ML091910523: Difference between revisions

From kanterella
Jump to navigation Jump to search
Created page by program invented by StriderTol
StriderTol Bot change
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML091910523
| number = ML091910523
| issue date = 07/10/2009
| issue date = 07/10/2009
| title = 07/29/2009 Notice of Meeting with NextEra Energy Point Beach, LLC to Discuss Progress of Licensee'S Actions Taken in Response to Substantive Cross-cutting Issues & Discuss Results of an Independent Assessment of Effectiveness of Corrective
| title = Notice of Meeting with NextEra Energy Point Beach, LLC to Discuss Progress of Licensees Actions Taken in Response to Substantive Cross-cutting Issues & Discuss Results of an Independent Assessment of Effectiveness of Corrective Actions.
| author name =  
| author name =  
| author affiliation = NRC/RGN-III
| author affiliation = NRC/RGN-III
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 10, 2009 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 10, 2009 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee:
NextEra Energy Point Beach, LLC Name of Facility:
Point Beach Nuclear Plant, Units 1 and 2 Docket Nos.:
50-266; 50-301 Date and Time of Meeting:
Wednesday, July 29, 2009, 1:00 p.m. (CDT)
Location of Meeting:
U.S. Nuclear Regulatory Commission Region III Office 2443 Warrenville Road, Suite 210 Lisle, IL 60532 Purpose of Meeting:
Discuss the progress of the licensees actions taken in response to substantive cross-cutting issues and discuss the results of an independent assessment of the effectiveness of the corrective actions for nuclear safety culture surveys conducted at Point Beach in 2004, 2006, and 2008.
Category:
This is a Category 1 Meeting. The public is invited to observe the meeting and will have an opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.
NRC Attendees Mark Satorius, Regional Administrator Cynthia Pederson, Deputy Regional Administrator Steven West, Director, Division of Reactor Projects Anne Boland, Director, Division of Reactor Safety Michael Kunowski, Chief, Division of Reactor Projects Branch 5 John Jandovitz, Acting Senior Resident Inspector Others as assigned Licensee Attendees Larry Meyer, Site Vice-President Charles Trezise, Engineering Director Brad Castiglia, Performance Improvement Management Rob Harrsch, Operations Manager Tom Vehec, Maintenance Manager James Costedio, Licensing Manager Others as assigned


Name of Licensee:   NextEra Energy Point Beach, LLC
Notice of Significant Licensee Meeting Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Mike Kunowski at (630) 829-9618 by Friday, July 24, 2009.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC=s meeting coordinator.
Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Interested members of the public can participate in this meeting via a toll-free teleconference; for details, please call the NRC meeting contact.
Approved By: /RA/
Michael Kunowski, Chief Branch 5 Division of Reactor Projects Meeting


Name of Facility:   Point B each Nuclear Plan t, Units 1 and 2
==Contact:==
Michael Kunowski, Chief Branch 5 (630) 829-9618 Michael.Kunowski@nrc.gov


Docket Nos.:    50-266; 50-301
Notice of Significant Licensee Meeting Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Mike Kunowski at (630) 829-9618 by Friday, July 24, 2009.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC=s meeting coordinator.
Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Interested members of the public can participate in this meeting via a toll-free teleconference; for details, please call the NRC meeting contact.
Approved By: /RA/
Michael Kunowski, Chief Branch 5 Division of Reactor Projects Meeting


Date and Time of Meeting: Wednesday, July 29, 2009, 1:00 p.m. (CDT)
==Contact:==
Michael Kunowski, Chief Branch 5 (630) 829-9618 Michael.Kunowski@nrc.gov DOCUMENT NAME: G:\\1-SECY\\1-WORK IN PROGRESS\\PTBH NOTICE OF PUBLIC MTG 72909.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MKunowski:cms DATE 07/10/09 OFFICIAL RECORD COPY


Location of Meeting:  U.S. Nuclear Regulatory Commission Region III Office 2443 Warrenville Road, Suite 210 Lisle, IL 60532
Notice of Significant Licensee Meeting DISTRIBUTION:
 
