                                                    UNITED STATES
UNITED STATES
                                      NUCLEAR REGULATORY COMMISSION                                                 i
g
  5             j                                       REGION IV                                                 f
g
    $            g                          611 HYAN PLAZA DRIVE, SulTE 400                                         {
NUCLEAR REGULATORY COMMISSION
                                              art.INGiON, TEXAS 76011 4064                                          j
i
    %,***** ,d
f
                                                  March 10, 1998
5
        ' EA 97-468
j
          Mr. C. L. Terry
REGION IV
          TU Electric
611 HYAN PLAZA DRIVE, SulTE 400
          Group Vice President, Nuclear
{
          ATTN: Regulatory Affairs Department
$
          P.O. Box 1002
g
          Glen Rose, Texas 76043
%,***** ,d
          SUBJECT: NRC INSPECTION REPORT 50-445/97-19; 50-446/97-19
art.INGiON, TEXAS 76011 4064
          Dear Mr. Terry:                                                                                             ,
j
                                                                                                                    I
March 10, 1998
                  Thank you for your letter of February 16,1998, in response to our January 16,1998,                 I
' EA 97-468
          letter and Notice of Violation conceming changes to your emergency plan. We have reviewed
Mr. C. L. Terry
          your reply and find it responsive to the concems raised in our Notice of Violation. We will review
TU Electric
          the implementation of your corrective actions during a future inspection to determine that full             j
Group Vice President, Nuclear
                                                                                                                      l
ATTN: Regulatory Affairs Department
          compliance has been achieved and will be maintained.                                                       i
P.O. Box 1002
                                                                                                                      l
Glen Rose, Texas 76043
                                                            Sincerely,                                               {
SUBJECT: NRC INSPECTION REPORT 50-445/97-19; 50-446/97-19
                                                            Blaine Murray, Chief
Dear Mr. Terry:
                                                                                                                l'j
,
                                                            Plant Support Branch
I
                                                            Division of Reactor Safety
Thank you for your letter of February 16,1998, in response to our January 16,1998,
          Docket Nos.: 50-445;50-446
letter and Notice of Violation conceming changes to your emergency plan. We have reviewed
          License Nos.: NPF-87; NPF-89
your reply and find it responsive to the concems raised in our Notice of Violation. We will review
          cc:
the implementation of your corrective actions during a future inspection to determine that full
          Mr. R4er D. Walker
j
          TU Electric
compliance has been achieved and will be maintained.
          Regulatory Affairs Manager
i
                              '
Sincerely,
          P.O. Box 1002
{
          Glen Rose, Texas 76043
l'
                                                                                        b!!{ !{!lllk!b,!!{l h!!!
Blaine Murray, Chief
              9803120354 980310
j
              POR   ADOCK 05000445
Plant Support Branch
              G                     PDR
Division of Reactor Safety
                                                      *
Docket Nos.: 50-445;50-446
                                                        ,
License Nos.: NPF-87; NPF-89
cc:
Mr. R4er D. Walker
TU Electric
Regulatory Affairs Manager
'
P.O. Box 1002
Glen Rose, Texas 76043
b!!{ !{!lllk!b,!!{l h!!!
9803120354 980310
POR
ADOCK 05000445
G
PDR
*
,


  ,
,
.
TU Electric
-2-
Juanita Ellis
President- CASE
1426 South Polk Street
Dallas, Texas 75224
TU Electric
Bethesda Licensing
'
3 Metro Center, Suite 610
Bethesda, Maryland 20814
l
George L. Edgar, Esq.
Morgan, Lewis & Bockius
1800 M. Street, NW
Washington, D.C. 20036
G. R. Bynog, Program Manager /
Chief Inspector
Texas Department of Licensing & Regulation
Boiler Division
P.O. Box 12157, Capitol Station
Austin, Texas 78711
Honorable Dale McPherson
County Judge
P.O. Box 851
Glen Rose, Texas 76043
Texas Radiation Control Program Director
1100 West 49th Street
Austin, Texas 78756
John Howard, Director
Environmental and Natural Resources Policy
Omce of the Governor
P.O. Box 12428
Austin, Texas 78711
*
.
.
    TU Electric                                -2-
9
    Juanita Ellis
    President- CASE
    1426 South Polk Street
    Dallas, Texas 75224
    TU Electric
    Bethesda Licensing
                                                    '
    3 Metro Center, Suite 610
    Bethesda, Maryland 20814
                                                    l
    George L. Edgar, Esq.
    Morgan, Lewis & Bockius
    1800 M. Street, NW
    Washington, D.C. 20036
    G. R. Bynog, Program Manager /
      Chief Inspector
    Texas Department of Licensing & Regulation
    Boiler Division
    P.O. Box 12157, Capitol Station
    Austin, Texas 78711
    Honorable Dale McPherson
    County Judge
    P.O. Box 851
    Glen Rose, Texas 76043
    Texas Radiation Control Program Director
    1100 West 49th Street
    Austin, Texas 78756
    John Howard, Director
    Environmental and Natural Resources Policy
    Omce of the Governor
    P.O. Box 12428
    Austin, Texas 78711
                      *
                        .
                                            9


  ,~
f
f
                                                                                                                            l
,~
                                                                                                                            l
l
      TU Electric                                                 -3-
TU Electric
      DISTRIBUTION w/coov of licensee's letter dated February 16.1998:
-3-
      DCD (IE35)                                                                                                           l
DISTRIBUTION w/coov of licensee's letter dated February 16.1998:
      Regional Administrator                                                                                               I
DCD (IE35)
      CP Resident inspector (2)
Regional Administrator
      DRS Director
CP Resident inspector (2)
      DRS Deputy Director
DRS Director
      DRP Director                                                                                                         i
DRS Deputy Director
      DRS-PSB
DRP Director
      Branch Chief (DRP/A)
i
      Project Engineer (DRP/A)
DRS-PSB
      Branch Chief (DRP/TSS)
Branch Chief (DRP/A)
      MIS System
Project Engineer (DRP/A)
      RIV File
Branch Chief (DRP/TSS)
      Action item File (Goines) (98-G-41 )
MIS System
    .
RIV File
        DOCUMENT NAME: R:\_CPSES\CP719AK.GMG
Action item File (Goines) (98-G-41 )
      To receive copy of document, indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy
.
        RIV:PSB               E     C:DRS\PSBn
DOCUMENT NAME: R:\\_CPSES\\CP719AK.GMG
        GMGood:nh (,M(y BMurray JJ
To receive copy of document, indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy
        OE/1/98                     pfD98
RIV:PSB
          3                         j'             OFFICIAL RECORD COPY
E
                                                            .
C:DRS\\PSBn
GMGood:nh (,M(y BMurray JJ
OE/1/98
pfD98
3
j'
OFFICIAL RECORD COPY
.


