Senior Resident  
Inspector  
North Anna Power Station NRC Senior Resident  
Inspector  
Surry Power Station Serial No. 16-023 Docket Nos.: 50-336/423  
50-338/339  
50-280/281  
Page 2 of 2   
*./ ATTACHMENT  
1 Serial No. 16-023 Docket Nos.: 50-336/423  
Table of Estimated  
Licensing  
Actions for Millstone  
Power Station MILLSTONE  
POWER STATION -UNITS 2 & 3 DOMINION  
NUCLEA.R  
CONNECTICUT,  
INC.   
Table of Estimated  
Licensing  
Actions Millstone  
Power Station Units 2 and 3 Docket Nos: 50-336/50-423  
TSTF Number, If Projected  
Submittal  
Outage Outage Related Can the NRC staff Proprietary  
Plant Name and Unit Number(*)  
Licensing  
Action Type Licensing  
Action Description/Title  
make the lnfonnallon  
C-ta any Date Related?  
Date public? lnfonnatlon  
Millstone  
Power Station Unit 2 and 3 Relief Request Relief Requests  
RR-04-23  
and IR-03-28  
to use UT in lieu of RT. 04/2016 Yes 102017 Yes No Millstone  
Power Station Unit 2 License Amendment  
LAR for Large Break LOCA Reanalysis  
05/2016 Yes 402016 Yes Yes Millstone  
Power Station Unit 3 Exemptions  
Exemption  
for AXIOM Lead Test Assembly  
07/2016 Yes 402017 Yes No Millstone  
Power Station Unit 2 License Amendment  
LAR to Revise MPS2 TS 3.8.1.1 to add a required  
ACTION that 09/2016 Yes 402017 Yes No would reduce shutdown  
risk at MPS3. (RSST) Millstone Power Station Unit 3 License Amendment  
LAR to Add New TS 3/4.7.15  
for Main Feedwater  
Isolation
, 12/2016 No Yes No Regulating,  
and Bypass Valves Millstone  
Power Station Unit 2 License Amendment  
Extension  
of Type A ILRT Interval  
to 15 Years. Revise TS for 10/2017 Yes 402018 Yes No Containment  
Leakage Rate Testing Requirements  
Millstone  
Power Station Units 2 and 3 License Amendment  
LAR for Electrical  
Cross-Tie Connection  
2017 No Yes No Millstone  
Power Station Unit 3 License Amendment  
TSTF-556  
LAR for Resolution  
of Open Phase Condition  
Bulletin  
2012-01 -2017 No Yes No Design Vulnerability  
in electric  
power system Millstone  
Power Station Unit 2 License Amendment  
LAR to Revise SR 4.6.2.1.2.b to Increase  
RBCCW Minimum 2017 No Yes No Flow Rate to CAR Coolers from >500 gpm to >1700 gpm Millstone  
Power Station Unit 3 License Amendment  
TSTF-374 Modify TS requirements  
for EDG fuel oil testing 2017 No Yes No Millstone  
Power Station Units 2 and 3 License Amendment  
TSTF-552 Diesel Generator  
Frequency  
and Voltage Surveillance  
2018 No Yes No Requirements
. WCAP-17308-NP. Measurement  
Uncertainty  
Recapture  
(MUR) -Recovery  
of a Millstone Power Station Unit 2 License Amendment  
portion of the 2% measurements  
Uncertainty  
Required  
by 2018 No Yes No Rono  
Millstone  
Power Station Unit 2 License Amendment  
Delete Item 8 (Containment Water Level Narrow Range) from 2018 No Yes No Table 3.3-11 of TS 3.3.3.8 Millstone Power Station Unit 3 License Amendment  
Extension of Type A ILRT Interval to 15 Years. Revise TS for 10/2019 Yes 402020 Yes No Containment  
Leakage Rate Testing Requirements  
Page 1of1   
ATTACHMENT  
2 Serial No. 16-023 Docket Nos.: 50-338/339  
Table of Estimated  
Licensing  
Actions for North Anna Power Station NORTH ANNA POWER STATION-UNITS  
1 & 2 VIRGINIA  
ELECTRIC  
AND POWER COMPANY (DOMINION)   
Table of Estimated  
Licensing  
Actions North Anna Power Station Unit 1 and Unit 2 Docket Nos: 50-338/339  
Plant Name and Unit Number(s)  
North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Unit 1 North Anna Power Station, Units 1 and 2 North Anna Power Station, Unit 1 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 Licensing  
Action Type License Amendment  
License Amendment  
License Amendment  
License Amendment  
License Amendment  
License Amendment  
License Amendment  
License Amendment  
Relief Request Relief Request Relief Request License Amendment  
License Amendment  
TSTF Number, If any TSTF-522  
Licensing  
Action Description/Title  
EAL Revision  
-Fuel clad degradation  
and fuel clad barrier loss ISFSI License Renewal (for Pad 1 TN-32) Fuel Independent  
SBLOCA Analysis  
(TS Reference  
Change/COLR Mod) Revision  
to Spent Fuel Criticality  
Analysis  
-updated fuel design w/ 5% fuel enrichment  
LAR for PAD 5.0 and FSLOCA [Large Break] Adds Open Phase Condition  
(OPC) Isolation System operability and surveillance  
requireme
nts for mitigation  
of an OPC Revise the Environmental  
Protection  
Plan to Correct CFR References  
Revise the surveillance  
