ML070790730: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:NRC & NEAC Meeting NRC & NEAC Meeting Concerning Millstone Station Performance Concerning Millstone Station Performance 2006 Reactor Oversight Program 2006 Reactor Oversight Program 2 2 Purpose of Today's MeetingNRC will address Millstone NRC will address Millstone
{{#Wiki_filter:NRC & NEAC Meeting NRC & NEAC Meeting Concerning Millstone Station Performance Concerning Millstone Station Performance 2006 Reactor Oversight Program 2006 Reactor Oversight Program
''s performance as s performance as described in the annual assessment letterdescribed in the annual assessment letter
 
!!NEAC will be given the opportunity to respond to the NEAC will be given the opportunity to respond to the information, request clarifications, and ask additional information, request clarifications, and ask additional questions as needed questions as neededNRC will be available to engage interested NRC will be available to engage interested stakeholders on performance of the plant and our role stakeholders on performance of the plant and our role in ensuring safe plant operationsin ensuring safe plant operations 3 3 AgendaIntroduction and NRC OrganizationReview of NRC Reactor Oversight ProcessRegulatory Summary of National Plant PerformanceNRC Assessment of Millstone's PerformanceNEAC Response and RemarksNRC and NEAC Closing RemarksBreakNRC available to address public questions 4 4 Region I Organization Region I OrganizationSamuel J. CollinsRegional Administrator Marc L. DapasDeputy Regional AdministratorDavid C. LewDirector Division of Reactor ProjectsJames W. CliffordDeputy DirectorA. Randolph BloughDirector Division of Reactor SafetyMarsha K. GamberoniDeputy DirectorPaul G. KrohnBranch ChiefRegional SpecialistsMillstoneResident InspectorsMax SchneiderJamie BenjaminRicardo FernandesSenior Project EngineerBarry NorrisProject EngineerEugene Huang 5 5 NRC Representatives NRC RepresentativesJim Clifford, Deputy Division Director, DRPJim Clifford, Deputy Division Director, DRP
22 Purpose of Todays Meeting
--(6" 0) 337 (6" 0) 337--5080 5080Paul Krohn, Branch Chief Paul Krohn, Branch Chief
 NRC will address Millstone NRC will address Millstones performance as s performance as described in the annual assessment letter described in the annual assessment letter NEAC will be given the opportunity to respond to the NEAC will be given the opportunity to respond to the information, request clarifications, and ask additional information, request clarifications, and ask additional questions as needed questions as needed
--(6" 0) 337 (6" 0) 337--5" 20 5" 20Max Schneider, Senior Resident InspectorMax Schneider, Senior Resident InspectorJamie Benjamin, Resident InspectorJamie Benjamin, Resident InspectorRicardo Ricardo Fernandes Fernandes, Resident Inspector , Resident Inspector  
 NRC will be available to engage interested NRC will be available to engage interested stakeholders on performance of the plant and our role stakeholders on performance of the plant and our role in ensuring safe plant operations in ensuring safe plant operations
--(860) 447(860) 447--3" 70 3" 70Eugene Huang, Project EngineerEugene Huang, Project Engineer
 
