ML071970498: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
 
StriderTol Bot change
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 07/16/2007
| issue date = 07/16/2007
| title = Information Request to Support Upcoming Prairie Island Nuclear Generating Plant Units 1 and 2 Problem Identification and Resolution Inspection
| title = Information Request to Support Upcoming Prairie Island Nuclear Generating Plant Units 1 and 2 Problem Identification and Resolution Inspection
| author name = Skokowski R A
| author name = Skokowski R
| author affiliation = NRC/RGN-III/DRP/RPB3
| author affiliation = NRC/RGN-III/DRP/RPB3
| addressee name = Wadley M D
| addressee name = Wadley M
| addressee affiliation = Nuclear Management Co, LLC
| addressee affiliation = Nuclear Management Co, LLC
| docket = 05000282, 05000306
| docket = 05000282, 05000306
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:July 16, 2007Mr. Michael D. WadleySite Vice President Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089
{{#Wiki_filter:July 16, 2007 Mr. Michael D. Wadley Site Vice President Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089


==SUBJECT:==
==SUBJECT:==
INFORMATION REQUEST TO SUPPORT UPCOMING PRAIRIEISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2, PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION
INFORMATION REQUEST TO SUPPORT UPCOMING PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2, PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION


==Dear Mr. Wadley:==
==Dear Mr. Wadley:==
This letter is to request information to support our biennial PI&R inspection beginning September 10, 2007, at Prairie Island Nuclear Generating Plant, Units 1 and 2. This inspection will be performed in accordance with the Nuclear Regulatory Commission (NRC) baseline Inspection Procedure 71152.
Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection.
The documents requested are copies of performance indicator reports and lists of information, necessary to ensure the inspection team is adequately prepared for the inspection. The information may be provided in either CD-ROM or hard copy format and should be ready for NRC review by August 27, 2007. Ms. Desiree R. Smith, the Lead Inspector, will contact you to determine the best method of providing the requested information.
If there are any questions about the material requested, or the inspection in general, please do not hesitate to call Ms. Desiree R. Smith at (630) 829-9637, or to contact her by email at drc1@nrc.gov.


This letter is to request information to support our biennial PI&R inspection beginningSeptember 10, 2007, at Prairie Island Nuclear Generating Plant, Units 1 and 2. This inspection will be performed in accordance with the Nuclear Regulatory Commission (NRC) baseline Inspection Procedure 71152. Experience has shown that these inspections are extremely resource intensive both for theNRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection.The documents requested are copies of performance indicator reports and lists of information,necessary to ensure the inspection team is adequately prepared for the inspection. The information may be provided in either CD-ROM or hard copy format and should be ready for NRC review by August 27, 2007. Ms. Desiree R. Smith, the Lead Inspector, will contact you to determine the best method of providing the requested information. If there are any questions about the material requested, or the inspection in general, please donot hesitate to call Ms. Desiree R. Smith at (630) 829-9637, or to contact her by email at drc1@nrc.gov.
M. Wadley In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60


M. Wadley-2-In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of thisletter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Sincerely,/RA/Richard A. Skokowski, ChiefBranch 3 Division of Reactor ProjectsDocket Nos. 50-282; 50-306License Nos. DPR-42; DPR-60
==Enclosure:==
Requested Information to Support PI&R Inspection cc w/encl:
D. Cooper, Senior Vice President and Chief Nuclear Officer M. Sellman, President and Chief Executive Officer Regulatory Affairs Manager J. Rogoff, Vice President, Counsel & Secretary Nuclear Asset Manager State Liaison Officer, Minnesota Department of Health Tribal Council, Prairie Island Indian Community Administrator, Goodhue County Courthouse Commissioner, Minnesota Department of Commerce Manager, Environmental Protection Division Office of the Attorney General of Minnesota
 
M. Wadley In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely, Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60