requirements for TS 3.7.10 and 3.7.12 for the PREACS and MCR/ESGR  
Filters to operate them for greater than or equal to 15 minutes. Revise TS 5.5.10 to incorporate the requirements  
of Regulatory  
Guide 1.52, revision  
3, which requires  
In-Place  
Filter Testing/Laboratory  
Testing to be extended  
to 24 months. Second Period Limited Examination  
Relief Request -N1-14-LMT-002  
Request to extend the reactor vessel weld examinations  
by ten years. The PWR Owner's Group analysis  
by Westinghouse  
has already been started
. N1-14-NDE-008  
I N2-14-NDE-003  
North Anna Unit 1 Fifth Interval  
ISi Program Relief Requests  
LAR to rely on off-site  
EMT's rather than on-site EMT's LAR to move the Local Emergency  
Operations  
Facility  
(LEOF) to an EOF located at Innsbrook  
Page 1of1 Projected  
Submittal  
Outage Outage Can the NRC staff Proprietary  
make the lnfonnatlon  
Comments  
Date Related? Related Data public? Yes or No Information  
07/2016 No Yes No 05/2016 No Yes No 08/2016 No Yes Supports  
compliance Yes with 10CFR50.46(c) 09/2016 No Yes Yes 2018 No Yes Supports  
compliance  
Yes with 10CFR50.46(c)  
2nd Otr 2018 01/2017 Yes (NAPS1) Yes No 4th Otr 2020 (NAPS2) 2017 No Yes No 09/2016 No Yes No 2017 No Yes No 07/2016 Yes 102018 Yes No 2018 Yes 302019 Yes No 2017 No Yes No 2017 No Yes No   
ATTACHMENT  
3 Serial No. 16-023 Docket Nos.: 50-280/281  
Table of Estimated  
Licensing  
Actions for Surry Power Station SURRY POWER STATION-UNITS 1 & 2 VIRGINIA  
ELECTRIC  
AND POWER COMPANY (DOMINION)   
Table of Estimated  
Licensing  
Actions Surry Power Station Unit 1 and Unit 2 Docket Nos: 50-280/281  
Plant Name and Unit Number(*)  
Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Licensing  
Action Type License Amendment  
License Amendment License Amendment  
License Amendment License Amendment  
License Amendment  
License Amendment  
License Amendment  
License Amendment  
Relief Request License Amendment  
License Amendment  
License Amendment License Amendment  
License Amendment License Amendment  
License Amendment  
License Amendment  
License Amendment  
License Amendment  
License Amendment  
TSTF Number, If any TSTF-547 Projected  
Submittal  
Licensing  
Action Description/Title  
Date Alternate  
monitoring  
of rod position  
with one 05/2016 inoperable  
rod position  
indicator  
Revises Residual  
Heat Removal (RHR) and Component Cooling (CC) Systems'  
TS 05/2016 Requirements  
and adds an RHR Surveillance  
Revises the Fuel Cladding Barrier Degradation  
and 06/2016 Loss Emergency  
Action Level Thresholds  
Extends the Charging  
Pump Service Water and MCR/ESGR  
AC Subsystems  
Flowpath  
Allowed 05/2016 Outage Time from 24 to 72 hrs Expands the Primary Grade (PG) Water Lockout TS 05/2016 Requirements  
Extends the Emergency  
Service Water Pump 06/2016 Allowed Outage Time from 7 to 14 days Adds Open Phase Condition  
(OPC) Isolation  
System operability  
and surveillance  
requirements 01/2017 for mitigation of an OPC Revises RCS Activity  
Limits and Dose 06/2016 Consequences  
for FHA, SGTR, MSLB and LRA TS change to extend ACT to permit replacement  
of the Reserve Station Service Transformer  
C and and 03/2017 cable/bus replacement  
ISi Alternative  
Request to permit use of CFRP application  
in buried safety related SW Piping as 07/2016 pressure  
boundary  
Administrati
ve change deletes temporary
/one-time  
TS AOTs/Requirements  
for previously  
completed  
08/2016 chilled water pipe replacement  
project, and other Revised UFSAR Dose Analyses  
09/2016 Fuel Independen
t SBLOCA Analysis 09/2016 Topical Report DOM-NAF-2 Appendix  
E (AGORA 12/2016 CHF Correlation
) RLBLOCA for Vendor Qualification  
Program 04/2017 AGORA Vendor Qualificat
ion Program Submittal 04/2017 Spent Fuel Poot Criticality  
Analysis 2018 Full Spectrum  
LOCA Analysis 2018 Relocation  
of Leak Testing of Miscellaneous 2018 Radioactive  
Materails to TRM LAR to rely on off-site EMrs rather than on-site 2017 EMrs LAR to move the Local Emergency Operations 2017 Facility (LEOF) to an EOF located at Innsbrook  
Page 1of1 Outage Outage Related Can the NRC staff Proprietary  
make the Information  
Comments  
Related?  
Date public? Yea or No Information  
No Yes No No Yes No No Yes No No Yes No No Yes No No Yes No Yes 2nd Qtr 2018 (SPS1) Yes No 4th Qtr 2018 (SPS2) No Yes No Yes Yes No 3rd Qtr 2018 Yes Yes No 2nd Qtr 2017 No Yes No No Yes No No Yes Yes No Yes TBD No Yes TBD No Yes TBD No Yes Yes No Yes Yes No Yes No No Yes No No Yes No
}}
}}

