{{#Wiki_filter:'*' Dominion Resources Services, Inc. Innsbrook Technical Center 5000 Dominion Boulevard, 2SE, Glen Allen, VA 23060 May 2, 2016 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852-2738 Serial No.: NLOS/MLW: Docket Nos.: License Nos.: DOMINION NUCLEAR CONNECTICUT, INC. (DNC) VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION) MILLSTONE POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1AND2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY ISSUE SUMMARY 2015-16 PLANNED LICENSING ACTION SUBMITTALS 16-023 R4 50-336/423 50-338/339 50-280/281 DPR-65 NPF-49 NPF-4/7 DPR-32/37 In response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary 2015-16, Revision 1, "Planned Licensing Actions Submittals for All Power Reactor Licensees," Attachments 1 through 3 provide the requested information on proposed planned licensing action submittals for the next three calendar years for Millstone (MPS), North Anna (NAPS) and Surry (SPS) Power Stations. Neither DNC nor Dominion currently have power uprates planned in the nextfive years. The information in the attachments is being voluntarily provided to assist the NRC in planning for the necessary resources during the budget process. Alterations to the planned licensing actions in Attachments 1 through 3 will be communicated to the appropriate NRC Project Managers as they occur. If you have any questions concerning this information, please contact Michael Whitlock at (804) 273-3123. Sincerely, Mark D. Sartain Vice President -Nuclear Engineering Dominion Nuclear Connecticut, Inc. Virginia Electric and Power Company Attachment 1: Table of Estimated Licensing Actions for Millstone Power Station Attachment 2: Table of Estimated Licensing Actions for North Anna Power Station Attachment 3: Table of Estimated Licensing Actions for Surry Power Station Commitments made in this letter: None | {{#Wiki_filter:'*' Dominion | ||
cc: U. S. Nuclear Regulatory Commission Region I 2100 Renaissance Blvd. Suite 100 King of Prussia, 19406-2713 U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, Georgia 30303-1257 R. V. Guzman U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 C-2 11555 Rockville Pike Rockville, MD 20852-2738 K. R. Cotton-Gross U.S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 Dr. V. Sreenivas U. S. Nuclear Regulatory Commission One White Flint North Mail Stop 08 G-9A 11555 Rockville Pike Rockville, MD 20852-2738 NRC Senior Resident Inspector Millstone Power Station NRC Senior Resident Inspector North Anna Power Station NRC Senior Resident Inspector Surry Power Station Serial No. 16-023 Docket Nos.: 50-336/423 50-338/339 50-280/281 Page 2 of 2 | Resources | ||
*./ ATTACHMENT 1 Serial No. 16-023 Docket Nos.: 50-336/423 Table of Estimated Licensing Actions for Millstone Power Station MILLSTONE POWER STATION -UNITS 2 & 3 DOMINION NUCLEA.R CONNECTICUT, INC. | Services, | ||
Table of Estimated Licensing Actions Millstone Power Station Units 2 and 3 Docket Nos: 50-336/50-423 TSTF Number, If Projected Submittal Outage Outage Related Can the NRC staff Proprietary Plant Name and Unit Number(*) Licensing Action Type Licensing Action Description/Title make the lnfonnallon C-ta any Date Related? Date public? lnfonnatlon Millstone Power Station Unit 2 and 3 Relief Request Relief Requests RR-04-23 and IR-03-28 to use UT in lieu of RT. 04/2016 Yes 102017 Yes No Millstone Power Station Unit 2 License Amendment LAR for Large Break LOCA Reanalysis 05/2016 Yes 402016 Yes Yes Millstone Power Station Unit 3 Exemptions Exemption for AXIOM Lead Test Assembly 07/2016 Yes 402017 Yes No Millstone Power Station Unit 2 License Amendment LAR to Revise MPS2 TS 3.8.1.1 to add a required ACTION that 09/2016 Yes 402017 Yes No would reduce shutdown risk at MPS3. (RSST) Millstone Power Station Unit 3 License Amendment LAR to Add New TS 3/4.7.15 for Main Feedwater Isolation, 12/2016 No Yes No Regulating, and Bypass Valves Millstone Power Station Unit 2 License Amendment Extension of Type A ILRT Interval to 15 Years. Revise TS for 10/2017 Yes 402018 Yes No Containment Leakage Rate Testing Requirements Millstone Power Station Units 2 and 3 License