--(6" 0) 337 (6" 0) 337--5322 5322 6 6NRC Performance GoalsNRC Performance GoalsSafety: Ensure protection of the public health and Safety: Ensure protection of the public health and safety and the environmentsafety and the environmentSecurity: Ensure the secure use and management of Security: Ensure the secure use and management of radioactive materials radioactive materialsOpenness: Ensure openness in our regulatory processOpenness: Ensure openness in our regulatory processEffectiveness: Ensure that NRC actions are effective, Effectiveness: Ensure that NRC actions are effective, efficient, realistic, and timely efficient, realistic, and timelyManagement: Ensure excellence in agency Management: Ensure excellence in agency management to carry out NRC strategic objectivesmanagement to carry out NRC strategic objectives 7 7 Reactor Oversight Process Reactor Oversight ProcessSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance AreasSafetyCornerstonesBaseline Inspection ResultsSignificance ThresholdAction MatrixSignificance ThresholdPerformance IndicatorResultsRegulatory ResponseStrategicPerformance Areas 8 8 Typical Baseline Inspection AreasEquipment Alignment   Triennial Fire Protection   Operator Response     Emergency Preparedness Radiation Release Controls     Worker Radiation Protection Corrective Action Program Corrective Action Case Reviews 9 9 Significance ThresholdPerformance Indicators Green: Only Baseline Inspection White:May increase NRC oversightYellow:Requires more NRC oversight Red:Requires more NRC oversight Inspection Findings Green:Very Low safety issue White:Low to moderate safety issueYellow:Substantial safety issue Red:High safety issue 10 10 Action Matrix Concept Action Matrix ConceptLicenseeResponseRegulatoryResponseDegradedCornerstoneMultiple/Rep.DegradedCornerstoneUnacceptablePerformance Increasing Safety Significance Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC Inspection EffortsIncreasing NRC/Licensee Management InvolvementIncreasing NRC/Licensee Management Involvement Increasing Regulatory Actions Increasing Regulatory Actions 11 11Regulatory Summary of National Plant Performance Status at End of 2006Licensee Response 70Regulatory Response   24Degraded Cornerstone   6Multiple/Repetitive Degraded Cornerstone3Unacceptable  0 Total" 03 12 12 National SummaryPerformance Indicator Results (at end of 2006)
33 Agenda
!Green" 843!White""!Yellow 0!Red 0Total Inspection Findings (2006)
 Introduction and NRC Organization
!Green 676!White" 3!Yellow 0!Red 0 13 13 NRC 2006 Inspection Activities Millstone!!Hours of inspection and assessment related activitiesHours of inspection and assessment related activities
 Review of NRC Reactor Oversight Process
--5720 hours at Millstone Unit 2 5720 hours at Millstone Unit 2
 Regulatory Summary of National Plant Performance
--343" hours at Millstone Unit 3 343" hours at Millstone Unit 3
 NRC Assessment of Millstones Performance
!!Three resident inspectors assigned to the siteThree resident inspectors assigned to the site
 NEAC Response and Remarks
--Ricardo Fernandes started at Millstone in Nov. 2006Ricardo Fernandes started at Millstone in Nov. 2006
 NRC and NEAC Closing Remarks
!!Other Inspections Other Inspections
 Break
--"3 Regional inspections "3 Regional inspections
 NRC available to address public questions  
--6 Team inspections6 Team inspections 14 14 NRC Major Inspection Activities NRC Major Inspection Activities Millstone Millstone!!Daily Resident InspectionsDaily Resident Inspections
 
!!Problem Identification and Resolution team inspectionProblem Identification and Resolution team inspection
44 Region I Organization Region I Organization Samuel J. Collins Regional Administrator Marc L. Dapas Deputy Regional Administrator David C. Lew Director Division of Reactor Projects James W. Clifford Deputy Director A. Randolph Blough Director Division of Reactor Safety Marsha K. Gamberoni Deputy Director Paul G. Krohn Branch Chief Regional Specialists Millstone Resident Inspectors Max Schneider Jamie Benjamin Ricardo Fernandes Senior Project Engineer Barry Norris Project Engineer Eugene Huang
!!Component Design Basis team inspectionComponent Design Basis team inspection
 
!!Unit 2 Unplanned Scrams with Loss of Normal Heat Removal Unit 2 Unplanned Scrams with Loss of Normal Heat Removal supplemental inspectionsupplemental inspection
55 NRC Representatives NRC Representatives
!!Unit 2 Pressurizer Replacement team inspectionUnit 2 Pressurizer Replacement team inspection
 Jim Clifford, Deputy Division Director, DRP Jim Clifford, Deputy Division Director, DRP
!!Emergency Preparedness Exercise team inspectionEmergency Preparedness Exercise team inspection
-- (610) 337 (610) 337--5080 5080
!!Unit 2 Refueling Outage Unit 2 Refueling Outage 15 15 NRC 2006 Assessment Results NRC 2006 Assessment Results Millstone MillstoneLicensee Response Column for Unit 2 and Unit 3Licensee Response Column for Unit 2 and Unit 3 at the end of 2006 at the end of 2006Unit 2 had a White Performance Indicator for the first Unit 2 had a White Performance Indicator for the first three quarters.
 Paul Krohn, Branch Chief Paul Krohn, Branch Chief
-- (610) 337 (610) 337--5120 5120
 Max Schneider, Senior Resident Inspector Max Schneider, Senior Resident Inspector Jamie Benjamin, Resident Inspector Jamie Benjamin, Resident Inspector Ricardo Ricardo Fernandes Fernandes, Resident Inspector  
, Resident Inspector  
-- (860) 447 (860) 447--3170 3170
 Eugene Huang, Project Engineer Eugene Huang, Project Engineer
-- (610) 337 (610) 337--5322 5322
 