Revision as of 08:35, 30 June 2018

Millstone, Units 2 & 3, North Anna, Units 1 & 2, and Surry, Units 1 & 2, NRC Regulatory Issue Summary 2015-16 Planned Licensing Action Submittals
ML16130A564
Person / Time
Site: Millstone, Surry, North Anna  Dominion icon.png
Issue date: 05/02/2016
From: Sartain M D
Dominion Nuclear Connecticut, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RIS-15-016, SN 16-023
Download: ML16130A564 (8)


See also: RIS 2015-16

Text

'*' Dominion

Resources

Services,

Inc. Innsbrook

Technical

Center 5000 Dominion

Boulevard,

2SE, Glen Allen, VA 23060 May 2, 2016 U. S. Nuclear Regulatory

Commission

Attention:

Document

Control Desk One White Flint North 11555 Rockville

Pike Rockville,

MD 20852-2738

Serial No.: NLOS/MLW:

Docket Nos.: License Nos.: DOMINION

NUCLEAR CONNECTICUT,

INC. (DNC) VIRGINIA

ELECTRIC

AND POWER COMPANY (DOMINION)

MILLSTONE

POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1AND2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY

ISSUE SUMMARY 2015-16 PLANNED LICENSING

ACTION SUBMITTALS16-023 R4 50-336/423

50-338/339

50-280/281

DPR-65 NPF-49 NPF-4/7 DPR-32/37

In response

to Nuclear Regulatory

Commission

(NRC) Regulatory

Issue Summary 2015-16,

Revision

1, "Planned

Licensing

Actions Submittals

for All Power Reactor Licensees,"

Attachments

1 through 3 provide the requested

information

on proposed

planned licensing

action submittals

for the next three calendar

years for Millstone

(MPS), North Anna (NAPS) and Surry (SPS) Power Stations.

