IR 05000151/2008001: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 3: | Line 3: | ||
| issue date = 07/31/2009 | | issue date = 07/31/2009 | ||
| title = IR 05000151-08-001(DNMS), on 07/17/2009 for University of Illinois Nuclear Reactor | | title = IR 05000151-08-001(DNMS), on 07/17/2009 for University of Illinois Nuclear Reactor | ||
| author name = Lipa C | | author name = Lipa C | ||
| author affiliation = NRC/RGN-III/DNMS/DB | | author affiliation = NRC/RGN-III/DNMS/DB | ||
| addressee name = Holm R | | addressee name = Holm R | ||
| addressee affiliation = Univ of Illinois - Urbana - Champaign | | addressee affiliation = Univ of Illinois - Urbana - Champaign | ||
| docket = 05000151 | | docket = 05000151 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter | {{#Wiki_filter:July 31, 2009 | ||
==SUBJECT:== | |||
NRC INSPECTION REPORT 050-00151/08-01(DNMS) - UNIVERSITY OF ILLINOIS NUCLEAR REACTOR | |||
SUBJECT: NRC INSPECTION REPORT 050-00151/08-01(DNMS) - UNIVERSITY OF ILLINOIS NUCLEAR REACTOR | |||
==Dear Mr. Holm:== | ==Dear Mr. Holm:== | ||
On July 17, 2009, the NRC completed inspection activities at the permanently shut down University of Illinois Nuclear Reactor. The purpose of the inspection was a routine inspection to evaluate current reactor activities and discuss planned decommissioning activities. At the conclusion of the on-site inspection on July 17, the inspectors discussed the inspection findings with you. | On July 17, 2009, the NRC completed inspection activities at the permanently shut down University of Illinois Nuclear Reactor. The purpose of the inspection was a routine inspection to evaluate current reactor activities and discuss planned decommissioning activities. At the conclusion of the on-site inspection on July 17, the inspectors discussed the inspection findings with you. | ||
This inspection consisted of an examination of current activities at the Nuclear Reactor as they relate to safety and compliance with the | This inspection consisted of an examination of current activities at the Nuclear Reactor as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection included a selective examination of procedures and representative records, and interviews with personnel. | ||
Based on the results of this inspection, the NRC did not identify any violations. | Based on the results of this inspection, the NRC did not identify any violations. | ||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). The | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding this inspection. | ||
Sincerely, | |||
/RA/ | |||
Christine Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch | |||
Docket No. 50-151 License No. R-115 | |||
Enclosure: | |||
NRC Inspection Report 050-00151/08-01(DNMS) | |||
cc w/encl: Daren Perrero, IEMA James Stubbins, University of Illinois | cc w/encl: Daren Perrero, IEMA James Stubbins, University of Illinois | ||
}} | }} | ||
Latest revision as of 10:31, 14 January 2025
| ML092160231 | |
| Person / Time | |
|---|---|
| Site: | University of Illinois |
| Issue date: | 07/31/2009 |
| From: | Christine Lipa NRC/RGN-III/DNMS/DB |
| To: | Holm R University of Illinois |
| References | |
| IR-08-001 | |
| Download: ML092160231 (8) | |
Text
July 31, 2009
SUBJECT:
NRC INSPECTION REPORT 050-00151/08-01(DNMS) - UNIVERSITY OF ILLINOIS NUCLEAR REACTOR
Dear Mr. Holm:
On July 17, 2009, the NRC completed inspection activities at the permanently shut down University of Illinois Nuclear Reactor. The purpose of the inspection was a routine inspection to evaluate current reactor activities and discuss planned decommissioning activities. At the conclusion of the on-site inspection on July 17, the inspectors discussed the inspection findings with you.
This inspection consisted of an examination of current activities at the Nuclear Reactor as they relate to safety and compliance with the Commissions rules and regulations. Areas examined during the inspection are identified in the enclosed report. Within these areas, the inspection included a selective examination of procedures and representative records, and interviews with personnel.
Based on the results of this inspection, the NRC did not identify any violations.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). The NRCs document system is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. We will gladly discuss any questions you may have regarding this inspection.
Sincerely,
/RA/
Christine Lipa, Chief Materials Control, ISFSI, and Decommissioning Branch
Docket No. 50-151 License No. R-115
Enclosure:
NRC Inspection Report 050-00151/08-01(DNMS)
cc w/encl: Daren Perrero, IEMA James Stubbins, University of Illinois