66 NRC Performance Goals NRC Performance Goals
 Safety: Ensure protection of the public health and Safety: Ensure protection of the public health and safety and the environment safety and the environment
 Security: Ensure the secure use and management of Security: Ensure the secure use and management of radioactive materials radioactive materials
 Openness: Ensure openness in our regulatory process Openness: Ensure openness in our regulatory process
 Effectiveness: Ensure that NRC actions are effective, Effectiveness: Ensure that NRC actions are effective, efficient, realistic, and timely efficient, realistic, and timely
 Management: Ensure excellence in agency Management: Ensure excellence in agency management to carry out NRC strategic objectives management to carry out NRC strategic objectives
 
77 Reactor Oversight Process Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas
 
88 Typical Baseline Inspection Areas
 Equipment Alignment  
 Triennial Fire Protection  
 Operator Response  
 Emergency Preparedness  
 Radiation Release Controls  
 Worker Radiation Protection  
 Corrective Action Program  
 Corrective Action Case Reviews
 
99 Significance Threshold Performance Indicators Green:
Only Baseline Inspection White:
May increase NRC oversight Yellow:
Requires more NRC oversight Red:
Requires more NRC oversight Inspection Findings Green:
Very Low safety issue White:
Low to moderate safety issue Yellow:
Substantial safety issue Red:
High safety issue
 
10 10 Action Matrix Concept Action Matrix Concept Licensee
 
===Response===
Regulatory
 
===Response===
Degraded Cornerstone Multiple/Rep.
Degraded Cornerstone Unacceptable Performance Increasing Safety Significance Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions Increasing Regulatory Actions
 
11 11 Regulatory Summary of National Plant Performance Status at End of 2006 Licensee Response 70 Regulatory Response 24 Degraded Cornerstone 6
Multiple/Repetitive Degraded Cornerstone 3
Unacceptable 0
Total 103
 
12 12 National Summary
 Performance Indicator Results (at end of 2006)
Green 1843 White 11 Yellow 0
Red 0
 Total Inspection Findings (2006)
Green 676 White 13 Yellow 0
Red 0
 
13 13 NRC 2006 Inspection Activities Millstone Hours of inspection and assessment related activities Hours of inspection and assessment related activities 5720 hours at Millstone Unit 2 5720 hours at Millstone Unit 2 3431 hours at Millstone Unit 3 3431 hours at Millstone Unit 3 Three resident inspectors assigned to the site Three resident inspectors assigned to the site Ricardo Fernandes started at Millstone in Nov. 2006 Ricardo Fernandes started at Millstone in Nov. 2006 Other Inspections Other Inspections 13 Regional inspections 13 Regional inspections 6 Team inspections 6 Team inspections
 
14 14 NRC Major Inspection Activities NRC Major Inspection Activities Millstone Millstone Daily Resident Inspections Daily Resident Inspections Problem Identification and Resolution team inspection Problem Identification and Resolution team inspection Component Design Basis team inspection Component Design Basis team inspection Unit 2 Unplanned Scrams with Loss of Normal Heat Removal Unit 2 Unplanned Scrams with Loss of Normal Heat Removal supplemental inspection supplemental inspection Unit 2 Pressurizer Replacement team inspection Unit 2 Pressurizer Replacement team inspection Emergency Preparedness Exercise team inspection Emergency Preparedness Exercise team inspection Unit 2 Refueling Outage Unit 2 Refueling Outage
 
15 15 NRC 2006 Assessment Results NRC 2006 Assessment Results Millstone Millstone
 Licensee Response Column for Unit 2 and Unit 3 Licensee Response Column for Unit 2 and Unit 3 at the end of 2006 at the end of 2006
 Unit 2 had a White Performance Indicator for the first Unit 2 had a White Performance Indicator for the first three quarters.
three quarters.
three quarters.
--Unplanned Scrams with Loss of Normal Heat RemovalUnplanned Scrams with Loss of Normal Heat Removal
-- Unplanned Scrams with Loss of Normal Heat Removal Unplanned Scrams with Loss of Normal Heat Removal
--NRC completed Supplemental Inspection (September 2006) NRC completed Supplemental Inspection (September 2006)  
-- NRC completed Supplemental Inspection (September 2006)
--PI returned to Green in 4PI returned to Green in 4 th th Quarter Quarter 16 16 NRC 2006 Inspection Results NRC 2006 Inspection Results Millstone Millstone!!Inspection Findings Inspection Findings
NRC completed Supplemental Inspection (September 2006)  
--8 Findings of very low safety significance (Green) at Unit 28 Findings of very low safety significance (Green) at Unit 2
-- PI returned to Green in 4 PI returned to Green in 4th th Quarter Quarter
--8 Findings of very low safety significance (Green) at Unit 38 Findings of very low safety significance (Green) at Unit 3
 
