ML18116A107: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:  
{{#Wiki_filter:The requirement to remain in the EOPs because of reactor pressure/water level and drywell pressure following the initial transient indicates complications beyond the typical reactor scram.   


The requirement to remain in the EOPs because of reactor pressure/water level and drywell pressure following the initial transient indicates complications beyond the typical reactor scram.   
******}}
 
******  
 
}}

Revision as of 21:11, 17 May 2018

FAQ 18-03 Columbia Scram Exemption Request Proposed Response
ML18116A107
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 08/20/2017
From: Garmoe A D
NRC/NRR/DIRS/IRAB
To:
Garmoe A D, NRR/DIRS, 415-3814
References
FAQ 18-03
Download: ML18116A107 (5)


Text

The requirement to remain in the EOPs because of reactor pressure/water level and drywell pressure following the initial transient indicates complications beyond the typical reactor scram.