{{Adams | |||
| number = ML091270080 | |||
| issue date = 05/06/2009 | |||
| title = IR 05000282-09-008, and IR 05000306-09-008, for Prairie Island, Units 1 & 2, Final Significance Determination of White Finding and Notice of Violation | |||
| author name = Satorius M | |||
| author affiliation = NRC/RGN-III/ORA | |||
| addressee name = Wadley M | |||
| addressee affiliation = Northern States Power Co | |||
| docket = 05000282, 05000306 | |||
| license number = DPR-042, DPR-060 | |||
| contact person = | |||
| case reference number = EA-08-349 | |||
| document report number = IR-09-008 | |||
| document type = Letter, Notice of Violation, Inspection Report | |||
| page count = 7 | |||
}} | |||
See also: [[see also::IR 05000282/2009008]] | |||
=Text= | |||
{{#Wiki_filter:May 6, 2009 | |||
EA-08-349 | |||
Mr. Michael D. Wadley | |||
Site Vice President | |||
Prairie Island Nuclear Generating Plant | |||
Northern States Power Company-Minnesota | |||
1717 Wakonade Drive East | |||
Welch, MN 55089 | |||
SUBJECT: | |||
FINAL SIGNIFICANCE DETERMINATION OF WHITE FINDING AND NOTICE | |||
OF VIOLATION; NRC INSPECTION REPORT NO. 05000282/2009008; | |||
05000306/2009008; PRAIRIE ISLAND NUCLEAR GENERATING PLANT, | |||
UNITS 1 AND 2 | |||
Dear Mr. Wadley: | |||
This letter provides you the final significance determination of the preliminary Yellow finding | |||
discussed in our previous communication dated February 10, 2009, which provided Inspection | |||
Report Number 05000282/2008009; 05000306/2008009 (ML090410466). The finding involved | |||
the shipment of a package containing radioactive material, via an exclusive-use open transport | |||
vehicle. When the package arrived at its destination, the detected radiation levels exceeded | |||
Nuclear Regulatory Commission (NRC) regulations, which invoke the Department of | |||
Transportation requirements limiting the radiation level on the surface of a package shipped in an | |||
open transport vehicle to 200 millirem per hour. | |||
At your request, a Regulatory Conference was held on March 17, 2009, to further discuss your | |||
views on this issue. During the conference, you and your staff described your assessment of | |||
the significance of the finding, and the corrective actions taken to resolve it, including the root | |||
cause evaluation of the finding. Specifically, your assessment of the significance of the finding | |||
focused on the appropriateness of the different radiation detectors used to accurately | |||
characterize the true dose rate for the source of the radiation. You presented information to | |||
support your belief that an ion chamber detector was the appropriate instrument to be used, due | |||
to the detectors slower response and its ability to accurately measure the true dose rate. You | |||
also provided information to support your belief that a Geiger-Mueller detector would greatly | |||
overestimate the actual dose rate. Therefore, you concluded that a White significance was the | |||
appropriate outcome. | |||
On March 26, 2009, your staff provided supplemental information in response to NRC | |||
questions raised during the Regulatory Conference (ML090890369). After reviewing the | |||
information developed during the inspection and provided during and after the conference, we | |||
determined that both instruments provided valid measurements of the radiation levels near the | |||
surface of the package. The differences in the instrument responses appeared to be primarily | |||
due to the differences in detector geometries and response characteristics. While both | |||
M. Wadley | |||
-2- | |||
instruments provided measured radiation levels that exceeded the regulatory limit of | |||
200 millirem per hour, the significance assessed using the public radiation safety Significance | |||
Determination Process (SDP) resulted in different significance levels depending on the | |||
instrument used. | |||
The source of the radiation was from a discrete radioactive particle, which was a point source. | |||
The NRC is aware that the biological effect of exposure to point sources of radiation is less than | |||
that from an equivalent exposure to the whole body resulting from exposure to broader beams | |||
of radiation. However, this risk insight is not fully factored into the current public radiation safety | |||
cornerstone SDP, whose risk outcomes are based solely on the radiation level at the surface of | |||
a package relative to the regulatory limits. In this particular case, the source of radiation, the | |||
discrete radioactive particle, was located on the underside of the package in an area that was | |||
not readily accessible to a member of the public during transport. Therefore, because of the | |||
limited actual radiological risk to the public, the NRC determined that the application of | |||