  '                                                                                                                       1
1
                                                                                                                            i
'
c                                                                                                                           1
i
    TU Electric                                                 -3-
c
    DISTRIBUTION w/cooy of licensee's letter dated February 16.1998:
TU Electric
    DCD (IE35)
-3-
    Regional Administrator
DISTRIBUTION w/cooy of licensee's letter dated February 16.1998:
    CP Resident inspector (2)
DCD (IE35)
    DRS Director
Regional Administrator
    DRS Deputy Director
CP Resident inspector (2)
    DRP Director                                                                                                           !
DRS Director
    - DRS-PSB
DRS Deputy Director
    Branch Chief (DRP/A)                                                                                                   '
DRP Director
    Project Engineer (DRP/A)
- DRS-PSB
      Branch Chief (DRP/TSS)
Branch Chief (DRP/A)
      MIS System                                                                                                             ,
'
      RIV File                                                                                                               i
Project Engineer (DRP/A)
    Action item File (Goines) (98-G-41 ) -                                                                                 l
Branch Chief (DRP/TSS)
                                                                                                                            !
MIS System
                                                                                                                            .
,
                                                                                                                            1
RIV File
                                                                                                                            i
Action item File (Goines) (98-G-41 ) -
                                                                                                                            l
!
      DOCUMENT NAME: R:\_CPSES\CP719AK.GMG
.
      To receive copy of document, Indicate in box: "C" = Copy without endosures "E" = Copy with enclosures "N" = No copy
i
        RIV:PSB                 E     C:DRS\PSB,.                                                                           1
l
        GMGood:nh @@ BMurray i)
DOCUMENT NAME: R:\\_CPSES\\CP719AK.GMG
        DE/2/98                       pfD98
To receive copy of document, Indicate in box: "C" = Copy without endosures "E" = Copy with enclosures "N" = No copy
          3                         j'             OFFICIAL RECORD COPY
RIV:PSB
                                                                .
E
                                                            O
C:DRS\\PSB,.
GMGood:nh @@ BMurray i)
DE/2/98
pfD98
3
j'
OFFICIAL RECORD COPY
.
O


    .
.
  4
4
..
..
                .                      .
Log # TXX 98030
                                                                                Log # TXX 98030
.
          i
.
            f. FFBIO.
f.
              ;
'I
                            i
_
                                    'I
.=
                                    JI
File # 10130
                                                      ._
FFBIO.
                                                      r
.
                                                                .=
i
                                                                C
JI
                                                                                File # 10130
r
                                                                                        IR 97-19
C
                                                                                Ref. # 10CFR2.201
IR 97-19
                              . - -
i
                                        {          7UELECTRIC
;
                ~__f
Ref. # 10CFR2.201
                  }G[C                 1
{
      c.s m nery                                                               February 16, 1998
7UELECTRIC
      se,%m
. - -
      & PrincipalNuciant Oficer
~__f
          U. S. Nuclear Regulatory Commission
1
          Attn: Document Control Desk
}G[C
          Washington, DC 20555
c.s m nery
          SUBJECT: COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
February 16, 1998
                          DOCKET NOS. 50 445 AND 50-446
se,%m
                          NRC INSPECTION REPORT NOS. 50-445/97-19 AND 50 446/97 19
& PrincipalNuciant Oficer
                          RESPONSE TO NOTICE OF VIOLATION
U. S. Nuclear Regulatory Commission
          Gentlemen:
Attn: Document Control Desk
          TU Electric has reviewed the NRC's post Enforcement Conference letter
Washington, DC 20555
          dated January 16, 1998, concerning the subject inspection conducted
SUBJECT: COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
          during the period of September 22 25, 1997. Attached to the letter was a
DOCKET NOS. 50 445 AND 50-446
          Notice of Violation.
NRC INSPECTION REPORT NOS. 50-445/97-19 AND 50 446/97 19
          TU Electric hereby responds to the Notice of Violation in the attachment
RESPONSE TO NOTICE OF VIOLATION
          to this letter.
Gentlemen:
          Additionally. TV Electric has completed an independent review of the CPSES
TU Electric has reviewed the NRC's post Enforcement Conference letter
          Emergency Plan as committed in TU Electric's letter TXX 97211 to the NRC
dated January 16, 1998, concerning the subject inspection conducted
          dated September 26, 1997. The results of this review have been documented
during the period of September 22 25, 1997. Attached to the letter was a
            and are available onsite for your review.
Notice of Violation.
                                                                      Since       y,
TU Electric hereby responds to the Notice of Violation in the attachment
                                                                      f!
to this letter.
                                                                            '
Additionally. TV Electric has completed an independent review of the CPSES
                                                                                /
Emergency Plan as committed in TU Electric's letter TXX 97211 to the NRC
                                                                        C. L. Ter y
dated September 26, 1997. The results of this review have been documented
            CLW/c1w
and are available onsite for your review.
            Attachment
Since
                                                                                                  l
y,
            c-     E. W. Henchoff. Region-IV
f!
                    J. I. Tapia. Region IV
'
                    T. J. Polich. NRR
/
                    Resident Inspectors. CPSES
C. L. Ter y
                                                                                                  i
CLW/c1w
                                                              98-0820
Attachment
                                      COMANCHE PEAK STEAM E1.ECTRIC STATION
l
                                          P.O. Boa 1002 Glen Rme. Texas 76043 1002
c-
                  h                                   *
E. W. Henchoff. Region-IV
J. I. Tapia. Region IV
T. J. Polich. NRR
Resident Inspectors. CPSES
i
98-0820
COMANCHE PEAK STEAM E1.ECTRIC STATION
P.O. Boa 1002 Glen Rme. Texas 76043 1002
h
*