Amendment LAR for Electrical Cross-Tie Connection 2017 No Yes No Millstone Power Station Unit 3 License Amendment TSTF-556 LAR for Resolution of Open Phase Condition Bulletin 2012-01 -2017 No Yes No Design Vulnerability in electric power system Millstone Power Station Unit 2 License Amendment LAR to Revise SR 4.6.2.1.2.b to Increase RBCCW Minimum 2017 No Yes No Flow Rate to CAR Coolers from >500 gpm to >1700 gpm Millstone Power Station Unit 3 License Amendment TSTF-374 Modify TS requirements for EDG fuel oil testing 2017 No Yes No Millstone Power Station Units 2 and 3 License Amendment TSTF-552 Diesel Generator Frequency and Voltage Surveillance 2018 No Yes No Requirements. WCAP-17308-NP. Measurement Uncertainty Recapture (MUR) -Recovery of a Millstone Power Station Unit 2 License Amendment portion of the 2% measurements Uncertainty Required by 2018 No Yes No Rono Millstone Power Station Unit 2 License Amendment Delete Item 8 (Containment Water Level Narrow Range) from 2018 No Yes No Table 3.3-11 of TS 3.3.3.8 Millstone Power Station Unit 3 License Amendment Extension of Type A ILRT Interval to 15 Years. Revise TS for 10/2019 Yes 402020 Yes No Containment Leakage Rate Testing Requirements Page 1of1 | Inc. Innsbrook | ||
ATTACHMENT 2 Serial No. 16-023 Docket Nos.: 50-338/339 Table of Estimated Licensing Actions for North Anna Power Station NORTH ANNA POWER STATION-UNITS 1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION) | Technical | ||
Table of Estimated Licensing Actions North Anna Power Station Unit 1 and Unit 2 Docket Nos: 50-338/339 Plant Name and Unit Number(s) North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Unit 1 North Anna Power Station, Units 1 and 2 North Anna Power Station, Unit 1 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 Licensing Action Type License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment Relief Request Relief Request Relief Request License Amendment License Amendment TSTF Number, If any TSTF-522 Licensing Action Description/Title EAL Revision -Fuel clad degradation and fuel clad barrier loss ISFSI License Renewal (for Pad 1 TN-32) Fuel Independent SBLOCA Analysis (TS Reference Change/COLR Mod) Revision to Spent Fuel Criticality Analysis -updated fuel design w/ 5% fuel enrichment LAR for PAD 5.0 and FSLOCA [Large Break] Adds Open Phase Condition (OPC) Isolation System operability and surveillance | Center 5000 Dominion | ||
ATTACHMENT 3 Serial No. 16-023 Docket Nos.: 50-280/281 Table of Estimated Licensing Actions for Surry Power Station SURRY POWER STATION-UNITS 1 & 2 VIRGINIA ELECTRIC AND POWER COMPANY (DOMINION) | Boulevard, | ||
Table of Estimated Licensing Actions Surry Power Station Unit 1 and Unit 2 Docket Nos: 50-280/281 Plant Name and Unit Number(*) Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Licensing Action Type License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment Relief Request License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment License Amendment TSTF Number, If any TSTF-547 Projected Submittal Licensing Action Description/Title Date Alternate monitoring of rod position with one 05/2016 inoperable rod position indicator Revises Residual Heat Removal (RHR) and Component Cooling (CC) Systems' TS 05/2016 Requirements and adds an RHR Surveillance Revises the Fuel Cladding Barrier Degradation and 06/2016 Loss Emergency Action Level Thresholds Extends the Charging Pump Service Water and MCR/ESGR AC Subsystems Flowpath Allowed 05/2016 Outage Time from 24 to 72 hrs Expands the Primary Grade (PG) Water Lockout TS 05/2016 Requirements Extends the Emergency Service Water Pump 06/2016 Allowed Outage Time from 7 to 14 days Adds Open Phase Condition (OPC) Isolation System operability and surveillance requirements 01/2017 for mitigation of an OPC Revises RCS Activity Limits and Dose 06/2016 Consequences for FHA, SGTR, MSLB and LRA TS change to extend ACT to permit replacement of the Reserve Station Service Transformer C and and 03/2017 cable/bus replacement ISi Alternative Request to permit use of CFRP application in buried safety related SW Piping as 07/2016 pressure boundary | 2SE, Glen Allen, VA 23060 May 2, 2016 U. S. Nuclear Regulatory | ||