==Enclosure:==
==Enclosure:==
Requested Information to Support PI&R Inspectioncc w/encl:D. Cooper, Senior Vice President and Chief Nuclear Officer M. Sellman, President and Chief Executive Officer Regulatory Affairs Manager J. Rogoff, Vice President, Counsel & Secretary Nuclear Asset Manager State Liaison Officer, Minnesota Department of Health Tribal Council, Prairie Island Indian Community Administrator, Goodhue County Courthouse Commissioner, Minnesota Department of Commerce Manager, Environmental Protection Division Office of the Attorney General of Minnesota M. Wadley-2-In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of thisletter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).Sincerely,Richard A. Skokowski, ChiefBranch 3 Division of Reactor ProjectsDocket Nos. 50-282; 50-306License Nos. DPR-42; DPR-60
Requested Information to Support PI&R Inspection cc w/encl:
D. Cooper, Senior Vice President and Chief Nuclear Officer M. Sellman, President and Chief Executive Officer Regulatory Affairs Manager J. Rogoff, Vice President, Counsel & Secretary Nuclear Asset Manager State Liaison Officer, Minnesota Department of Health Tribal Council, Prairie Island Indian Community Administrator, Goodhue County Courthouse Commissioner, Minnesota Department of Commerce Manager, Environmental Protection Division Office of the Attorney General of Minnesota DOCUMENT NAME: G:/PrairieIslandPI&RRequestLetter2007.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME DSmith:dtp RSkokowski DATE 07/12/2007 07/16/2007 OFFICIAL RECORD COPY


==Enclosure:==
Letter to M. Wadley from R. Skokowski dated July 16, 2007 DISTRIBUTION:
Requested Information to Support  PI&R Inspectioncc w/encl:D. Cooper, Senior Vice President and Chief  Nuclear Officer M. Sellman, President and Chief Executive Officer Regulatory Affairs Manager J. Rogoff, Vice President, Counsel & Secretary Nuclear Asset Manager State Liaison Officer, Minnesota Department of Health Tribal Council, Prairie Island Indian Community Administrator, Goodhue County Courthouse Commissioner, Minnesota Department of Commerce Manager, Environmental Protection Division Office of the Attorney General of MinnesotaDOCUMENT NAME:  G:/PrairieIslandPI&RRequestLetter2007.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-SensitiveTo receive a copy of this document, indicate in the concurrence  box "C" = Copy without attach/encl "E" = Copy with attach/encl  "N" = No copyOFFICERIIIRIIINAMEDSmith:dtpRSkokowskiDATE07/12/200707/16/2007OFFICIAL RECORD COPY Letter to M. Wadley from R. Skokowski dated July 16, 2007DISTRIBUTION
TEB MLC RidsNrrDirsIrib GEG KGO JTA DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)
:TEB MLC RidsNrrDirsIrib GEG KGO JTA DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number) Requested Information to Support Problem Identification and Resolution (PI&R)Inspection1.A copy of administrative procedure(s) for the corrective action process, trendingprogram, quality assurance audit program, self-assessment program, corrective action effectiveness review program, and industry experience review program, operator work around, and temporary modification.2.A copy of Quality Assurance (QA) audits and/or self-assessments of the correctiveaction program completed since August 2005
 