      .
.
    .
.
  .
.
!
!
        Attachment to TXX-98030
Attachment to TXX-98030
        Page 1 of 5
Page 1 of 5
                                  RESPONSE TO NOTICE OF VIOLATION
RESPONSE TO NOTICE OF VIOLATION
                                    RESTATEMENT OF VIOLATION A
RESTATEMENT OF VIOLATION A
                                      (445:446/EA 97-468)
(445:446/EA 97-468)
        A.     10 CFR 50.54(q) requires-licensees to follow and maintain in effect.
A.
              an emergency plan which meets the standards in 50.47(b) and the
10 CFR 50.54(q) requires-licensees to follow and maintain in effect.
              requirements of Appendix E to Part 50. Licensees are permitted to
an emergency plan which meets the standards in 50.47(b) and the
              make changes to the plan without Commission approval only if the
requirements of Appendix E to Part 50.
              changes do not decrease the effectiveness of the plan and the plan,
Licensees are permitted to
              as changed, continues to meet 50.47(b) planning standards and
make changes to the plan without Commission approval only if the
              Appendix E requirements.
changes do not decrease the effectiveness of the plan and the plan,
              10 CFR 50.47(b)(2) requires. in part, that the onsite e:sergency
as changed, continues to meet 50.47(b) planning standards and
              response plan must meet the standard of providing that adequate
Appendix E requirements.
              staffing for initial facility accident response in key functional
10 CFR 50.47(b)(2) requires. in part, that the onsite e:sergency
              areas be maintained at all times, and timely augmentation of
response plan must meet the standard of providing that adequate
              response capabilities is available.
staffing for initial facility accident response in key functional
              Contrary to these requirements, on October 29, 1996, the licensee
areas be maintained at all times, and timely augmentation of
              made changes to its emergency plan, without Commission approval,
response capabilities is available.
              that decreased the effectiveness of the plan and did not continue to
Contrary to these requirements, on October 29, 1996, the licensee
              meet Planning Standard 50.47(b)(2). Specifically. on shift and
made changes to its emergency plan, without Commission approval,
              augmentation capabilities were reduced as follows:
that decreased the effectiveness of the plan and did not continue to
              o        Adequate staffing for initial response in key functional areas
meet Planning Standard 50.47(b)(2).
                        was not maintained when the emergency response organization no ,
Specifically. on shift and
                        longer included a dedicated communicator to perform offsite
augmentation capabilities were reduced as follows:
                        agency notifications.                                           l
Adequate staffing for initial response in key functional areas
                o      Timely augmentation of response capabilities was not available
o
                        when two 40 minute responders, to help the shift technical
was not maintained when the emergency response organization no ,
                        advisor perform dose assessment and engineering tasks, were     l
longer included a dedicated communicator to perform offsite
                                                                                        -
agency notifications.
                        deleted.
Timely augmentation of response capabilities was not available
                o      Timely augmentation of response capabilities was not available
o
                        when one 40 minute responder. to perform offsite monitoring.     !
when two 40 minute responders, to help the shift technical
                        was deleted. As a result, offsite monitoring capabilities
advisor perform dose assessment and engineering tasks, were
                        would be delayed until the 70 minute responders arrived, since
deleted.
                        on shift resources were not sufficient to perform the
-
                        monitoring (according to the licensee).
Timely augmentation of response capabilities was not available
                o        Timely augmentation of response capabilities was not available
o
                        when five 40 minute responders to help perform station
when one 40 minute responder. to perform offsite monitoring.
                        surveys, team coverage, onsite surveys, access control,         ;
was deleted. As a result, offsite monitoring capabilities
                        personnel monitoring, and dosimetry were deleted.               l
would be delayed until the 70 minute responders arrived, since
                      .                                                                 I
on shift resources were not sufficient to perform the
                                                                                        !
monitoring (according to the licensee).
                                                                                        l
Timely augmentation of response capabilities was not available
                                              ,
o
                                                                                        i
when five 40 minute responders to help perform station
                                                                                        !
surveys, team coverage, onsite surveys, access control,
                                          .
personnel monitoring, and dosimetry were deleted.
l
.
l
,
i
.