Commission | |||
Attention: | |||
Document | |||
Control Desk One White Flint North 11555 Rockville | |||
Pike Rockville, | |||
MD 20852-2738 | |||
Serial No.: NLOS/MLW: | |||
Docket Nos.: License Nos.: DOMINION | |||
NUCLEAR CONNECTICUT, | |||
INC. (DNC) VIRGINIA | |||
ELECTRIC | |||
AND POWER COMPANY (DOMINION) | |||
MILLSTONE | |||
POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1AND2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY | |||
ISSUE SUMMARY 2015-16 PLANNED LICENSING | |||
ACTION SUBMITTALS | |||
16-023 R4 50-336/423 | |||
50-338/339 | |||
50-280/281 | |||
DPR-65 NPF-49 NPF-4/7 DPR-32/37 | |||
In response | |||
to Nuclear Regulatory | |||
Commission | |||
(NRC) Regulatory | |||
Issue Summary 2015-16, | |||
Revision | |||
1, "Planned | |||
Licensing | |||
Actions Submittals | |||
for All Power Reactor Licensees," | |||
Attachments | |||
1 through 3 provide the requested | |||
information | |||
on proposed | |||
planned licensing | |||
action submittals | |||
for the next three calendar | |||
years for Millstone | |||
(MPS), North Anna (NAPS) and Surry (SPS) Power Stations. | |||
Neither DNC nor Dominion | |||
currently | |||
have power uprates planned in the nextfive | |||
years. The information | |||
in the attachments | |||
is being voluntarily | |||
provided | |||
to assist the NRC in planning | |||
for the necessary | |||
resources | |||
during the budget process. | |||
Alterations | |||
to the planned licensing | |||
actions in Attachments | |||
1 through 3 will be communicated | |||
to the appropriate | |||
NRC Project Managers | |||
as they occur. If you have any questions | |||
concerning | |||
this information, | |||
please contact Michael Whitlock | |||
at (804) 273-3123. | |||
Sincerely, | |||
Mark D. Sartain Vice President | |||
-Nuclear Engineering | |||
Dominion | |||
Nuclear Connecticut, | |||
Inc. Virginia | |||
Electric | |||
and Power Company Attachment | |||
1: Table of Estimated | |||
Licensing | |||
Actions for Millstone | |||
Power Station Attachment | |||
2: Table of Estimated | |||
Licensing | |||
Actions for North Anna Power Station Attachment | |||
3: Table of Estimated | |||
Licensing | |||
Actions for Surry Power Station Commitments | |||
made in this letter: None | |||
cc: U. S. Nuclear Regulatory | |||
Commission | |||
Region I 2100 Renaissance | |||
Blvd. Suite 100 King of Prussia, | |||
19406-2713 | |||
U. S. Nuclear Regulatory | |||
Commission | |||
Region II Marquis One Tower 245 Peachtree | |||
Center Ave., NE, Suite 1200 Atlanta, | |||
Georgia 30303-1257 | |||
R. V. Guzman U.S. Nuclear Regulatory | |||
Commission | |||
One White Flint North Mail Stop 08 C-2 11555 Rockville | |||
Pike Rockville, | |||
MD 20852-2738 | |||
K. R. Cotton-Gross | |||
U.S. Nuclear Regulatory | |||
Commission | |||
One White Flint North Mail Stop 08 G-9A 11555 Rockville | |||
Pike Rockville, | |||
MD 20852-2738 | |||
Dr. V. Sreenivas | |||
U. S. Nuclear Regulatory | |||
Commission | |||
One White Flint North Mail Stop 08 G-9A 11555 Rockville | |||
Pike Rockville, | |||
MD 20852-2738 | |||
NRC Senior Resident | |||
Inspector | |||
Millstone | |||
Power Station NRC Senior Resident | |||
Inspector | |||
North Anna Power Station NRC Senior Resident | |||
Inspector | |||
Surry Power Station Serial No. 16-023 Docket Nos.: 50-336/423 | |||
50-338/339 | |||
50-280/281 | |||
Page 2 of 2 | |||
*./ ATTACHMENT | |||
1 Serial No. 16-023 Docket Nos.: 50-336/423 | |||
Table of Estimated | |||
Licensing | |||
Actions for Millstone | |||
Power Station MILLSTONE | |||
POWER STATION -UNITS 2 & 3 DOMINION | |||
NUCLEA.R | |||
CONNECTICUT, | |||
INC. | |||
Table of Estimated | |||
Licensing | |||
Actions Millstone | |||
Power Station Units 2 and 3 Docket Nos: 50-336/50-423 | |||
TSTF Number, If Projected | |||
Submittal | |||
Outage Outage Related Can the NRC staff Proprietary | |||
Plant Name and Unit Number(*) | |||
Licensing | |||
Action Type Licensing | |||
Action Description/Title | |||
make the lnfonnallon | |||
C-ta any Date Related? | |||
Date public? lnfonnatlon | |||
Millstone | |||
Power Station Unit 2 and 3 Relief Request Relief Requests | |||