Inspection Manual Chapter 0609, Appendix M, Significance Determination Process Using | |||
Qualitative Criteria, was more appropriate to evaluate the actual public radiation safety | |||
significance of this finding. | |||
The NRC used the results of the measurements obtained at the receipt of the package and the | |||
relative risk from the point radiation source to develop the significance of the finding. As stated | |||
above, both radiation detection instruments measured radiation levels that exceeded the | |||
regulatory limit, which provides a level of protection to a member of the public that may come | |||
into contact with the shipment. Although no exposures to the public resulted from the shipment, | |||
the potential consequences could have been greater under less favorable circumstances. Any | |||
shipment with radiation levels that exceed regulatory limits can be potentially significant, and in | |||
this case the risk was more than minimal. Based on this assessment and after considering the | |||
information developed during the inspection, the information you provided at the conference, | |||
and the supplemental information, the NRC has concluded that the finding is appropriately | |||
characterized as White, a finding with low to moderate increased importance to safety that may | |||
require additional NRC inspections. | |||
You have 30 calendar days from the date of this letter to appeal the staffs determination of | |||
significance for the identified White finding. Such appeals will be considered to have merit only | |||
if they meet the criteria given in the NRC Inspection Manual Chapter 0609, Attachment 2. | |||
The NRC has determined that the failure to properly characterize, prepare, and ship a package | |||
containing radioactive material and the failure to provide adequate training to workers who | |||
were involved in the preparation of the package for transport are violations of 10 CFR 71.5, | |||
which invokes 49 CFR 173.441(a) and 49 CFR 172.704, as cited in the enclosed Notice of | |||
Violation (Notice). The circumstances surrounding the violations were described in detail in the | |||
subject inspection report. In accordance with the NRC Enforcement Policy, the Notice is | |||
considered escalated enforcement action because it is associated with a White finding. | |||
The NRC has concluded that the information regarding the reason for the violations, the | |||
corrective actions taken and planned to correct the violations and prevent recurrence, and | |||
the date when full compliance was achieved were adequately addressed at the Regulatory | |||
Conference and on the docket (ML090790543 and ML090700284). Therefore, you are not | |||
required to respond to this letter unless the description therein does not accurately reflect your | |||
corrective actions or your position. | |||
M. Wadley | |||
-3- | |||
As a result of our review of Prairie Island Units 1 and 2 performance, including this White | |||
finding, we have assessed you to be in the Regulatory Response column of the NRCs | |||
Action Matrix. Therefore, we plan to conduct a supplemental inspection using Inspection | |||
Procedure 95001, Inspection for One or Two White Inputs in a Strategic Performance Area, | |||
when your staff has notified us of your readiness for this inspection. This inspection procedure | |||
is conducted to provide assurance that the root cause and contributing causes of risk significant | |||
performance issues are understood, the extent of condition is identified, and the corrective | |||
actions are sufficient to prevent recurrence. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, | |||
its enclosures, and your response, if you choose to provide one, will be made available | |||
electronically for public inspection in the NRC Public Document Room or from the | |||
NRCs document system (ADAMS), accessible from the NRC Web site at | |||
http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response | |||
should not include any personal privacy, proprietary, or safeguards information so that | |||
it can be made available to the public without redaction. | |||
Sincerely, | |||
/RA/ | |||
Mark A. Satorius | |||
Regional Administrator | |||
Docket Nos. 50-282; 50-306 | |||
License Nos. DPR-42; DPR-60 | |||
Enclosure: | |||
Notice of Violation | |||
cc w/encl: | |||
D. Koehl, Chief Nuclear Officer | |||
Regulatory Affairs Manager | |||
P. Glass, Assistant General Counsel | |||
Nuclear Asset Manager | |||
J. Stine, State Liaison Officer, Minnesota Department of Health | |||
Tribal Council, Prairie Island Indian Community | |||
Administrator, Goodhue County Courthouse | |||
Commissioner, Minnesota Department of Commerce | |||
Manager, Environmental Protection Division | |||