    .
.
  .
.
      Attachment to TXX 98030
Attachment to TXX 98030
      Page 2 of 5
Page 2 of 5
                                  RESPONSE TO V70LATION A
RESPONSE TO V70LATION A
                                  (445:446/EA 97-468)
(445:446/EA 97-468)
      TU Electric ' accepts the violation.
TU Electric ' accepts the violation.
      1.     Reason for Violation:
1.
      The examples cited In Violation A represent changes which say be perceived
Reason for Violation:
      as reductions in capability but are changes which TU Electric concluded
The examples cited In Violation A represent changes which say be perceived
      did not represent a reduction in the effectiveness of the CPSES Energency
as reductions in capability but are changes which TU Electric concluded
      Plan. TU Electric also concluded that these changes as incorporated-into
did not represent a reduction in the effectiveness of the CPSES Energency
      the CPSES Emergency Plan. Revision 25, continued to be compliant with the
Plan.
      standards of 10 CFR 50.47(b) concerning adequate onshift and timely
TU Electric also concluded that these changes as incorporated-into
      - avgsentation staffing capabilities. The examples cited were either offset
the CPSES Emergency Plan. Revision 25, continued to be compliant with the
      by changes that increased the total onshift staffing levels, or were
standards of 10 CFR 50.47(b) concerning adequate onshift and timely
      -similar to other plan changes that had previously been justified,
- avgsentation staffing capabilities. The examples cited were either offset
      proposed, accepted and/or implemented by other licensees. A detailed
by changes that increased the total onshift staffing levels, or were
      explanation of TU Electric's conclusions regarding the cited changes is
-similar to other plan changes that had previously been justified,
      documented in NRC letter dated November 5.1997. "Predecisional
proposed, accepted and/or implemented by other licensees. A detailed
      Enforcement Conference Summary."
explanation of TU Electric's conclusions regarding the cited changes is
      2.     Corrective actions taken:
documented in NRC letter dated November 5.1997. "Predecisional
      Following inspection 445/446 97-19 conducted September 22 25, 1997
Enforcement Conference Summary."
      TU Electric consitted in letter TXX-97211 dated September 26, 1997, to
2.
      promptly revise the CPSES Emergency Plan. Revision 25. and include
Corrective actions taken:
      corrective actions with respect to Table 1.1 " Staffing Requirements For
Following inspection 445/446 97-19 conducted September 22 25, 1997
      Emergencies." In the interim period prior to revising the plan. TV
TU Electric consitted in letter TXX-97211 dated September 26, 1997, to
      Electric implemented insediate corrective actions to provide emergency
promptly revise the CPSES Emergency Plan. Revision 25. and include
      response augmentation staffing levels consensurate with those levels that
corrective actions with respect to Table 1.1 " Staffing Requirements For
      had previously been committed to in Table.l.1 of CPSES Emergency Plan.
Emergencies." In the interim period prior to revising the plan. TV
      Revision 24. The insediate corrective actions taken regarding onshift and
Electric implemented insediate corrective actions to provide emergency
      augmentation staffing are identified in letter TXX 97211.
response augmentation staffing levels consensurate with those levels that
      Subsequent 1r TU Electric revised the CPSES Energency Plan. Table 1.1 in
had previously been committed to in Table.l.1 of CPSES Emergency Plan.
      Revision 2f which became effective October 15. 1997. Revision 26 was
Revision 24. The insediate corrective actions taken regarding onshift and
      submitted to the NRC by TU Electric letter TXX 97225 dated October 22.
augmentation staffing are identified in letter TXX 97211.
      1997. Changes incorporated into Table 1.1 of the CPSES Emergency Plan.
Subsequent 1r TU Electric revised the CPSES Energency Plan. Table 1.1 in
      Revision 26. address the cited issues and meet the expectations conveyed
Revision 2f which became effective October 15. 1997. Revision 26 was
      in NRC Inspection Report No. 50 445/97-19: 50 446/97 19.
submitted to the NRC by TU Electric letter TXX 97225 dated October 22.
      3. .   Steps to prevent recurrence:
1997. Changes incorporated into Table 1.1 of the CPSES Emergency Plan.
      TU Electric has reviewed the CPSES policy. program and available industry
Revision 26. address the cited issues and meet the expectations conveyed
      guidance for making changes to the CPSES Emergency Plan under the
in NRC Inspection Report No. 50 445/97-19: 50 446/97 19.
      provisions of 10 CFR 50.54(q). The results of this review, including
3. .
      recommendations for improvement, have been docur;ented and are available
Steps to prevent recurrence:
      onsite for review.
TU Electric has reviewed the CPSES policy. program and available industry
      Tlj Electric intends to consider the expectations conveyed in NRC
guidance for making changes to the CPSES Emergency Plan under the
      Inspection Report No. 50 445/97 19: 50 446/97 19. NRC actions regarding
provisions of 10 CFR 50.54(q). The results of this review, including
recommendations for improvement, have been docur;ented and are available
onsite for review.
Tlj Electric intends to consider the expectations conveyed in NRC
Inspection Report No. 50 445/97 19: 50 446/97 19. NRC actions regarding
l
l
                                        .
.
                                                                        .   .
.
                                                                                  .. _m
.
..
_m


  .
.
..
..
.-
.-
    Attachment to TXX 98030
Attachment to TXX 98030
    Page 3 of 5
Page 3 of 5
    emergency planning at other licensees, and any related future guidance
emergency planning at other licensees, and any related future guidance
    published by the NRC prior to making changes to the CPSES Emergency Plan
published by the NRC prior to making changes to the CPSES Emergency Plan
    without prior NRC approval.                                                   ;
without prior NRC approval.
    4.     Date when full compliance achieved:
;
                                                                                  '
4.
    TU Electric is in full compliance. Corrective actions to address the cited
Date when full compliance achieved:
    examples were completed October 15, 1997, in association with the             i
'
    effective date of the CPSES Emergency Plan. Revision 26.
TU Electric is in full compliance. Corrective actions to address the cited
                                  RESTATEMENT OF VIOLATION B
examples were completed October 15, 1997, in association with the
                                      (445:446/EA 468)
i
    B.     10 CFR 50.54(q) requires licensees to follow and maintain in effect
effective date of the CPSES Emergency Plan. Revision 26.
            an emergency plan which meets the standards in 50.47(b) and the
RESTATEMENT OF VIOLATION B
            requirements of Appendix E to Part 50. Licensees are permitted to     '
(445:446/EA 468)
            make changes to the plan without Commission approval only if the
B.
            changes do not decrease the effectiveness of the plan and the plan.
10 CFR 50.54(q) requires licensees to follow and maintain in effect
            as changed, continues to meet 50.47(b) planning standards and
an emergency plan which meets the standards in 50.47(b) and the
            Appendix E requirements.
requirements of Appendix E to Part 50.
            10 CFR 50.47(b)(2) requires. in part, that the onsite emergency
Licensees are permitted to
            response plan must meet the standard of providing that facility
'
            assignments be unambiguously defined, adequate staffing to provide
make changes to the plan without Commission approval only if the
            initial facility accident response be maintained in key functional
changes do not decrease the effectiveness of the plan and the plan.
            areas at all times, and timely augmentation of response capabilities   .
as changed, continues to meet 50.47(b) planning standards and
            1s available.                                                           j
Appendix E requirements.
            10 CFR Part 50. Appendix E.IV.A requires that emergency plans
10 CFR 50.47(b)(2) requires. in part, that the onsite emergency
            describe the organization for coping with radiological emergencies.     l
response plan must meet the standard of providing that facility
            including definition of authorities, responsibilities, and duties of   l
assignments be unambiguously defined, adequate staffing to provide
            individuals assigned to the emergency organization.                   ]
initial facility accident response be maintained in key functional
              10 CFR Part 50. Appendix E.IV.F.1 requires that emergency plans
areas at all times, and timely augmentation of response capabilities
            describe the specialized training and retraining programs for
.
            certain categories of emergency response personnel. including fire
1s available.
            brigade members and security personnel.
j
              10 CFR Part 50. Appendix E.IV.A.8 requires that emergency plans
10 CFR Part 50. Appendix E.IV.A requires that emergency plans
              identify the state and/or local officials who would order protective
describe the organization for coping with radiological emergencies.
              actions.
including definition of authorities, responsibilities, and duties of
              Contrary to these requirements, on October 29, 1996, the licensee
individuals assigned to the emergency organization.
              made the following changes to its emergency plan without Commission
]
              approval that did not continue to meet Planning Standard               ,
10 CFR Part 50. Appendix E.IV.F.1 requires that emergency plans
              50.47.(b)(2), or the requirements of Appendix E.
describe the specialized training and retraining programs for
                                                                                    I
certain categories of emergency response personnel. including fire
              1.     Changes involving the description of emergency response       l
brigade members and security personnel.
                      organization members did not continue to meet Planning         l
10 CFR Part 50. Appendix E.IV.A.8 requires that emergency plans
                                                                                    '
identify the state and/or local officials who would order protective
                      Standard 50.47(b)(2) and Appendix E.IV.A requirements.
actions.
                      Specifically. the description and responsibilities of the     l
Contrary to these requirements, on October 29, 1996, the licensee
                                        *
made the following changes to its emergency plan without Commission
                                                                                    i
approval that did not continue to meet Planning Standard
                                                                                  J
,
50.47.(b)(2), or the requirements of Appendix E.
1.
Changes involving the description of emergency response
organization members did not continue to meet Planning
'
Standard 50.47(b)(2) and Appendix E.IV.A requirements.
Specifically. the description and responsibilities of the
*
i
J