RR-04-23 | |||
and IR-03-28 | |||
to use UT in lieu of RT. 04/2016 Yes 102017 Yes No Millstone | |||
Power Station Unit 2 License Amendment | |||
LAR for Large Break LOCA Reanalysis | |||
05/2016 Yes 402016 Yes Yes Millstone | |||
Power Station Unit 3 Exemptions | |||
Exemption | |||
for AXIOM Lead Test Assembly | |||
07/2016 Yes 402017 Yes No Millstone | |||
Power Station Unit 2 License Amendment | |||
LAR to Revise MPS2 TS 3.8.1.1 to add a required | |||
ACTION that 09/2016 Yes 402017 Yes No would reduce shutdown | |||
risk at MPS3. (RSST) Millstone Power Station Unit 3 License Amendment | |||
LAR to Add New TS 3/4.7.15 | |||
for Main Feedwater | |||
Isolation | |||
, 12/2016 No Yes No Regulating, | |||
and Bypass Valves Millstone | |||
Power Station Unit 2 License Amendment | |||
Extension | |||
of Type A ILRT Interval | |||
to 15 Years. Revise TS for 10/2017 Yes 402018 Yes No Containment | |||
Leakage Rate Testing Requirements | |||
Millstone | |||
Power Station Units 2 and 3 License Amendment | |||
LAR for Electrical | |||
Cross-Tie Connection | |||
2017 No Yes No Millstone | |||
Power Station Unit 3 License Amendment | |||
TSTF-556 | |||
LAR for Resolution | |||
of Open Phase Condition | |||
Bulletin | |||
2012-01 -2017 No Yes No Design Vulnerability | |||
in electric | |||
power system Millstone | |||
Power Station Unit 2 License Amendment | |||
LAR to Revise SR 4.6.2.1.2.b to Increase | |||
RBCCW Minimum 2017 No Yes No Flow Rate to CAR Coolers from >500 gpm to >1700 gpm Millstone | |||
Power Station Unit 3 License Amendment | |||
TSTF-374 Modify TS requirements | |||
for EDG fuel oil testing 2017 No Yes No Millstone | |||
Power Station Units 2 and 3 License Amendment | |||
TSTF-552 Diesel Generator | |||
Frequency | |||
and Voltage Surveillance | |||
2018 No Yes No Requirements | |||
. WCAP-17308-NP. Measurement | |||
Uncertainty | |||
Recapture | |||
(MUR) -Recovery | |||
of a Millstone Power Station Unit 2 License Amendment | |||
portion of the 2% measurements | |||
Uncertainty | |||
Required | |||
by 2018 No Yes No Rono | |||
Millstone | |||
Power Station Unit 2 License Amendment | |||
Delete Item 8 (Containment Water Level Narrow Range) from 2018 No Yes No Table 3.3-11 of TS 3.3.3.8 Millstone Power Station Unit 3 License Amendment | |||
Extension of Type A ILRT Interval to 15 Years. Revise TS for 10/2019 Yes 402020 Yes No Containment | |||
Leakage Rate Testing Requirements | |||
Page 1of1 | |||
ATTACHMENT | |||
2 Serial No. 16-023 Docket Nos.: 50-338/339 | |||
Table of Estimated | |||
Licensing | |||
Actions for North Anna Power Station NORTH ANNA POWER STATION-UNITS | |||
1 & 2 VIRGINIA | |||
ELECTRIC | |||
AND POWER COMPANY (DOMINION) | |||
Table of Estimated | |||
Licensing | |||
Actions North Anna Power Station Unit 1 and Unit 2 Docket Nos: 50-338/339 | |||
Plant Name and Unit Number(s) | |||
North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Unit 1 North Anna Power Station, Units 1 and 2 North Anna Power Station, Unit 1 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 Licensing | |||
Action Type License Amendment | |||
License Amendment | |||
License Amendment | |||
License Amendment | |||
License Amendment | |||
License Amendment | |||
License Amendment | |||
License Amendment | |||
Relief Request Relief Request Relief Request License Amendment | |||
License Amendment | |||
TSTF Number, If any TSTF-522 | |||
Licensing | |||
Action Description/Title | |||
EAL Revision | |||
-Fuel clad degradation | |||
and fuel clad barrier loss ISFSI License Renewal (for Pad 1 TN-32) Fuel Independent | |||
SBLOCA Analysis | |||
(TS Reference | |||
Change/COLR Mod) Revision | |||
to Spent Fuel Criticality | |||
Analysis | |||
-updated fuel design w/ 5% fuel enrichment | |||
LAR for PAD 5.0 and FSLOCA [Large Break] Adds Open Phase Condition | |||
(OPC) Isolation System operability and surveillance | |||
requireme | |||
nts for mitigation | |||
of an OPC Revise the Environmental | |||
Protection | |||
Plan to Correct CFR References | |||
Revise the surveillance | |||
requirements for TS 3.7.10 and 3.7.12 for the PREACS and MCR/ESGR | |||