.3.A copy of the QA manual.4.A copy of the Employee Concerns Program/Ombudsman administrative procedure.
Enclosure 1
5.A list of QA audits completed since August 2005 with brief description of areas wherefindings were identified.6.A list of self-assessments completed since August 2005.
Requested Information to Support Problem Identification and Resolution (PI&R)
7.A list of root cause evaluations completed since August 2005.
Inspection 1.
8.A list of test failures (In-service Test (IST) or Technical Specification surveillances) sinceAugust 2005, with a brief description of component/system which failed.9.A list of all open condition reports sorted by significance level including a description ofthe issue, the date initiated, and the significance category.10.A list of condition reports closed since August 2005 including description of issue,significance category, date initiated, date closed, and whether there is an associated operability evaluation.11.A list of condition reports initiated since August 2005 that involve inadequate orineffective corrective actions. Include the date initiated, a brief description, status, and significance category of the issue.12.A list of condition reports initiated since August 2005 that identify trends of conditionsadverse to quality. Include the date initiated, a brief description, status, and significance category for each item.13.A copy of any performance reports for the past two years used to track the correctiveaction program effectiveness.14.A list of condition reports issued during the past two refueling outages sorted by systemand component, including a brief description, status, and significant category for each item. 15.A copy of condition reports associated with non-cited and cited violations sinceAugust 2005.16.A list of operating experience documents received since August 2005 and anyassociated condition reports.17.A list of effectiveness reviews completed since August 2005.
A copy of administrative procedure(s) for the corrective action process, trending program, quality assurance audit program, self-assessment program, corrective action effectiveness review program, and industry experience review program, operator work around, and temporary modification.
18.A list of rework items and repeat failures since August 2005.
2.
: 19. A list of maintenance rule (a)(1) systems and components, and the associatedhealth reports since August 2005.20.A copy of any corrective action program trend reports for the past two years.
A copy of Quality Assurance (QA) audits and/or self-assessments of the corrective action program completed since August 2005.
21.A list of dates, times and locations for all scheduled meetings associated withthe implementation of the corrective action program.22.A copy of the latest organization chart and phone listing.
3.
23.A list of the top ten risk-significant systems. Documents requested to be available during the inspection:a.Updated Final Safety Analysis Reportb.Technical Specifications c.Procedures d.Copies of any self-assessments and associated condition reports generated inpreparation for the inspection}}
A copy of the QA manual.
4.
A copy of the Employee Concerns Program/Ombudsman administrative procedure.
5.
A list of QA audits completed since August 2005 with brief description of areas where findings were identified.
6.
A list of self-assessments completed since August 2005.
7.
A list of root cause evaluations completed since August 2005.
8.
A list of test failures (In-service Test (IST) or Technical Specification surveillances) since August 2005, with a brief description of component/system which failed.
9.
A list of all open condition reports sorted by significance level including a description of the issue, the date initiated, and the significance category.
10.
A list of condition reports closed since August 2005 including description of issue, significance category, date initiated, date closed, and whether there is an associated operability evaluation.
11.
A list of condition reports initiated since August 2005 that involve inadequate or ineffective corrective actions. Include the date initiated, a brief description, status, and significance category of the issue.
12.
A list of condition reports initiated since August 2005 that identify trends of conditions adverse to quality. Include the date initiated, a brief description, status, and significance category for each item.
13.
A copy of any performance reports for the past two years used to track the corrective action program effectiveness.
14.
A list of condition reports issued during the past two refueling outages sorted by system and component, including a brief description, status, and significant category for each item.
 
Enclosure 2
15.
A copy of condition reports associated with non-cited and cited violations since August 2005.
16.
A list of operating experience documents received since August 2005 and any associated condition reports.
17.
A list of effectiveness reviews completed since August 2005.
18.
A list of rework items and repeat failures since August 2005.
: 19.
A list of maintenance rule (a)(1) systems and components, and the associated health reports since August 2005.
20.
A copy of any corrective action program trend reports for the past two years.
21.
A list of dates, times and locations for all scheduled meetings associated with the implementation of the corrective action program.
22.
A copy of the latest organization chart and phone listing.
23.
A list of the top ten risk-significant systems.
Documents requested to be available during the inspection:
a.
Updated Final Safety Analysis Report b.
Technical Specifications c.
Procedures d.
Copies of any self-assessments and associated condition reports generated in preparation for the inspection}}

Latest revision as of 22:55, 14 January 2025

Information Request to Support Upcoming Prairie Island Nuclear Generating Plant Units 1 and 2 Problem Identification and Resolution Inspection
ML071970498
Person / Time
Site: Prairie Island  
Issue date: 07/16/2007
From: Richard Skokowski
NRC/RGN-III/DRP/RPB3
To: Wadley M
Nuclear Management Co
References
Download: ML071970498 (6)


Text

July 16, 2007 Mr. Michael D. Wadley Site Vice President Prairie Island Nuclear Generating Plant Nuclear Management Company, LLC 1717 Wakonade Drive East Welch, MN 55089

SUBJECT:

INFORMATION REQUEST TO SUPPORT UPCOMING PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2, PROBLEM IDENTIFICATION AND RESOLUTION (PI&R) INSPECTION

Dear Mr. Wadley:

This letter is to request information to support our biennial PI&R inspection beginning September 10, 2007, at Prairie Island Nuclear Generating Plant, Units 1 and 2. This inspection will be performed in accordance with the Nuclear Regulatory Commission (NRC) baseline Inspection Procedure 71152.

Experience has shown that these inspections are extremely resource intensive both for the NRC inspectors and the utility staff. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a list of documents required for the inspection.

The documents requested are copies of performance indicator reports and lists of information, necessary to ensure the inspection team is adequately prepared for the inspection. The information may be provided in either CD-ROM or hard copy format and should be ready for NRC review by August 27, 2007. Ms. Desiree R. Smith, the Lead Inspector, will contact you to determine the best method of providing the requested information.