Stephen Campbell, Region III Coordinator, OEDO Robert Nelson, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR Lois James, Branch Chief, DORL, NRR Justin Poole, Project Manager, DORL, NRR Cynthia Pederson, Deputy Regional Administrator, RIII Steven West, Director, Division of Reactor Projects, RIII Gary Shear, Deputy Director, Division of Reactor Projects, RIII Anne Boland, Director, Division of Reactor Safety, RIII Deborah Jackson, Acting Deputy Director, Division of Reactor Safety, RIII Michael Kunowski, DRP Branch Chief John Jandovitz, Acting Senior Resident Inspector, Point Beach DRS Branch Chiefs:
Purpose of Meeting:  Discuss the progress of the licensee's actions taken in response to substantive cross-cutting issues and discuss the results of an independent assessment of the effectiveness of the corrective actions for nuclear safety culture surveys conducted at Point Beach in 2004, 2006, and 2008.
Robert Daley David Hills Eric Duncan AnnMarie Stone Steven Orth Hironori Peterson Allan Barker, Regional State Liaison Officer, RIII Harral Logaras, Regional Government Liaison Specialist PMNS Viktoria Mitlyng, RIII Public Affairs Prema Chandrathil, RIII Public Affairs Tammy Tomczak, ORA Patricia Buckley, ORA Margaret Bucholz, DRP}}
 
Category:    This is a Category 1 Meeting. The public is invited to observe the meeting and will have an opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.
 
NRC Attendees Mark Satorius, Regional Administrator Cynthia Pederson, Deputy Regional Administrator Steven West, Director, Division of Reactor Projects Anne Boland, Director, Division of Reactor Safety Michael Kunowski, Chief, Division of Reactor Projects Branch 5 John Jandovitz, Acting Senior Resident Inspector Others as assigned
 
Licensee Attendees Larry Meyer, Site Vice-President Charles Trezise, Engineering Director Brad Castiglia, Performance Improvement Management Rob Harrsch, Operations Manager Tom Vehec, Maintenance Manager James Costedio, Licensing Manager Others as assigned Notice of Significant     Licensee Meeting  
 
Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Mike Kunowski at (630) 829-9618 by Friday, July 24, 2009.
The NRC provides reas onable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC
=s meeting coordinator. Determinations on requests for r easonable accommodation will be made on a case-by-case basis. Interested members of the public can participate in this meeting via a toll-free teleconference; for details, please call the NRC meeting contact.
 
Approved By: /RA/    Michael Kunowski, Chief Branch 5 Division of Reactor Projects
 
Meeting Contact: Michael Kunowski, Chief Branch 5 (630) 829-9618 Michael.Kunowski@nrc.gov Notice of Significant    Licensee Meeting
 
Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Mike Kunowski at (630) 829-9618 by Friday, July 24, 2009.
The NRC provides reas onable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC
=s meeting coordinator. Determinations on requests for r easonable accommodation will be made on a case-by-case basis. Interested members of the public can participate in this meeting via a toll-free teleconference; for details, please call the NRC meeting contact.
 
Approved By: /RA/    Michael Kunowski, Chief Branch 5 Division of Reactor Projects
 
Meeting Contact: Michael Kunowski, Chief Branch 5 (630) 829-9618 Michael.Kunowski@nrc.gov
 
DOCUMENT NAME:  G:\1-SECY\1-WORK IN PROGRESS\PTBH NOTICE OF PUBLIC MTG 72909.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl  "N" = No copy OFFICE  RIII    RIII  RIII RIII  NAME  MKunowski:cms
 
DATE  07/10/09      OFFICIAL RECORD COPY
 
Notice of Significant      Licensee Meeting
 
DISTRIBUTION
: Stephen Campbell, Region III Coordinator, OEDO Robert Nelson, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR Lois James, Branch Chief, DORL, NRR Justin Poole, Project Manager, DORL, NRR Cynthia Pederson, Deputy Regional Ad ministrator, RIII Steven West, Director, Division of Reactor Projects, RIII Gary Shear, Deputy Director, Division of R eactor Proj ects, RIII Anne Boland, Director, Division of Reactor Safety, RIII Deborah Jackson, Acting Deputy Director, Division of Reactor Safety, RIII Michael Kunowski, DRP Branch Chief John Jandovitz, Acting Senior Resident Inspector, Point Beach DRS Branch Chiefs:
Robert Daley David Hills Eric Duncan AnnMarie Stone Steven Orth Hironori Peterson  
 
Allan Barker, Regi onal State Liaison Officer, RIII Harral Logaras, Regional Government Liaison Specialist PMNS Viktoria Mitlyng, RIII Public Affairs  
 
Prema Chandrathil, RIII Public Affairs Tammy Tomczak, ORA Patricia Buckley, ORA Margaret Bucholz, DRP}}

