ML093080682: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 November 2, 2009  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 November 2, 2009 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555  
 
Mr. Charles G. Pardee  
 
Senior Vice President, Exelon Generation Company, LLC  
 
President and Chief Nuclear Officer (CNO), Exelon Nuclear  
 
4300 Winfield Road  
 
Warrenville, IL 60555  


==SUBJECT:==
==SUBJECT:==
Line 31: Line 21:


==Dear Mr. Pardee:==
==Dear Mr. Pardee:==
In a telephone conversation on October 27, 2009, Mr. M. Entwistle, Requalification Training Lead, and Mr. B. Palagi, Senior Operations Engineer, made arrangements for the U. S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the LaSalle County Station. The inspection is planned for the week of November 16, 2009, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled for the week of the inspection to the NRC by November 9, 2009. Mr. Entwistle has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection of information is estimated to average 4 hours per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.


In a telephone conversation on October 27, 2009, Mr. M. Entwistle, Requalification Training
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
 
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Bruce Palagi at 630-829-9611, or me at 630-829-9707.
Lead, and Mr. B. Palagi, Senior Operations Engineer, made arrangements for the U. S. Nuclear
Sincerely,  
 
/RA/
Regulatory Commission (NRC) to inspect the licensed operator requalification program at the
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 cc:
 
Distribution via ListServ J. White, Training Department  
LaSalle County Station. The inspection is planned for the week of November 16, 2009, which
 
coincides with your regularly scheduled requalific ation examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your
 
NRC-approved requalification program.
 
In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their
 
biennial comprehensive requalification written examinations or annual operating tests as
 
necessary to support the NRC's inspection program needs. In order for the NRC to adequately
 
prepare for this inspection, please furnish the written examinations and operating tests
 
scheduled for the week of the inspection to the NRC by November 9, 2009. Mr. Entwistle has
 
been advised of this request and provided with the name and address of the NRC lead
 
inspector assigned to this inspection.
 
This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this
 
collection of information is estimated to average 4 hours per response, including the time for
 
reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to
 
the Records and FOIA/Privacy Services Branch (T-5 F52), U. S. Nuclear Regulatory
 
Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV
; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.
 
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection
 
of information unless it displays a currently valid OMB control number. 
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be  
 
available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records System (PAR S) component of NRC's Agencywide Documents  
 
Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matte
: r. If you have any questions regarding this inspection, please contact Bruce Palagi at 630-829-9611, or me at 630-829-9707.  
 
Sincerely,       /RA/   Hironori Peterson, Chief Operations Branch  
 
Division of Reactor Safety  
 
Docket Nos. 50-373; 50-374  
 
License Nos. NPF-11; NPF-18  
 
cc: Distribution via ListServ J. White, Training Department
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
 
available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records System (PAR S) component of NRC's Agencywide Documents
 
Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRC's public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matte
: r. If you have any questions regarding this inspection, please contact Bruce Palagi at 630-829-9611, or me at 630-829-9707.
 
Sincerely,        /RA/  Hironori Peterson, Chief Operations Branch
 
Division of Reactor Safety
 
Docket Nos. 50-373; 50-374
 
License Nos. NPF-11; NPF-18
 
cc: Distribution via ListServ J. White, Training Department  
 
DISTRIBUTION
: Susan Bagley RidsNrrDorlLpl3-2 Resource
 
RidsNrrPMLaSalle
 
RidsNrrDirsIrib Resource
 
Cynthia Pederson 
 
Steven Orth
 
Jared Heck
 
Allan Barker
 
Carole Ariano
 
Linda Linn
 
DRPIII DRSIII Patricia Buckley
 
Tammy Tomczak
 
John McHale
 
DOCUMENT NAME:  G:\DRS\Work in Progress\LAS 110209 DRS OL Requal Insp.doc  Publicly Available  Non-Publicly Available  Sensitive  Non-Sensitive To receive a copy ofis document, indicate in the box:
  "" = Copy without attachment/encloure  " E" = Copy with attachment/enclosure  " N" = No copy th C s  O FFICE R III  R III N AME B Palagi:co
 
H Peterson     
 
DATE 11/02/09 11/02/09 


OFFICIAL RECORD COPY}}
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.
Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Bruce Palagi at 630-829-9611, or me at 630-829-9707.
Sincerely,
/RA/
Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 cc:
Distribution via ListServ J. White, Training Department DISTRIBUTION:
Susan Bagley RidsNrrDorlLpl3-2 Resource RidsNrrPMLaSalle RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak John McHale DOCUMENT NAME: G:\\DRS\\Work in Progress\\LAS 110209 DRS OL Requal Insp.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of is document, indicate in the box: " " = Copy without attachment/enclo ure "E" = Copy with attachment/enclosure "N" = No copy th C
s OFFICE RIII RIII NAME BPalagi:co HPeterson DATE 11/02/09 11/02/09 OFFICIAL RECORD COPY}}

Latest revision as of 08:27, 14 January 2025

Ltr. 11/02/2009 LaSalle Requalification Program Inspection
ML093080682
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 11/02/2009
From: Hironori Peterson
Operations Branch III
To: Pardee C
Exelon Generation Co, Exelon Nuclear
References
Download: ML093080682 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 November 2, 2009 Mr. Charles G. Pardee Senior Vice President, Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO), Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION

Dear Mr. Pardee:

In a telephone conversation on October 27, 2009, Mr. M. Entwistle, Requalification Training Lead, and Mr. B. Palagi, Senior Operations Engineer, made arrangements for the U. S. Nuclear Regulatory Commission (NRC) to inspect the licensed operator requalification program at the LaSalle County Station. The inspection is planned for the week of November 16, 2009, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their biennial comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately prepare for this inspection, please furnish the written examinations and operating tests scheduled for the week of the inspection to the NRC by November 9, 2009. Mr. Entwistle has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0018. The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of these information collections, including suggestions for reducing the burden, to the Records and FOIA/Privacy Services Branch (T-5 F52), U. S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail to INFOCOLLECTS@NRC.GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0018), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Bruce Palagi at 630-829-9611, or me at 630-829-9707.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 cc:

Distribution via ListServ J. White, Training Department

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the Electronic Reading Room page of the NRCs public Web site at http://www.nrc.gov/reading-rm/adams.html.

Thank you for your cooperation in this matter. If you have any questions regarding this inspection, please contact Bruce Palagi at 630-829-9611, or me at 630-829-9707.

Sincerely,

/RA/

Hironori Peterson, Chief Operations Branch Division of Reactor Safety Docket Nos. 50-373; 50-374 License Nos. NPF-11; NPF-18 cc:

Distribution via ListServ J. White, Training Department DISTRIBUTION:

Susan Bagley RidsNrrDorlLpl3-2 Resource RidsNrrPMLaSalle RidsNrrDirsIrib Resource Cynthia Pederson Steven Orth Jared Heck Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak John McHale DOCUMENT NAME: G:\\DRS\\Work in Progress\\LAS 110209 DRS OL Requal Insp.doc Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of is document, indicate in the box: " " = Copy without attachment/enclo ure "E" = Copy with attachment/enclosure "N" = No copy th C

s OFFICE RIII RIII NAME BPalagi:co HPeterson DATE 11/02/09 11/02/09 OFFICIAL RECORD COPY