If there are any questions about the material requested, or the inspection in general, please do not hesitate to call Ms. Desiree R. Smith at (630) 829-9637, or to contact her by email at drc1@nrc.gov.

M. Wadley In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60

Enclosure:

Requested Information to Support PI&R Inspection cc w/encl:

D. Cooper, Senior Vice President and Chief Nuclear Officer M. Sellman, President and Chief Executive Officer Regulatory Affairs Manager J. Rogoff, Vice President, Counsel & Secretary Nuclear Asset Manager State Liaison Officer, Minnesota Department of Health Tribal Council, Prairie Island Indian Community Administrator, Goodhue County Courthouse Commissioner, Minnesota Department of Commerce Manager, Environmental Protection Division Office of the Attorney General of Minnesota

M. Wadley In accordance with 10 CFR 2.790 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely, Richard A. Skokowski, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-282; 50-306 License Nos. DPR-42; DPR-60

Enclosure:

Requested Information to Support PI&R Inspection cc w/encl:

D. Cooper, Senior Vice President and Chief Nuclear Officer M. Sellman, President and Chief Executive Officer Regulatory Affairs Manager J. Rogoff, Vice President, Counsel & Secretary Nuclear Asset Manager State Liaison Officer, Minnesota Department of Health Tribal Council, Prairie Island Indian Community Administrator, Goodhue County Courthouse Commissioner, Minnesota Department of Commerce Manager, Environmental Protection Division Office of the Attorney General of Minnesota DOCUMENT NAME: G:/PrairieIslandPI&RRequestLetter2007.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME DSmith:dtp RSkokowski DATE 07/12/2007 07/16/2007 OFFICIAL RECORD COPY

Letter to M. Wadley from R. Skokowski dated July 16, 2007 DISTRIBUTION:

TEB MLC RidsNrrDirsIrib GEG KGO JTA DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov (inspection reports, final SDP letters, any letter with an IR number)

Enclosure 1

Requested Information to Support Problem Identification and Resolution (PI&R)

Inspection 1.

A copy of administrative procedure(s) for the corrective action process, trending program, quality assurance audit program, self-assessment program, corrective action effectiveness review program, and industry experience review program, operator work around, and temporary modification.

2.

A copy of Quality Assurance (QA) audits and/or self-assessments of the corrective action program completed since August 2005.

3.

A copy of the QA manual.

4.

A copy of the Employee Concerns Program/Ombudsman administrative procedure.

5.

A list of QA audits completed since August 2005 with brief description of areas where findings were identified.

6.

A list of self-assessments completed since August 2005.

7.

A list of root cause evaluations completed since August 2005.

8.

A list of test failures (In-service Test (IST) or Technical Specification surveillances) since August 2005, with a brief description of component/system which failed.

9.

A list of all open condition reports sorted by significance level including a description of the issue, the date initiated, and the significance category.

10.

A list of condition reports closed since August 2005 including description of issue, significance category, date initiated, date closed, and whether there is an associated operability evaluation.

11.

A list of condition reports initiated since August 2005 that involve inadequate or ineffective corrective actions. Include the date initiated, a brief description, status, and significance category of the issue.

12.

A list of condition reports initiated since August 2005 that identify trends of conditions adverse to quality. Include the date initiated, a brief description, status, and significance category for each item.

13.

A copy of any performance reports for the past two years used to track the corrective action program effectiveness.

14.

A list of condition reports issued during the past two refueling outages sorted by system and component, including a brief description, status, and significant category for each item.

Enclosure 2

15.

A copy of condition reports associated with non-cited and cited violations since August 2005.

16.

A list of operating experience documents received since August 2005 and any associated condition reports.

17.

A list of effectiveness reviews completed since August 2005.

18.

A list of rework items and repeat failures since August 2005.

19.

A list of maintenance rule (a)(1) systems and components, and the associated health reports since August 2005.

20.

A copy of any corrective action program trend reports for the past two years.

21.

A list of dates, times and locations for all scheduled meetings associated with the implementation of the corrective action program.

22.

A copy of the latest organization chart and phone listing.

23.

A list of the top ten risk-significant systems.

Documents requested to be available during the inspection:

a.

Updated Final Safety Analysis Report b.

Technical Specifications c.

Procedures d.

Copies of any self-assessments and associated condition reports generated in preparation for the inspection