Filters to operate them for greater than or equal to 15 minutes. Revise TS 5.5.10 to incorporate the requirements | |||
of Regulatory | |||
Guide 1.52, revision | |||
3, which requires | |||
In-Place | |||
Filter Testing/Laboratory | |||
Testing to be extended | |||
to 24 months. Second Period Limited Examination | |||
Relief Request -N1-14-LMT-002 | |||
Request to extend the reactor vessel weld examinations | |||
by ten years. The PWR Owner's Group analysis | |||
by Westinghouse | |||
has already been started | |||
. N1-14-NDE-008 | |||
I N2-14-NDE-003 | |||
North Anna Unit 1 Fifth Interval | |||
ISi Program Relief Requests | |||
LAR to rely on off-site | |||
EMT's rather than on-site EMT's LAR to move the Local Emergency | |||
Operations | |||
Facility | |||
(LEOF) to an EOF located at Innsbrook | |||
Page 1of1 Projected | |||
Submittal | |||
Outage Outage Can the NRC staff Proprietary | |||
make the lnfonnatlon | |||
Comments | |||
Date Related? Related Data public? Yes or No Information | |||
07/2016 No Yes No 05/2016 No Yes No 08/2016 No Yes Supports | |||
compliance Yes with 10CFR50.46(c) 09/2016 No Yes Yes 2018 No Yes Supports | |||
compliance | |||
Yes with 10CFR50.46(c) | |||
2nd Otr 2018 01/2017 Yes (NAPS1) Yes No 4th Otr 2020 (NAPS2) 2017 No Yes No 09/2016 No Yes No 2017 No Yes No 07/2016 Yes 102018 Yes No 2018 Yes 302019 Yes No 2017 No Yes No 2017 No Yes No | |||
ATTACHMENT | |||
3 Serial No. 16-023 Docket Nos.: 50-280/281 | |||
Table of Estimated | |||
Licensing | |||
Actions for Surry Power Station SURRY POWER STATION-UNITS 1 & 2 VIRGINIA | |||
ELECTRIC | |||
AND POWER COMPANY (DOMINION) | |||
Table of Estimated | |||
Licensing | |||
Actions Surry Power Station Unit 1 and Unit 2 Docket Nos: 50-280/281 | |||
Plant Name and Unit Number(*) | |||
Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Licensing | |||
Action Type License Amendment | |||
License Amendment License Amendment | |||
License Amendment License Amendment | |||
License Amendment | |||
License Amendment | |||
License Amendment | |||
License Amendment | |||
Relief Request License Amendment | |||
License Amendment | |||
License Amendment License Amendment | |||
License Amendment License Amendment | |||
License Amendment | |||
License Amendment | |||
License Amendment | |||
License Amendment | |||
License Amendment | |||
TSTF Number, If any TSTF-547 Projected | |||
Submittal | |||
Licensing | |||
Action Description/Title | |||
Date Alternate | |||
monitoring | |||
of rod position | |||
with one 05/2016 inoperable | |||
rod position | |||
indicator | |||
Revises Residual | |||
Heat Removal (RHR) and Component Cooling (CC) Systems' | |||
TS 05/2016 Requirements | |||
and adds an RHR Surveillance | |||
Revises the Fuel Cladding Barrier Degradation | |||
and 06/2016 Loss Emergency | |||
Action Level Thresholds | |||
Extends the Charging | |||
Pump Service Water and MCR/ESGR | |||
AC Subsystems | |||
Flowpath | |||
Allowed 05/2016 Outage Time from 24 to 72 hrs Expands the Primary Grade (PG) Water Lockout TS 05/2016 Requirements | |||
Extends the Emergency | |||
Service Water Pump 06/2016 Allowed Outage Time from 7 to 14 days Adds Open Phase Condition | |||
(OPC) Isolation | |||
System operability | |||
and surveillance | |||
requirements 01/2017 for mitigation of an OPC Revises RCS Activity | |||
Limits and Dose 06/2016 Consequences | |||
for FHA, SGTR, MSLB and LRA TS change to extend ACT to permit replacement | |||
of the Reserve Station Service Transformer | |||
C and and 03/2017 cable/bus replacement | |||
ISi Alternative | |||
Request to permit use of CFRP application | |||
in buried safety related SW Piping as 07/2016 pressure | |||
boundary | |||
Administrati | |||
ve change deletes temporary | |||
/one-time | |||
TS AOTs/Requirements | |||
for previously | |||
completed | |||
08/2016 chilled water pipe replacement | |||
project, and other Revised UFSAR Dose Analyses | |||
09/2016 Fuel Independen | |||
t SBLOCA Analysis 09/2016 Topical Report DOM-NAF-2 Appendix | |||
E (AGORA 12/2016 CHF Correlation | |||
) RLBLOCA for Vendor Qualification | |||
Program 04/2017 AGORA Vendor Qualificat | |||
ion Program Submittal 04/2017 Spent Fuel Poot Criticality | |||
