ML061600127: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:Page 1 NRC FORM 699 | {{#Wiki_filter:Page 1 NRC FORM 699 U.S. NUCLEAR REGULATORY COMMISSION DATE (9-2003) 05/30/2006 CONVERSATION RECORD TIME 3:30pm NAME OF PERSON(S) CONTACTED OR IN CONTACT WITH YOU TELEPHONE NO. | ||
TYPE OF CONVERSATION Thomas Matthews VISIT ORGANIZATION CONFERENCE Omaha Public Power District SUBJECT TELEPHONE Discussion of Impending Exemption for Fort Calhoun to Use a Light Weight Transfer Cask for an INCOMING Upcoming Dry Fuel Storage Campaign OUTGOING | |||
==SUMMARY== | ==SUMMARY== | ||
( | (Continue on Page 2) | ||
Omaha Public Power District (OPPD) Attendees: Jeff Reinhart - Site Director; Sudesh Gambhir - Division Manager, Nuclear Projects; Bernie Van Sant - Manager, Nuclear Projects; Steve Andersen - ISFSI Project Manager; Tom Matthews - | Omaha Public Power District (OPPD) Attendees: Jeff Reinhart - Site Director; Sudesh Gambhir - Division Manager, Nuclear Projects; Bernie Van Sant - Manager, Nuclear Projects; Steve Andersen - ISFSI Project Manager; Tom Matthews - | ||
Supervisor, Nuclear Licensing; and Rich Jaworski - Licensing Engineer. | Supervisor, Nuclear Licensing; and Rich Jaworski - Licensing Engineer. | ||
NRC Attendees: William Brach, Wayne Hodges, Ed Hackett, Larry Campbell, Jorge Solis, Blair Spitzberg (RIV), Scott Atwater (RIV), Ray Kellar (RIV), Joh Hanna (Resident Inspector) and Joe Sebrosky Transnuclear Inc., (TN) Attendees: Jim Axline, Robert Grubb, Jayant Bondre, UB Chopra, and Greg Banken (TN consultant) | NRC Attendees: William Brach, Wayne Hodges, Ed Hackett, Larry Campbell, Jorge Solis, Blair Spitzberg (RIV), Scott Atwater (RIV), Ray Kellar (RIV), Joh Hanna (Resident Inspector) and Joe Sebrosky Transnuclear Inc., (TN) Attendees: Jim Axline, Robert Grubb, Jayant Bondre, UB Chopra, and Greg Banken (TN consultant) | ||
The purpose of the call was for Fort Calhoun to describe what they intend to do relative to seeking an exemption for a change in method of evaluation for the thermal methodology used to model the transfer cask inside the transport trailer supplemental shielding. Fort Calhoun discussed how it intended to supplement the draft exemption request that was discussed in a public meeting on 5/24/06. (The 5/24/06 meeting summary is publicly available in ADAMS under ML061560554). Fort Calhoun indicated that the thermal calculation it would submit as part of the exemption request would use a heat load of 18.4 KW as opposed to the technical specification limit of 24KW. Fort Calhoun and TN indicated that, although the calculations were not completed, the temperature range for the fuel cladding surface temperature was around 700F. The staff noted that this was near the 752F limit provided as guidance in ISG-11. The staff cautioned Fort Calhoun to consider simplifying options in their exemption request that would overwhelm the uncertainty in the thermal calculations that Fort Calhoun intended to provide as part of its exemption request. | The purpose of the call was for Fort Calhoun to describe what they intend to do relative to seeking an exemption for a change in method of evaluation for the thermal methodology used to model the transfer cask inside the transport trailer supplemental shielding. Fort Calhoun discussed how it intended to supplement the draft exemption request that was discussed in a public meeting on 5/24/06. (The 5/24/06 meeting summary is publicly available in ADAMS under ML061560554). Fort Calhoun indicated that the thermal calculation it would submit as part of the exemption request would use a heat load of 