  .
.
..
..
    Attachment to TXX 98030
Attachment to TXX 98030
    Page 4 of 5
Page 4 of 5
                  following four emergency response organization positions were
following four emergency response organization positions were
                  deleted from Revision 25 but remained on the organization         i
deleted from Revision 25 but remained on the organization
                  chart and emergency response organization call out roster: a)     ,
i
                  emergency operations facility radiation assessment                 i
chart and emergency response organization call out roster: a)
                  coordin9 tor. b) technical support center operations
,
                    coordinator, c) operations advisor, and d) supporting staff
emergency operations facility radiation assessment
                    for the logistical support coordinator.                           l
i
            2.     Changes involving the description of the emergency response
coordin9 tor. b) technical support center operations
                    organization training program did not continue to meet
coordinator, c) operations advisor, and d) supporting staff
                    Appendix E.IV.F.1 requirements.     Specifically, the description
for the logistical support coordinator.
                    of the fire brigade and security training programs were           i
2.
                    deleted from Revision 25,
Changes involving the description of the emergency response
            3.     Changes involving the description of offsite decision makers
organization training program did not continue to meet
                    did not continue to meet Appendix E.IV.A.8 requirements.
Appendix E.IV.F.1 requirements.
                    Specifically, the identification of the offsite protective
Specifically, the description
                    action decision makers for the ingestion pathway zone was
i
                    deleted frca Revision 25 to the plan.
of the fire brigade and security training programs were
                                  RESPONSE TO VIOLATION B
deleted from Revision 25,
                                    (445:446/EA 97 468)
3.
      TU Electric accepts the violation.                                             i
Changes involving the description of offsite decision makers
      1.     Reason for Violation:
did not continue to meet Appendix E.IV.A.8 requirements.
      TU Electric evaluated cited changes 1 and 2 above and concluded that they
Specifically, the identification of the offsite protective
      were consistent with TV Electric's understanding of the regulations. This       i
action decision makers for the ingestion pathway zone was
                                                                                      !
deleted frca Revision 25 to the plan.
      conclusion was based in part, on previous NRC acceptance in SSER 22 of a
RESPONSE TO VIOLATION B
      similar level of detail in the plan's emergency organization description
(445:446/EA 97 468)
      and that training requirements were globally defined in plan sections 1
TU Electric accepts the violation.
      and 13 ressectively. A detailed explanation of TU Electric's conclusions
i
      regarding t1e cited changes is documented in NRC letter dated November 5,
1.
      1997. "Predecisional Enforcement Conference Summary."
Reason for Violation:
      With respect to cited change 3. TU Electric made an administrative error
TU Electric evaluated cited changes 1 and 2 above and concluded that they
      during preparation and issue of Revision 25 that removed the
were consistent with TV Electric's understanding of the regulations. This
      identification of the subject offsite protective action decision maker for
i
      the ingestion pathway zone.
conclusion was based in part, on previous NRC acceptance in SSER 22 of a
      2.     Corrective actions taken:
similar level of detail in the plan's emergency organization description
      TU Electric has revised the CPSES Emergency Plan to address the cited
and that training requirements were globally defined in plan sections 1
      changes. The CPSES Emergency Plan. Revision 26. was submitted to the NRC
and 13 ressectively. A detailed explanation of TU Electric's conclusions
      by TU Electcic letter TXX 97225 dated October 22, 1997. Revision 26
regarding t1e cited changes is documented in NRC letter dated November 5,
      changes incorporated in plan section 1 address cited issues 1 and 3 above
1997. "Predecisional Enforcement Conference Summary."
      regarding emergency organization description and identification of the
With respect to cited change 3. TU Electric made an administrative error
      offsite protective action decision maker for the ingestion pathway zone. A
during preparation and issue of Revision 25 that removed the
      Revision 26 change incorporated in plan section 13 addressed cited issue 2
identification of the subject offsite protective action decision maker for
      regarding the deletion of description of training program requirements for
the ingestion pathway zone.
                                          .
2.
Corrective actions taken:
TU Electric has revised the CPSES Emergency Plan to address the cited
changes. The CPSES Emergency Plan. Revision 26. was submitted to the NRC
by TU Electcic letter TXX 97225 dated October 22, 1997. Revision 26
changes incorporated in plan section 1 address cited issues 1 and 3 above
regarding emergency organization description and identification of the
offsite protective action decision maker for the ingestion pathway zone. A
Revision 26 change incorporated in plan section 13 addressed cited issue 2
regarding the deletion of description of training program requirements for
.