Analysis 2018 Full Spectrum | |||
LOCA Analysis 2018 Relocation | |||
of Leak Testing of Miscellaneous 2018 Radioactive | |||
Materails to TRM LAR to rely on off-site EMrs rather than on-site 2017 EMrs LAR to move the Local Emergency Operations 2017 Facility (LEOF) to an EOF located at Innsbrook | |||
Page 1of1 Outage Outage Related Can the NRC staff Proprietary | |||
make the Information | |||
Comments | |||
Related? | |||
Date public? Yea or No Information | |||
No Yes No No Yes No No Yes No No Yes No No Yes No No Yes No Yes 2nd Qtr 2018 (SPS1) Yes No 4th Qtr 2018 (SPS2) No Yes No Yes Yes No 3rd Qtr 2018 Yes Yes No 2nd Qtr 2017 No Yes No No Yes No No Yes Yes No Yes TBD No Yes TBD No Yes TBD No Yes Yes No Yes Yes No Yes No No Yes No No Yes No | |||
}} | }} | ||
Revision as of 08:35, 30 June 2018
| ML16130A564 | |
| Person / Time | |
|---|---|
| Site: | Millstone, Surry, North Anna |
| Issue date: | 05/02/2016 |
| From: | Sartain M D Dominion Nuclear Connecticut, Virginia Electric & Power Co (VEPCO) |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RIS-15-016, SN 16-023 | |
| Download: ML16130A564 (8) | |
See also: RIS 2015-16
Text
'*' Dominion
Resources
Services,
Inc. Innsbrook
Technical
Center 5000 Dominion
Boulevard,
2SE, Glen Allen, VA 23060 May 2, 2016 U. S. Nuclear Regulatory
Commission
Attention:
Document
Control Desk One White Flint North 11555 Rockville
Pike Rockville,
MD 20852-2738
Serial No.: NLOS/MLW:
Docket Nos.: License Nos.: DOMINION
NUCLEAR CONNECTICUT,
ELECTRIC
AND POWER COMPANY (DOMINION)
MILLSTONE
POWER STATION UNITS 2 AND 3 NORTH ANNA POWER STATION UNITS 1AND2 SURRY POWER STATION UNITS 1 AND 2 NRC REGULATORY
ISSUE SUMMARY 2015-16 PLANNED LICENSING
ACTION SUBMITTALS16-023 R4 50-336/423
50-338/339
50-280/281
DPR-65 NPF-49 NPF-4/7 DPR-32/37
In response
to Nuclear Regulatory
Commission
(NRC) Regulatory
Issue Summary 2015-16,
Revision
1, "Planned
Licensing
Actions Submittals
for All Power Reactor Licensees,"
Attachments
1 through 3 provide the requested
information
on proposed
planned licensing
action submittals
for the next three calendar
years for Millstone
(MPS), North Anna (NAPS) and Surry (SPS) Power Stations.
Neither DNC nor Dominion
currently
have power uprates planned in the nextfive
years. The information
in the attachments
is being voluntarily
provided
to assist the NRC in planning
for the necessary
resources
during the budget process.
Alterations
to the planned licensing
actions in Attachments
1 through 3 will be communicated
to the appropriate
NRC Project Managers
as they occur. If you have any questions
concerning
this information,
please contact Michael Whitlock
at (804) 273-3123.
Sincerely,
Mark D. Sartain Vice President
-Nuclear Engineering
Dominion
Nuclear Connecticut,
Inc. Virginia
Electric
and Power Company Attachment
1: Table of Estimated
Licensing
Actions for Millstone
Power Station Attachment
2: Table of Estimated
Licensing
Actions for North Anna Power Station Attachment
3: Table of Estimated
Licensing
Actions for Surry Power Station Commitments
made in this letter: None
cc: U. S. Nuclear Regulatory
Commission
Region I 2100 Renaissance
Blvd. Suite 100 King of Prussia,
19406-2713
U. S. Nuclear Regulatory
Commission
Region II Marquis One Tower 245 Peachtree
Center Ave., NE, Suite 1200 Atlanta,
Georgia 30303-1257
R. V. Guzman U.S. Nuclear Regulatory
Commission
One White Flint North Mail Stop 08 C-2 11555 Rockville
Pike Rockville,
MD 20852-2738
K. R. Cotton-Gross
U.S. Nuclear Regulatory
Commission
One White Flint North Mail Stop 08 G-9A 11555 Rockville
Pike Rockville,
MD 20852-2738
Dr. V. Sreenivas
U. S. Nuclear Regulatory
Commission
One White Flint North Mail Stop 08 G-9A 11555 Rockville
Pike Rockville,
MD 20852-2738
NRC Senior Resident
Inspector
Millstone
Power Station NRC Senior Resident
Inspector
North Anna Power Station NRC Senior Resident
Inspector
Surry Power Station Serial No.16-023 Docket Nos.: 50-336/423
50-338/339
50-280/281
Page 2 of 2
- ./ ATTACHMENT
1 Serial No.16-023 Docket Nos.: 50-336/423
Table of Estimated
Licensing
Actions for Millstone
Power Station MILLSTONE
POWER STATION -UNITS 2 & 3 DOMINION
NUCLEA.R
INC.