Office of the Attorney General of Minnesota | |||
Emergency Preparedness Coordinator, Dakota | |||
County Law Enforcement Center | |||
M. Wadley | |||
-3- | |||
As a result of our review of Prairie Island Units 1 and 2 performance, including this White finding, we have | |||
assessed you to be in the Regulatory Response column of the NRCs Action Matrix. Therefore, we plan | |||
to conduct a supplemental inspection using Inspection Procedure 95001, Inspection for One or Two | |||
White Inputs in a Strategic Performance Area, when your staff has notified us of your readiness for this | |||
inspection. This inspection procedure is conducted to provide assurance that the root cause and | |||
contributing causes of risk significant performance issues are understood, the extent of condition is | |||
identified, and the corrective actions are sufficient to prevent recurrence. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosures, | |||
and your response, if you choose to provide one, will be made available electronically for public | |||
inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible | |||
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your | |||
response should not include any personal privacy, proprietary, or safeguards information so that | |||
it can be made available to the public without redaction. | |||
Sincerely, | |||
/RA/ | |||
Mark A. Satorius | |||
Regional Administrator | |||
Docket Nos. 50-282; 50-306 | |||
License Nos. DPR-42; DPR-60 | |||
Enclosure: | |||
Notice of Violation | |||
cc w/encl: | |||
D. Koehl, Chief Nuclear Officer | |||
Regulatory Affairs Manager | |||
P. Glass, Assistant General Counsel | |||
Nuclear Asset Manager | |||
J. Stine, State Liaison Officer, Minnesota Department of Health | |||
Tribal Council, Prairie Island Indian Community | |||
Administrator, Goodhue County Courthouse | |||
Commissioner, Minnesota Department of Commerce | |||
Manager, Environmental Protection Division | |||
Office of the Attorney General of Minnesota | |||
Emergency Preparedness Coordinator, Dakota | |||
County Law Enforcement Center | |||
DISTRIBUTION: | |||
See next page | |||
DOCUMENT NAME: G:\\EICS\\ENFORCEMENT\\Enforcement Cases 2008\\EA-08-349 Prairie Island | |||
Transportation\\EA-08-349 Draft Final Letter White and NOV.doc | |||
; Publicly Available Non-Publicly Available | |||
Sensitive | |||
; Non-Sensitive | |||
OFFICE RIII | |||
RIII | |||
RIII | |||
RIII | |||
D: OE | |||
D: NRR | |||
RIII | |||
RIII | |||
NAME | |||
Gryglak | |||
Lougheed Cassidy | |||
for Orth | |||
West | |||
Hilton for | |||
Carpenter1 | |||
Pedersen2 | |||
Heck | |||
Satorius | |||
DATE | |||
05/04/09 | |||
05/01/09 | |||
05/04/09 | |||
05/04/09 | |||
04/30/09 | |||
04/30/09 | |||
05/05/09 05/05/09 | |||
OFFICIAL RECORD COPY | |||
1 OE concurrence per N. Hilton received via e-mail from Gregory Bowman on April 30, 2009. | |||
2 NRR concurrence per R. Pedersen received via e-mail from Gregory Bowman on April 30, 2009. | |||
Letter to Mr. Michael D. Wadley from Mr. Mark A. Satorius dated May 6, 2009 | |||
SUBJECT: | |||
FINAL SIGNIFICANCE DETERMINATION OF WHITE FINDING AND NOTICE | |||
OF VIOLATION; NRC INSPECTION REPORT NO. 05000282/2009008; | |||
05000306/2009008; PRAIRIE ISLAND NUCLEAR GENERATING PLANT, | |||
UNITS 1 AND 2 | |||
DISTRIBUTION: | |||
ADAMS (PARS) | |||
RidsSecyMailCenter Resource | |||
OCADistribution | |||
Bill Borchardt, EDO | |||
Bruce Mallett, DEDR | |||
Cynthia Carpenter, OE | |||
Nick Hilton, OE | |||
Gregory Bowman, OE | |||
Mark Satorius, RIII | |||
Catherine Marco, OGC | |||
Marvin Itzkowitz, OGC | |||
Eric Leeds, NRR | |||
Bruce Boger, NRR | |||
Daniel Holody, RI | |||
Carolyn Evans, RII | |||
Jared Heck, RIII | |||
William Jones, RIV | |||
MaryAnn Ashley, NRR | |||
Karla Stoedter, RIII | |||
Paul Zurawski, RIII | |||
Eliot Brenner, OPA | |||
Hubert Bell, OIG | |||
Guy Caputo, OI | |||
Mona Williams, OCFO | |||
John Giessner, RIII | |||
Scott Thomas, RIII | |||
Martin J. Phalen, RIII | |||
Mark W. Mitchell, RIII | |||
Peter J. Lee, RIII | |||
Viktoria Mitlyng, OPA RIII | |||
Prema Chandrathil, OPA RIII | |||
Allan Barker, RIII | |||
Paul Pelke, RIII | |||
Patricia Lougheed, RIII | |||
Magdalena Gryglak, RIII | |||
RidsNrrDirsIrib | |||
OEMAIL Resource | |||
OEWEB Resource | |||
NOTICE OF VIOLATION | |||
Northern States Power Company - Minnesota | |||
Docket Nos. 50-282; 50-306 | |||
Prairie Island Nuclear Generating Plant, Units 1 and 2 | |||
License Nos. DPR-42; DPR-60 | |||
EA-08-349 | |||
During an NRC inspection conducted on November 17, 2008 through January 21, 2009, two | |||
violations of NRC requirements were identified. In accordance with the NRC Enforcement | |||
Policy, the violations are listed below: | |||
Title 10 CFR 71.5, Transportation of Licensed Material, requires licensees to comply | |||