Neither DNC nor Dominion

currently

have power uprates planned in the nextfive

years. The information

in the attachments

is being voluntarily

provided

to assist the NRC in planning

for the necessary

resources

during the budget process.

Alterations

to the planned licensing

actions in Attachments

1 through 3 will be communicated

to the appropriate

NRC Project Managers

as they occur. If you have any questions

concerning

this information,

please contact Michael Whitlock

at (804) 273-3123.

Sincerely,

Mark D. Sartain Vice President

-Nuclear Engineering

Dominion

Nuclear Connecticut,

Inc. Virginia

Electric

and Power Company Attachment

1: Table of Estimated

Licensing

Actions for Millstone

Power Station Attachment

2: Table of Estimated

Licensing

Actions for North Anna Power Station Attachment

3: Table of Estimated

Licensing

Actions for Surry Power Station Commitments

made in this letter: None

cc: U. S. Nuclear Regulatory

Commission

Region I 2100 Renaissance

Blvd. Suite 100 King of Prussia,

19406-2713

U. S. Nuclear Regulatory

Commission

Region II Marquis One Tower 245 Peachtree

Center Ave., NE, Suite 1200 Atlanta,

Georgia 30303-1257

R. V. Guzman U.S. Nuclear Regulatory

Commission

One White Flint North Mail Stop 08 C-2 11555 Rockville

Pike Rockville,

MD 20852-2738

K. R. Cotton-Gross

U.S. Nuclear Regulatory

Commission

One White Flint North Mail Stop 08 G-9A 11555 Rockville

Pike Rockville,

MD 20852-2738

Dr. V. Sreenivas

U. S. Nuclear Regulatory

Commission

One White Flint North Mail Stop 08 G-9A 11555 Rockville

Pike Rockville,

MD 20852-2738

NRC Senior Resident

Inspector

Millstone

Power Station NRC Senior Resident

Inspector

North Anna Power Station NRC Senior Resident

Inspector

Surry Power Station Serial No.16-023 Docket Nos.: 50-336/423

50-338/339

50-280/281

Page 2 of 2

  • ./ ATTACHMENT

1 Serial No.16-023 Docket Nos.: 50-336/423

Table of Estimated

Licensing

Actions for Millstone

Power Station MILLSTONE

POWER STATION -UNITS 2 & 3 DOMINION

NUCLEA.R

CONNECTICUT,

INC.

Table of Estimated

Licensing

Actions Millstone

Power Station Units 2 and 3 Docket Nos: 50-336/50-423

TSTF Number, If Projected

Submittal

Outage Outage Related Can the NRC staff Proprietary

Plant Name and Unit Number(*)

Licensing

Action Type Licensing

Action Description/Title

make the lnfonnallon

C-ta any Date Related?

