ML073300646: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML073300646
| number = ML073300646
| issue date = 03/09/2007
| issue date = 03/09/2007
| title = Plant Vogtle Landfills #3, Solid Waste Permit Nos. 017-007D(L)(I), Table 1 - Groundwater Elevation and Monitoring Well Construction Details
| title = Plant Vogtle Landfills 3, Solid Waste Permit Nos. 017-007D(L)(I), Table 1 - Groundwater Elevation and Monitoring Well Construction Details
| author name = Godfrey J
| author name = Godfrey J
| author affiliation = Southern Nuclear Operating Co, Inc
| author affiliation = Southern Nuclear Operating Co, Inc
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:Southern Nuclear Operating Company, inc.
{{#Wiki_filter:Southern Nuclear Operating Company, inc.
42 inverness Center Parkway Birmingham, Alabama 35242 SOUTHERN COMPANY A
42 inverness Center Parkway Birmingham, Alabama 35242 SOUTHERNA COMPANY Energy to Serve l~urWorld""
Energy to Serve l~ur World""
File: E.03.40.C Log: EV-07-0575 March 9, 2007 FEDERAL EXPRESS Vogtle Electric Generating Plant Landfill #3 Solid Waste Permit No. 017-007D(L)(I)
File: E.03.40.C Log: EV-07-0575 March 9, 2007 FEDERAL EXPRESS Vogtle Electric Generating Plant Landfill #3 Solid Waste Permit No. 017-007D(L)(I)
Mr. Steve McManus Program Manager - Solid Waste Management Program Georgia Environmental Protection Division 4244 International Parkway, Suite 104 Atlanta, GA 30354
Mr. SteveMcManus Program Manager - Solid Waste Management Program Georgia Environmental Protection Division 4244 International Parkway, Suite 104 Atlanta, GA 30354


==Dear Mr. McManus:==
==Dear Mr. McManus:==
In October 2006, Southern Nuclear abandoned the monitor well GWB-16 at Plant Vogtle Li:~~~!!.Jt'3AJf'~~ml~lJ".~~L,MJ~~":b~sJl,,,glaGLL~~~~..a"f'~*!A~~~~~~*~"'"",J..J¥~"r initiated sampling of the new well, GWB-16!MW-16R, during our groundwater monitoring event that was conducted in December 2006. Depth to water measurements and groundwater elevations taken for this well on December 4,2006 are presented in Table 1.
In October 2006, Southern Nuclear abandoned the monitor well GWB-16 at Plant Vogtle Li:~~~!!.Jt'3AJf'~~ml~lJ".~~L,MJ~~":b~sJl,,,glaGLL~~~~..a"f'~*!A~~~~~~*~"'"",J..J¥~"r initiated sampling of the new well, GWB-16!MW-16R, during our groundwater monitoring event that was conducted in December 2006. Depth to water measurements and groundwater elevations taken for this well on December 4,2006 are presented in Table 1.
Table 1 - Groundwater Elevation and Monitoring Well Construction Details Total Well         Riser     Screened         Groundwater Depth           Height Interval (feet,       Elevation (feet, topvc)         (feet)       msl)             (feet, msl) 80.80             3.00 156.79 - 166.79         160.14 Field measurements taken from this well on December 5, 2006 are presented in Table 2.
Table 1 - Groundwater Elevation and Monitoring Well Construction Details Total Well Riser Screened Groundwater Depth Height Interval (feet, Elevation (feet, topvc)
Table 2 - Groundwater Sampling Field Measurements pH       Conductivity   Turbidity     Gallons         Odor       Color (umhos!sec)     (NTU)         Puraed 7.36             80         5.4             1           None       None
(feet) msl)
(feet, msl) 80.80 3.00 156.79 - 166.79 160.14 Field measurements taken from this well on December 5, 2006 are presented in Table 2.
Table 2 - Groundwater Sampling Field Measurements pH Conductivity Turbidity Gallons Odor Color (umhos!sec)
(NTU)
Puraed 7.36 80 5.4 1
None None


EV-07-0575 Page 2 Georgia Environmental Protection Division Mr. Steve McManus In accordance with the approved Groundwater Monitoring Plan, the groundwater sample from this well was analyzed for the Chapter 391-3-4 Appendix I list of parameters, which consist of total metals and volatile organic compounds. Analysis was also conducted for the Chapter 391-3-4 Appendix II parameter mercury.
EV-07-0575 Page 2 Georgia Environmental Protection Division Mr. Steve McManus In accordance with the approved Groundwater Monitoring Plan, the groundwater sample from this well was analyzed for the Chapter 391-3-4 Appendix I list of parameters, which consist of total metals and volatile organic compounds. Analysis was also conducted for the Chapter 391-3-4 Appendix II parameter mercury.
There were no detections of any parameters above the quantification limit in the replacement well during this monitoring period. The complete laboratory analytical reports, which include field and laboratory OA/OC results and chain of custody forms, are provided as part of the routine groundwater monitoring report submitted to Mr. Jeff Cown of the Georgia Environmental Protection Division.
There were no detections of any parameters above the quantification limit in the replacement well during this monitoring period. The complete laboratory analytical reports, which include field and laboratory OA/OC results and chain of custody forms, are provided as part of the routine groundwater monitoring report submitted to Mr. Jeff Cown of the Georgia Environmental Protection Division.
If you have any questions or comments regarding the well abandonment/replacement activities, please contact Mickey Perry at (205) 992-6994.
If you have any questions or comments regarding the well abandonment/replacement activities, please contact Mickey Perry at (205) 992-6994.
                                                    ,/
,/
                                                  /'
/'
~xG~
~xG~
Manager - Environmental Affairs JMG/MEP:ahl cSGc:cr'0,',r¥,,-~4!,cc,cJ~tt>CJ:;l1~.gc,,4E!~J:lc~+rc'c,c,>
Manager - Environmental Affairs JMG/MEP:ahl cSGc:cr'0,',r¥,,-~4!,cc,cJ~tt>CJ:;l1~.gc,,4E!~J:lc~+rc'c,c,>
Mr. Mickey Perry (SNC)
Mr. Mickey Perry (SNC)
Mr. Kurt Batsel (Dextra)
Mr. Kurt Batsel (Dextra)