Table of Estimated
Licensing
Actions Millstone
Power Station Units 2 and 3 Docket Nos: 50-336/50-423
TSTF Number, If Projected
Submittal
Outage Outage Related Can the NRC staff Proprietary
Plant Name and Unit Number(*)
Licensing
Action Type Licensing
Action Description/Title
make the lnfonnallon
C-ta any Date Related?
Date public? lnfonnatlon
Millstone
Power Station Unit 2 and 3 Relief Request Relief Requests
RR-04-23
and IR-03-28
to use UT in lieu of RT. 04/2016 Yes 102017 Yes No Millstone
Power Station Unit 2 License Amendment
LAR for Large Break LOCA Reanalysis
05/2016 Yes 402016 Yes Yes Millstone
Power Station Unit 3 Exemptions
Exemption
for AXIOM Lead Test Assembly
07/2016 Yes 402017 Yes No Millstone
Power Station Unit 2 License Amendment
LAR to Revise MPS2 TS 3.8.1.1 to add a required
ACTION that 09/2016 Yes 402017 Yes No would reduce shutdown
risk at MPS3. (RSST) Millstone Power Station Unit 3 License Amendment
LAR to Add New TS 3/4.7.15
for Main Feedwater
Isolation
, 12/2016 No Yes No Regulating,
and Bypass Valves Millstone
Power Station Unit 2 License Amendment
Extension
of Type A ILRT Interval
to 15 Years. Revise TS for 10/2017 Yes 402018 Yes No Containment
Leakage Rate Testing Requirements
Millstone
Power Station Units 2 and 3 License Amendment
LAR for Electrical
Cross-Tie Connection
2017 No Yes No Millstone
Power Station Unit 3 License Amendment
LAR for Resolution
Bulletin
2012-01 -2017 No Yes No Design Vulnerability
in electric
power system Millstone
Power Station Unit 2 License Amendment
LAR to Revise SR 4.6.2.1.2.b to Increase
RBCCW Minimum 2017 No Yes No Flow Rate to CAR Coolers from >500 gpm to >1700 gpm Millstone
Power Station Unit 3 License Amendment
TSTF-374 Modify TS requirements
for EDG fuel oil testing 2017 No Yes No Millstone
Power Station Units 2 and 3 License Amendment
TSTF-552 Diesel Generator
Frequency
and Voltage Surveillance
2018 No Yes No Requirements
. WCAP-17308-NP. Measurement
Uncertainty
Recapture
(MUR) -Recovery
of a Millstone Power Station Unit 2 License Amendment
portion of the 2% measurements
Uncertainty
Required
by 2018 No Yes No Rono
Millstone
Power Station Unit 2 License Amendment
Delete Item 8 (Containment Water Level Narrow Range) from 2018 No Yes No Table 3.3-11 of TS 3.3.3.8 Millstone Power Station Unit 3 License Amendment
Extension of Type A ILRT Interval to 15 Years. Revise TS for 10/2019 Yes 402020 Yes No Containment
Leakage Rate Testing Requirements
Page 1of1
ATTACHMENT
2 Serial No.16-023 Docket Nos.: 50-338/339
Table of Estimated
Licensing
Actions for North Anna Power Station NORTH ANNA POWER STATION-UNITS
1 & 2 VIRGINIA
ELECTRIC
AND POWER COMPANY (DOMINION)
Table of Estimated
Licensing
Actions North Anna Power Station Unit 1 and Unit 2 Docket Nos: 50-338/339
Plant Name and Unit Number(s)
North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 North Anna Power Station, Unit 1 North Anna Power Station, Units 1 and 2 North Anna Power Station, Unit 1 North Anna Power Station, Units 1 and 2 North Anna Power Station, Units 1 and 2 Licensing
Action Type License Amendment
License Amendment
License Amendment
License Amendment
License Amendment
License Amendment
License Amendment
License Amendment
Relief Request Relief Request Relief Request License Amendment
License Amendment
Licensing
Action Description/Title
EAL Revision
-Fuel clad degradation
and fuel clad barrier loss ISFSI License Renewal (for Pad 1 TN-32) Fuel Independent
SBLOCA Analysis
(TS Reference
Change/COLR Mod) Revision
to Spent Fuel Criticality
Analysis
-updated fuel design w/ 5% fuel enrichment
LAR for PAD 5.0 and FSLOCA [Large Break] Adds Open Phase Condition
(OPC) Isolation System operability and surveillance
requireme
nts for mitigation
of an OPC Revise the Environmental
Protection
Plan to Correct CFR References
Revise the surveillance
requirements for TS 3.7.10 and 3.7.12 for the PREACS and MCR/ESGR
Filters to operate them for greater than or equal to 15 minutes. Revise TS 5.5.10 to incorporate the requirements
of Regulatory
Guide 1.52, revision
3, which requires
In-Place
Filter Testing/Laboratory