Date public? lnfonnatlon

Millstone

Power Station Unit 2 and 3 Relief Request Relief Requests

RR-04-23

and IR-03-28

to use UT in lieu of RT. 04/2016 Yes 102017 Yes No Millstone

Power Station Unit 2 License Amendment

LAR for Large Break LOCA Reanalysis

05/2016 Yes 402016 Yes Yes Millstone

Power Station Unit 3 Exemptions

Exemption

for AXIOM Lead Test Assembly

07/2016 Yes 402017 Yes No Millstone

Power Station Unit 2 License Amendment

LAR to Revise MPS2 TS 3.8.1.1 to add a required

ACTION that 09/2016 Yes 402017 Yes No would reduce shutdown

risk at MPS3. (RSST) Millstone Power Station Unit 3 License Amendment

LAR to Add New TS 3/4.7.15

for Main Feedwater

Isolation

, 12/2016 No Yes No Regulating,

and Bypass Valves Millstone

Power Station Unit 2 License Amendment

Extension

of Type A ILRT Interval

to 15 Years. Revise TS for 10/2017 Yes 402018 Yes No Containment

Leakage Rate Testing Requirements

Millstone

Power Station Units 2 and 3 License Amendment

LAR for Electrical

Cross-Tie Connection

2017 No Yes No Millstone

Power Station Unit 3 License Amendment

TSTF-556

LAR for Resolution

of Open Phase Condition

Bulletin

2012-01 -2017 No Yes No Design Vulnerability

in electric

power system Millstone

Power Station Unit 2 License Amendment

LAR to Revise SR 4.6.2.1.2.b to Increase

RBCCW Minimum 2017 No Yes No Flow Rate to CAR Coolers from >500 gpm to >1700 gpm Millstone

Power Station Unit 3 License Amendment

TSTF-374 Modify TS requirements

for EDG fuel oil testing 2017 No Yes No Millstone

Power Station Units 2 and 3 License Amendment

TSTF-552 Diesel Generator

Frequency

and Voltage Surveillance

2018 No Yes No Requirements

. WCAP-17308-NP. Measurement

Uncertainty

Recapture

(MUR) -Recovery

of a Millstone Power Station Unit 2 License Amendment

portion of the 2% measurements

Uncertainty

Required

by 2018 No Yes No Rono

Millstone

Power Station Unit 2 License Amendment

Delete Item 8 (Containment Water Level Narrow Range) from 2018 No Yes No Table 3.3-11 of TS 3.3.3.8 Millstone Power Station Unit 3 License Amendment

Extension of Type A ILRT Interval to 15 Years. Revise TS for 10/2019 Yes 402020 Yes No Containment

Leakage Rate Testing Requirements

Page 1of1

ATTACHMENT

2 Serial No.16-023 Docket Nos.: 50-338/339

Table of Estimated

Licensing

Actions for North Anna Power Station NORTH ANNA POWER STATION-UNITS

1 & 2 VIRGINIA

ELECTRIC

AND POWER COMPANY (DOMINION)

Table of Estimated

Licensing

Actions North Anna Power Station Unit 1 and Unit 2 Docket Nos: 50-338/339

Plant Name and Unit Number(s)

North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Unit 1 North Anna Power Station, Units 1 and 2 North Anna Power Station, Unit 1 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 Licensing

Action Type License Amendment

License Amendment

License Amendment

License Amendment

License Amendment

License Amendment

License Amendment

License Amendment

Relief Request Relief Request Relief Request License Amendment

License Amendment

TSTF Number, If any TSTF-522

Licensing

Action Description/Title

EAL Revision

-Fuel clad degradation

and fuel clad barrier loss ISFSI License Renewal (for Pad 1 TN-32) Fuel Independent

SBLOCA Analysis

(TS Reference

Change/COLR Mod) Revision

to Spent Fuel Criticality

Analysis

-updated fuel design w/ 5% fuel enrichment

LAR for PAD 5.0 and FSLOCA [Large Break] Adds Open Phase Condition

(OPC) Isolation System operability and surveillance

requireme

nts for mitigation

of an OPC Revise the Environmental

Protection

Plan to Correct CFR References

Revise the surveillance

requirements for TS 3.7.10 and 3.7.12 for the PREACS and MCR/ESGR

Filters to operate them for greater than or equal to 15 minutes. Revise TS 5.5.10 to incorporate the requirements