with the Department of Transportation (DOT) regulations in Title 49 CFR parts 170 | |||
through 189 relative to the transportation of licensed material. Specifically, | |||
1) | |||
Title 49 CFR 173.441(a) requires that each package of radioactive material | |||
offered for transportation must be designed and prepared for shipment, so that | |||
under conditions normally incident to transportation, the radiation level does not | |||
exceed 2 millisievert per hour (200 millirem per hour) at any point on the external | |||
surface of the package. | |||
Contrary to the above, on October 29, 2008, the licensee shipped a package | |||
containing radioactive material that was not designed or prepared to assure that, | |||
under conditions normally incident to transportation, the radiation level on the | |||
external surface of the package would not exceed 200 mrem per hour. | |||
2) | |||
Title 49 CFR 172.704, Training Requirements, requires that individuals involved | |||
in the transport of hazardous materials receive function specific training relative | |||
to their specific tasks, and that these individuals receive recurrent training at least | |||
once every three years. | |||
Contrary to the above, as of October 29, 2008, five people involved in preparing | |||
a package for radioactive shipment and transport had not received the required | |||
function-specific training. | |||
These violations are associated with a White Significance Determination Process | |||
finding. | |||
The NRC has concluded that information regarding the reason for the violations, the corrective | |||
actions taken and planned to correct the violations and prevent recurrence and the date | |||
when full compliance was achieved was adequately addressed on the docket in Inspection | |||
Report No. 05000282/2008009; 05000306/2008009, at the Regulatory Conference, and in | |||
your letter dated March 26, 2009. However, you are required to submit a written statement or | |||
explanation pursuant to 10 CFR 2.201 if the description therein does not accurately reflect | |||
your corrective actions or your position. In that case, or if you choose to respond, clearly | |||
mark your response as a "Reply to a Notice of Violation, EA-08-349", and send it to the | |||
Notice of Violation | |||
-2- | |||
U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555- | |||
0001 with a copy to the Regional Administrator, Region III, and a copy to the Prairie Island | |||
Resident Inspectors, within 30 days of the date of the letter transmitting this Notice of | |||
Violation (Notice). | |||
If you contest this enforcement action, you should also provide a copy of your response, with | |||
the basis for your denial, to the Director, Office of Enforcement, United States Nuclear | |||
Regulatory Commission, Washington, DC 20555-0001. | |||
If you choose to respond, your response will be made available electronically for public | |||
inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), | |||
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. Therefore, | |||
to the extent possible, the response should not include any personal privacy, proprietary, or | |||
safeguards information so that it can be made available to the public without redaction. | |||
In accordance with 10 CFR 19.11, you may be required to post this Notice within two working | |||
days. | |||
Dated this 6th day of May 2009 | |||
}} | |||
Latest revision as of 11:59, 14 January 2025
| ML091270080 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 05/06/2009 |
| From: | Satorius M Region 3 Administrator |
| To: | Wadley M Northern States Power Co |
| References | |
| EA-08-349 IR-09-008 | |
| Download: ML091270080 (7) | |
See also: IR 05000282/2009008
Text
May 6, 2009
Mr. Michael D. Wadley
Site Vice President
Prairie Island Nuclear Generating Plant
Northern States Power Company-Minnesota
1717 Wakonade Drive East
Welch, MN 55089
SUBJECT:
FINAL SIGNIFICANCE DETERMINATION OF WHITE FINDING AND NOTICE
OF VIOLATION; NRC INSPECTION REPORT NO. 05000282/2009008;
05000306/2009008; PRAIRIE ISLAND NUCLEAR GENERATING PLANT,
UNITS 1 AND 2
Dear Mr. Wadley:
This letter provides you the final significance determination of the preliminary Yellow finding
discussed in our previous communication dated February 10, 2009, which provided Inspection
Report Number 05000282/2008009; 05000306/2008009 (ML090410466). The finding involved
the shipment of a package containing radioactive material, via an exclusive-use open transport
vehicle. When the package arrived at its destination, the detected radiation levels exceeded
Nuclear Regulatory Commission (NRC) regulations, which invoke the Department of
Transportation requirements limiting the radiation level on the surface of a package shipped in an
open transport vehicle to 200 millirem per hour.