--" Finding of very low safety significance (Green) common
16 16 NRC 2006 Inspection Results NRC 2006 Inspection Results Millstone Millstone Inspection Findings Inspection Findings
" Finding of very low safety significance (Green) common to both units to both units 17 17 NRC 2006 Inspection Results NRC 2006 Inspection Results Millstone MillstoneCommon Theme EvaluationCommon Theme Evaluation
-- 8 Findings of very low safety significance (Green) at Unit 2 8 Findings of very low safety significance (Green) at Unit 2
!!Identified five findings with a common theme in the area of Identified five findings with a common theme in the area of problem identification and resolution (specifically, quality of problem identification and resolution (specifically, quality of operability determinations).operability determinations).
-- 8 Findings of very low safety significance (Green) at Unit 3 8 Findings of very low safety significance (Green) at Unit 3
!!Reviewed Millstone Reviewed Millstone
-- 1 Finding of very low safety significance (Green) common 1 Finding of very low safety significance (Green) common to both units to both units
''s corrective actions.
 
17 17 NRC 2006 Inspection Results NRC 2006 Inspection Results Millstone Millstone Common Theme Evaluation Common Theme Evaluation Identified five findings with a common theme in the area of Identified five findings with a common theme in the area of problem identification and resolution (specifically, quality of problem identification and resolution (specifically, quality of operability determinations).
operability determinations).
Reviewed Millstone Reviewed Millstones corrective actions.
s corrective actions.
s corrective actions.
!!Concluded that Millstone Concluded that Millstone
Concluded that Millstone Concluded that Millstones actions are acceptable in scope, s actions are acceptable in scope, timeliness, and effectiveness to address these issues.
''s actions are acceptable in scope, s actions are acceptable in scope, timeliness, and effectiveness to address these issues.timeliness, and effectiveness to address these issues.
timeliness, and effectiveness to address these issues.
!!As a result, no substantive cross As a result, no substantive cross
As a result, no substantive cross As a result, no substantive cross--cutting issue was identified.
--cutting issue was identified.cutting issue was identified.
cutting issue was identified.
18 18 NRC Annual Assessment Summary NRC Annual Assessment Summary Millstone MillstoneDominion operated Millstone Units 2 & 3 in a manner Dominion operated Millstone Units 2 & 3 in a manner that preserved public health and safetythat preserved public health and safetyAll Reactor Oversight Process cornerstone objectives All Reactor Oversight Process cornerstone objectives were met were metNRC plans baseline inspections at Millstone for the 2007 NRC plans baseline inspections at Millstone for the 2007 assessment periodassessment period 19 19 Contacting the NRC Contacting the NRCReport an emergency Report an emergency
 
!!(30") 8" 6 (30") 8" 6--5" 00 (call collect) 5" 00 (call collect)Report a safety concern:
18 18 NRC Annual Assessment Summary NRC Annual Assessment Summary Millstone Millstone
Report a safety concern:  
 Dominion operated Millstone Units 2 & 3 in a manner Dominion operated Millstone Units 2 & 3 in a manner that preserved public health and safety that preserved public health and safety
!!(800) 695 (800) 695--7403 7403 !!Allegation@nrc.gov Allegation@nrc.govGeneral information or questions General information or questions
 All Reactor Oversight Process cornerstone objectives All Reactor Oversight Process cornerstone objectives were met were met
!!www.nrc.gov www.nrc.gov
 NRC plans baseline inspections at Millstone for the 2007 NRC plans baseline inspections at Millstone for the 2007 assessment period assessment period
!!Select Select ""What We Do What We Do
 
