{{#Wiki_filter:Dominion Energy South Carolina, Inc Virgil C. Summer Nuclear Station Bradham Boulevard & Highway 215, Jenkinsville, SC 29065 Mailing Address:
P.O. Box 88, Jenkinsville, SC 29065 DominionEnergy.com Attn: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Serial No. 25-172 VCS LIC/JB Rev 0 Docket No. 50-395 License No. NPF-12 DOMINION ENERGY SOUTH CAROLINA (DESC)
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 SPECIAL REPORT 2025-004 INOPERABLE VENTILATION EXHAUST TREATMENT SYSTEM Dominion Energy South Carolina, Inc. (DESC) hereby submits VCSNS Special Report 2025-004, as required by the VCSNS Offsite Dose Calculation Manual (ODCM). Specifically, ODCM 1.2.5.1 Action a required a Special Report due to the inoperability of the Auxiliary Building (AB) Ventilation Exhaust Treatment System.
The AB Ventilation Exhaust Treatment System was declared inoperable on May 13, 2025, when it was tagged out to send an activated carbon canister for lab analysis. The lab test results
. Carbon replacement has been completed and the AB Ventilation Exhaust Treatment System was declared operable on July 1, 2025.
Should you have any questions, please call Justin Bouknight at (803) 941-9828.
Sincerely, Beth Jenkins Site Vice President V.C. Summer Nuclear Station Commitments contained in this letter: None July 7, 2025
 
Serial No. 25-172 Docket No 50-395 Page 2 of 2 cc:
G. J. Lindamood Santee Cooper J. Lara NRC Region II G. Miller NRC Project Manager NRC Resident Inspector}}

Latest revision as of 21:50, 4 August 2025

(VCSNS) Unit 1, Special Report 2025-004, Inoperable Ventilation Exhaust Treatment System
ML25189A042
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 07/07/2025
From: Jenkins B
Dominion Energy South Carolina, South Carolina Electric & Gas Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
VCS LIC/JB Rev. 0, 25-172
Download: ML25189A042 (1)


Text

Dominion Energy South Carolina, Inc Virgil C. Summer Nuclear Station Bradham Boulevard & Highway 215, Jenkinsville, SC 29065 Mailing Address:

P.O. Box 88, Jenkinsville, SC 29065 DominionEnergy.com Attn: Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Serial No.25-172 VCS LIC/JB Rev 0 Docket No. 50-395 License No. NPF-12 DOMINION ENERGY SOUTH CAROLINA (DESC)

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 SPECIAL REPORT 2025-004 INOPERABLE VENTILATION EXHAUST TREATMENT SYSTEM Dominion Energy South Carolina, Inc. (DESC) hereby submits VCSNS Special Report 2025-004, as required by the VCSNS Offsite Dose Calculation Manual (ODCM). Specifically, ODCM 1.2.5.1 Action a required a Special Report due to the inoperability of the Auxiliary Building (AB) Ventilation Exhaust Treatment System.

The AB Ventilation Exhaust Treatment System was declared inoperable on May 13, 2025, when it was tagged out to send an activated carbon canister for lab analysis. The lab test results

. Carbon replacement has been completed and the AB Ventilation Exhaust Treatment System was declared operable on July 1, 2025.

Should you have any questions, please call Justin Bouknight at (803) 941-9828.

Sincerely, Beth Jenkins Site Vice President V.C. Summer Nuclear Station Commitments contained in this letter: None July 7, 2025

Serial No.25-172 Docket No 50-395 Page 2 of 2 cc:

G. J. Lindamood Santee Cooper J. Lara NRC Region II G. Miller NRC Project Manager NRC Resident Inspector