At your request, a Regulatory Conference was held on March 17, 2009, to further discuss your
views on this issue. During the conference, you and your staff described your assessment of
the significance of the finding, and the corrective actions taken to resolve it, including the root
cause evaluation of the finding. Specifically, your assessment of the significance of the finding
focused on the appropriateness of the different radiation detectors used to accurately
characterize the true dose rate for the source of the radiation. You presented information to
support your belief that an ion chamber detector was the appropriate instrument to be used, due
to the detectors slower response and its ability to accurately measure the true dose rate. You
also provided information to support your belief that a Geiger-Mueller detector would greatly
overestimate the actual dose rate. Therefore, you concluded that a White significance was the
appropriate outcome.
On March 26, 2009, your staff provided supplemental information in response to NRC
questions raised during the Regulatory Conference (ML090890369). After reviewing the
information developed during the inspection and provided during and after the conference, we
determined that both instruments provided valid measurements of the radiation levels near the
surface of the package. The differences in the instrument responses appeared to be primarily
due to the differences in detector geometries and response characteristics. While both
M. Wadley
-2-
instruments provided measured radiation levels that exceeded the regulatory limit of
200 millirem per hour, the significance assessed using the public radiation safety Significance
Determination Process (SDP) resulted in different significance levels depending on the
instrument used.
The source of the radiation was from a discrete radioactive particle, which was a point source.
The NRC is aware that the biological effect of exposure to point sources of radiation is less than
that from an equivalent exposure to the whole body resulting from exposure to broader beams
of radiation. However, this risk insight is not fully factored into the current public radiation safety
cornerstone SDP, whose risk outcomes are based solely on the radiation level at the surface of
a package relative to the regulatory limits. In this particular case, the source of radiation, the
discrete radioactive particle, was located on the underside of the package in an area that was
not readily accessible to a member of the public during transport. Therefore, because of the
limited actual radiological risk to the public, the NRC determined that the application of
Inspection Manual Chapter 0609, Appendix M, Significance Determination Process Using
Qualitative Criteria, was more appropriate to evaluate the actual public radiation safety
significance of this finding.
The NRC used the results of the measurements obtained at the receipt of the package and the
relative risk from the point radiation source to develop the significance of the finding. As stated
above, both radiation detection instruments measured radiation levels that exceeded the
regulatory limit, which provides a level of protection to a member of the public that may come
into contact with the shipment. Although no exposures to the public resulted from the shipment,
the potential consequences could have been greater under less favorable circumstances. Any
shipment with radiation levels that exceed regulatory limits can be potentially significant, and in
this case the risk was more than minimal. Based on this assessment and after considering the
information developed during the inspection, the information you provided at the conference,
and the supplemental information, the NRC has concluded that the finding is appropriately
characterized as White, a finding with low to moderate increased importance to safety that may
require additional NRC inspections.
You have 30 calendar days from the date of this letter to appeal the staffs determination of
significance for the identified White finding. Such appeals will be considered to have merit only
if they meet the criteria given in the NRC Inspection Manual Chapter 0609, Attachment 2.
The NRC has determined that the failure to properly characterize, prepare, and ship a package
containing radioactive material and the failure to provide adequate training to workers who
were involved in the preparation of the package for transport are violations of 10 CFR 71.5,
which invokes 49 CFR 173.441(a) and 49 CFR 172.704, as cited in the enclosed Notice of
Violation (Notice). The circumstances surrounding the violations were described in detail in the
subject inspection report. In accordance with the NRC Enforcement Policy, the Notice is
considered escalated enforcement action because it is associated with a White finding.