""for Public Affairs for Public AffairsPaul Paul Krohn Krohn, Branch Chief, Branch Chief
19 19 Contacting the NRC Contacting the NRC
!!pgk"@nrc.gov pgk"@nrc.gov 20 20 Reference Sources Reference SourcesReactor Oversight ProcessReactor Oversight Process
 Report an emergency Report an emergency
!!http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.htmlhttp://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.htmlPublic Electronic Reading RoomPublic Electronic Reading Room
 
!!http://www.nrc.gov/readinghttp://www.nrc.gov/reading
(301) 816 (301) 816--5100 (call collect) 5100 (call collect)
--rm.htmlrm.htmlPublic Document RoomPublic Document Room
 Report a safety concern:
!!""--800 800--397 397--4209 (Toll Free) 4209 (Toll Free) 21 21 NEAC Response and Remarks NEAC Response and Remarks Millstone Nuclear Power Station Millstone Nuclear Power Station Unit 2 and Unit 3 Unit 2 and Unit 3 END OF THE PRESENTATION END OF THE PRESENTATIONNuclear Regulatory Commission Nuclear Regulatory Commission  
Report a safety concern:  
--Region I Region IKing of Prussia, PennsylvaniaKing of Prussia, Pennsylvania March 22, 2007 March 22, 2007}}
 
(800) 695 (800) 695--7403 7403  
 
Allegation@nrc.gov Allegation@nrc.gov
 General information or questions General information or questions
 
www.nrc.gov www.nrc.gov
 
Select Select What We Do What We Do for Public Affairs for Public Affairs
 Paul Paul Krohn Krohn, Branch Chief
, Branch Chief
 
pgk1@nrc.gov pgk1@nrc.gov
 
20 20 Reference Sources Reference Sources
 Reactor Oversight Process Reactor Oversight Process
 
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html
 Public Electronic Reading Room Public Electronic Reading Room
 
http://www.nrc.gov/reading http://www.nrc.gov/reading--rm.html rm.html
 Public Document Room Public Document Room
 
11--800 800--397 397--4209 (Toll Free) 4209 (Toll Free)
 
21 21 NEAC Response and Remarks NEAC Response and Remarks Millstone Nuclear Power Station Millstone Nuclear Power Station Unit 2 and Unit 3 Unit 2 and Unit 3
 
END OF THE PRESENTATION END OF THE PRESENTATION Nuclear Regulatory Commission Nuclear Regulatory Commission -- Region I Region I King of Prussia, Pennsylvania King of Prussia, Pennsylvania March 22, 2007 March 22, 2007}}

Latest revision as of 02:38, 15 January 2025

2006 NRC and Neac Public Meeting Slides to Discuss Millstone Station Annual Assessment Performance EOC 2006-07
ML070790730
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 03/20/2007
From: Paul Krohn
NRC/RGN-I/DRP/PB6
To:
Krohn P, RI/DRP/PB6/610-337-5120
References
Download: ML070790730 (22)


Text

NRC & NEAC Meeting NRC & NEAC Meeting Concerning Millstone Station Performance Concerning Millstone Station Performance 2006 Reactor Oversight Program 2006 Reactor Oversight Program

22 Purpose of Todays Meeting

 NRC will address Millstone NRC will address Millstones performance as s performance as described in the annual assessment letter described in the annual assessment letter NEAC will be given the opportunity to respond to the NEAC will be given the opportunity to respond to the information, request clarifications, and ask additional information, request clarifications, and ask additional questions as needed questions as needed

 NRC will be available to engage interested NRC will be available to engage interested stakeholders on performance of the plant and our role stakeholders on performance of the plant and our role in ensuring safe plant operations in ensuring safe plant operations

33 Agenda

 Introduction and NRC Organization

 Review of NRC Reactor Oversight Process

 Regulatory Summary of National Plant Performance

 NRC Assessment of Millstones Performance

 NEAC Response and Remarks

 NRC and NEAC Closing Remarks

 Break

 NRC available to address public questions

44 Region I Organization Region I Organization Samuel J. Collins Regional Administrator Marc L. Dapas Deputy Regional Administrator David C. Lew Director Division of Reactor Projects James W. Clifford Deputy Director A. Randolph Blough Director Division of Reactor Safety Marsha K. Gamberoni Deputy Director Paul G. Krohn Branch Chief Regional Specialists Millstone Resident Inspectors Max Schneider Jamie Benjamin Ricardo Fernandes Senior Project Engineer Barry Norris Project Engineer Eugene Huang