    .
.
t *
t
      '
*
                                                                                  .
'
                                                                                  1
.
        Attachment to 110C-98030                                                 {
Attachment to 110C-98030
        Pa9e 5 of 5                                                               l
{
                                                                                  1
Pa9e 5 of 5
        the fire brigade and security. These changes revise the CPSES Emergency   l
the fire brigade and security. These changes revise the CPSES Emergency
        Plan to meet'the expectations conveyed in NRC Inspection Report No. 50-   !
Plan to meet'the expectations conveyed in NRC Inspection Report No. 50-
        445/97 19: 50 446/97 19.                                                 q
445/97 19: 50 446/97 19.
                                                                                  l
q
        3.     Steps to prevent recurrence:                                     ;
3.
        TU Electric intends to consider the expectations conveyed in NRC
Steps to prevent recurrence:
        Inspection Report No. 50-445/97 19: 50 446/97 19, NRC actions regarding   i
;
        emergency planning at other licensees, and any related future guidance   j
TU Electric intends to consider the expectations conveyed in NRC
                                                                                  '
Inspection Report No. 50-445/97 19: 50 446/97 19, NRC actions regarding
        published by the NRC prior to making changes to the CPSES Emergency Plan
i
        without prior NRC approval.
emergency planning at other licensees, and any related future guidance
        TV Electric considers the administrative error associated with cited
j
        change 3 to be an isolated case. This error and management expectations
published by the NRC prior to making changes to the CPSES Emergency Plan
        on self checking have been discussed with appropriate personnel.
'
        4.     Date when full compliance achieved:
without prior NRC approval.
        TU Electric is in full compliance.     Corrective actions to address the
TV Electric considers the administrative error associated with cited
        cited changes were completed October 15, 1997, in association with the   i
change 3 to be an isolated case. This error and management expectations
        effective date of the CPSES Emergency Plan, Revision 26.
on self checking have been discussed with appropriate personnel.
                                                                                  4
4.
                      .
Date when full compliance achieved:
                                              4
TU Electric is in full compliance.
                                          G
Corrective actions to address the
cited changes were completed October 15, 1997, in association with the
i
effective date of the CPSES Emergency Plan, Revision 26.
4
.
4
G
}}
}}

Latest revision as of 05:51, 23 May 2025

Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Repts 50-445/97-19 & 50-446/97-19 Issued on 980116.Implementation of Corrective Actions Will Be Reviewed During Future Inspections
ML20216A876
Person / Time
Site: Comanche Peak  
Issue date: 03/10/1998
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Terry C
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
References
50-445-97-19, 50-446-97-19, EA-97-468, NUDOCS 9803120354
Download: ML20216A876 (4)


See also: IR 05000445/1997019

Text

l

'

'

ff

%,

UNITED STATES

g

g

NUCLEAR REGULATORY COMMISSION

i

f

5

j

REGION IV

611 HYAN PLAZA DRIVE, SulTE 400

{

$

g

%,***** ,d

art.INGiON, TEXAS 76011 4064

j

March 10, 1998

' EA 97-468

Mr. C. L. Terry

TU Electric

Group Vice President, Nuclear

ATTN: Regulatory Affairs Department

P.O. Box 1002

Glen Rose, Texas 76043

SUBJECT: NRC INSPECTION REPORT 50-445/97-19; 50-446/97-19

Dear Mr. Terry:

,

I

Thank you for your letter of February 16,1998, in response to our January 16,1998,

letter and Notice of Violation conceming changes to your emergency plan. We have reviewed

your reply and find it responsive to the concems raised in our Notice of Violation. We will review

the implementation of your corrective actions during a future inspection to determine that full

j

compliance has been achieved and will be maintained.

i

Sincerely,

{

l'

Blaine Murray, Chief

j

Plant Support Branch

Division of Reactor Safety

Docket Nos.: 50-445;50-446

License Nos.: NPF-87; NPF-89

cc:

Mr. R4er D. Walker

TU Electric

Regulatory Affairs Manager

'

P.O. Box 1002

Glen Rose, Texas 76043

b!!{ !{!lllk!b,!!{l h!!!

9803120354 980310

POR

ADOCK 05000445

G

PDR

,

,

.

TU Electric

-2-

Juanita Ellis

President- CASE

1426 South Polk Street

Dallas, Texas 75224

TU Electric

Bethesda Licensing

'

3 Metro Center, Suite 610

Bethesda, Maryland 20814

l

George L. Edgar, Esq.

Morgan, Lewis & Bockius

1800 M. Street, NW

Washington, D.C. 20036

G. R. Bynog, Program Manager /

Chief Inspector

Texas Department of Licensing & Regulation

Boiler Division

P.O. Box 12157, Capitol Station

Austin, Texas 78711

Honorable Dale McPherson

County Judge

P.O. Box 851

Glen Rose, Texas 76043

Texas Radiation Control Program Director

1100 West 49th Street

Austin, Texas 78756

John Howard, Director

Environmental and Natural Resources Policy

Omce of the Governor

P.O. Box 12428

Austin, Texas 78711

.

9

f

,~

l

TU Electric

-3-

DISTRIBUTION w/coov of licensee's letter dated February 16.1998:

DCD (IE35)

Regional Administrator

CP Resident inspector (2)

DRS Director

DRS Deputy Director

DRP Director

i

DRS-PSB

Branch Chief (DRP/A)

Project Engineer (DRP/A)

Branch Chief (DRP/TSS)

MIS System

RIV File

Action item File (Goines) (98-G-41 )

.

DOCUMENT NAME: R:\\_CPSES\\CP719AK.GMG

To receive copy of document, indicate in box: "C" = Copy without enclosures *E" = Copy with enclosures "N" = No copy

RIV:PSB

E

C:DRS\\PSBn

GMGood:nh (,M(y BMurray JJ

OE/1/98

pfD98

3

j'

OFFICIAL RECORD COPY

.