18.4 KW as opposed to the technical specification limit of 24KW. Fort Calhoun and TN indicated that, although the calculations were not completed, the temperature range for the fuel cladding surface temperature was around 700F. The staff noted that this was near the 752F limit provided as guidance in ISG-11. The staff cautioned Fort Calhoun to consider simplifying options in their exemption request that would overwhelm the uncertainty in the thermal calculations that Fort Calhoun intended to provide as part of its exemption request. | ||
Continue on Page 2 ACTION REQUIRED None NAME OF PERSON DOCUMENTING CONVERSATION | Continue on Page 2 ACTION REQUIRED None NAME OF PERSON DOCUMENTING CONVERSATION SIGNATURE DATE Joe Sebroskv ACTION TAKEN TITLE OF PERSON TAKING ACTION SIGNATURE OF PERSON TAKING ACTION DATE NRC FORM 699 (9-2003) | ||
PRINTED ON RECYCLED PAPER}} | |||
Latest revision as of 08:32, 15 January 2025
| ML061600127 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun, 07201004 |
| Issue date: | 05/30/2006 |
| From: | Joseph Sebrosky NRC/NMSS/SFPO |
| To: | Matthews T Omaha Public Power District |
| References | |
| Download: ML061600127 (1) | |
Text
Page 1 NRC FORM 699 U.S. NUCLEAR REGULATORY COMMISSION DATE (9-2003) 05/30/2006 CONVERSATION RECORD TIME 3:30pm NAME OF PERSON(S) CONTACTED OR IN CONTACT WITH YOU TELEPHONE NO.
TYPE OF CONVERSATION Thomas Matthews VISIT ORGANIZATION CONFERENCE Omaha Public Power District SUBJECT TELEPHONE Discussion of Impending Exemption for Fort Calhoun to Use a Light Weight Transfer Cask for an INCOMING Upcoming Dry Fuel Storage Campaign OUTGOING
SUMMARY
(Continue on Page 2)
Omaha Public Power District (OPPD) Attendees: Jeff Reinhart - Site Director; Sudesh Gambhir - Division Manager, Nuclear Projects; Bernie Van Sant - Manager, Nuclear Projects; Steve Andersen - ISFSI Project Manager; Tom Matthews -
Supervisor, Nuclear Licensing; and Rich Jaworski - Licensing Engineer.
NRC Attendees: William Brach, Wayne Hodges, Ed Hackett, Larry Campbell, Jorge Solis, Blair Spitzberg (RIV), Scott Atwater (RIV), Ray Kellar (RIV), Joh Hanna (Resident Inspector) and Joe Sebrosky Transnuclear Inc., (TN) Attendees: Jim Axline, Robert Grubb, Jayant Bondre, UB Chopra, and Greg Banken (TN consultant)
The purpose of the call was for Fort Calhoun to describe what they intend to do relative to seeking an exemption for a change in method of evaluation for the thermal methodology used to model the transfer cask inside the transport trailer supplemental shielding. Fort Calhoun discussed how it intended to supplement the draft exemption request that was discussed in a public meeting on 5/24/06. (The 5/24/06 meeting summary is publicly available in ADAMS under ML061560554). Fort Calhoun indicated that the thermal calculation it would submit as part of the exemption request would use a heat load of 18.4 KW as opposed to the technical specification limit of 24KW. Fort Calhoun and TN indicated that, although the calculations were not completed, the temperature range for the fuel cladding surface temperature was around 700F. The staff noted that this was near the 752F limit provided as guidance in ISG-11. The staff cautioned Fort Calhoun to consider simplifying options in their exemption request that would overwhelm the uncertainty in the thermal calculations that Fort Calhoun intended to provide as part of its exemption request.
Continue on Page 2 ACTION REQUIRED None NAME OF PERSON DOCUMENTING CONVERSATION SIGNATURE DATE Joe Sebroskv ACTION TAKEN TITLE OF PERSON TAKING ACTION SIGNATURE OF PERSON TAKING ACTION DATE NRC FORM 699 (9-2003)