Latest revision as of 11:02, 14 January 2025

Notice of Meeting with NextEra Energy Point Beach, LLC to Discuss Progress of Licensees Actions Taken in Response to Substantive Cross-cutting Issues & Discuss Results of an Independent Assessment of Effectiveness of Corrective Actions.
ML091910523
Person / Time
Site: Point Beach  
Issue date: 07/10/2009
From:
NRC/RGN-III
To:
References
Download: ML091910523 (4)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 July 10, 2009 NOTICE OF SIGNIFICANT MEETING THIS MEETING IS OPEN TO PUBLIC ATTENDANCE Name of Licensee:

NextEra Energy Point Beach, LLC Name of Facility:

Point Beach Nuclear Plant, Units 1 and 2 Docket Nos.:

50-266; 50-301 Date and Time of Meeting:

Wednesday, July 29, 2009, 1:00 p.m. (CDT)

Location of Meeting:

U.S. Nuclear Regulatory Commission Region III Office 2443 Warrenville Road, Suite 210 Lisle, IL 60532 Purpose of Meeting:

Discuss the progress of the licensees actions taken in response to substantive cross-cutting issues and discuss the results of an independent assessment of the effectiveness of the corrective actions for nuclear safety culture surveys conducted at Point Beach in 2004, 2006, and 2008.

Category:

This is a Category 1 Meeting. The public is invited to observe the meeting and will have an opportunity to communicate with the NRC after the business portion of the meeting, but before the meeting is adjourned.

NRC Attendees Mark Satorius, Regional Administrator Cynthia Pederson, Deputy Regional Administrator Steven West, Director, Division of Reactor Projects Anne Boland, Director, Division of Reactor Safety Michael Kunowski, Chief, Division of Reactor Projects Branch 5 John Jandovitz, Acting Senior Resident Inspector Others as assigned Licensee Attendees Larry Meyer, Site Vice-President Charles Trezise, Engineering Director Brad Castiglia, Performance Improvement Management Rob Harrsch, Operations Manager Tom Vehec, Maintenance Manager James Costedio, Licensing Manager Others as assigned

Notice of Significant Licensee Meeting Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Mike Kunowski at (630) 829-9618 by Friday, July 24, 2009.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC=s meeting coordinator.

Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Interested members of the public can participate in this meeting via a toll-free teleconference; for details, please call the NRC meeting contact.

Approved By: /RA/

Michael Kunowski, Chief Branch 5 Division of Reactor Projects Meeting

Contact:

Michael Kunowski, Chief Branch 5 (630) 829-9618 Michael.Kunowski@nrc.gov

Notice of Significant Licensee Meeting Note: Attendance at this meeting by NRC personnel, other than those listed above, should be made known to Mike Kunowski at (630) 829-9618 by Friday, July 24, 2009.

The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC=s meeting coordinator.

Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Interested members of the public can participate in this meeting via a toll-free teleconference; for details, please call the NRC meeting contact.

Approved By: /RA/

Michael Kunowski, Chief Branch 5 Division of Reactor Projects Meeting

Contact:

Michael Kunowski, Chief Branch 5 (630) 829-9618 Michael.Kunowski@nrc.gov DOCUMENT NAME: G:\\1-SECY\\1-WORK IN PROGRESS\\PTBH NOTICE OF PUBLIC MTG 72909.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME MKunowski:cms DATE 07/10/09 OFFICIAL RECORD COPY

Notice of Significant Licensee Meeting DISTRIBUTION:

Stephen Campbell, Region III Coordinator, OEDO Robert Nelson, Deputy Director, Division of Operating Reactor Licensing (DORL), NRR Lois James, Branch Chief, DORL, NRR Justin Poole, Project Manager, DORL, NRR Cynthia Pederson, Deputy Regional Administrator, RIII Steven West, Director, Division of Reactor Projects, RIII Gary Shear, Deputy Director, Division of Reactor Projects, RIII Anne Boland, Director, Division of Reactor Safety, RIII Deborah Jackson, Acting Deputy Director, Division of Reactor Safety, RIII Michael Kunowski, DRP Branch Chief John Jandovitz, Acting Senior Resident Inspector, Point Beach DRS Branch Chiefs:

Robert Daley David Hills Eric Duncan AnnMarie Stone Steven Orth Hironori Peterson Allan Barker, Regional State Liaison Officer, RIII Harral Logaras, Regional Government Liaison Specialist PMNS Viktoria Mitlyng, RIII Public Affairs Prema Chandrathil, RIII Public Affairs Tammy Tomczak, ORA Patricia Buckley, ORA Margaret Bucholz, DRP