ML17171A261: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 14: Line 14:
| document type = Updated Final Safety Analysis Report (UFSAR)
| document type = Updated Final Safety Analysis Report (UFSAR)
| page count = 4
| page count = 4
}}
=Text=
{{#Wiki_filter:
QUALITY ASSURANCECHAPTER 17TABLE OF CONTENTSSectionTitlePage17.1QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION17.1-117.2QUALITY ASSURANCE DURING THE OPERATIONS PHASE17.2-1                                                                                17-i Amendment No. 12, (12/93)
CHAPTER 17QUALITY ASSURANCE17.1  QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTIONThis section is not applicable to the FSAR.17.1-1
}}
}}

Revision as of 22:26, 26 April 2018

St. Lucie, Unit 1, Updated Final Safety Analysis Report, Amendment No. 28, Chapter 17, Quality Assurance
ML17171A261
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 05/03/2017
From:
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML17172A000 List:
References
L-2017-074
Download: ML17171A261 (4)


Text

QUALITY ASSURANCECHAPTER 17TABLE OF CONTENTSSectionTitlePage17.1QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION17.1-117.2QUALITY ASSURANCE DURING THE OPERATIONS PHASE17.2-1 17-i Amendment No. 12, (12/93)

CHAPTER 17QUALITY ASSURANCE17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTIONThis section is not applicable to the FSAR.17.1-1