The NRC has concluded that the information regarding the reason for the violations, the
corrective actions taken and planned to correct the violations and prevent recurrence, and
the date when full compliance was achieved were adequately addressed at the Regulatory
Conference and on the docket (ML090790543 and ML090700284). Therefore, you are not
required to respond to this letter unless the description therein does not accurately reflect your
corrective actions or your position.
M. Wadley
-3-
As a result of our review of Prairie Island Units 1 and 2 performance, including this White
finding, we have assessed you to be in the Regulatory Response column of the NRCs
Action Matrix. Therefore, we plan to conduct a supplemental inspection using Inspection
Procedure 95001, Inspection for One or Two White Inputs in a Strategic Performance Area,
when your staff has notified us of your readiness for this inspection. This inspection procedure
is conducted to provide assurance that the root cause and contributing causes of risk significant
performance issues are understood, the extent of condition is identified, and the corrective
actions are sufficient to prevent recurrence.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter,
its enclosures, and your response, if you choose to provide one, will be made available
electronically for public inspection in the NRC Public Document Room or from the
NRCs document system (ADAMS), accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your response
should not include any personal privacy, proprietary, or safeguards information so that
it can be made available to the public without redaction.
Sincerely,
/RA/
Mark A. Satorius
Regional Administrator
Docket Nos. 50-282; 50-306
Enclosure:
cc w/encl:
D. Koehl, Chief Nuclear Officer
Regulatory Affairs Manager
P. Glass, Assistant General Counsel
Nuclear Asset Manager
J. Stine, State Liaison Officer, Minnesota Department of Health
Tribal Council, Prairie Island Indian Community
Administrator, Goodhue County Courthouse
Commissioner, Minnesota Department of Commerce
Manager, Environmental Protection Division
Office of the Attorney General of Minnesota
Emergency Preparedness Coordinator, Dakota
County Law Enforcement Center
M. Wadley
-3-
As a result of our review of Prairie Island Units 1 and 2 performance, including this White finding, we have
assessed you to be in the Regulatory Response column of the NRCs Action Matrix. Therefore, we plan
to conduct a supplemental inspection using Inspection Procedure 95001, Inspection for One or Two
White Inputs in a Strategic Performance Area, when your staff has notified us of your readiness for this
inspection. This inspection procedure is conducted to provide assurance that the root cause and
contributing causes of risk significant performance issues are understood, the extent of condition is
identified, and the corrective actions are sufficient to prevent recurrence.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter, its enclosures,
and your response, if you choose to provide one, will be made available electronically for public
inspection in the NRC Public Document Room or from the NRCs document system (ADAMS), accessible
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. To the extent possible, your
response should not include any personal privacy, proprietary, or safeguards information so that
it can be made available to the public without redaction.
Sincerely,
/RA/
Mark A. Satorius
Regional Administrator
Docket Nos. 50-282; 50-306
Enclosure:
cc w/encl:
D. Koehl, Chief Nuclear Officer
Regulatory Affairs Manager
P. Glass, Assistant General Counsel
Nuclear Asset Manager
J. Stine, State Liaison Officer, Minnesota Department of Health
Tribal Council, Prairie Island Indian Community
Administrator, Goodhue County Courthouse
Commissioner, Minnesota Department of Commerce
Manager, Environmental Protection Division
Office of the Attorney General of Minnesota
Emergency Preparedness Coordinator, Dakota
County Law Enforcement Center
DISTRIBUTION:
See next page
DOCUMENT NAME: G:\\EICS\\ENFORCEMENT\\Enforcement Cases 2008\\EA-08-349 Prairie Island