1

'

i

c

TU Electric

-3-

DISTRIBUTION w/cooy of licensee's letter dated February 16.1998:

DCD (IE35)

Regional Administrator

CP Resident inspector (2)

DRS Director

DRS Deputy Director

DRP Director

- DRS-PSB

Branch Chief (DRP/A)

'

Project Engineer (DRP/A)

Branch Chief (DRP/TSS)

MIS System

,

RIV File

Action item File (Goines) (98-G-41 ) -

!

.

i

l

DOCUMENT NAME: R:\\_CPSES\\CP719AK.GMG

To receive copy of document, Indicate in box: "C" = Copy without endosures "E" = Copy with enclosures "N" = No copy

RIV:PSB

E

C:DRS\\PSB,.

GMGood:nh @@ BMurray i)

DE/2/98

pfD98

3

j'

OFFICIAL RECORD COPY

.

O

.

4

..

Log # TXX 98030

.

.

f.

'I

_

.=

File # 10130

FFBIO.

.

i

JI

r

C

IR 97-19

i

Ref. # 10CFR2.201

{

7UELECTRIC

. - -

~__f

1

}G[C

c.s m nery

February 16, 1998

se,%m

& PrincipalNuciant Oficer

U. S. Nuclear Regulatory Commission

Attn: Document Control Desk

Washington, DC 20555

SUBJECT: COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50 445 AND 50-446

NRC INSPECTION REPORT NOS. 50-445/97-19 AND 50 446/97 19

RESPONSE TO NOTICE OF VIOLATION

Gentlemen:

TU Electric has reviewed the NRC's post Enforcement Conference letter

dated January 16, 1998, concerning the subject inspection conducted

during the period of September 22 25, 1997. Attached to the letter was a

Notice of Violation.

TU Electric hereby responds to the Notice of Violation in the attachment

to this letter.

Additionally. TV Electric has completed an independent review of the CPSES

Emergency Plan as committed in TU Electric's letter TXX 97211 to the NRC

dated September 26, 1997. The results of this review have been documented

and are available onsite for your review.

Since

y,

f!

'

/

C. L. Ter y

CLW/c1w

Attachment

l

c-

E. W. Henchoff. Region-IV

J. I. Tapia. Region IV

T. J. Polich. NRR

Resident Inspectors. CPSES

i

98-0820

COMANCHE PEAK STEAM E1.ECTRIC STATION

P.O. Boa 1002 Glen Rme. Texas 76043 1002

h

.

.

.

!

Attachment to TXX-98030

Page 1 of 5

RESPONSE TO NOTICE OF VIOLATION

RESTATEMENT OF VIOLATION A

(445:446/EA 97-468)

A.

10 CFR 50.54(q) requires-licensees to follow and maintain in effect.

an emergency plan which meets the standards in 50.47(b) and the

requirements of Appendix E to Part 50.

Licensees are permitted to

make changes to the plan without Commission approval only if the

changes do not decrease the effectiveness of the plan and the plan,

as changed, continues to meet 50.47(b) planning standards and

Appendix E requirements.

10 CFR 50.47(b)(2) requires. in part, that the onsite e:sergency

response plan must meet the standard of providing that adequate

staffing for initial facility accident response in key functional

areas be maintained at all times, and timely augmentation of

response capabilities is available.

Contrary to these requirements, on October 29, 1996, the licensee

made changes to its emergency plan, without Commission approval,

that decreased the effectiveness of the plan and did not continue to

meet Planning Standard 50.47(b)(2).

Specifically. on shift and

augmentation capabilities were reduced as follows:

Adequate staffing for initial response in key functional areas

o

was not maintained when the emergency response organization no ,

longer included a dedicated communicator to perform offsite

agency notifications.

Timely augmentation of response capabilities was not available

o

when two 40 minute responders, to help the shift technical

advisor perform dose assessment and engineering tasks, were

deleted.

-

Timely augmentation of response capabilities was not available

o

when one 40 minute responder. to perform offsite monitoring.

was deleted. As a result, offsite monitoring capabilities

would be delayed until the 70 minute responders arrived, since

on shift resources were not sufficient to perform the

monitoring (according to the licensee).

Timely augmentation of response capabilities was not available

o

when five 40 minute responders to help perform station

surveys, team coverage, onsite surveys, access control,

personnel monitoring, and dosimetry were deleted.

l

.

l

,

i

.

.

.

Attachment to TXX 98030

Page 2 of 5

RESPONSE TO V70LATION A

(445:446/EA 97-468)

TU Electric ' accepts the violation.

1.

Reason for Violation:

The examples cited In Violation A represent changes which say be perceived

as reductions in capability but are changes which TU Electric concluded

did not represent a reduction in the effectiveness of the CPSES Energency

Plan.

TU Electric also concluded that these changes as incorporated-into

the CPSES Emergency Plan. Revision 25, continued to be compliant with the

standards of 10 CFR 50.47(b) concerning adequate onshift and timely

- avgsentation staffing capabilities. The examples cited were either offset

by changes that increased the total onshift staffing levels, or were

-similar to other plan changes that had previously been justified,

proposed, accepted and/or implemented by other licensees. A detailed

explanation of TU Electric's conclusions regarding the cited changes is

documented in NRC letter dated November 5.1997. "Predecisional

Enforcement Conference Summary."

2.

Corrective actions taken:

Following inspection 445/446 97-19 conducted September 22 25, 1997

TU Electric consitted in letter TXX-97211 dated September 26, 1997, to

promptly revise the CPSES Emergency Plan. Revision 25. and include

corrective actions with respect to Table 1.1 " Staffing Requirements For

Emergencies." In the interim period prior to revising the plan. TV

Electric implemented insediate corrective actions to provide emergency

response augmentation staffing levels consensurate with those levels that

had previously been committed to in Table.l.1 of CPSES Emergency Plan.

Revision 24. The insediate corrective actions taken regarding onshift and

augmentation staffing are identified in letter TXX 97211.