of Regulatory

Guide 1.52, revision

3, which requires

In-Place

Filter Testing/Laboratory

Testing to be extended

to 24 months. Second Period Limited Examination

Relief Request -N1-14-LMT-002

Request to extend the reactor vessel weld examinations

by ten years. The PWR Owner's Group analysis

by Westinghouse

has already been started

. N1-14-NDE-008

I N2-14-NDE-003

North Anna Unit 1 Fifth Interval

ISi Program Relief Requests

LAR to rely on off-site

EMT's rather than on-site EMT's LAR to move the Local Emergency

Operations

Facility

(LEOF) to an EOF located at Innsbrook

Page 1of1 Projected

Submittal

Outage Outage Can the NRC staff Proprietary

make the lnfonnatlon

Comments

Date Related? Related Data public? Yes or No Information

07/2016 No Yes No 05/2016 No Yes No 08/2016 No Yes Supports

compliance Yes with 10CFR50.46(c) 09/2016 No Yes Yes 2018 No Yes Supports

compliance

Yes with 10CFR50.46(c)

2nd Otr 2018 01/2017 Yes (NAPS1) Yes No 4th Otr 2020 (NAPS2) 2017 No Yes No 09/2016 No Yes No 2017 No Yes No 07/2016 Yes 102018 Yes No 2018 Yes 302019 Yes No 2017 No Yes No 2017 No Yes No

ATTACHMENT

3 Serial No.16-023 Docket Nos.: 50-280/281

Table of Estimated

Licensing

Actions for Surry Power Station SURRY POWER STATION-UNITS 1 & 2 VIRGINIA

ELECTRIC

AND POWER COMPANY (DOMINION)

Table of Estimated

Licensing

Actions Surry Power Station Unit 1 and Unit 2 Docket Nos: 50-280/281

Plant Name and Unit Number(*)

Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Licensing

Action Type License Amendment

License Amendment License Amendment

License Amendment License Amendment

License Amendment

License Amendment

License Amendment

License Amendment

Relief Request License Amendment

License Amendment

License Amendment License Amendment

License Amendment License Amendment

License Amendment

License Amendment

License Amendment

License Amendment

License Amendment

TSTF Number, If any TSTF-547 Projected

Submittal

Licensing

Action Description/Title

Date Alternate

monitoring

of rod position

with one 05/2016 inoperable

rod position

indicator

Revises Residual

Heat Removal (RHR) and Component Cooling (CC) Systems'

TS 05/2016 Requirements

and adds an RHR Surveillance

Revises the Fuel Cladding Barrier Degradation

and 06/2016 Loss Emergency

Action Level Thresholds

Extends the Charging

Pump Service Water and MCR/ESGR

AC Subsystems

Flowpath

Allowed 05/2016 Outage Time from 24 to 72 hrs Expands the Primary Grade (PG) Water Lockout TS 05/2016 Requirements

Extends the Emergency

Service Water Pump 06/2016 Allowed Outage Time from 7 to 14 days Adds Open Phase Condition

(OPC) Isolation

System operability

and surveillance

requirements 01/2017 for mitigation of an OPC Revises RCS Activity

Limits and Dose 06/2016 Consequences

for FHA, SGTR, MSLB and LRA TS change to extend ACT to permit replacement

of the Reserve Station Service Transformer

C and and 03/2017 cable/bus replacement

ISi Alternative

Request to permit use of CFRP application

in buried safety related SW Piping as 07/2016 pressure

boundary

Administrati

ve change deletes temporary

/one-time

TS AOTs/Requirements

for previously

completed

08/2016 chilled water pipe replacement

project, and other Revised UFSAR Dose Analyses

09/2016 Fuel Independen

t SBLOCA Analysis 09/2016 Topical Report DOM-NAF-2 Appendix

E (AGORA 12/2016 CHF Correlation

) RLBLOCA for Vendor Qualification

Program 04/2017 AGORA Vendor Qualificat

ion Program Submittal 04/2017 Spent Fuel Poot Criticality

Analysis 2018 Full Spectrum

LOCA Analysis 2018 Relocation

of Leak Testing of Miscellaneous 2018 Radioactive

Materails to TRM LAR to rely on off-site EMrs rather than on-site 2017 EMrs LAR to move the Local Emergency Operations 2017 Facility (LEOF) to an EOF located at Innsbrook

Page 1of1 Outage Outage Related Can the NRC staff Proprietary

make the Information

Comments

Related?

Date public? Yea or No Information