Testing to be extended
to 24 months. Second Period Limited Examination
Relief Request -N1-14-LMT-002
Request to extend the reactor vessel weld examinations
by ten years. The PWR Owner's Group analysis
by Westinghouse
has already been started
. N1-14-NDE-008
I N2-14-NDE-003
North Anna Unit 1 Fifth Interval
ISi Program Relief Requests
LAR to rely on off-site
EMT's rather than on-site EMT's LAR to move the Local Emergency
Operations
Facility
(LEOF) to an EOF located at Innsbrook
Page 1of1 Projected
Submittal
Outage Outage Can the NRC staff Proprietary
make the lnfonnatlon
Comments
Date Related? Related Data public? Yes or No Information
07/2016 No Yes No 05/2016 No Yes No 08/2016 No Yes Supports
compliance Yes with 10CFR50.46(c) 09/2016 No Yes Yes 2018 No Yes Supports
compliance
Yes with 10CFR50.46(c)
2nd Otr 2018 01/2017 Yes (NAPS1) Yes No 4th Otr 2020 (NAPS2) 2017 No Yes No 09/2016 No Yes No 2017 No Yes No 07/2016 Yes 102018 Yes No 2018 Yes 302019 Yes No 2017 No Yes No 2017 No Yes No
ATTACHMENT
3 Serial No.16-023 Docket Nos.: 50-280/281
Table of Estimated
Licensing
Actions for Surry Power Station SURRY POWER STATION-UNITS 1 & 2 VIRGINIA
ELECTRIC
AND POWER COMPANY (DOMINION)
Table of Estimated
Licensing
Actions Surry Power Station Unit 1 and Unit 2 Docket Nos: 50-280/281
Plant Name and Unit Number(*)
Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Surry Power Station Units 1 and 2 Licensing
Action Type License Amendment
License Amendment License Amendment
License Amendment License Amendment
License Amendment
License Amendment
License Amendment
License Amendment
Relief Request License Amendment
License Amendment
License Amendment License Amendment
License Amendment License Amendment
License Amendment
License Amendment
License Amendment
License Amendment
License Amendment
TSTF Number, If any TSTF-547 Projected
Submittal
Licensing
Action Description/Title
Date Alternate
monitoring
of rod position
with one 05/2016 inoperable
rod position
indicator
Revises Residual
Heat Removal (RHR) and Component Cooling (CC) Systems'
TS 05/2016 Requirements
and adds an RHR Surveillance
Revises the Fuel Cladding Barrier Degradation
and 06/2016 Loss Emergency
Action Level Thresholds
Extends the Charging
Pump Service Water and MCR/ESGR
AC Subsystems
Flowpath
Allowed 05/2016 Outage Time from 24 to 72 hrs Expands the Primary Grade (PG) Water Lockout TS 05/2016 Requirements
Extends the Emergency
Service Water Pump 06/2016 Allowed Outage Time from 7 to 14 days Adds Open Phase Condition
(OPC) Isolation
System operability
and surveillance
requirements 01/2017 for mitigation of an OPC Revises RCS Activity
Limits and Dose 06/2016 Consequences
for FHA, SGTR, MSLB and LRA TS change to extend ACT to permit replacement
of the Reserve Station Service Transformer
C and and 03/2017 cable/bus replacement
ISi Alternative
Request to permit use of CFRP application
in buried safety related SW Piping as 07/2016 pressure
boundary
Administrati
ve change deletes temporary
/one-time
TS AOTs/Requirements
for previously
completed
08/2016 chilled water pipe replacement
project, and other Revised UFSAR Dose Analyses
09/2016 Fuel Independen
t SBLOCA Analysis 09/2016 Topical Report DOM-NAF-2 Appendix
E (AGORA 12/2016 CHF Correlation
) RLBLOCA for Vendor Qualification
Program 04/2017 AGORA Vendor Qualificat
ion Program Submittal 04/2017 Spent Fuel Poot Criticality
Analysis 2018 Full Spectrum
LOCA Analysis 2018 Relocation
of Leak Testing of Miscellaneous 2018 Radioactive
Materails to TRM LAR to rely on off-site EMrs rather than on-site 2017 EMrs LAR to move the Local Emergency Operations 2017 Facility (LEOF) to an EOF located at Innsbrook
Page 1of1 Outage Outage Related Can the NRC staff Proprietary
make the Information
Comments
Related?
Date public? Yea or No Information
No Yes No No Yes No No Yes No No Yes No No Yes No No Yes No Yes 2nd Qtr 2018 (SPS1) Yes No 4th Qtr 2018 (SPS2) No Yes No Yes Yes No 3rd Qtr 2018 Yes Yes No 2nd Qtr 2017 No Yes No No Yes No No Yes Yes No Yes TBD No Yes TBD No Yes TBD No Yes Yes No Yes Yes No Yes No No Yes No No Yes No