Subsequent 1r TU Electric revised the CPSES Energency Plan. Table 1.1 in

Revision 2f which became effective October 15. 1997. Revision 26 was

submitted to the NRC by TU Electric letter TXX 97225 dated October 22.

1997. Changes incorporated into Table 1.1 of the CPSES Emergency Plan.

Revision 26. address the cited issues and meet the expectations conveyed

in NRC Inspection Report No. 50 445/97-19: 50 446/97 19.

3. .

Steps to prevent recurrence:

TU Electric has reviewed the CPSES policy. program and available industry

guidance for making changes to the CPSES Emergency Plan under the

provisions of 10 CFR 50.54(q). The results of this review, including

recommendations for improvement, have been docur;ented and are available

onsite for review.

Tlj Electric intends to consider the expectations conveyed in NRC

Inspection Report No. 50 445/97 19: 50 446/97 19. NRC actions regarding

l

.

.

.

..

_m

.

..

.-

Attachment to TXX 98030

Page 3 of 5

emergency planning at other licensees, and any related future guidance

published by the NRC prior to making changes to the CPSES Emergency Plan

without prior NRC approval.

4.

Date when full compliance achieved:

'

TU Electric is in full compliance. Corrective actions to address the cited

examples were completed October 15, 1997, in association with the

i

effective date of the CPSES Emergency Plan. Revision 26.

RESTATEMENT OF VIOLATION B

(445:446/EA 468)

B.

10 CFR 50.54(q) requires licensees to follow and maintain in effect

an emergency plan which meets the standards in 50.47(b) and the

requirements of Appendix E to Part 50.

Licensees are permitted to

'

make changes to the plan without Commission approval only if the

changes do not decrease the effectiveness of the plan and the plan.

as changed, continues to meet 50.47(b) planning standards and

Appendix E requirements.

10 CFR 50.47(b)(2) requires. in part, that the onsite emergency

response plan must meet the standard of providing that facility

assignments be unambiguously defined, adequate staffing to provide

initial facility accident response be maintained in key functional

areas at all times, and timely augmentation of response capabilities

.

1s available.

j

10 CFR Part 50. Appendix E.IV.A requires that emergency plans

describe the organization for coping with radiological emergencies.

including definition of authorities, responsibilities, and duties of

individuals assigned to the emergency organization.

]

10 CFR Part 50. Appendix E.IV.F.1 requires that emergency plans

describe the specialized training and retraining programs for

certain categories of emergency response personnel. including fire

brigade members and security personnel.

10 CFR Part 50. Appendix E.IV.A.8 requires that emergency plans

identify the state and/or local officials who would order protective

actions.

Contrary to these requirements, on October 29, 1996, the licensee

made the following changes to its emergency plan without Commission

approval that did not continue to meet Planning Standard

,

50.47.(b)(2), or the requirements of Appendix E.

1.

Changes involving the description of emergency response

organization members did not continue to meet Planning

'

Standard 50.47(b)(2) and Appendix E.IV.A requirements.

Specifically. the description and responsibilities of the

i

J

.

..

Attachment to TXX 98030

Page 4 of 5

following four emergency response organization positions were

deleted from Revision 25 but remained on the organization

i

chart and emergency response organization call out roster: a)

,

emergency operations facility radiation assessment

i

coordin9 tor. b) technical support center operations

coordinator, c) operations advisor, and d) supporting staff

for the logistical support coordinator.

2.

Changes involving the description of the emergency response

organization training program did not continue to meet

Appendix E.IV.F.1 requirements.

Specifically, the description

i

of the fire brigade and security training programs were

deleted from Revision 25,

3.

Changes involving the description of offsite decision makers

did not continue to meet Appendix E.IV.A.8 requirements.

Specifically, the identification of the offsite protective

action decision makers for the ingestion pathway zone was

deleted frca Revision 25 to the plan.

RESPONSE TO VIOLATION B

(445:446/EA 97 468)

TU Electric accepts the violation.

i

1.

Reason for Violation:

TU Electric evaluated cited changes 1 and 2 above and concluded that they

were consistent with TV Electric's understanding of the regulations. This

i

conclusion was based in part, on previous NRC acceptance in SSER 22 of a

similar level of detail in the plan's emergency organization description

and that training requirements were globally defined in plan sections 1

and 13 ressectively. A detailed explanation of TU Electric's conclusions

regarding t1e cited changes is documented in NRC letter dated November 5,

1997. "Predecisional Enforcement Conference Summary."

With respect to cited change 3. TU Electric made an administrative error

during preparation and issue of Revision 25 that removed the

identification of the subject offsite protective action decision maker for

the ingestion pathway zone.

2.

Corrective actions taken:

TU Electric has revised the CPSES Emergency Plan to address the cited

changes. The CPSES Emergency Plan. Revision 26. was submitted to the NRC

by TU Electcic letter TXX 97225 dated October 22, 1997. Revision 26

changes incorporated in plan section 1 address cited issues 1 and 3 above

regarding emergency organization description and identification of the

offsite protective action decision maker for the ingestion pathway zone. A

Revision 26 change incorporated in plan section 13 addressed cited issue 2

regarding the deletion of description of training program requirements for

.

.

t

'

.

Attachment to 110C-98030

{

Pa9e 5 of 5

the fire brigade and security. These changes revise the CPSES Emergency

Plan to meet'the expectations conveyed in NRC Inspection Report No. 50-

445/97 19: 50 446/97 19.

q

3.

Steps to prevent recurrence:

TU Electric intends to consider the expectations conveyed in NRC

Inspection Report No. 50-445/97 19: 50 446/97 19, NRC actions regarding

i

emergency planning at other licensees, and any related future guidance

j

published by the NRC prior to making changes to the CPSES Emergency Plan

'

without prior NRC approval.

TV Electric considers the administrative error associated with cited

change 3 to be an isolated case. This error and management expectations

on self checking have been discussed with appropriate personnel.

4.

Date when full compliance achieved:

TU Electric is in full compliance.

Corrective actions to address the

cited changes were completed October 15, 1997, in association with the

i

effective date of the CPSES Emergency Plan, Revision 26.

4

.

4

G