55 NRC Representatives NRC Representatives

 Jim Clifford, Deputy Division Director, DRP Jim Clifford, Deputy Division Director, DRP

-- (610) 337 (610) 337--5080 5080

 Paul Krohn, Branch Chief Paul Krohn, Branch Chief

-- (610) 337 (610) 337--5120 5120

 Max Schneider, Senior Resident Inspector Max Schneider, Senior Resident Inspector Jamie Benjamin, Resident Inspector Jamie Benjamin, Resident Inspector Ricardo Ricardo Fernandes Fernandes, Resident Inspector

, Resident Inspector

-- (860) 447 (860) 447--3170 3170

 Eugene Huang, Project Engineer Eugene Huang, Project Engineer

-- (610) 337 (610) 337--5322 5322

66 NRC Performance Goals NRC Performance Goals

 Safety: Ensure protection of the public health and Safety: Ensure protection of the public health and safety and the environment safety and the environment

 Security: Ensure the secure use and management of Security: Ensure the secure use and management of radioactive materials radioactive materials

 Openness: Ensure openness in our regulatory process Openness: Ensure openness in our regulatory process

 Effectiveness: Ensure that NRC actions are effective, Effectiveness: Ensure that NRC actions are effective, efficient, realistic, and timely efficient, realistic, and timely

 Management: Ensure excellence in agency Management: Ensure excellence in agency management to carry out NRC strategic objectives management to carry out NRC strategic objectives

77 Reactor Oversight Process Reactor Oversight Process Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas Safety Cornerstones Baseline Inspection Results Significance Threshold Action Matrix Significance Threshold Performance Indicator Results Regulatory Response Strategic Performance Areas

88 Typical Baseline Inspection Areas

 Equipment Alignment

 Triennial Fire Protection

 Operator Response

 Emergency Preparedness

 Radiation Release Controls

 Worker Radiation Protection

 Corrective Action Program

 Corrective Action Case Reviews

99 Significance Threshold Performance Indicators Green:

Only Baseline Inspection White:

May increase NRC oversight Yellow:

Requires more NRC oversight Red:

Requires more NRC oversight Inspection Findings Green:

Very Low safety issue White:

Low to moderate safety issue Yellow:

Substantial safety issue Red:

High safety issue

10 10 Action Matrix Concept Action Matrix Concept Licensee

Response

Regulatory

Response

Degraded Cornerstone Multiple/Rep.

Degraded Cornerstone Unacceptable Performance Increasing Safety Significance Increasing Safety Significance Increasing NRC Inspection Efforts Increasing NRC Inspection Efforts Increasing NRC/Licensee Management Involvement Increasing NRC/Licensee Management Involvement Increasing Regulatory Actions Increasing Regulatory Actions

11 11 Regulatory Summary of National Plant Performance Status at End of 2006 Licensee Response 70 Regulatory Response 24 Degraded Cornerstone 6

Multiple/Repetitive Degraded Cornerstone 3

Unacceptable 0

Total 103

12 12 National Summary

 Performance Indicator Results (at end of 2006)

Green 1843 White 11 Yellow 0

Red 0

 Total Inspection Findings (2006)

Green 676 White 13 Yellow 0

Red 0

13 13 NRC 2006 Inspection Activities Millstone Hours of inspection and assessment related activities Hours of inspection and assessment related activities 5720 hours0.0662 days <br />1.589 hours <br />0.00946 weeks <br />0.00218 months <br /> at Millstone Unit 2 5720 hours0.0662 days <br />1.589 hours <br />0.00946 weeks <br />0.00218 months <br /> at Millstone Unit 2 3431 hours0.0397 days <br />0.953 hours <br />0.00567 weeks <br />0.00131 months <br /> at Millstone Unit 3 3431 hours0.0397 days <br />0.953 hours <br />0.00567 weeks <br />0.00131 months <br /> at Millstone Unit 3 Three resident inspectors assigned to the site Three resident inspectors assigned to the site Ricardo Fernandes started at Millstone in Nov. 2006 Ricardo Fernandes started at Millstone in Nov. 2006 Other Inspections Other Inspections 13 Regional inspections 13 Regional inspections 6 Team inspections 6 Team inspections

