ENS 58015: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 20: Line 20:
At 0815 CDT, on October 29, 2025, fitness-for-duty (FFD) program administrators identified that a contract employee, who was required to be part of the FFD program random testing pool, had been inadvertently removed from the pool on October 20, 2025. The employee's protected area access has been placed on hold in accordance with the station process. The issue has been placed into the site corrective action program for further review and evaluation to determine the cause. This event notification is being made in accordance with 10 CFR 26.719(b)(4).
At 0815 CDT, on October 29, 2025, fitness-for-duty (FFD) program administrators identified that a contract employee, who was required to be part of the FFD program random testing pool, had been inadvertently removed from the pool on October 20, 2025. The employee's protected area access has been placed on hold in accordance with the station process. The issue has been placed into the site corrective action program for further review and evaluation to determine the cause. This event notification is being made in accordance with 10 CFR 26.719(b)(4).
The NRC Resident Inspector has been notified.
The NRC Resident Inspector has been notified.
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20251030en.html#en58015
| URL = https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2025/20251031en.html#en58015
}}{{unit info
}}{{unit info
| Unit = 1
| Unit = 1

Latest revision as of 06:20, 31 October 2025

ENS 58015 +/-
Where
Monticello Xcel Energy icon.png
Minnesota (NRC Region 3)
Reporting
10 CFR 26.719, FFD Reporting Requirements
Time - Person (Reporting Time:+3.52 h0.147 days <br />0.021 weeks <br />0.00482 months <br />)
Opened: Nick Moody
16:46 Oct 29, 2025
NRC Officer: Kerby Scales
Last Updated: Oct 29, 2025
58015 - NRC Website
Loading map...