ML20217P308: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20217P308
| number = ML20217P308
| issue date = 04/29/1998
| issue date = 04/29/1998
| title = Forwards Rev 7 to Ccnpp Emergency Action Levels Technical Basis Document, IAW Reg Guide 1.101 Criteria
| title = Forwards Rev 7 to CCNPP Emergency Action Levels Technical Basis Document, IAW Reg Guide 1.101 Criteria
| author name = Cruse C
| author name = Cruse C
| author affiliation = BALTIMORE GAS & ELECTRIC CO.
| author affiliation = BALTIMORE GAS & ELECTRIC CO.

Latest revision as of 03:35, 23 May 2025

Forwards Rev 7 to CCNPP Emergency Action Levels Technical Basis Document, IAW Reg Guide 1.101 Criteria
ML20217P308
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 04/29/1998
From: Cruse C
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217P312 List:
References
RTR-REGGD-01.101, RTR-REGGD-1.101 NUDOCS 9805060231
Download: ML20217P308 (2)


Text

_ _ _ _ _ _ _ _ -

CitAnts II. Curse Baltimore Gas and Electric Company Vice President Calven Cliffs Nuclear Power Plant Nuclear Energy 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4455 April 29,1998 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant; Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Independent Spent Fuel Storage Installation Docket No. 72-8 Revision to Emergency Action Levels Technical Basis Document

REFERENCES:

(a)

Letter from Mr. D. G. Mcdonald, Jr. (NRC) to Mr. R. E. Denton (BGE),

dated April 12, 1994, Emergency Action Levels, Calvert Cliffs Nuclear Power Plant Units 1 and 2 (TAC Nos. M87080 and M87081)

(b)

Letter from Mr. T. F. Tipton (NUMARC) to NUMARC Administrative Points of Contact, dated June 30,1993, " Methodology for Development of Emergency Action Levels, "NUMARC/NESP-007, Revision 2, Questions and Answers, June 1993 Enclosed for your information is Revision 7 to the Calvert Cliffs Nuclear Power Plant Emergency Action Levels Technical Basis Document. The Technical Basis Document meets Regulatory Guide 1.101 criteria (i.e., NUMARC/NESP-007, Methodology for Development of Emergency Action Levels), and has been approved by Reference (a).

The Emergency Action Level changes that will be effected by Revision 7 of the Technical Basis f

Document will be incorporated in Revision 22 of the Calvert Cliffs Emergency Response Plan Implementation Procedure 3.0, "Immediate Actions."

Emergency Response Plan Implementation I

Procedure 3.0, Revision 22, will become effective in mid-June 1998. The Emergency Action Level Technical Basis Document, Revision 7 changes have been reviewed and endorsed by appropriate State and local agencies.

/jU,(-

J In addition to the Emergency Action Level changes, this revision incorporates more discussion from the NUMARC/NESP-007, " Methodology for Development of Emergency Action Levels." It also includes a questions and answers section from Nuclear Energy Institute's September 1992 workshop on implementation of NUMARC/NESP-007 (Reference b), and a Calvert Cliffs Nuclear Power Plant 9005060231 980429 PDR ADOCK 05000317 F

FDR

Documtnt Control Desk.

April 29,1998 Page 2 questions and answers section. New wording, effective with Revision 7, is in bold print. Words, deleted by Revision 7, are struck-through. Both are identified by margin marks.

Should you have questions regarding this matter, please contact Mr. T. E. Forgette, Director-Emergency Planning, at (410) 495-4996.

Very truly yours,

./,rr ? /h ap W CHC/JMO/bjd

/

Enclosure:

Revision 7 to the Calvert Cliffs Nuclear Power Plant Emergency. Action Levels Technical Basis Document cc:

(Without Enclosure)

R. S. Fleishman, Esquire H. J. Miller, NRC J. E. Silberg, Esquire Resident Inspector,NRC Director, Project Directorate I-1, NRC R. I. McLean, DNR A. W. Dromerick, NRC J. H. Walter, PSC i

l l