EV-07-0575 Page 3 Georgia Environmental Protection Division Mr. Steve McManus bc:   T. E. Tynan J. G. Aufdenkampe C. L. Buck N. D. Dennis S. A. Varnum D. G. Goodwin (Return Receipt)
EV-07-0575 Page 3 Georgia Environmental Protection Division Mr. Steve McManus bc:
      "'~JdJiB~~eflI1¥,-~tw'~.I~~~jQt~!l}}
T. E. Tynan J. G. Aufdenkampe C. L. Buck N. D. Dennis S. A. Varnum D. G. Goodwin (Return Receipt)
"'~JdJiB~~eflI1¥,-~tw'~.I~~~jQt~!l}}

Latest revision as of 19:49, 14 January 2025

Plant Vogtle Landfills 3, Solid Waste Permit Nos. 017-007D(L)(I), Table 1 - Groundwater Elevation and Monitoring Well Construction Details
ML073300646
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/09/2007
From: Godfrey J
Southern Nuclear Operating Co
To: Sean Mcmanus
Office of Nuclear Reactor Regulation, State of GA, Environmental Protection Div
References
017-007D(L)(I), EV-07-0575
Download: ML073300646 (3)


Text

Southern Nuclear Operating Company, inc.

42 inverness Center Parkway Birmingham, Alabama 35242 SOUTHERNA COMPANY Energy to Serve l~urWorld""

File: E.03.40.C Log: EV-07-0575 March 9, 2007 FEDERAL EXPRESS Vogtle Electric Generating Plant Landfill #3 Solid Waste Permit No. 017-007D(L)(I)

Mr. SteveMcManus Program Manager - Solid Waste Management Program Georgia Environmental Protection Division 4244 International Parkway, Suite 104 Atlanta, GA 30354

Dear Mr. McManus:

In October 2006, Southern Nuclear abandoned the monitor well GWB-16 at Plant Vogtle Li:~~~!!.Jt'3AJf'~~ml~lJ".~~L,MJ~~":b~sJl,,,glaGLL~~~~..a"f'~*!A~~~~~~*~"'"",J..J¥~"r initiated sampling of the new well, GWB-16!MW-16R, during our groundwater monitoring event that was conducted in December 2006. Depth to water measurements and groundwater elevations taken for this well on December 4,2006 are presented in Table 1.

Table 1 - Groundwater Elevation and Monitoring Well Construction Details Total Well Riser Screened Groundwater Depth Height Interval (feet, Elevation (feet, topvc)

(feet) msl)

(feet, msl) 80.80 3.00 156.79 - 166.79 160.14 Field measurements taken from this well on December 5, 2006 are presented in Table 2.

Table 2 - Groundwater Sampling Field Measurements pH Conductivity Turbidity Gallons Odor Color (umhos!sec)

(NTU)

Puraed 7.36 80 5.4 1

None None

EV-07-0575 Page 2 Georgia Environmental Protection Division Mr. Steve McManus In accordance with the approved Groundwater Monitoring Plan, the groundwater sample from this well was analyzed for the Chapter 391-3-4 Appendix I list of parameters, which consist of total metals and volatile organic compounds. Analysis was also conducted for the Chapter 391-3-4 Appendix II parameter mercury.

There were no detections of any parameters above the quantification limit in the replacement well during this monitoring period. The complete laboratory analytical reports, which include field and laboratory OA/OC results and chain of custody forms, are provided as part of the routine groundwater monitoring report submitted to Mr. Jeff Cown of the Georgia Environmental Protection Division.

If you have any questions or comments regarding the well abandonment/replacement activities, please contact Mickey Perry at (205) 992-6994.

,/

/'

~xG~

Manager - Environmental Affairs JMG/MEP:ahl cSGc:cr'0,',r¥,,-~4!,cc,cJ~tt>CJ:;l1~.gc,,4E!~J:lc~+rc'c,c,>

Mr. Mickey Perry (SNC)

Mr. Kurt Batsel (Dextra)

EV-07-0575 Page 3 Georgia Environmental Protection Division Mr. Steve McManus bc:

T. E. Tynan J. G. Aufdenkampe C. L. Buck N. D. Dennis S. A. Varnum D. G. Goodwin (Return Receipt)

"'~JdJiB~~eflI1¥,-~tw'~.I~~~jQt~!l