Transportation\\EA-08-349 Draft Final Letter White and NOV.doc
- Publicly Available Non-Publicly Available
Sensitive
- Non-Sensitive
OFFICE RIII
RIII
RIII
RIII
D: OE
D: NRR
RIII
RIII
NAME
Gryglak
Lougheed Cassidy
for Orth
West
Hilton for
Carpenter1
Pedersen2
Heck
Satorius
DATE
05/04/09
05/01/09
05/04/09
05/04/09
04/30/09
04/30/09
05/05/09 05/05/09
OFFICIAL RECORD COPY
1 OE concurrence per N. Hilton received via e-mail from Gregory Bowman on April 30, 2009.
2 NRR concurrence per R. Pedersen received via e-mail from Gregory Bowman on April 30, 2009.
Letter to Mr. Michael D. Wadley from Mr. Mark A. Satorius dated May 6, 2009
SUBJECT:
FINAL SIGNIFICANCE DETERMINATION OF WHITE FINDING AND NOTICE
OF VIOLATION; NRC INSPECTION REPORT NO. 05000282/2009008;
05000306/2009008; PRAIRIE ISLAND NUCLEAR GENERATING PLANT,
UNITS 1 AND 2
DISTRIBUTION:
RidsSecyMailCenter Resource
OCADistribution
Bill Borchardt, EDO
Bruce Mallett, DEDR
Cynthia Carpenter, OE
Mark Satorius, RIII
Catherine Marco, OGC
Marvin Itzkowitz, OGC
Eric Leeds, NRR
Bruce Boger, NRR
Daniel Holody, RI
Carolyn Evans, RII
Jared Heck, RIII
William Jones, RIV
MaryAnn Ashley, NRR
Karla Stoedter, RIII
Paul Zurawski, RIII
Eliot Brenner, OPA
Hubert Bell, OIG
Guy Caputo, OI
Mona Williams, OCFO
John Giessner, RIII
Scott Thomas, RIII
Martin J. Phalen, RIII
Mark W. Mitchell, RIII
Peter J. Lee, RIII
Viktoria Mitlyng, OPA RIII
Prema Chandrathil, OPA RIII
Allan Barker, RIII
Paul Pelke, RIII
Patricia Lougheed, RIII
Magdalena Gryglak, RIII
RidsNrrDirsIrib
OEMAIL Resource
OEWEB Resource
Northern States Power Company - Minnesota
Docket Nos. 50-282; 50-306
Prairie Island Nuclear Generating Plant, Units 1 and 2
During an NRC inspection conducted on November 17, 2008 through January 21, 2009, two
violations of NRC requirements were identified. In accordance with the NRC Enforcement
Policy, the violations are listed below:
Title 10 CFR 71.5, Transportation of Licensed Material, requires licensees to comply
with the Department of Transportation (DOT) regulations in Title 49 CFR parts 170
through 189 relative to the transportation of licensed material. Specifically,
1)
Title 49 CFR 173.441(a) requires that each package of radioactive material
offered for transportation must be designed and prepared for shipment, so that
under conditions normally incident to transportation, the radiation level does not
exceed 2 millisievert per hour (200 millirem per hour) at any point on the external
surface of the package.
Contrary to the above, on October 29, 2008, the licensee shipped a package
containing radioactive material that was not designed or prepared to assure that,
under conditions normally incident to transportation, the radiation level on the
external surface of the package would not exceed 200 mrem per hour.
2)
Title 49 CFR 172.704, Training Requirements, requires that individuals involved
in the transport of hazardous materials receive function specific training relative
to their specific tasks, and that these individuals receive recurrent training at least
once every three years.
Contrary to the above, as of October 29, 2008, five people involved in preparing
a package for radioactive shipment and transport had not received the required
function-specific training.
These violations are associated with a White Significance Determination Process
finding.
The NRC has concluded that information regarding the reason for the violations, the corrective
actions taken and planned to correct the violations and prevent recurrence and the date
when full compliance was achieved was adequately addressed on the docket in Inspection
Report No. 05000282/2008009; 05000306/2008009, at the Regulatory Conference, and in
your letter dated March 26, 2009. However, you are required to submit a written statement or
explanation pursuant to 10 CFR 2.201 if the description therein does not accurately reflect
your corrective actions or your position. In that case, or if you choose to respond, clearly
mark your response as a "Reply to a Notice of Violation, EA-08-349", and send it to the
-2-
U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-
0001 with a copy to the Regional Administrator, Region III, and a copy to the Prairie Island
Resident Inspectors, within 30 days of the date of the letter transmitting this Notice of
Violation (Notice).
If you contest this enforcement action, you should also provide a copy of your response, with
the basis for your denial, to the Director, Office of Enforcement, United States Nuclear
Regulatory Commission, Washington, DC 20555-0001.
If you choose to respond, your response will be made available electronically for public
inspection in the NRC Public Document Room or from the NRCs document system (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. Therefore,
to the extent possible, the response should not include any personal privacy, proprietary, or
safeguards information so that it can be made available to the public without redaction.
In accordance with 10 CFR 19.11, you may be required to post this Notice within two working
days.
Dated this 6th day of May 2009