ML17263A827: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:i//!iirrrrrr/I/Iarrriilifr//////////i///lf/Ill/ | {{#Wiki_filter:i//!iirrrrrr/I/Iarrriilifr | ||
//////////i | |||
///lf/Ill/8 ROCHESTER GASANDEIECTRICCORPORATION | |||
~89EASTAVENU@C1ROBERTCMECREOYVicePreridenr CinnaNuclearPioduclion August31,1994TELEPHONE rriiEACOOEPie 546-2TOOU.S.NuclearRegulatory Commission RegionalAdministrator, RegionIMr.ThomasT.Martin475Allendale RoadKingofPrussia,PA19406 | |||
==Subject:== | ==Subject:== | ||
RequestForEnforcement Discretion R.E.GinnaNuclearPowerPlantDocketNo.50-244 | |||
==Reference:== | ==Reference:== | ||
a.LetterfromR.C.Mecredy,RG&E,toT.T.Martin,NRC, | a.LetterfromR.C.Mecredy,RG&E,toT.T.Martin,NRC, | ||
==Subject:== | ==Subject:== | ||
" | "RequestForEnforcement Discretion," | ||
datedAugust30,1994. | |||
==DearMr.Martin,== | ==DearMr.Martin,== | ||
Inaccordance with10CFRPart2,AppendixC,andusingtheguidancecontained inNRCInspection ManualPart9900,RG&Ehadrequested Enforcement Discretion onAugust30,1994withrespecttoGinnaStationTechnical Specification 3.4.2.1.a (Ref.a).Mlsrequestwasacontingency actionintheeventthatnecessary repairsandtestingofMotor-Driven Auxiliary Feedwater (MDAFW)PumpBcouldnotbecompleted withinthesevendayLCOlimitwhichexpiredonAugust31,1994at0530hours.Merequested Enforcement Discretion wasverballyapprovedbytheNRCduringaphoneconversation betweenMr.WilliamLazarusNRC,RegionI,andRobertMecredy,VicePresident, NuclearProduction atapproximately 1720ESTonAugust30,1994.RG&Esuccessfully completed repairsofMDAFWPumpBonAugust31,1994at0508hours.Thepumpparameters asdocumented inthepostmaintenance testingofMDAFWPumpBareprovidedinAttachment A.Therefore, theLCOwasexitedbeforetheexpiration ofthesevendayLCOlimitandtheNRCauthorized. | |||
Enforcement Discretion wasnotrequiredorused.Verylyyours,cC'obertC.MecredXC:U.S.NuclearRegulatory Commission OfficeofNuclearReactorRegulation Assistant DirectorforRegionIReactorsMr.JoseA.CalvoWashington, D.C.20555GinnaStationSeniorResidentInspector II94gi030359 | |||
~4>02IPDRADDCK05000244PPDR ATTACHMENT A"B"MotorDrivenAuxiliary Feedwater PumpPerformance DataPre-Major Maintenance Test:(Degraded Condition) | |||
TestDateDP(PSID)Acceptance Criteria(PSID)Flow(GPM)Vibration (MilsDisp)8/26/941123.21125.5InbdOutbdVertVert.08'10.12.14InbdOutbdHorizHorizPost-Major Maintenance Test:(RepairCompleted) | |||
TestDateDP(PSID)Acceptance Criteria(PSID)Flow(GPM)Vibration (MilsDisp)8/31/941224.41125.5200InbdOutbdInbdVertVertHoriz.08.08.07OutbdHoriz.09}} | |||
Revision as of 11:55, 29 June 2018
| ML17263A827 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 08/31/1994 |
| From: | MECREDY R C ROCHESTER GAS & ELECTRIC CORP. |
| To: | MARTIN T T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML17263A826 | List: |
| References | |
| NUDOCS 9411030359 | |
| Download: ML17263A827 (2) | |
Text
i//!iirrrrrr/I/Iarrriilifr
//////////i
///lf/Ill/8 ROCHESTER GASANDEIECTRICCORPORATION
~89EASTAVENU@C1ROBERTCMECREOYVicePreridenr CinnaNuclearPioduclion August31,1994TELEPHONE rriiEACOOEPie 546-2TOOU.S.NuclearRegulatory Commission RegionalAdministrator, RegionIMr.ThomasT.Martin475Allendale RoadKingofPrussia,PA19406
Subject:
RequestForEnforcement Discretion R.E.GinnaNuclearPowerPlantDocketNo.50-244
Reference:
a.LetterfromR.C.Mecredy,RG&E,toT.T.Martin,NRC,
Subject:
"RequestForEnforcement Discretion,"
datedAugust30,1994.
DearMr.Martin,
Inaccordance with10CFRPart2,AppendixC,andusingtheguidancecontained inNRCInspection ManualPart9900,RG&Ehadrequested Enforcement Discretion onAugust30,1994withrespecttoGinnaStationTechnical Specification 3.4.2.1.a (Ref.a).Mlsrequestwasacontingency actionintheeventthatnecessary repairsandtestingofMotor-Driven Auxiliary Feedwater (MDAFW)PumpBcouldnotbecompleted withinthesevendayLCOlimitwhichexpiredonAugust31,1994at0530hours.Merequested Enforcement Discretion wasverballyapprovedbytheNRCduringaphoneconversation betweenMr.WilliamLazarusNRC,RegionI,andRobertMecredy,VicePresident, NuclearProduction atapproximately 1720ESTonAugust30,1994.RG&Esuccessfully completed repairsofMDAFWPumpBonAugust31,1994at0508hours.Thepumpparameters asdocumented inthepostmaintenance testingofMDAFWPumpBareprovidedinAttachment A.Therefore, theLCOwasexitedbeforetheexpiration ofthesevendayLCOlimitandtheNRCauthorized.
Enforcement Discretion wasnotrequiredorused.Verylyyours,cC'obertC.MecredXC:U.S.NuclearRegulatory Commission OfficeofNuclearReactorRegulation Assistant DirectorforRegionIReactorsMr.JoseA.CalvoWashington, D.C.20555GinnaStationSeniorResidentInspector II94gi030359
~4>02IPDRADDCK05000244PPDR ATTACHMENT A"B"MotorDrivenAuxiliary Feedwater PumpPerformance DataPre-Major Maintenance Test:(Degraded Condition)
TestDateDP(PSID)Acceptance Criteria(PSID)Flow(GPM)Vibration (MilsDisp)8/26/941123.21125.5InbdOutbdVertVert.08'10.12.14InbdOutbdHorizHorizPost-Major Maintenance Test:(RepairCompleted)
TestDateDP(PSID)Acceptance Criteria(PSID)Flow(GPM)Vibration (MilsDisp)8/31/941224.41125.5200InbdOutbdInbdVertVertHoriz.08.08.07OutbdHoriz.09