14 14 NRC Major Inspection Activities NRC Major Inspection Activities Millstone Millstone Daily Resident Inspections Daily Resident Inspections Problem Identification and Resolution team inspection Problem Identification and Resolution team inspection Component Design Basis team inspection Component Design Basis team inspection Unit 2 Unplanned Scrams with Loss of Normal Heat Removal Unit 2 Unplanned Scrams with Loss of Normal Heat Removal supplemental inspection supplemental inspection Unit 2 Pressurizer Replacement team inspection Unit 2 Pressurizer Replacement team inspection Emergency Preparedness Exercise team inspection Emergency Preparedness Exercise team inspection Unit 2 Refueling Outage Unit 2 Refueling Outage

15 15 NRC 2006 Assessment Results NRC 2006 Assessment Results Millstone Millstone

 Licensee Response Column for Unit 2 and Unit 3 Licensee Response Column for Unit 2 and Unit 3 at the end of 2006 at the end of 2006

 Unit 2 had a White Performance Indicator for the first Unit 2 had a White Performance Indicator for the first three quarters.

three quarters.

-- Unplanned Scrams with Loss of Normal Heat Removal Unplanned Scrams with Loss of Normal Heat Removal

-- NRC completed Supplemental Inspection (September 2006)

NRC completed Supplemental Inspection (September 2006)

-- PI returned to Green in 4 PI returned to Green in 4th th Quarter Quarter

16 16 NRC 2006 Inspection Results NRC 2006 Inspection Results Millstone Millstone Inspection Findings Inspection Findings

-- 8 Findings of very low safety significance (Green) at Unit 2 8 Findings of very low safety significance (Green) at Unit 2

-- 8 Findings of very low safety significance (Green) at Unit 3 8 Findings of very low safety significance (Green) at Unit 3

-- 1 Finding of very low safety significance (Green) common 1 Finding of very low safety significance (Green) common to both units to both units

17 17 NRC 2006 Inspection Results NRC 2006 Inspection Results Millstone Millstone Common Theme Evaluation Common Theme Evaluation Identified five findings with a common theme in the area of Identified five findings with a common theme in the area of problem identification and resolution (specifically, quality of problem identification and resolution (specifically, quality of operability determinations).

operability determinations).

Reviewed Millstone Reviewed Millstones corrective actions.

s corrective actions.

Concluded that Millstone Concluded that Millstones actions are acceptable in scope, s actions are acceptable in scope, timeliness, and effectiveness to address these issues.

timeliness, and effectiveness to address these issues.

As a result, no substantive cross As a result, no substantive cross--cutting issue was identified.

cutting issue was identified.

18 18 NRC Annual Assessment Summary NRC Annual Assessment Summary Millstone Millstone

 Dominion operated Millstone Units 2 & 3 in a manner Dominion operated Millstone Units 2 & 3 in a manner that preserved public health and safety that preserved public health and safety

 All Reactor Oversight Process cornerstone objectives All Reactor Oversight Process cornerstone objectives were met were met

 NRC plans baseline inspections at Millstone for the 2007 NRC plans baseline inspections at Millstone for the 2007 assessment period assessment period

19 19 Contacting the NRC Contacting the NRC

 Report an emergency Report an emergency

(301) 816 (301) 816--5100 (call collect) 5100 (call collect)

 Report a safety concern:

Report a safety concern:

(800) 695 (800) 695--7403 7403

Allegation@nrc.gov Allegation@nrc.gov

 General information or questions General information or questions

www.nrc.gov www.nrc.gov

Select Select What We Do What We Do for Public Affairs for Public Affairs

 Paul Paul Krohn Krohn, Branch Chief

, Branch Chief

pgk1@nrc.gov pgk1@nrc.gov

20 20 Reference Sources Reference Sources

 Reactor Oversight Process Reactor Oversight Process

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html

 Public Electronic Reading Room Public Electronic Reading Room

http://www.nrc.gov/reading http://www.nrc.gov/reading--rm.html rm.html

 Public Document Room Public Document Room

11--800 800--397 397--4209 (Toll Free) 4209 (Toll Free)

21 21 NEAC Response and Remarks NEAC Response and Remarks Millstone Nuclear Power Station Millstone Nuclear Power Station Unit 2 and Unit 3 Unit 2 and Unit 3

END OF THE PRESENTATION END OF THE PRESENTATION Nuclear Regulatory Commission Nuclear Regulatory Commission -- Region I Region I King of Prussia, Pennsylvania King of Prussia, Pennsylvania March 22, 2007 March 22, 2007